This is a Public Safety specification document for the Route 54 Sanitary Sewer Extension Project, Contract No. WB-1, issued by the West Branch Regional Authority in Pennsylvania. The project involves construction of approximately 1,520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, one duplex sewage pumping station, 404 linear feet of force main, one stream crossing, and all required surface restoration and appurtenances located within easements in Clinton Township, Lycoming County, Pennsylvania. Sealed bids for the project must be submitted online at http://pennbid.net/ by 1:00 PM local prevailing time on Monday, February 16, 2026. Prospective bidders are required to register as plan holders on PennBid to receive periodic updates on addenda and project information. Bid documents are available for download exclusively through PennBid, and neither the Owner nor Engineer will be responsible for documents obtained from other sources.

Each bid must be accompanied by a certified check, bank check, or bid bond equal to ten percent of the total bid amount as security for proper execution of the Agreement. The project is subject to Pennsylvania Department of Labor and Industry prevailing minimum wage rates and the Pennsylvania Steel Products Procurement Act of 1978, P.L. 6, as amended. The specification sections establish requirements for workers' personal conduct on site, schedule change approval by the Owner to ensure public safety compliance, maintenance of Material Safety Data Sheets for all products used on the project, and specific hot work safety requirements including fire tarps, fire watch assignments, and fire extinguisher availability.

View the file

Other files

File Type Posted
63-REV 1.19.26 16000 Elect Gen Prov.pdf PDF
17-00700 Gen Cond.pdf PDF
31-01600 Mat and Equp.pdf PDF
4-00250 Experience Equipmt and Finan Stmt.pdf PDF
52-05900 Miscelanous Metals.pdf PDF
47-02820 Topsoil Seeding.pdf PDF
14-00660 Form Change Order No 1.pdf PDF
1-1 CD COVER.pdf PDF
36-02000 Site Wrk.pdf PDF
42-02310 Horizontal DD.pdf PDF
7-00630 Public Verification Form.pdf PDF
26-01340 Shop Draw.pdf PDF
70-REV 1.19.26 16402 Underground Construction.pdf PDF
27-01380 Construct Photos.pdf PDF
50-03200 Concrete Reinforcement.pdf PDF
11-00610 Release of Lien.pdf PDF
32-01700 Cont Close.pdf PDF
24-01090 Ref Stand.pdf PDF
8-00350 Non-Discrimination.pdf PDF
66-REV 1.19.26 16130 Boxes.pdf PDF
56-15015 NonPress PVC.pdf PDF
30-01570 Traffic Reg.pdf PDF
38-02110 Demolition.pdf PDF
69-REV 1.19.26 16161 Grounding.pdf PDF
60-15100 Basic Req Plumb Wrk.pdf PDF
10-00600 Bonding Forms.pdf PDF
34-01720 Proj Rec Doc.pdf PDF
67-REV 1.19.26 16140 Wiring Devices.pdf PDF
64-REV 1.19.26 16111 Conduit.pdf PDF
44-02600 Paving Surface.pdf PDF
53-09900 Painting.pdf PDF
48-02900 Landscaping.pdf PDF
46-02710 Chain Link Fence.pdf PDF
62-15136 Basic Pip Mat and Meth.pdf PDF
5-00300 Bid Form.pdf PDF
61-15115 Supp and Anchors.pdf PDF
35-01740 Warranty and Bonds.pdf PDF
3-00200 Instructions to Bidders.pdf PDF
51-03300 Cast in Place.pdf PDF
37-02102 Clear Grub.pdf PDF
58-2 TOC.pdf PDF
21-01000 Summ of Work.pdf PDF
18-00800 Supp Cond.pdf PDF
45-02607 Manholes.pdf PDF
55-11930 Pump Equp.pdf PDF
71-REV 1.19.26 16511 Led Exterior Lighting.pdf PDF
19-Wage Rates.pdf PDF
68-REV 1.19.26 16160 Panelboards.pdf PDF
41-02300 HDPE Pipe.pdf PDF
15-00670 Payment Application.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01560

PUBLIC SAFETY DIVISION 1

West Branch Regional Authority 01560-1 January 2026 Route 54 Sanitary Sewer Extension Project Public Safety Contract No. WB-1

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Workers' Personal Conduct on the Job Site.

B. Schedule changes.

C. Compliance material for employees.

D. Hot work.

1.02 RELATED SECTIONS

A. Standard General Conditions of the Construction Contract and Supplementary Conditions.

B. Section 01000: Summary of Work and Special Requirements.

PART 2 - PRODUCTS

NOT APPLICABLE

PART 3 - EXECUTION

3.01 WORKERS' PERSONAL CONDUCT ON THE JOB SITE

A. Prior to the start of construction, the Owner and the Engineer will establish the rules to manage workers personal conduct on site, including but not limited to the following:

1. Tobacco policy.

2. Use of recreational audio equipment.

3. Dress code.

4. Use of offensive language.

3.02 SCHEDULE CHANGES

A. Any proposed changes to the construction schedule shall be reviewed by the Owner to assure that the public safety requirements of this section of the Specifications have not been reduced and that no hazard has been created by the proposed change in the schedule.

3.03 MATERIAL SAFETY DATA SHEETS (MSDS)

A. Contractor shall maintain on the job site, in a single file, a complete set of manufacturer's Material Safety Data Sheets for every product used on the project.

1. The SDS sheets shall be made available to the Owner, Engineer and Engineer's representatives upon request.

SECTION 01560

PUBLIC SAFETY DIVISION 1

West Branch Regional Authority 01560-2 January 2026 Route 54 Sanitary Sewer Extension Project Public Safety Contract No. WB-1

2. The Contractors shall provide, per MSDS, all necessary handling, worker protection, and instruction for all workers on site to prevent worker accidents and property damage.

3.04 HOT WORK (WELDING/BURNING) REQUIREMENTS

A. Contractor shall comply with the following minimum requirements for all hot work:

1. Cover adjacent areas with fire tarps.

2. Assign fire watch to the immediate area. Should fire danger exist on adjacent floor assign fire watch to that area also.

3. Assign to fire watch only personnel familiar with fire call box locations who shall have appropriate fire extinguishers.

4. Take all additional precautions to prevent fire from being caused by hot work operations.

File details come from the government source that posted it. Updated .