This is an Erosion and Sedimentation Control specification document for the WC2608 SWOPE Stormwater Basin Retrofit Project being administered by West Chester University of Pennsylvania. The specification section (312500) establishes requirements for the furnishing of all equipment, labor, and materials necessary to construct and maintain erosion and sedimentation control devices and systems in accordance with Pennsylvania Department of Transportation Publication 408 and the Pennsylvania Department of Environmental Protection Erosion and Sediment Pollution Control Program Manual. Work includes installation and maintenance of erosion control matting, compost filter socks, pumped water filter bags, and rock construction entrances. The contractor is responsible for timely installation and maintenance of all sedimentation control devices to prevent sediment movement from the construction site to offsite areas or into the stream system. Visual inspections of all sedimentation control devices must be conducted once per week and promptly after every rainstorm, with additional measures installed as needed. Upon site stabilization and owner approval, the contractor must remove all sediment control devices and accumulated silt, disposing of waste materials properly and restabilizing all disturbed areas.
The Erosion and Sedimentation Control specification does not contain separate pricing information, as it represents a portion of the broader WC2608 SWOPE Stormwater Basin Retrofit Project with a total contract cost range of $450,000 to $550,000 and a contract period from December 7, 2026, through July 3, 2027 (208 calendar days). The overall project is classified as a Prevailing Wage project under prevailing wage determination serial number 26-07767, dated August 25, 2026. The project is located at the southeast corner of the intersection of South High Street and East Campus Drive in West Chester, Pennsylvania. A pre-bid site visit was scheduled for November 6, 2026, at 11:00 AM. No set-asides, incumbent contractors, or renewal options are identified in this specification document.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WCU Project No. WC2608 SWOPE Stormwater Basin Retrofit Project
October 8, 2026
EROSION AND SEDIMENTATION CONTROL 312500 - 1
RETTEW Project No.: 0272903615
DIVISION 31 - EARTHWORK
SECTION 312500 - EROSION AND SEDIMENTATION CONTROL
PART 1 - GENERAL
1.1 RELATED REFERENCES
A. Drawings and general provisions of this Contract, including General and Supplementary Conditions and Division 1 specification sections, apply to this section.
1.2 DESCRIPTION OF WORK
A. The Work within this section includes, but is not limited to, the furnishing of all equipment, labor and materials and performing all operations necessary to construct and maintain erosion and sedimentation control devices and/or systems in accordance with the specifications, applicable drawings and Contract Documents.
1.3 QUALITY ASSURANCE
A. Referenced standards shall be the following:
1. Pennsylvania Department of Transportation (PennDOT) Publication 408, Specifications and its revisions
2. Pennsylvania Department of Environmental Protection (DEP) Erosion and Sediment
Pollution Control Program Manual.
B. Be responsible for the timely installation and maintenance of all sedimentation control devices necessary to prevent the movement of sediment from the construction site to offsite areas or into the stream system via surface runoff or underground drainage systems. Measures in addition to those shown on the drawings necessary to prevent the movement of sediment off site shall be installed, maintained, removed, and cleaned up at the expense of the CONTRACTOR. No additional charges to the OWNER will be considered.
PART 2 - MATERIALS
2.1 EROSION CONTROL MATTING
A. As specified and shown on the Drawings.
2.2 COMPOST FILTER SOCK
A. As specified in DEP Erosion and Sediment Pollution Control Program Manual and on the Drawings.
October 8, 2026
EROSION AND SEDIMENTATION CONTROL 312500 - 2
RETTEW Project No.: 0272903615
2.3 PUMPED WATER FILTER BAG
A. As specified in DEP Erosion and Sediment Pollution Control Program Manual.
2.4 ROCK CONSTRUCTION ENTRANCE
A. As shown on the plans and specified in DEP Erosion and Sediment Pollution Control Program Manual.
PART 3 - CONSTRUCTION
3.1 EROSION CONTROL MATTING
A. As specified and shown on the Drawings.
3.2 COMPOST FILTER SOCK
A. As specified in DEP Erosion and Sediment Pollution Control Program Manual and on the Drawings.
3.3 PUMPED WATER FILTER BAG
A. As specified in DEP Erosion and Sediment Pollution Control Program Manual.
3.4 ROCK CONSTRUCTION ENTRANCE
A. As shown on the plans and specified in DEP Erosion and Sediment Pollution Control Program Manual.
3.5 INSPECTIONS
A. Make a visual inspection of all sedimentation control devices once per week and promptly after every rainstorm. If such inspection reveals that additional measures are needed to prevent movement of sediment to offsite areas or streams, promptly install additional devices as needed.
Sediment controls in need of maintenance shall be repaired promptly.
3.6 REMOVAL AND FINAL CLEANUP
A. Once the site has been fully stabilized against erosion and approval is given by the owner, remove sediment control devices and all accumulated silt. Dispose of silt and waste materials in proper manner. Re-grade all areas disturbed during this process and stabilize against erosion with surfacing materials as indicated on the drawings.
October 8, 2026
EROSION AND SEDIMENTATION CONTROL 312500 - 3
RETTEW Project No.: 0272903615
END OF SECTION 312500
| PART 1 - GENERAL |
| 1.1 RELATED REFERENCES |
| A. Drawings and general provisions of this Contract, including General and Supplementary Conditions and Division 1 specification sections, apply to this section. |
| 1.2 DESCRIPTION OF WORK |
| A. The Work within this section includes, but is not limited to, the furnishing of all equipment, labor and materials and performing all operations necessary to construct and maintain erosion and sedimentation control devices and/or systems in accorda... |
| 1.3 QUALITY ASSURANCE |
| A. Referenced standards shall be the following: |
| 1. Pennsylvania Department of Transportation (PennDOT) Publication 408, Specifications and its revisions |
| 2. Pennsylvania Department of Environmental Protection (DEP) Erosion and Sediment Pollution Control Program Manual. |
B. Be responsible for the timely installation and maintenance of all sedimentation control devices necessary to prevent the movement of sediment from the construction site to offsite areas or into the stream system via surface runoff or underground dr...
| PART 2 - MATERIALS |
| 2.1 EROSION CONTROL MATTING |
| A. As specified and shown on the Drawings. |
| 2.2 COMPOST FILTER SOCK |
| A. As specified in DEP Erosion and Sediment Pollution Control Program Manual and on the Drawings. |
| 2.3 PUMPED WATER FILTER BAG |
| A. As specified in DEP Erosion and Sediment Pollution Control Program Manual. |
| 2.4 ROCK CONSTRUCTION ENTRANCE |
| A. As shown on the plans and specified in DEP Erosion and Sediment Pollution Control Program Manual. |
| PART 3 - CONSTRUCTION |
| 3.1 EROSION CONTROL MATTING |
| A. As specified and shown on the Drawings. |
| 3.2 COMPOST FILTER SOCK |
| A. As specified in DEP Erosion and Sediment Pollution Control Program Manual and on the Drawings. |
| 3.3 PUMPED WATER FILTER BAG |
| A. As specified in DEP Erosion and Sediment Pollution Control Program Manual. |
| 3.4 ROCK CONSTRUCTION ENTRANCE |
| A. As shown on the plans and specified in DEP Erosion and Sediment Pollution Control Program Manual. |
| 3.5 INSPECTIONS |
| A. Make a visual inspection of all sedimentation control devices once per week and promptly after every rainstorm. If such inspection reveals that additional measures are needed to prevent movement of sediment to offsite areas or streams, promptly in... |
| 3.6 REMOVAL AND FINAL CLEANUP |
| A. Once the site has been fully stabilized against erosion and approval is given by the owner, remove sediment control devices and all accumulated silt. Dispose of silt and waste materials in proper manner. Re-grade all areas disturbed during this p... |