004-012900 PAYMENT PROCEDURES 71-FA-8.1.pdf

PDF 547 KB Posted

Attached to
WC2608 SWOPE Stormwater Basin Retrofit Project
Solicitation number
Not on record
Issued by
Chester County, Pennsylvania

About this file

Payment Procedures Section 012900

This is a Payment Procedures specification document for the WC2608 SWOPE Stormwater Basin Retrofit Project administered by West Chester University of Pennsylvania. The specification establishes comprehensive payment protocols governing contractor compensation, progress payments, and stored materials procedures. The contractor must develop a detailed Schedule of Values breaking down contract costs into specific line items coordinated with the construction schedule, subcontractors, suppliers, and the application for payment form. For contracts of $6,000,000 or less, mobilization costs may not exceed 0.75% of the contract price at award; for larger contracts, amounts exceeding $45,000 require negotiation. General conditions costs (field office overhead) are required as separate line items for contracts between $1,000,000 and $6,000,000 with durations exceeding 120 days, with allowances up to 4% of contract price at award, though higher amounts may be negotiated based on contract duration. Applications for Payment must use AIA Documents G702 and G703 or university-approved alternatives, submitted monthly or less frequently as specified at the Pre-Construction Conference, and must include itemization, substantiation, and contractor certification that work is complete per contract requirements and all subcontractors and suppliers have been paid for previous work.

The specification requires submission of the Schedule of Values prior to or at the Pre-Construction Conference for university approval before use as the payment basis. Initial progress payments require submission of an approved Schedule of Values and a list of subcontractors, principal suppliers, and fabricators. At substantial completion, the contractor must submit a Certificate of Substantial Completion showing 100% completion for finished work portions and a schedule and cost estimate for incomplete items. Final payment requires submission of a Consent of Surety to Final Payment using AIA Form G707 and proof of payment of taxes, fees, and similar obligations using AIA Forms G706 and G706A. The university retains the right to correct overpayments on subsequent applications and may withhold funds for deficiencies in required submissions. Payment for stored materials not yet incorporated into the work is available only for critical items documented on the university's Stored Materials & Bill of Sale Form, located within Pennsylvania, available for inspection, clearly marked as university property, and insured against loss with the university as loss payee; payment is limited to the invoiced price without overhead or profit markup.

View the file

Other files

File Type Posted
WC2608 Solicitation Cover Sheet. 10.29.26.pdf PDF
003-012600 CONTRACT MODIFIATION PROCEDURES 71-FA-8.1.pdf PDF
005-013100 PROJECT MANAGEMENT AND COORDINATION 71-FA-8.1.pdf PDF
008-013300 SUBMITTAL PROCEDURES 71-FA-8.1.pdf PDF
012-016000 PRODUCT REQUIREMENTS 71-FA-8.1.pdf PDF
015-017329 CUTTING AND PATCHING 71-FA-8.1.pdf PDF
315000 - Excavation Backfill and Compaction.pdf PDF
310519 - Geosynthetics.pdf PDF
B5 WC2608 Bid Bond Form, 71-FA-8.2_Dec_2023 10.24.26.pdf PDF
001-011000, SUMMARY 71-FA-8.1.pdf PDF
019-017839 PROJECT RECORD DOCUMENTS 71-FA-8.1.pdf PDF
C4 WC2608 Insurance Rider_71-FA-8.2_Dec_2023 10.29.26.pdf PDF
002-012200 UNIT PRICES 71-FA-8.1.pdf PDF
016-017700 CLOSEOUT PROCEDURES 71-FA-8.1.pdf PDF
312500 - Erosion & Sedimentation Control.pdf PDF
014-017123 FIELD ENGINEERING 71-FA-8.1.pdf PDF
329200 - TURF AND GRASSES.pdf PDF
C6 WC2608 Weekly Certified Payroll Form llc-25[1].pdf PDF
C5 WC2608 PW 26-07767.pdf PDF
B6 WC2608 SDB Instructions, 71-FA-8.2_Dec_2023 10.24.26.pdf PDF
006-013119 PROJECT MEETINGS 71-FA-8.1.pdf PDF
C2 WC2608 P and P Contract Bond Form 71-FA-8.2_Dec_2023 UPDATED 10.24.26.pdf PDF
017-017823 OPERATIONS AND MAINTENANCE DATA 71-FA-8.1.pdf PDF
B7 WC2608 SDB Form, 71-FA-8.2_Dec_2023 10.24.26.pdf PDF
B4 WC2608 Bid Form, 71-FA-8.2_Dec_2023 10.24.26.pdf PDF
013-016200 PRODUCT OPTIONS 71-FA-8.1.pdf PDF
010-014500 QUALITY CONTROL 71-FA-8.1.pdf PDF
Bid Set Oct 2026 SIGNED SEALED WC2608 1.pdf PDF
C3 WC2608 General_Conditions_71-FA-8.2_Dec_2023 10.24.26..pdf PDF
C1 WC2608 Standard Form of K_71-FA-8.2_Dec_2023.pdf PDF
334211 - Storm Drainage.pdf PDF
A WC2608.1_000000_TABLE OF CONTENTS_10-29-26.pdf PDF
C8 WC2608 PW EmploymentVerification FORM.pdf PDF
311000 - Site Clearing.pdf PDF
313700 - Riprap.pdf PDF
C7 WC2608 Public Works Employment Verification Notice 2.16.24 (1).pdf PDF
B2 WC2608 Spec Instr to Bidders 71-FA-8.2_Dec_2023 10.30.26.pdf PDF
007-013200B CONSTRUCTION PROGRES DOCUMENTATION 71-FA-8.1.pdf PDF
B8 WC2608 Contractor Qualification Statement updated 10.24.26.pdf PDF
018-017836 WARRANTIES 71-FA-8.1.pdf PDF
4-RFP WCU0508262274 - Appendix A - Technical Submittal Response.pdf PDF
1-RFP WCU05808262274 - Appendix C - Contract Exceptions.pdf PDF
2-RFP WCU0508262247 - Appendix B - Trade Secret Confidential Information Notice.pdf PDF
3-RFP WCU0508262274 - Full-Service Print, Mail, and Distribution Service Contractor.pdf PDF
1-IFB WCU0407261013 - (1) NEW 2025 Low Cab Forward (LCF) 16 Foot Box Truck .pdf PDF
2-IFB WCU0407261013 - Bid Specification - Attachment A.pdf PDF
1-WC2602 Contract Forms Conditions.zip ZIP file
4-WC2602 Drawings.zip ZIP file
2-WC2602 Specs 3.30.2026 updated.zip ZIP file
3-WC2602 Bid Form Requirements.zip ZIP file
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WCU Project No. WC2608 SWOPE Stormwater Basin Retrofit Project

October 8, 2026

General Requirements for 71-FA-8.1 Section 012900 – Payment Procedures

SECTION 012900

PAYMENT PROCEDURES

PART 1 - GENERAL

1.01 SUPPLEMENTAL INSTRUCTIONS

While this Section shall govern, the Contractor shall comply with supplemental administrative procedures which may be issued by the University at the Pre-Construction Conference.

1.02 SCHEDULE OF VALUES

A. Each Contractor shall establish a detailed breakdown of the costs indicating a schedule of quantities and values for the items of work included in his Contract. This detailed breakdown of the costs shall be his Schedule of Values. The Schedule of Values shall be coordinated with the Construction Schedule, subcontractors and suppliers, the Application for Payment form, and other required administrative schedules and forms.

B. The Schedule of Values shall use the format provided at the end of this Section, or another format acceptable to the University. The listing of Technical Specifications in the Project Manual Table of Contents may be used as a guide to establish the Items for the Schedule of Values.

1. The Contract Price should be broken down into components represented by Items (Columns:

Item Number and Item Description) in sufficient detail to facilitate evaluation of progress for progress reports and Applications for Payment. Principal subcontract amounts should be broken down into several Items. Each Item should be complete including its total cost and proportionate share of general and administrative overhead and profit. All dollar amounts should be rounded to the nearest whole dollar. The total of all the Items (Column: Extended Prices) should equal the Contract price.

2. The Contractor may include his initial cost of bonds as a separate Item. The basis for this Item shall be in the form of an invoice from the surety identifying the bond cost being paid.

3. The Contractor may include mobilization costs as a separate Item. Mobilization costs should include those costs required for establishment of the field construction operations, but not including costs for the continued operation of the field construction operations for the duration of the project. For Contracts of $6,000,000 or less, the Contractor may include mobilization costs of up to three-quarters of a percent (0.75%) of the contract price at award. For Contracts exceeding $6,000,000, the Contractor may propose mobilization costs in excess of $45,000, but the final amount shall be determined by negotiation with the University before submission of the Schedule of Values for approval. Contract duration should also be a consideration in negotiation of mobilization costs.

Mobilization costs, if included on the Schedule of Values, may include, as appropriate:

a. Setup of field offices/trailers and storage buildings/facilities

b. Setup/hookup of power, telephone, and other utilities and services for the offices/trailers and the site

c. Setup/hookup of temporary power, water, and other utilities and services required for construction

d. Installation of fencing, construction fencing, gates, and other protective and demarking facilities

e. Installation of access routes, parking, and storage facilities

f. Installation of signs, postings, and traffic control

October 8, 2026

General Requirements for 71-FA-8.1 Section 012900 – Payment Procedures

g. Site survey, to include establishing construction baselines and benchmarks

h. Acquisition of safety and health general protective equipment for the workforce and the general public, to include protective facilities

i. Building permits and other permits

j. Other appropriate costs

4. General conditions costs, commonly called field office overhead, and which represent the cost of continued operation of the field construction site for the duration of the project, shall be included as a separate Item, per the following stipulations.

a. For Contracts of $1,000,000 or less, the Contractor may choose to include a separate Item for general conditions costs. This Item may be up to four percent (4%) of the contract price at award. If the Contractor chooses to not include general conditions costs as a separate Item, such costs shall be included at a pro rata share in all other Items.

b. For Contracts between $1,000,000 and $6,000,000, with a Contract duration of one hundred twenty (120) days or less, the Contractor shall include a separate Item for general conditions costs. This Item may be up to four percent (4%) of the contract price at award.

c. For Contracts between $1,000,000 and $6,000,000, with a Contract duration of greater than one hundred twenty (120) days, the Contractor shall include a separate Item for general conditions costs. This Item may be up to four percent (4%) of the contract price at award. The Contractor may propose this Item to be in excess of four percent (4%), but in that case the final amount shall be determined by negotiation with the University before submission of the Schedule of Values for approval.

d. For Contracts of $6,000,000 or more, the Contractor shall include a separate Item for general conditions costs. This Item may be up to four percent (4%) of the contract price at award. The Contractor may propose this Item to be in excess of four percent (4%), but in that case the final amount shall be determined by negotiation with the University before submission of the Schedule of Values for approval. Contract duration should also be a consideration in negotiation of general conditions costs.

General conditions costs may include, as appropriate:

a. Salaries of onsite management personnel and other personnel not assigned to any specific Item(s) of work and not paid from general and administrative overhead

b. Cost of vehicles and equipment not assigned to any specific Item(s) of work

c. Rental of field offices/trailers and storage buildings/facilities

d. Cost of power, telephone, and other utilities and services for the offices/ trailers and the site

e. Cost of temporary power, water, and other utilities and services required for construction

f. Periodic and ongoing maintenance of fencing, construction fencing, gates, and other protective and demarking facilities

g. Periodic and ongoing maintenance of access routes, parking, and storage facilities

h. Periodic and ongoing maintenance of signs, postings, and traffic control

i. Periodic and ongoing safety and health activities for the workforce and the general public, to include protective facilities

j. Periodic and ongoing maintenance of erosion control, dust control, and environmental protection

k. Other appropriate costs

5. If the Contractor includes mobilization costs (paragraph 1.02 B. 3.) as a separate Item, the Contractor shall also include demobilization costs as a separate Item. However, the

October 8, 2026

General Requirements for 71-FA-8.1 Section 012900 – Payment Procedures

Contractor may include demobilization costs as a separate Item even if mobilization costs are not included. Demobilization costs may include those costs required for de-establishment, discontinuation, and removal of the field construction operations.

Demobilization costs may include, as appropriate, costs similar to those categories identified in paragraph 1.02 B. 3. above. Demobilization costs shall be the same amount as mobilization costs; however, the contractor may propose lower demobilization costs, with the final amount being determined by negotiation with the University.

6. The Contractor shall include separate Items, or a single composite Item, for contract closeout requirements, as applicable to the Contract. Contract closeout requirements include project record documents, warranties, operations and maintenance data, spare parts and attic stock, and final cleanup.

C. The general and administrative overhead identified in paragraph 1.02 B. 1. and the general conditions costs identified in paragraph 1.02 B. 4. should represent distinct and different costs.

The Contractor may choose to include his general conditions costs as a part of the overhead included in paragraph 1.02 B. 1., but in that case he will have no general conditions costs in his Schedule of Values. If used, this alternate accounting methodology shall be used throughout the duration of the Contract, and shall be carried over into change order pricing.

D. The Contractor shall submit his proposed Schedule of Values to the University prior to or at the Pre-Construction Conference. Once approved by the University, the Schedule of Values shall be used as basis for payment with Applications for Payment.

1.03 PROGRESS PAYMENT PROCEDURES

A. Each Application for Payment shall be consistent with previous applications and payments as certified and paid by the University. Entries and data on the Application for Payment shall match data on the Schedule of Values and the Construction Schedule.

B. The schedule of periodic payments and the specific dates and time frames relative to Applications for Payment will be provided by the University at the Pre-Construction Conference. Payments will be made not more frequently than monthly.

C. The Contractor shall use AIA Documents G702 and G703, Application and Certificate for Payment, or another form acceptable to or prescribed by the University.

D. Applications for Payment shall be submitted in the manner and format, to the person or address, and in the number of copies specified by the University at the Pre-Construction Conference.

E. Each Application for Payment shall be signed by a person authorized to sign official Contract documents on behalf of the Contractor.

F. Applications for Payment shall incorporate fully-executed Change Orders and Construction Change Directives issued prior to the last day of the period covered by the Application for Payment.

G. If the University erroneously overpaid on an item on a previous Application for Payment, the University reserves the right to correct the overpayment on subsequent Applications for Payment.

H. An Application for Payment will be processed for payment if it is a proper invoice. An Application for Payment is a proper invoice if it contains: itemization and substantiation of the amount requested, and certification. Certification shall be a signed statement by the Contractor acknowledging that the work covered by the application for payment has been completed in

October 8, 2026

General Requirements for 71-FA-8.1 Section 012900 – Payment Procedures accordance with the contract, that all amounts have been paid to subcontractors and suppliers for work for which previous payments were made by the University, and that the current requested payment is now due. All other requirements, such as deficiencies that arise from statutorily-required submissions, deficiencies that arise from System, University, or contractually-required submissions, and deficiencies that arise from other contractual requirements, will not stop an application for payment from being processed, but instead, will result in withholding of money from the payment.

I. If the University determines that the Application for Payment is not a proper invoice, the University will notify the Contractor as soon as possible, but no later than seven (7) days from receipt of the Application for Payment, that it is not a proper invoice and as to the reasons why.

In this case the Contractor shall be required to submit a new Application for Payment.

J. The Initial Application for Payment, the Application for Payment at Substantial Completion, and the Final Application for Payment involve additional requirements, as outlined in paragraphs 1.04, 1.05, and 1.06 below.

1.04 INITIAL PROGRESS PAYMENT PROCEDURES

A. The University may reject the Initial Application for Payment if the following items have not been submitted or completed by the Contractor prior to or in conjunction with the Initial Application for Payment.

1. Approved Schedule of Values

2. List of Subcontractors, Principal Suppliers, and Fabricators

B. The University may reject an Application for Payment if the Preliminary Project Schedule or the Initial Project Schedule, in accordance with Specification Section 013200, Construction Progress Documentation, are due by the date of that Application for Payment but have not been submitted.

1.05 PROGRESS PAYMENT PROCEDURES AT AND AFTER SUBSTANTIAL COMPLETION

A. Requirements for Substantial Completion are found in Specification Section 017700, Closeout Procedures. After receipt of the Certificate of Substantial Completion, the Contractor should submit an Application for Payment at Substantial Completion for reduction in retainage. This Application shall reflect any Certificates of Partial Substantial Completion issued previously for designated portions of the work and any previous reductions in retainage that may have been processed.

B. The Application for Payment at Substantial Completion should show 100 percent completion for the portion(s) of the work identified as substantially complete. For that work that is not 100 percent complete, the Contractor shall provide a proposed schedule for completion of any incomplete work and a proposed cost estimate to complete each item of work. The basis of this work is the punch list attached to the Certificate of Substantial Completion. The University shall have the final decision as to the schedule and cost for these items of work.

1.06 FINAL PROGRESS PAYMENT PROCEDURES

A. Requirements for Final Completion are found in Specification Section 017700, Closeout Procedures. After receipt of the Certificate of Final Completion, the Contractor should submit a Final Application for Payment.

B. The following administrative actions and submittals must precede or coincide with an Application for Payment at Substantial Completion.

October 8, 2026

General Requirements for 71-FA-8.1 Section 012900 – Payment Procedures

1. The Contractor shall submit a Consent of Surety to Final Payment, using AIA Form G707 or another form acceptable to or prescribed by the University.

2. The Contractor shall submit AIA Forms G706 and G706A, or other suitable proof of payment of taxes, fees, and similar obligations.

1.07 PAYMENT PROCEDURES FOR STORED MATERIALS

A. The University will consider making payment for materials or equipment not yet incorporated in the work, but delivered, paid for, and suitably stored at the project site or at some other agreed-upon location.

B. Payment for such materials or equipment stored at a location other than the project site shall be conditional upon the following.

1. The University must determine that the materials or equipment are critical to the project.

2. The materials or equipment must be documented on the System's Stored Materials & Bill of Sale Form, or another form acceptable to or prescribed by the University.

3. The quantities of materials or equipment stored must represent the maximum quantities for which the Contractor may be entitled to payment under the provisions of the Contract.

4. The storage location shall be physically in the Commonwealth of Pennsylvania.

5. The storage location, and the materials or equipment therein, must be available, at reasonable times, to the University for inspection.

6. The materials or equipment shall be stored safely and securely, to protect them from damage or loss.

7. The materials or equipment shall be clearly marked and identified for the project and/or Contract, and as property of the University.

8. The Contractor shall provide proof of insurance for the storage location, and for the materials or equipment therein, against loss or damage, with loss payable to the University.

9. The Contractor shall have good title to the materials or equipment, free and clear of all liens and encumbrances.

10. The Contractor shall provide an invoice, or other form, which adequately establishes the University’s title to such materials or equipment while they remain under the custody and control of the Contractor, regardless of any exclusions in the insurance policy.

11. The Contractor shall pay, at its own expense, all costs in connection with the sale, delivery, storage, protection, and insurance of the materials or equipment.

C. Payment will be made under the appropriate Items on the Schedule of Values as part of a periodic progress payment. Payment will be made only for the invoiced price of the materials or equipment. Overhead and profit will not be paid on stored materials or equipment.

PART 2 – PRODUCTS

October 8, 2026

General Requirements for 71-FA-8.1 Section 012900 – Payment Procedures

(Not Used)

PART 3 – EXECUTION

(Not Used)

END OF SECTION 012900

Attachments:

Schedule of Values Form Stored Materials & Bill of Sale Form

October 8, 2026

General Requirements for 71-FA-8.1 Section 012900 – Payment Procedures

SCHEDULE OF VALUES

_________________________ UNIVERSITY

ARCHITECT NAME: CONTRACTOR'S NAME: CONTRACT NUMBER:

ADDRESS: ADDRESS: DESCRIPTION:

APPROVED:

Signature

TELEPHONE NO.

DATE: TYPE OF CONTRACT:

ITEM

NUMBER

ITEM DESCRIPTION NUMBER AND KIND

OF UNIT

COST

PER UNIT

MATERIAL COST LABOR AND

OTHER COST

EXTENDED

PRICE

I (we) hereby certify that the above is a true and correct breakdown including all materials, accessories, labor, insurance, etc., per contract requirements.

Contractor Title Date

University Representative Approval Title Date

October 8, 2026

General Requirements for 71-FA-8.1 Section 012900 – Payment Procedures

STORED MATERIALS & BILL OF SALE

_________________________ UNIVERSITY

PROJECT NUMBER:

LOCATION:

CONTRACT NUMBER:

CONTRACTOR:

PROJECT TITLE:

MATERIAL/EQUIPMENT SCHEDULE OF

VALUES

STORAGE LOCATION QUANTITY UNIT WHOLESALE

PRICE

EXTENDED

WHOLESALE PRICE

TOTAL $

The Contractor agrees to the terms and conditions of paragraph 1.07, PAYMENT PROCEDURES FOR STORED MATERIALS, of Specification Section 012900, PAYMENT PROCEDURES.

Contractor Title Date

University Representative Approval Title Date

SECTION 012900
PAYMENT procedures
PART 1 - GENERAL
1.02 SCHEDULE OF VALUES
1.04 INITIAL PROGRESS PAYMENT PROCEDURES
A. The University may reject the Initial Application for Payment if the following items have not been submitted or completed by the Contractor prior to or in conjunction with the Initial Application for Payment.
B. The University may reject an Application for Payment if the Preliminary Project Schedule or the Initial Project Schedule, in accordance with Specification Section 013200, Construction Progress Documentation, are due by the date of that Application ...
1.05 PROGRESS PAYMENT PROCEDURES AT AND AFTER SUBSTANTIAL COMPLETION
1.06 FINAL PROGRESS PAYMENT PROCEDURES
1.07 PAYMENT PROCEDURES FOR STORED MATERIALS
Attachments:
Schedule of Values Form
SCHEDULE OF VALUES
_________________________ UNIVERSITY
STORED MATERIALS & BILL OF SALE
_________________________ UNIVERSITY