N6264925RA059-0003.pdf
PDF 376 KB Posted
- Solicitation number
- N6264925RA059-0008
About this file
This document is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract for contract N6264925RA059, issued by NAVSUP FLC Yokosuka Contracting Department. The amendment, numbered 0003 and effective 15-Jul-2025, addresses two primary purposes: responding to contractor questions and distributing revised technical documents including TGI 3819P22114A12_c0v1, TGI 3819P43701A01_c2v1, and drawings DWG_2492510_81994_C_ and DWG_NMP-162_D_.
The amendment includes two specific technical clarifications: first, confirming the distribution of requested drawings, and second, modifying paragraph 5.6 of the technical document to correct a reference from "1.3.7" to "1.3.6" regarding valve installation instructions. The modification ensures accuracy in technical guidance for valve and valve positioner replacement, with the government providing explicit responses to the contractor's technical inquiries about drawing references and procedural details.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USSBLUERIDGETYCOM7
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose for this amendment is as follow s.
1. To respond to the questions received.
2. To distribute revised TGI 3819P22114A12_c0v1 and TGI 3819P43701A01_c2v1.
3. To distribute DWG_2492510_81994_C_ and DWG_NMP-162_D_.
See the continuation sheet for details.
All other information remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jul-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6264925RA059
X 9B. DATED (SEE ITEM 11)
13-Jun-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jul-2025
CODE
NAVSUP FLC YOKOSUKA
(CODE 200)
CONTRACTING DEPARTMENT
PSC 473 BOX 11
FPO AP 96349-0011
N62649 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6264925RA059
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Below is the questions received and responses.
Question (3) We are requesting the following DWGs.
3819P22114A12 Copy Required: No Ref 2.3 DWG # 514-2492510 Ref 2.4 DWG # NMP-162
Government Answer (3) Confirmed, TGI revised to allow to refer requested DWGs.
Question (4) Regarding LCC-19 25-R-A059 TGI3819P43701A01, Para5.6 mentions :
Remove existing and install each new valve listed in 1.3.7 in accordance with DETAIL 12-A of 2.9.
However, Para1.3.7 does not mention Valve, but Valve Positioner, which is also mentioned by Para5.5.
What kind of Drawing & Item No. do we have to refer to for the valve specified by Para5.6 ; Remove existing and install ?
Please let us know the correlation and revise the TGI if needed.
Government Answer (4) Paragraph 5.6 has been amended to read as follows:
Remove existing and install each new valve listed in 1.3.6 in accordance with DETAIL 12-A (V1) of 2.9.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .