Addendum 003 - Valves - Corporation Stops R0.pdf
PDF 3 MB Posted
- Attached to
- Request for Proposal - Construction Services for Project L-897, Central Plateau Water Treatment Facility
- Solicitation number
- 338214
- Issued by
-
Department of Energy
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER PAGE OF SELLER’S SUBMITTAL
City Name: Hanford, WA - MSA
Pall Project No.: 01.000287
Job Number: Project L-897, Subcontract 70816
Task Register 6 (Task 1 – VI Submittal Package)
To: (Contractor)
Mission Support Alliance, LLC (MSA)
PO Box 650
Richland, WA 99352
From: (Subcontractor)
Pall Water
A Division of Pall Corporation
839 State Route 13
Cortland, NY 13045
Patty Willis
Phone: 607-758-1699
Name of Project: Hanford, WA, Central Plateau WTF
Pall Document Number: NYCS000015357 Rev: 00
Description of Item: Corporation Stops, 01.287
Specification Section: 43 21 00
Deviations: See document NYCS000015386
INDEX:
Page 1: Cover Page Information
Page 2: Revision History and Approvals
Page 3: Tab 1 - NYCS000015414,CSS,Corporation Stops,01.287
Pages 4-5: Tab 2 - NYCS000015360,Corporation Stop,0.5in,PVC,WH172230
Date: 12/19/2019
PALL ADVANCED SEPARATIONS SYSTEMS
DIVISION OF PALL CORPORATION, CORTLAND, NY
Rev Name Date Created By
Approved By
Created By
Approved By
Created By
Approved By
Created By
Approved By
Revision Description
Title
Document # Revision griffinju Text Box These commodities, technology, or software may only be exported from the United States in accordance with the Export Administration Regulations. Diversion contrary to U.S. law is prohibited.
Doc Number: NYCS000015414R00 Doc Title: NYCS000015414,CSS,Corporation Stops,01.287.docx
Components Specification Sections
The following specification sections are relevant to the approval of submittal NYCS000015357, Corporation Stops,01.287:
L‐897,Attachment No. 2 ‐ HNF‐SPEC‐63538, Section 43 21 00, Pumping Equipment – Basic Requirement.
Any exceptions and clarifications to the specification section above can be found in submittal:
NYCS000015386, Es and Cs, Section 43 21 00,01.287.
Pall has not taken any exceptions or clarifications relevant to the corporation stop proposed.
The corporation stop is considered as equivalent to a quill.
Application The use of a corporation stop is required when the process water pipe cannot be drained at the diffuser to allow for maintenance. With a corporation stop, the diffuser can be removed while the process water pipe remains full and pressurized.
Corporation Stops 1⁄2", 3⁄4", 1", 11⁄4", 11⁄2", and 2" sizes
Water Pipe
Corporation Stop
FIGURE 1
SOLUTION TUBE
PENETRATION
LENGTH
L
D
L = D
Sizes and Material Options Sizes Ball Valve Solution Tube Assembly
1⁄2" PVC, CPVC PVC, CPVC
3⁄4" Brass, PVC, CPVC PVC, CPVC
1" Brass, PVC, CPVC PVC, CPVC, PVDF, PTFE, Stainless Steel
11⁄4" PVC, CPVC PVC, CPVC
11⁄2" Brass, PVC, CPVC PVC, CPVC, Stainless Steel
2" Brass PVC, CPVC
Hydro Instruments utilizes no-lead brass corporation stop valves certified to the requirements of NSF/ANSI 61 Annex F and G, and NSF/ANSI 372. All other wetter materials in the corporation stop assembly are plastic.
Corporation stops are available with a variety of threaded and hose inlet connections. See Figures 2, 3, 4, and 5 for recommended installation configurations.
Solution Tube Penetration Length A corporation stop allows the injected chemical to enter the process water line away from the edge of the pipe. This facilitates more rapid and complete mixing of the injected chemical solution.
See Figure 1. It is recommended that the solution tube does not penetrate further than 1⁄3 of the process water line diameter. Please specify solution tube penetration length when ordering.
INSTRUMENTS
600 Emlen Way, Telford, PA 18969 • Telephone: (215) 799-0980 • Fax: (215) 799-0984 BULLETIN CS Rev. 12/13 Toll Free in the U.S.: 1 (888) 38-HYDRO • www.hydroinstruments.com • sales@hydroinstruments.com
PROUDLY
MADE IN USA
LarkinD Highlight
LarkinD Highlight
LarkinD Highlight
LarkinD Text Box comes with L = 6 inches, trim at installation
LarkinD Text Box
NYCS000015360R00
LarkinD Text Box
WH172330
Part #: CSP-050-PVC
Ejector Union
Ball Valve
FIGURE 2
EJECTOR CLOSE COUPLED PIPE INSTALLATION
Elbow
Water Pipe
Corporation Stop
Ejector
FIGURE 5
REMOTE HOSE CONNECTION
Hose
Water Pipe
Corporation Stop
Union
Ball Valve
FIGURE 4
REMOTE THREADED CONNECTION
Elbow
Water Pipe
Corporation Stop
Hose
Ejector
Water Pipe
Corporation Stop
FIGURE 3
EJECTOR CLOSE COUPLED HOSE INSTALLATION
Installations Any installation of a corporation stop must allow for sufficient clearance to remove the diffuser by pulling it toward the ejector after the nut has been loosened.
Rigid Pipe: See Figures 2 and 4. When using rigid pipe a shutoff valve and an elbow must be installed with a union after the turn. The shutoff valve will allow isolation of the section of pipe during removal. The union will allow withdrawal of the diffuser.
Hose: See Figures 3 and 5. Sufficient clearance must be available to remove the diffuser by pulling it toward the ejector after the nut has been loosened.
Safety Chain: The purpose of the safety chain is to prevent the solution diffuser from blowing out due to high pressure in the process water line after the nut has been loosened on the corporation stop. Take care when loosening the nut as the solution diffuser may be forced outward at high velocity. However, the safety chain will prevent the solution diffuser from coming completely out of the corporation stop. When the safety chain is taut, the corporation stop valve is to be closed. After this valve has been closed, the chain should be detached to allow removal of the solution diffuser assembly.
INSTRUMENTS
600 Emlen Way, Telford, PA 18969 • Telephone: (215) 799-0980 • Fax: (215) 799-0984 BULLETIN CS Rev. 12/13 Toll Free in the U.S.: 1 (888) 38-HYDRO • www.hydroinstruments.com • sales@hydroinstruments.com
PROUDLY
MADE IN USA
| Cover Page Information |
| Revision History and Approvals |
| Tab 1 - NYCS000015414,CSS,Corporation Stops |
| Tab 2 - NYCS000015360,Corporation Stops,0.5in,PVC |
| Title: Corporation Stops, 01.287 |
| Document: NYCS000015357 |
| Revision: 00 |
| RevRow1: 0 |
| NameCreated By: DMLarkin |
| DateCreated By: 11-DEC-2019 |
| NameApproved By: JHoskins |
| DateApproved By: 11-DEC-2019 |
| Revision DescriptionRow1: Initial Issue |
| RevRow2: |
| NameCreated By_2: |
| DateCreated By_2: |
| NameApproved By_2: |
| DateApproved By_2: |
| Revision DescriptionRow2: |
| RevRow3: |
| NameCreated By_3: |
| DateCreated By_3: |
| NameApproved By_3: |
| DateApproved By_3: |
| Revision DescriptionRow3: |
| RevRow4: |
| NameCreated By_4: |
| DateCreated By_4: |
| NameApproved By_4: |
| DateApproved By_4: |
| Revision DescriptionRow4: |
File details come from the government source that posted it. Updated .