This is a Section 313700 specification document for Riprap work as part of the WC2608 SWOPE Stormwater Basin Retrofit Project at West Chester University of Pennsylvania, located at the southeast corner of the intersection of South High Street and East Campus Drive in West Chester, Pennsylvania. The specification covers the supply and installation of riprap rock materials and associated geotextile filter fabric for erosion control and energy dissipation purposes. The work involves stockpiling materials at designated on-site locations, preparing subgrade conditions including excavation and compaction, placing geotextile filter fabric (Class 4, Type A per PennDOT Publication 408 Section 735.1), and carefully placing riprap rock to create an even distribution with minimal voids without damaging the underlying fabric. All riprap materials must meet PennDOT Publication 408 Section 850.2(a) requirements and originate from PennDOT-approved sources. The project has a contract period from December 7, 2026, to July 3, 2027, spanning 208 calendar days. A pre-bid site visit is scheduled for November 6, 2026, at 11:00 AM.

The overall project cost range is $450,000 to $550,000 for general construction work, and this is designated as a prevailing wage project with wage determination serial number 26-07767 dated August 25, 2026. The riprap specification section requires independent laboratory testing supervised by a Professional Engineer, with material test reports and certifications for size and gradation of each riprap class to be submitted to the engineer. Specific placement requirements include restrictions on drop heights (maximum 1 foot for rocks smaller than 1 foot, with minimum 6-inch bedding layer for larger rocks), prohibition of placement by dumping or in layers, and careful rearrangement of individual rocks to ensure uniform distribution. No liquidated damages provision is included in the contract structure, and no incumbent vendors are identified for this work.

View the file

Other files

File Type Posted
WC2608 Solicitation Cover Sheet. 10.29.26.pdf PDF
003-012600 CONTRACT MODIFIATION PROCEDURES 71-FA-8.1.pdf PDF
005-013100 PROJECT MANAGEMENT AND COORDINATION 71-FA-8.1.pdf PDF
008-013300 SUBMITTAL PROCEDURES 71-FA-8.1.pdf PDF
012-016000 PRODUCT REQUIREMENTS 71-FA-8.1.pdf PDF
015-017329 CUTTING AND PATCHING 71-FA-8.1.pdf PDF
315000 - Excavation Backfill and Compaction.pdf PDF
310519 - Geosynthetics.pdf PDF
B5 WC2608 Bid Bond Form, 71-FA-8.2_Dec_2023 10.24.26.pdf PDF
001-011000, SUMMARY 71-FA-8.1.pdf PDF
019-017839 PROJECT RECORD DOCUMENTS 71-FA-8.1.pdf PDF
C4 WC2608 Insurance Rider_71-FA-8.2_Dec_2023 10.29.26.pdf PDF
004-012900 PAYMENT PROCEDURES 71-FA-8.1.pdf PDF
002-012200 UNIT PRICES 71-FA-8.1.pdf PDF
016-017700 CLOSEOUT PROCEDURES 71-FA-8.1.pdf PDF
312500 - Erosion & Sedimentation Control.pdf PDF
014-017123 FIELD ENGINEERING 71-FA-8.1.pdf PDF
329200 - TURF AND GRASSES.pdf PDF
C6 WC2608 Weekly Certified Payroll Form llc-25[1].pdf PDF
C5 WC2608 PW 26-07767.pdf PDF
B6 WC2608 SDB Instructions, 71-FA-8.2_Dec_2023 10.24.26.pdf PDF
006-013119 PROJECT MEETINGS 71-FA-8.1.pdf PDF
C2 WC2608 P and P Contract Bond Form 71-FA-8.2_Dec_2023 UPDATED 10.24.26.pdf PDF
017-017823 OPERATIONS AND MAINTENANCE DATA 71-FA-8.1.pdf PDF
B7 WC2608 SDB Form, 71-FA-8.2_Dec_2023 10.24.26.pdf PDF
B4 WC2608 Bid Form, 71-FA-8.2_Dec_2023 10.24.26.pdf PDF
013-016200 PRODUCT OPTIONS 71-FA-8.1.pdf PDF
010-014500 QUALITY CONTROL 71-FA-8.1.pdf PDF
Bid Set Oct 2026 SIGNED SEALED WC2608 1.pdf PDF
C3 WC2608 General_Conditions_71-FA-8.2_Dec_2023 10.24.26..pdf PDF
C1 WC2608 Standard Form of K_71-FA-8.2_Dec_2023.pdf PDF
334211 - Storm Drainage.pdf PDF
A WC2608.1_000000_TABLE OF CONTENTS_10-29-26.pdf PDF
C8 WC2608 PW EmploymentVerification FORM.pdf PDF
311000 - Site Clearing.pdf PDF
C7 WC2608 Public Works Employment Verification Notice 2.16.24 (1).pdf PDF
B2 WC2608 Spec Instr to Bidders 71-FA-8.2_Dec_2023 10.30.26.pdf PDF
007-013200B CONSTRUCTION PROGRES DOCUMENTATION 71-FA-8.1.pdf PDF
B8 WC2608 Contractor Qualification Statement updated 10.24.26.pdf PDF
018-017836 WARRANTIES 71-FA-8.1.pdf PDF
4-RFP WCU0508262274 - Appendix A - Technical Submittal Response.pdf PDF
1-RFP WCU05808262274 - Appendix C - Contract Exceptions.pdf PDF
2-RFP WCU0508262247 - Appendix B - Trade Secret Confidential Information Notice.pdf PDF
3-RFP WCU0508262274 - Full-Service Print, Mail, and Distribution Service Contractor.pdf PDF
1-IFB WCU0407261013 - (1) NEW 2025 Low Cab Forward (LCF) 16 Foot Box Truck .pdf PDF
2-IFB WCU0407261013 - Bid Specification - Attachment A.pdf PDF
1-WC2602 Contract Forms Conditions.zip ZIP file
4-WC2602 Drawings.zip ZIP file
2-WC2602 Specs 3.30.2026 updated.zip ZIP file
3-WC2602 Bid Form Requirements.zip ZIP file
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WCU Project No. WC2608 SWOPE Stormwater Basin Retrofit Project

October 8, 2026

RIPRAP 313700-1

RETTEW Project No.: 0272903615

DIVISION 31 - EARTHWORK

SECTION 313700 - RIPRAP

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Riprap rock materials.

1.2 RELATED SECTIONS

A. Section 310519 – Geosynthetics

B. Section 312500 – Erosion and Sedimentation Control

C. Section 315000 – Excavation Backfill and Compaction

1.3 REFERENCES

A. Pennsylvania Department of Transportation (PennDOT) Specifications Publication 408, as amended, Sections 212, 735, 850 and 851.

1.4 SUBMITTALS

A. Material Test Reports: From a qualified testing agency indicating and interpreting test results for compliance of the following with requirements indicated:

1. Certification of size and gradation for each class of riprap required.

1.5 QUALITY ASSURANCE

A. Source Quality Control

1. Independent Laboratory Tests: Furnish Engineer two copies of test result reports.

B. Aggregate Material Test

1. Conduct aggregate quality tests in accordance with requirements of appropriate

Referenced Standard for such material.

2. All material must be certified from supplier that the aggregate originates from a source approved by PennDOT and that the material complies with specified PennDOT requirements.

C. Field Quality Control

1. All field quality control testing must be supervised by a Professional Engineer.

October 8, 2026

RIPRAP 313700-2

RETTEW Project No.: 0272903615

PART 2 - PRODUCTS

2.1 MATERIALS

A. Riprap: Rock, Class as required meeting the requirements of PennDOT Publication 408 Section 850.2(a).

B. Geotextile Filter Fabric: Class 4, Type A, meeting the requirements of Section 310519 and PennDOT Publication Section 735.1.

PART 3 - EXECUTION

3.1 STOCKPILING

A. Stockpile materials on site at locations indicated on the Plans and as designated by OWNER.

B. Stockpile in sufficient quantities to meet project schedule and requirements.

C. Separate differing materials with dividers or stockpile apart to prevent mixing.

3.2 PREPARATION

A. Prepare the area required for placing the geotextile and rock, including but not limited to excavating, removing unsuitable material, backfilling, compaction of subgrade, placing embankment, and clearing and grubbing. Excavate and prepare the subgrade according to Section 315000.

B. Place the geotextile where shown on the Plans and in accordance with Section 310519.

3.3 PLACEMENT OF RIPRAP

A. Carefully place rock on the geotextiles to produce an even distribution of pieces, with a minimum of voids and without tearing the geotextile. Place the full course thickness in one operation in a manner to prevent segregation and to avoid displacement of the underlying material.

B. Do not place rock in layers, by dumping into chutes, or by similar methods likely to cause segregation or geotextile damage.

C. Do not drop rocks directly on the fabric from a height greater than 1 foot. Do not allow the rock placement procedure to puncture or damage the fabric. When placing rock greater than 1 foot in size, use a minimum 6-inch layer of bedding on top of the geotextile to prevent damage to the fabric.

D. Rearrange individual rocks, if necessary, to ensure uniform distribution.

October 8, 2026

RIPRAP 313700-3

RETTEW Project No.: 0272903615

E. Make appropriate connection of Rock Energy Dissipator to downstream watercourse as indicated.

3.4 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Disposal: Remove stockpile, leave area in a clean and neat condition.

B. Remove waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off Owner's property.

END OF SECTION

PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Riprap rock materials.
1.2 RELATED SECTIONS
A. Section 310519 – Geosynthetics
B. Section 312500 – Erosion and Sedimentation Control
C. Section 315000 – Excavation Backfill and Compaction
1.3 REFERENCES
A. Pennsylvania Department of Transportation (PennDOT) Specifications Publication 408, as amended, Sections 212, 735, 850 and 851.
1.4 SUBMITTALS
A. Material Test Reports: From a qualified testing agency indicating and interpreting test results for compliance of the following with requirements indicated:
1. Certification of size and gradation for each class of riprap required.
1.5 QUALITY ASSURANCE
A. Source Quality Control
1. Independent Laboratory Tests: Furnish Engineer two copies of test result reports.
B. Aggregate Material Test
1. Conduct aggregate quality tests in accordance with requirements of appropriate Referenced Standard for such material.
2. All material must be certified from supplier that the aggregate originates from a source approved by PennDOT and that the material complies with specified PennDOT requirements.
C. Field Quality Control
1. All field quality control testing must be supervised by a Professional Engineer.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Riprap: Rock, Class as required meeting the requirements of PennDOT Publication 408 Section 850.2(a).
B. Geotextile Filter Fabric: Class 4, Type A, meeting the requirements of Section 310519 and PennDOT Publication Section 735.1.
PART 3 - EXECUTION
3.1 STOCKPILING
A. Stockpile materials on site at locations indicated on the Plans and as designated by OWNER.
B. Stockpile in sufficient quantities to meet project schedule and requirements.
C. Separate differing materials with dividers or stockpile apart to prevent mixing.
3.2 PREPARATION
A. Prepare the area required for placing the geotextile and rock, including but not limited to excavating, removing unsuitable material, backfilling, compaction of subgrade, placing embankment, and clearing and grubbing. Excavate and prepare the subg...
B. Place the geotextile where shown on the Plans and in accordance with Section 310519.
3.3 PLACEMENT OF RIPRAP
A. Carefully place rock on the geotextiles to produce an even distribution of pieces, with a minimum of voids and without tearing the geotextile. Place the full course thickness in one operation in a manner to prevent segregation and to avoid displac...
B. Do not place rock in layers, by dumping into chutes, or by similar methods likely to cause segregation or geotextile damage.
C. Do not drop rocks directly on the fabric from a height greater than 1 foot. Do not allow the rock placement procedure to puncture or damage the fabric. When placing rock greater than 1 foot in size, use a minimum 6-inch layer of bedding on top of t...
D. Rearrange individual rocks, if necessary, to ensure uniform distribution.
E. Make appropriate connection of Rock Energy Dissipator to downstream watercourse as indicated.
3.4 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Disposal: Remove stockpile, leave area in a clean and neat condition.
B. Remove waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off Owner's property.