Addendum 003 - Equipment- Immersion Heaters R1.pdf

PDF 648 KB Posted

Attached to
Request for Proposal - Construction Services for Project L-897, Central Plateau Water Treatment Facility
Solicitation number
338214
Issued by

View the file

Other files

File Type Posted
Addendum 003 - O and M Manual - Prelim Oper and Maint Manual - Template R0.pdf PDF
Addendum 003 - Equipment - Automatic Strainers R0.pdf PDF
Addendum 003 - Valves - Other Check Valves R0.pdf PDF
Addendum 003 - Recommended Electrical Spare Parts List R0.pdf PDF
Addendum 003 - Equipment - Tab 3 - Anchor Bolt List R0.pdf PDF
Addendum 003 - Valves - Butterfly Valves R0.pdf PDF
Addendum 003 - Electrical Drawings - REMOTE IO 24VDC POWER PANEL.pdf PDF
Addendum 003 - Valves - Air Release Valves R0.pdf PDF
Addendum 003 - Analytical Instrumentation Valve List R0.pdf PDF
Addendum 003 - Valves - Auto Drain Valve R0.pdf PDF
Addendum 003 - Equipment - Commissioning Plan R0.pdf PDF
Addendum 003 - Valves - Diaphragm Valves R0.pdf PDF
Addendum 003 - VDL 006-006 RFP Const Bidder Pall Documents.xlsx XLSX spreadsheet
Addendum 003 - Valves - Other Solenoid Valves R0.pdf PDF
Addendum 003 - Electrical Drawings - FEED STRAINER PLC IO PANEL.pdf PDF
Addendum 003 - Valves - Other Air Pressure Valves R0.pdf PDF
Addendum 003 - Analytical Instrumentation - Flow Instrumentation R1.pdf PDF
Addendum 003 - Valves - Solenoid Valves R0.pdf PDF
Addendum 003 - Equipment - Actuator Torque Tables R1.pdf PDF
Addendum 003 - Equipment - Filter Elements R0.pdf PDF
Addendum 003 - Valves - Dual Disc Check Valves R0.pdf PDF
Addendum 003 - Equipment - FRP Tanks R0.pdf PDF
Addendum 003 - Equipment - Equipment List R0 - Pall Comments.pdf PDF
Addendum 003 - O and M Manual - System Functional Description (SFD) R0.pdf PDF
Addendum 003 - Electrical Drawings - MAIN CONTROL PANEL.pdf PDF
Addendum 003 - Electrical Drawings - MF VALVE RACK PANEL.pdf PDF
Addendum 003 - Electrical Drawings - Main CP 24VDC Power Panel.pdf PDF
Addendum 003 - Analytical Instrumentation - Level Instrumentation R1.pdf PDF
Addendum 003 - Valves - Air Pressure Control Valves R0.pdf PDF
Addendum 003 - Equipment - FRP Tanks attachment.pdf PDF
Addendum 003 - Contractual Electrical Spare Parts List R0.pdf PDF
Addendum 003 - Equipment - Air System R1.pdf PDF
Addendum 003 - Analytical Instrumentation - Temperature Instrumentation R1.pdf PDF
Addendum 003 - Valves - Ball Valves R0.pdf PDF
Addendum 003 - Valves - Chemical Pressure Control Valves R0.pdf PDF
Addendum 003 - Major Electrical Comp R0.pdf PDF
Addendum 003 - Electrical Drawings - CIP CAUSTIC ROOM PLC IO PANEL.pdf PDF
Addendum 003 - Exceptions and Clarifications - Specification Cross Reference Matrix R0.pdf PDF
Addendum 003 - Equipment - Calibration Columns R0.pdf PDF
Addendum 003 - Equipment - Centrifugal Pumps R0.pdf PDF
Addendum 003 - Equipment - Indeeco Heater General Infor R0.pdf PDF
Addendum 003 - Mechanical Drawings - Membrane Train Assy Dwg R3.pdf PDF
Addendum 003.pdf PDF
Addendum 003 - Equipment - Wilden Pump General Information R0.pdf PDF
Addendum 003 - Equipment - Water Softener R0.pdf PDF
Addendum 003 - Electrical Drawings - Interconnect Diagram Pall Comments.pdf PDF
Addendum 003 - Analytical Instrumentation - Pressure Instrumentation R1.pdf PDF
Addendum 003 - Mechanical Drawings - P and ID R4 Pall Submittal Return Comments.pdf PDF
Addendum 003 - Valves - Water Pressure Control Valves R0.pdf PDF
Addendum 003 - Equipment - Other Strainers R0.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER PAGE OF SELLER’S SUBMITTAL

City Name: Hanford, WA - MSA

Pall Project No.: 01.000287

Job Number: Project L-897, Subcontract 70816

Task Register 6 (Task 1 – VI Submittal Package)

To: (Contractor)

Mission Support Alliance, LLC (MSA)

PO Box 650

Richland, WA 99352

From: (Subcontractor)

Pall Water

A Division of Pall Corporation

839 State Route 13

Cortland, NY 13045

Patty Willis

Phone: 607-758-1699

Name of Project: Hanford, WA, Central Plateau WTF

Pall Document Number: NYCS000015132 Rev: 01

Description of Item: Immersion Heaters

Specification Section: 43 53 49

Deviations: See document NYCS000015388

INDEX:

Page 1: Cover Page Information

Page 2: Revision History and Approvals

Page 3: Tab 1 - NYCS000015393,CSS,Immersion Heaters,01.287

Page 4: Tab 2 - NYCS000015347,Heater,Indecco,Incoloy,80kW,460V,WH075290

Page 5: Tab 3 - NYCS000015352,Heater,Indecco,Titanium,80kW,10in,WH075289

Date: 12/19/2019

PALL ADVANCED SEPARATIONS SYSTEMS

DIVISION OF PALL CORPORATION, CORTLAND, NY

Rev Name Date Created By

Approved By

Created By

Approved By

Created By

Approved By

Created By

Approved By

Revision Description

Title

Document # Revision griffinju Text Box These commodities, technology, or software may only be exported from the United States in accordance with the Export Administration Regulations. Diversion contrary to U.S. law is prohibited.

Doc Number: NYCS000015393R01 Doc Title: NYCS000015393,CSS,Immersion Heaters,01.287.docx

Components Specification Sections

The following specification sections are relevant to the approval of submittal NYCS000015132, Immersion Heaters,01.287:

L‐897, Attachment No. 2 ‐ HNF‐SPEC‐63538, Section 43 53 49, Membrane Filtration System ‐ General.

Any exceptions and clarifications to the specification section above can be found in submittal NYCS000015388,L‐897,Section 43 53 49,Es and Cs,01.287.

Pall has not taken any exceptions or clarifications relevant to the immersion heaters proposed.

Status Part # Description Heater Key Revision

Confirmed 725DU311525 HTR FLG 10X150 80KW 480/3/4 SST/INC 100016432 0

Application Data

Heated Substance: Water

Process Max Temp. (°F): 212

Process Max Press.(PSIG): 160

Heater Orientation: Horizontal

Pipe Flange Data

Size: 10

Flange Material: 304 SST

Class/Std: 150/ANSI B16.5

Gasket Material: Fiber - Garlock 2900

0.062 Thk.

Accessories: None

Element Data

Watts Per Sq.In: 20.56

Moisture Seal Type: Epoxy Seal

Quantity: 24

Quantity Per Circuit: 6

Sheath Material: Incoloy 800

O.D. (in): 0.475

Watts: 3333.33

Volts: 480

Sensor Data

Sensor #1

Type: Sheath Type K Inconel

Location: Standard

XDim: 9.03

Control: See WD

Sensor #2

Type: N/A

Location: N/A

XDim: N/A

Note: See Drawing for referenced XDim Tolerance +/-0.500 in. (12.7mm)

General Data

KW +5/-10%: 80.00

KW per Circuit: 20.00

Voltage: 480

Phase: 3

Circuit Quantity: 4

Line Amps: 96.23

Amps Per Circuit: 24.06

Connection Type: Delta

Connection: Permanent Bussing

Certification Data

UL Recognized & CSA Certified

Enclosure Data

Type 4X - SST Octagon

Designed For Outdoor Use

Wire Connection Data

Power

Min. Wire Temp. Rating: 200 Deg. C

Wire Size: 10 AWG

Wire Qty: 12

Connection Size: 1 1/2" NPT Hub

Connection Qty: 1

Control

Connection Size: 1/2" NPT Hub

Connection Qty: 1

Note: See Drawing for Supplied Location, Size and Type

"B": 60 in (1524.0mm) +/-0.5 (12.7mm) "D": 9.5 in (241.3mm) +0/-0.03 (0.76mm) "OAE": 6.375 in (162.3mm) +/-0.25 (6.3mm)

"Cold Zone": 6 in (152.4mm) +/-0.625 in (16.2mm) "N": N/A "OAZ": 4.1875 in (106.4mm) +/-0.25 (6.3mm)

304 SST Spacers and Rods Required | Lifting Lugs Are Provided

Connection Locations, Sizes and Types: [H1: 1 1/2" NPT Hub] [H2: 1/2" NPT Hub] [H3: NA] [H4: NA]

Drawing

Suitable Pipe Schedules

5s, 5, 10s, 10, 20, 30, STD, 40, 60, SchXH

INDEECO - 425 Hanley Industrial Ct-St. Louis,MO 63144

HEATER SPECIFICATION Page 1 of 1

Date Dec 03, 2019

LarkinD Text Box

NYCS000015347R00

LarkinD Text Box

WH075290

NKUTIL

Callout 6-inch cold zone is likely not enough. Cannot verify without FRP tank drawings. Approval pending FRP submittal.

NKUTIL

Callout Spacers will be immersed in chemicals, SST may not be correct material selection

NKUTIL

Callout Interior face of flange will be immersed in chemicals, SST may not be correct material selection

Status Part # Description Heater Key Revision

Confirmed 725DU311524 HTR FLG 10X150 80KW 480/3/4 STL/SST 100016386 0

Application Data

Heated Substance: Water

Process Max Temp. (°F): 212

Process Max Press.(PSIG): 160

Heater Orientation: Horizontal

Pipe Flange Data

Size: 10

Flange Material: Steel

Class/Std: 150/ANSI B16.5

Gasket Material: Fiber - Garlock 2900

0.062 Thk.

Accessories: None

Element Data

Watts Per Sq.In: 20.56

Moisture Seal Type: Epoxy Seal

Quantity: 24

Quantity Per Circuit: 6

Sheath Material: 304 SST

O.D. (in): 0.475

Watts: 3333.33

Volts: 480

Sensor Data

Sensor #1

Type: Sheath Type K 316SST

Location: Standard

XDim: 9.81

Control: See WD

Sensor #2

Type: N/A

Location: N/A

XDim: N/A

Note: See Drawing for referenced XDim Tolerance +/-0.500 in. (12.7mm)

General Data

KW +5/-10%: 80.00

KW per Circuit: 20.00

Voltage: 480

Phase: 3

Circuit Quantity: 4

Line Amps: 96.23

Amps Per Circuit: 24.06

Connection Type: Delta

Connection: Permanent Bussing

Certification Data

UL Recognized & CSA Certified

Enclosure Data

Type 4X - SST Octagon

Designed For Outdoor Use

Wire Connection Data

Power

Min. Wire Temp. Rating: 200 Deg. C

Wire Size: 10 AWG

Wire Qty: 12

Connection Size: 1 1/2" NPT Hub

Connection Qty: 1

Control

Connection Size: 1/2" NPT Hub

Connection Qty: 1

Note: See Drawing for Supplied Location, Size and Type

"B": 60 in (1524.0mm) +/-0.5 (12.7mm) "D": 9.5 in (241.3mm) +0/-0.03 (0.76mm) "OAE": 6.375 in (162.3mm) +/-0.25 (6.3mm)

"Cold Zone": 6 in (152.4mm) +/-0.625 in (16.2mm) "N": N/A "OAZ": 4.1875 in (106.4mm) +/-0.25 (6.3mm)

304 SST Spacers and Rods Required | Lifting Lugs Are Provided

Connection Locations, Sizes and Types: [H1: 1 1/2" NPT Hub] [H2: 1/2" NPT Hub] [H3: NA] [H4: NA]

Drawing

Suitable Pipe Schedules

5s, 5, 10s, 10, 20, 30, STD, 40, 60, SchXH

Special Construction Flange, Elements and Spacers are all made from Titanium.

Optional Features

INDEECO - 425 Hanley Industrial Ct-St. Louis,MO 63144

Information has been added to this item that cannot be fully evaluated by the I Heat program. Any technical information contained herein is subject to change upon review by INDEECO. If any such changes are required, INDEECO will notify the customer for approval prior to the start of manufacturing.

HEATER SPECIFICATION Page 1 of 1

Date Dec 05, 2019

LarkinD Text Box

NYCS000015352R00

LarkinD Text Box

WH075289

NKUTIL

Callout 6-inch cold zone is likely not enough. Cannot verify without FRP tank drawings. Approval pending FRP submittal.

NKUTIL

Callout Spacers will be immersed in chemicals, SST may not be correct material selection

Cover Page Information
Revision History and Approvals
Tab 01 - NYCS000015393,CSS,Immersion Heaters,01.287
Tab 02 - NYCS000015347,Heater,Indeeco,Incoloy,80kW,460V,WH075290
Tab 03 - NYCS000015352,Heater,Indeeco,Titanium,80kW,10in,WH075289
Title: Immersion Heaters, 01.287
Document: NYCS000015132
Revision: 01
RevRow1: 0
NameCreated By: DMLarkin
DateCreated By: 09-DEC-2019
NameApproved By: JHoskins
DateApproved By: 09-DEC-2019
Revision DescriptionRow1: Initial Issue
RevRow2: 1
NameCreated By_2: DMLarkin
DateCreated By_2: 16-DEC-2019
NameApproved By_2: JHoskins
DateApproved By_2: 16-DEC-201
Revision DescriptionRow2: Tab 1 changed
RevRow3:
NameCreated By_3:
DateCreated By_3:
NameApproved By_3:
DateApproved By_3:
Revision DescriptionRow3:
RevRow4:
NameCreated By_4:
DateCreated By_4:
NameApproved By_4:
DateApproved By_4:
Revision DescriptionRow4:

File details come from the government source that posted it. Updated .