3819P25606T01_c0v0_TGI.pdf
PDF 84 KB Posted
- Solicitation number
- N6264925RA059-0008
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge, dated 14-FEB-2025, focusing on the Circulating/Cooling Sea Water System (T & OP) - KTR. The instruction details a tightness and operational test for the sea water system, with specific tasks assigned to contractors, quality assurance (QA) personnel, and ship's force (S/F) workers. The document references Technical Procedure TP 25611-3-300KTR and requires all parties to accomplish and document the tightness and operational test in accordance with this reference. The TGI includes administrative details such as component information, project number, system identification, and key personnel like Yousuke Kamimura (preparer) and Jason Y. Ohta (approver), with the zone manager identified as Takehide Yaginuma.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
14-FEB-2025 1428
20.14.15.2.9020 (September 2024) ICN: 3819P25606 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 25611-3-300KTR TT T 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 25611
CU PHASE TITLE: CIRCULATING/COOLING SEA WATER SYS (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EX00L026
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
KAMIMURA, YOUSUKE 246.2 3152434987 03-FEB-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 13-FEB-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EX00-L026
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
256A1106
Tightness & Operational Test for Circulating/Cooling Sea Water System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
14-FEB-2025 1428
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P25606 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 25611-3-300KTR TT T 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 25611
CU PHASE TITLE: CIRCULATING/COOLING SEA WATER SYS (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 25611-3-300KTR SEA WATER SYS (T & OP) -
KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 25611-3-300KTR.
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 25611-3-300KTR.
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 25611-3-300KTR.
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P25606 KEY OP: T01
File details come from the government source that posted it. Updated .