2.7 - Drawings 07 of 17 - 00-MK-001 to 10-MJ-011.pdf

PDF 21 MB Posted

Attached to
NOLA EHRM Infrastructure Upgrades Construction - New Orleans, LA 629-22-700
Solicitation number
36C77623B0038
Issued by

About this file

This document provides details on a federal contract opportunity for infrastructure upgrades at a Veterans Affairs facility in New Orleans, Louisiana. The solicitation number is 36C77623B0038 and is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The opportunity type is a solicitation for construction services related to NOLA EHRM Infrastructure Upgrades at the New Orleans location. Specific requirements include performing upgrades to existing mechanical, electrical, and roofing systems across several buildings as depicted in the 21MB set of construction drawings referenced as file 2.7 - Drawings 07 of 17 - 00-MK-001 to 10-MJ-011.pdf. Responses to the solicitation are due on an unspecified date. The award date and any other contractual terms such as pricing or subcontracting goals are not included in this document.

View the file

Other files

File Type Posted
36C77623B0038 0007.pdf PDF
Tech Questions Tracker - NOLA - 8-25-23.pdf PDF
Brand Name JA - NOLA EHRM.pdf PDF
Tech Questions Tracker - NOLA - 8-23-23.pdf PDF
36C77623B0038 0006.pdf PDF
36C77623B0038 0005.pdf PDF
Tech Questions Tracker - NOLA - 8-9-23.pdf PDF
36C77623B0038 0004.pdf PDF
Specs and Drawings - NOLA EHRM - Addendum No 2.pdf PDF
36C77623B0038 0003.pdf PDF
Specs and Drawings - NOLA EHRM - Addendum No 1.pdf PDF
36C77623B0038 0002.pdf PDF
NOLA EHRM Site Visit Sign-In Sheet 19 July 23.pdf PDF
36C77623B0038 0001.pdf PDF
Site Visit Instructions.pdf PDF
2.12 - Drawings 12 of 17 - 00-EG-001 to 02-ED-051.pdf PDF
2.2 - Drawings 02 of 17 - 000-AJ-601 to 000-AJ-606.pdf PDF
2.4 - Drawings 04 of 17 - 01-AE-011 to 02-AE-052.pdf PDF
2.17 - Drawings 17 of 17 - 04-FP-100 to 11-FP-110.pdf PDF
1 - Specifications.pdf PDF
2.10 - Drawings 10 of 17 - 04-TD-011 to 08-TD-051.pdf PDF
2.13 - Drawings 13 of 17 - 02-EP-011 to 03-EP-071.pdf PDF
2.5 - Drawings 05 of 17 - 02-AC-011 to 03-AE-071.pdf PDF
2.16 - Drawings 16 of 17 - 00-FP-000 to 03-FP-111.pdf PDF
2.11 - Drawings 11 of 17 - 08-TN-011 to 00-TJ-028.pdf PDF
2.9 - Drawings 09 of 17 - 02-TN-011 to 03-TN-071.pdf PDF
IFB 36C77623B0038 - 6-29-23.pdf PDF
6 - Contractor Safety and Environmental Record.docx DOCX document
4 - DBA Wage Rates - Orleans County - 06-16-23.pdf PDF
2.1 - Drawings 01 of 17 - GI001 to GI003.pdf PDF
2.6 - Drawings 06 of 17 - 03-AC-011 to 11-AE-011.pdf PDF
2.8 - Drawings 08 of 17 - 00-TG-001 to 02-TD-052.pdf PDF
2.14 - Drawings 14 of 17 - 04-ED-011 to 10-EP-011.pdf PDF
2.15 - Drawings 15 of 17 - 01-EJ-001 to 00-EJ-026.pdf PDF
3 - HVAC Load Calculations.pdf PDF
5 - Limitations on Subcontracting - Construction.docx DOCX document
2.3 - Drawings 03 of 17 - 00-CG-001 to CJ-A102.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CEILING AIR TERMINAL (ROUND)

FLEXIBLE DUCT

DUCT DOWN (ROUND)

DUCT UP (ROUND)

CD-1 12X12

100 CFM

PL105

A

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

DRAWING NUMBER WHERE DRAWN

PL105

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

DIRECTION OF PIPE PITCH (DOWN)

UNION

CAPPED OUTLET

POINT OF CONNECTION BETWEEN NEW AND

STRAINER

BALL VALVE

CHECK VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC OR MANUAL AIR VENT

PIPE OR DUCT BREAK (GRAPHIC ONLY -

COLD WATER PIPING

CONTINUOUS PIPE/DUCT)

(WALL TYPE)

DN

DN

UP

UP EXHAUST DUCT (UP & DOWN)

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN REGISTER OR TOP GRILLE

DNUP RETURN DUCT (UP & DOWN)

SQUARE 3-WAY CEILING DIFFUSERS

SQUARE 2-WAY CEILING DIFFUSERS

SQUARE 1-WAY CEILING DIFFUSERS

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

ROUND AND SQUARE 4-WAY CEILING DIFFUSERS

SECTION.)

10x8

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL

MANUAL VOLUME DAMPER

SUPPLY

RETURN45°

RETURN, NO SPLITTER (45° TAP)

STANDARD BRANCH SUPPLY OR

45°

AUTOMATIC CONTROL DAMPER MODULATING

EXISTING WORK

PUMP

S

T

DUCT SMOKE DETECTOR LOCATION (DETECTOR

PROVIDED BY DIVISION 26)

THERMOSTAT

TE TEMPERATURE SENSOR

VFD VARIABLE FREQUENCY DRIVE

DIFFUSER CALLOUT ( TYPE, SIZE, CFM)

PETE'S PLUG

STRAINER WITH BLOWDOWN VALVE & 3/4'' HOSE

CONNECTION

DRAIN/BLOWDOWN VALVE WITH 3/4'' HOSE

CONNECTION

SYMBOL

SYMBOL LEGEND

DESCRIPTION SYMBOL DESCRIPTION

COMBINATION FIRE/SMOKE DAMPER

1 HR FIRE RATED WALL

CEILING / WALL ACCESS PANEL

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

RISE OR DROP IN PIPE

THERMOMETER

PIPE UP

PIPE DOWN

GATE VALVE

AUTOMATIC AIR VENT

VENT PIPING

WASTE PIPING

HOT WATER CIRCULATION PIPING

HOT WATER PIPING

AV

CONNECT NEW DUCT TO EXISTING DUCT

BACK DRAFT DAMPER

BDD

FC

FLEXIBLE CONNECTION, EQUIPMENT,

VANED ELBOW (SHORT RADIUS)

EXISTING DUCT TO BE REMOVED

VIBRATION, OR SEISMIC

AUTOMATIC CONTROL DAMPER TWO

POSITION

EXISTING PIPE TO BE REMOVED

EXPANSION LOOP

TH TEMPERATURE AND HUMIDITY SENSOR

SUPPLY ARROW

EXHAUST ARROW

CONDENSATE PUMP

CIRCUIT SETTER

BALANCING VALVE

FLEXIBLE PIPE CONNECTION

EXPANSION JOINT

26-P-3

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

PUMP NO.3 IN BUILDING NO.26

EQUIPMENT ABBREVIATION (PUMP)

26-TU-I-I ITEM NUMBER (TERMINAL UNIT NO.1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO.1

BUILDING NO. WHERE EQUIPMENT IS LOCATED

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

RE RACK SENSOR

TRANSFER GRILLE

100FA

LEGACY ROOM NUMBER

100F8

ROOM DOOR TAG NUMBER

ROOM NAME

ROOM NAME

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP 629-22-700

LOCATION

''1

10% BASIS OF DESIGN 07.08.2022 CONSULTANT

CONSULTANT: A/E:

GDM

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

04-25-2023

FULLY

SPRINKLED

GDM

1584 MCNEIL ST, SUITE 200

DUPONT, WA 98327

P: 360.318.7095

JESSE BARKSDALE, LEED-AP, CPD

WWW.GDM-AE.COM

35% SCHEMATIC DESIGN 11.10.2022

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

65% DESIGN DEVELOPMENT 01.13.2023

03.17.202395% CONSTRUCTION DOCUMENTS

04.25.2023100% CONSTRUCTION DOCUMENTS

04-25-2023

A u to d e s k D o c s /2

-0

N e w

O rl e a n s

E H

R M

/2 -0

N e w O rl e a n s E

H R

M

M e c h

.r v t

00-MK-001

HVAC LEGEND, ABBREVIATION LIST, AND

GENERAL NOTES

JB KT

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

100% CONSTRUCTION

DOCUMENTS

GENERAL NOTES

1. PROVIDE SYSTEM STARTUP, TESTING, & ADJUSTMENTS OF INSTALLED

SYSTEMS TO MEET PERFORMANCE REQUIREMENTS INDICATED IN THE

CONTRACT DOCUMENTS.

2. CONTRACTOR SHALL SUPPORT SYSTEM COMMISSIONING AND SHALL

COORDINATE WITH PROJECT COMMISSIONING AGENT.

3. CONTRACTOR SHALL PROVIDE ALL DOCUMENTATION REQUIRED TO SUPPORT

SYSTEM COMMISSIONING.

4. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND

CONSTRUCTION FEES. FURNISH COPIES OF ALL CONSTRUCTION PERMITS,

FINAL APPROVED PERMITS, AND SIMILAR DOCUMENTS TO OWNER

DOCUMENTING COMPLIANCE WITH CODE REQUIREMENTS.

5. LOCATE ALL VALVES, TRAPS, TEST PORTS, DAMPERS, CONTROLS,

CLEANOUTS, ETC. TO BE ACCESSIBLE FOR MAINTENANCE, ADJUSTMENT, &

TESTING. PROVIDE ACCESS PANELS FOR ALL CONCEALED DEVICES. ACCESS

PANEL LOCATIONS SHALL BE COORDINATED WITH ARCHITECT.

6. ALL PIPING & DUCTWORK IN FINISHED ROOMS OR SPACES SHALL BE

CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING

SYSTEM. REFER TO ARCHITECTURAL DOCUMENTS FOR FURRING & CHASE

LOCATIONS & SIZES.

7. THE FIRST FIGURE OF DUCT SIZE CALLOUTS INDICATES DIMENSION OF FACE

SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS. PROVIDE

ANY APPLICABLE DUCT LINING AND INSULATION PER THESE PLANS AND

SPECIFICATIONS. NOMINAL OUTER DUCT DIMENSIONS ARE NET INSIDE

DIMENSIONS PLUS 2X INSULATION THICKNESS.

8. DUCTWORK SHALL BE 2.0" PRESSURE CLASS UNLESS OTHERWISE NOTED ON

THESE DRAWINGS.

9. CONSTRUCT DUCTWORK ACCORDING TO INTERNATIONAL ENERGY

CONSERVATION CODE SECTION C403.11.2.

10. PROVIDE TURNING VANES IN ALL MITERED RECTANGULAR DUCT ELBOWS &

TEES.

11. PROVIDE MANUAL BALANCING DAMPERS ON ALL NEW AND MODIFIED DUCT

BRANCHES TO AIR INLETS & OUTLETS. LOCATE DAMPERS AS CLOSE TO MAIN

TRUNK DUCT CONNECTION AS POSSIBLE. WHERE BRANCH DUCTWORK IS

INACCESSIBLE (SUCH AS ABOVE HARD LID CEILING SYSTEM), PROVIDE

BALANCING DAMPER AT REGISTER, GRILLE, OR DIFFUSER.

12. PROVIDE MOTORIZED DAMPERS ON OUTDOOR AIR SUPPLY, EXHAUST

OPENINGS, AND RELIEF OUTLETS. DAMPERS SHALL HAVE A MAXIMUM

LEAKAGE RATE OF 4 CFM PER SQUARE FOOT AT 1” W.C.

13. RELIEF GRAVITY DAMPERS SHALL HAVE A MAXIMUM LEAKAGE RATE OF 20

CFM PER SQUARE FOOT AT 1” W.C. DAMPERS SMALLER THAN 24” IN EITHER

DIRECTION SHALL HAVE A MAXIMUM LEAKAGE RATE OF 40 CFM PER SQUARE

FOOT AT 1” W.C.

14. PROVIDE COMPLETE CONDENSATE DRAINAGE SYSTEM FOR ALL SPLIT

SYSTEMS, VRF SYSTEMS, AND SIMILAR SYSTEMS WITH REFRIGERANT OR

CHILLED WATER COOLING INSTALLED PER THIS PROJECT. FIELD ROUTE

DRAINAGE PIPING FROM EQUIPMENT TO NEAREST DRAIN LOCATION (SUCH AS

SERVICE SINK, FUNNEL DRAIN, ETC.). SLOPE NON-PRESSURIZED DRAIN

PIPING TO DRAIN LOCATION. PIPING & FITTINGS SHALL BE COPPER. MINIMUM

PIPE SIZE SHALL BE 3/4". INCREASE PIPE SIZE WHERE APPLICABLE PER

INTERNATIONAL MECHANICAL CODE 307.2.2.

15. SIZE REFRIGERANT PIPING ON SPLIT SYSTEM UNITS PER MANUFACTURER'S

RECOMMENDATION.

16. TOTAL STATIC PRESSURE NOTED IN SCHEDULES SHALL BE ASSUMED TO

INCLUDE DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.

17. ALL SUPPLY AIR FILTERS SHALL BE MERV-11 RATED. ALL

RETURN/EXHAUST/OUTSIDE AIR FILTERS SHALL BE MERV-11 RATED.

18. AIR INLET & OUTLET SIZES SHOWN ON PLANS ARE NECK SIZES. PROVIDE

ADDITIONAL PANS, HARDWARE, ETC., REQUIRED TO INSTALL AIR INLETS &

OUTLETS IN CEILING SYSTEM.

19. WALL REGISTER-TYPE AIR INLETS & OUTLETS SHALL BE INSTALLED AT 7" AFF

MINIMUM ELEVATION.

20. AIR INLETS & OUTLETS IN UNFINISHED SPACES OR OPEN CEILING AREAS

SHALL BE INSTALLED AT 96" AFF UNLESS OTHERWISE NOTED ON THESE

DRAWINGS.

21. ALL PRESSURES LISTED ARE GAGE PRESSURES UNLESS OTHERWISE NOTED.

22. COORDINATE ALL MECHANICAL, PLUMBING & FIRE PROTECTION WORK WITH

OTHER TRADES TO INSURE PROPER AND ADEQUATE INTERFACE OF THEIR

WORK WITH THE WORK SHOWN ON THESE DOCUMENTS. CONTRACTOR SHALL

PROVIDE COORDINATED SHOP DRAWINGS FOR APPROVAL PRIOR TO

FABRICATION AND INSTALLATION.

23. ALL ELECTRICAL WORK SHALL BE PERFORMED IN ACCORDANCE WITH NFPA

70 STANDARDS AND LOCAL REQUIREMENTS.

24. ALL FIELD WIRING SHALL REQUIRE AN ELECTRICAL PERMIT AND SHALL BE

PERFORMED BY A LICENSED ELECTRICIAN.

25. A SHORT DASH IN A SCHEDULE TABLE CELL INDICATES THAT THE COLUMN

HEADING IS NOT USED OR NOT APPLICABLE TO THAT SCHEDULED ITEM.

26. MAINTAIN AND RESTORE (IF INTERRUPTED) ALL CONDUITS & CONDUCTORS,

PIPING, & DUCTWORK PASSING THROUGH RENOVATED AREAS AND

SERVICING UNDISTURBED AREAS.

27. REMOVE ALL ABANDONED DUCTWORK, PIPING, CONTROLS, WIRING, ETC.,

WHERE ACCESSIBLE IN RENOVATED AREAS.

28. WHERE CONTROLS ARE DEMOLISHED, REMOVE WIRING BACK TO NEAREST

CONTROL PANEL OR JUNCTION BOX. REMOVE ACCESSIBLE CONDUIT,

JUNCTION BOXES, ETC.

29. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL FOR ALL EQUIPMENT AND

COMPONENTS REMOVED DURING DEMOLITION.

30. CONTRACTOR SHALL PROVIDE AND INSTALL ISOLATION VALVES IN SUPPORT

OF ALL PIPED EQUIPMENT AND UPDATE AS-BUILT DRAWINGS ON FINAL

PLACEMENT.

31. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL CUTTING &

RESTORATION WORK NECESSARY IN EXISTING AREAS OF THE BUILDING TO

PROVIDE WORK SHOWN ON THESE DOCUMENTS. REFER TO ARCHITECTURAL

DOCUMENTS FOR RESTORATION REQUIREMENTS. CUTTING WORK SHALL

INCLUDE SAWCUTTING, CORE-DRILLING, AND ALL SIMILAR WORK AS

REQUIRED BY THE TYPE OF CONSTRUCTION BEING PENETRATED OR

MODIFIED.

32. WHERE DIRECTION REGARDING RESTORATION AT SPECIFIC LOCATIONS OF

CUTTING, CORE-DRILLING, & SIMILAR ACTIVITIES DOES NOT EXIST IN THE

ARCHITECTURAL DOCUMENTS, RESTORATION SHALL INCLUDE PATCHING TO

MATCH EXISTING SURROUNDING CONSTRUCTION AND FINISHES. PATCHED

AREAS SHALL BE RE-PAINTED FULL HEIGHT OF WALL FROM WALL CORNER TO

WALL CORNER.

33. PROVIDE DRIP TRAY WITH LEAK DETECTOR MONITORED BY AND CONNECTED

TO DDC SYSTEM AT ALL LOCATIONS WHERE CONDENSING UNITS, INDOOR

UNITS, CONDENSATE PIPING, CW PIPING, OR ANY OTHER LIQUID-CARRYING

ELEMENTS ARE LOCATED ABOVE DATA EQUIPMENT. DRIP TRAYS SHALL BE

PROVIDED WITH 120V POWERED CONDENSATE PUMP. PROVIDE 3/4"

CONDENSATE DRAIN PIPING FROM PUMP TO DRAIN LOCATION. PUMPED

CONDENSATE DRAIN PIPING MAY BE CONNECTED TO OTHER PUMPED OR

GRAVITY CONDENSATE DRAIN PIPES IN THE SAME ROOM. COORDINATE WITH

EC TO PROVIDE 120V POWER FOR CONDENSATE PUMP.

ABBREVIATIONS LIST

°F DEGREES FAHRENHEIT

(E) EXISTING

A AMPERES

A/E ARCHITECT/ENGINEER

ABV ABOVE

AMPS AMPERES

AFF ABOVE FINISHED FLOOR

ASJ ALL SURFACE JACKET

BLDG BUILDING

BMS BUILDING MANAGEMENT SYSTEM

BTUH BRITISH THERMAL UNITS PER HOUR

CFM CUBIC FEET PER MINUTE

CFSD COMBINATION FIRE/SMOKE DAMPER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CW COLD WATER

COND CONDENSATE

DDC DIRECT DIGITAL CONTROL

DIA DIAMETER

DN DOWN

EA EXHAUST AIR

EC ELECTRICAL CONTRACTOR

ECM ELECTRONICALLY CONTROLLED MOTOR

EER ENERGY EFFICIENCY RATIO

ELEC ELECTRICAL

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

F FAHRENHEIT

FLA FULL LOAD AMPS

FLR FLOOR

FPM FEET PER MINUTE

FSD FIRE SMOKE DAMPER

FT FEET

GPF GALLONS PER FLUSH

GPM GALLONS PER MINUTE

GR GRAINS

GYP GYPSUM

H HEIGHT

HP HORSEPOWER

HR HOUR

HW HOT WATER

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

IN INCH

INDW INDIRECT WASTE

KW KILOWATT

KWH KILOWATT PER HOUR

LB POUND

LBS POUNDS

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH THOUSAND BRITISH THERMAL UNITS PER HOUR

MCA MINIMUM CIRCUIT AMPACITY

MCR MAIN COMPUTER ROOM

MFG MANUFACTURE

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT PROTECTION

MRT MEAN RADIANT TEMPERATURE

NRC NOISE REDUCTION COEFFICIENT

OA OUTSIDE AIR

ORL OVERFLOW RAIN LEADER

PC PRESSURE CONDENSATE

PD PRESSURE DROP

PH PHASE

PVC POLYVINYL CHLORIDE

RA RETURN AIR

RL RAIN LEADER

RH RELATIVE HUMIDITY

RM ROOM

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SCOP SEASONAL COEFFICIENT OF PERFORMANCE

SEER SEASONAL ENERGY EFFICIENCY RATIO

SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL

ASSOCIATION

SQ FT SQUARE FEET

TEMP TEMPERATURE

TYP TYPICAL

V VENT

V VOLT

VA UNITED STATES DEPARTMENT OF VETERAN'S AFFAIRS

VFD VARIABLE FREQUENCY DRIVE

W/ WITH

W WASTE

W WATT

W WIDTH

W.C. WATER COLUMN

WG WATER GAUGE

Revisions: Date:

HANGER ROD UP TO

ATTACHMENT TO CEILING

STRUCTURE (TYP)

METAL CHANNEL STRUT

PIPE MOUNTING

STRAP (TYP)

PIPING (TYP)

GALVANIZED PIPE SHIELD

TO PROTECT PLASTIC

PIPING (TYP)

PIPE SADDLE (TYP)

STEEL STRAP

PIPE HANGER

ALL THREAD ROD

ATTACH TO STRUCTURE

PIPE

PROVIDE GALVANIZED PIPE SHIELD TO

PROTECT PLASTIC PIPING (PIPE SHIELDS

SHALL SURROUND ENTIRE PIPE

CIRCUMFERENCE)

6" MIN

PROVIDE GALVANIZED PIPE

SHIELD TO PROTECT PLASTIC PIPING

(PIPE SHIELDS SHALL SURROUND

ENTIRE PIPE CIRCUMFERENCE)

TURNBUCKLE

PIPE

EYE BOLT

TURNBUCKLE

INSULATION

PROVIDE GALVANIZED PIPE

SHIELD BETWEEN HANGER AND

INSULATION UP TO CENTERLINE OF PIPE

STEEL STRAP

PIPE

RIGID INSULATION

PIPE

PIPE INSULATION

10" MIN

6" MIN

PROVIDE GALVANIZED PIPE

SHIELD BETWEEN HANGER AND

INSULATION UP TO CENTERLINE

OF PIPE

PIPE HANGER

ALL THREAD ROD

ATTACH TO

STRUCTURE

EYE BOLT

RIGID INSULATION

STEEL STRAP

PIPE

EYE BOLT

PROVIDE GALVANIZED PIPE

SHIELD TO PROTECT PLASTIC PIPING (PIPE

SHIELDS SHALL SURROUND ENTIRE PIPE

CIRCUMFERENCE)

TURNBUCKLE

INSULATION

PROVIDE GALVANIZED PIPE

SHIELD BETWEEN HANGER AND

INSULATION UP TO CENTERLINE

OF PIPE

STEEL STRAP

PIPE

EYE BOLT

RIGID

INSULATION

CONDENSATE DRAIN

SIZE PER PLANS.

CLEANOUT

1-1/2" P-TRAP

PLUMBING FIXTURE AS

SHOWN ON PLANS

VENT PIPE

SIDE VIEW

FURRED-OUT WALL

CONDENSATE

CONNECTION

SLIP JOINT

NUT AND SEAL

ESCUTCHEON

1-1/2" FEMALE NPT

CONNECTION

JR SMITH 9200 CONDENSATE TRAP

16 GAUGE x 1" WIDE

HANGER STRAP.

SECURE EACH STRAP TO DUCT

WITH (2) #10 SELF TAPPING SHEET

METAL SCREWS.

SUPPLY DUCT. SEE

PLANS FOR DUCT SIZE.

NOTE:

1. PROVIDE AND CONSTRUCT DUCT HANGERS AND SUPPORTS PER 2006 SMACNA HVAC DUCT CONSTRUCTION STANDARDS FIGURE 5-5.

2. LENGTH OF SUPPORTS, STRAP SIZES, AND SIZES OF STEEL ANGLES AS REQUIRED FOR DUCT SIZE AND CONFIGURATION.

3. MAXIMUM 10' SPACING BETWEEN SUPPORTS.

4. DUCTS SHALL BE SUPPORTED INDEPENDENTLY AT EQUIPMENT AND ON BOTH SIDES OF AN EXPANSION OR FLEXIBLE JOINT.

5. HANGER SUPPORTS SHALL BE SECURELY FASTENED TO THE BUILDING OR STRUCTURE.

16 GAUGE x 1" WIDE

HANGER STRAP.

SECURE EACH STRAP TO DUCT

WITH (2) #10 SELF TAPPING

SHEET METAL SCREWS.

SUPPLY DUCT. SEE

PLANS FOR DUCT SIZE.

SPRING VIBRATION

ISOLATORS SPRING VIBRATION

ISOLATORS

6" MAX

SEE PLANS FOR DUCT SIZE

18 GA METAL

STRAP 1'' WIDE

(2) NUTS WITH WASHER AND

LOCK-WASHER.

THREADED ROD. ATTACH

TO STRUCTURE.

SHEET METAL CAN SAME

SIZE AS DIFFUSER NECK

T-BAR / HARD LID CEILING SYSTEM

COLLAR

FLEXIBLE DUCT

AIR INLET OR OUTLET

NOTE: NOTE:

1. USE THIS TYPE OF CONNECTION WHERE THERE IS

ENOUGYH CEILING SPACE TO KEEP KINGS OUT OF

FLEXIBLE DUCTS.

2. T-BAR CEILING SHOWN, USE GRILLES CONFIGURED

FOR HARD LID CEILING OR SURFACE MOUNTING FOR

HARD LID CEILING APPLICATIONS.

FLEXIBLE DUCT

AIR INLET OR OUTLET

T-BAR / HARD LID CEILING SYSTEM

SQUARE TO ROUND

TRANSISTION

1. USE THIS TYPE OF CONNECTION IN CONSTRICTED

CEILING SPACES.

2. T-BAR CEILING SHOWN, USE GRILLES CONFIGURED

FOR HARD LID CEILING OR SURFACE MOUNTING FOR

HARD LID CEILING APPLICATIONS.

WATER RETURN

WATER SUPPLY

MV

MANUAL AIR VENT

TEST PLUG (TYP)

UNION CONNECTIONS (TYP)

REDUCER, IF REQUIRED

SHUT OFF VALVE

3-WAY MODULATING CONTROL

VALVE WITH ELECTRONIC

ACTUATOR

WYE STRAINER WITH BLOWDOWN

VALVE & HOSE CONNECTIONS

FLEX HOSE CONNECTIONS

THESE COMPONENTS MAY BE PROVIDED

AS PART OF MANUFACTURER-ASSEMBLED

COIL CONNECTION KIT

NOTES:

1. ALL COIL CONNECTIONS SHALL BE MADE IN A COUNTER FLOW CONFIGURATION.

2. SUPPORT PIPING INDEPENDENT FROM CONNECTED COIL AND TERMINAL UNIT.

CRAC UNIT

CIRCULATION PUMP

CRAC UNIT

CHILLED WATER RETURN

CHILLED WATER SUPPLY

MV

MANUAL AIR VENT

TEST PLUG (TYP)

UNION CONNECTIONS (TYP)

REDUCER, IF REQUIRED

SHUT OFF VALVE

PRESSURE INDEPENDENT 2-WAY

CONTROL

VALVE WITH ELECTRONIC ACTUATOR

WYE STRAINER WITH BLOWDOWN

VALVE & HOSE CONNECTIONS

FLEX HOSE CONNECTIONS

THESE COMPONENTS MAY BE PROVIDED

AS PART OF MANUFACTURER-ASSEMBLED

COIL CONNECTION KIT

NOTES:

1. ALL COIL CONNECTIONS SHALL BE MADE IN A COUNTER FLOW

CONFIGURATION.

2. SUPPORT PIPING INDEPENDENT FROM CONNECTED COIL AND TERMINAL UNIT.

CIRCULATION PUMP

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP 629-22-700

LOCATION

''1

10% BASIS OF DESIGN 07.08.2022 CONSULTANT

CONSULTANT: A/E:

GDM

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

FOR OFFICIAL USE ONLY (FOUO)

04-25-2023

FULLY

SPRINKLED

GDM

1584 MCNEIL ST, SUITE 200

DUPONT, WA 98327

P: 360.318.7095

JESSE BARKSDALE, LEED-AP, CPD

WWW.GDM-AE.COM

35% SCHEMATIC DESIGN 11.10.2022

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

65% DESIGN DEVELOPMENT 01.13.2023

03.17.202395% CONSTRUCTION DOCUMENTS

04.25.2023100% CONSTRUCTION DOCUMENTS

04-25-2023

A u to d e s k D o c s /2

-0

N e w

O rl e a n s

E H

R M

/2 -0

N e w O rl e a n s E

H R

M

M e c h

.r v t

00-MK-500

DETAILS

JB ADR

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

100% CONSTRUCTION

DOCUMENTS

TYPICAL PIPE SUPPORT DETAIL

TYPICAL INDIRECT DRAIN DETAIL

TYPICAL DUCT SUPPORT DETAIL

AIR INLET AND OUTLET DETAIL

CRAC UNIT WATER COILS - 3-WAY PIPING CONNECTIONS

CRAC UNIT WATER COILS - 2 WAY PIPING CONNECTION

ALL THREAD (TYP)

DEHUMIDIFICATION UNIT

UNISTRUT SUPPORT

DOUBLE NUTS ABOVE AND BELOW

UNISTRUT, WITH WASHERS BETWEEN

NUTS AND UNISTRUT

EXTERIOR WALL

FLASHING COLLAR

CAULK ALL AROUND

WALL CAP, SIZED AS SHOWN

ON PLANS

2"

2"

MOTORIZED 2-POSITION

DAMPER INTERLOCKED WITH

DEHUMIDIFICATION UNIT

CAT-6 (MINIMUM) ETHERNET CABLE

CONNECT TO NETWORK SWITCH

FRONT/BOTTOM TEMPERATURE

SENSOR (CENTERED, MAXIMUM 1'

FROM BOTTOM OF CABINET)

RACK-MOUNT ENVIRONMENTAL

MONITOR WITH INTEGRAL

TEMPERATURE & HUMIDITY SENSORS

(4' +/-6" FROM BOTTOM OF CABINET)

REAR TOP TEMPERATURE SENSOR

(CENTERED, MAXIMUM 1' FROM TOP

OF CABINET)

DATA CABINET

SENSOR WIRING

FRONT/TOP TEMPERATURE SENSOR

(CENTERED, MAXIMUM 1' FROM TOP OF

CABINET)

NOTES:

1. ATTACH SENSORS TO DATA CABINET/RACK. DO NOT ATTACH TO CABINET DOOR.

CONDENSING UNIT

WALL SUPPORT BRACKET (TYP)

NOTES:

1) PROVIDE WALL SUPPORT SYSTEM TO MEET UNIT WEIGHT AND SIZE.

2) WALL SUPPORT TO BE MINIMUM 7 FEET AFF.

3) PROVIDE WALL SUPPORT SYSTEM TO MEET SEISMIC RESTRAINT REQUIREMENTS.

4) PROVIDE MOUNTING HARDWARE TO ATTACH UNIT TO WALL SUPPORTS AS RECOMMENDED BY UNIT MANUFACTURER.

PIPE

150# RAISED FACE

FLANGES (TYP)

SUPPORT ROD (TYP)

EXPANSION LOOPS

STACKED EXPANSION LOOP

PIPE (TYP)

150# RAISED FACE

FLANGES (TYP)

SUPPORT ROD

EXPANSION LOOP

EXPANSION LOOP

FULL PORT BALL VALVE (TYP)

PRESSURE GAUGE (TYP)

2-4 PIPE DIAMETERS MAX (TYP)

INLINE PUMP

HANGER ROD UP TO STRUCTURE

CLEVIS PIPE HANGER

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP 629-22-700

LOCATION

''1

10% BASIS OF DESIGN 07.08.2022 CONSULTANT

CONSULTANT: A/E:

GDM

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

FOR OFFICIAL USE ONLY (FOUO)

04-25-2023

FULLY

SPRINKLED

GDM

1584 MCNEIL ST, SUITE 200

DUPONT, WA 98327

P: 360.318.7095

JESSE BARKSDALE, LEED-AP, CPD

WWW.GDM-AE.COM

35% SCHEMATIC DESIGN 11.10.2022

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

65% DESIGN DEVELOPMENT 01.13.2023

03.17.202395% CONSTRUCTION DOCUMENTS

04.25.2023100% CONSTRUCTION DOCUMENTS

04-25-2023

A u to d e s k D o c s /2

-0

N e w

O rl e a n s

E H

R M

/2 -0

N e w O rl e a n s E

H R

M

M e c h

.r v t

00-MK-501

DETAILS

JB ADR

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

100% CONSTRUCTION

DOCUMENTS

DEHUMIDIFICATION UNIT SUPPORT

DUCT PENETRATION OF WALL WITH WALL CAP

DATA CABINET MONITORING DETAIL

WALL SUPPORT DETAIL

EXPANSION LOOP DETAIL

INLINE PUMP DETAIL

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP 629-22-700

LOCATION

''1

10% BASIS OF DESIGN 07.08.2022 CONSULTANT

CONSULTANT: A/E:

GDM

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

04-25-2023

FULLY

SPRINKLED

GDM

1584 MCNEIL ST, SUITE 200

DUPONT, WA 98327

P: 360.318.7095

JESSE BARKSDALE, LEED-AP, CPD

WWW.GDM-AE.COM

35% SCHEMATIC DESIGN 11.10.2022

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

65% DESIGN DEVELOPMENT 01.13.2023

03.17.202395% CONSTRUCTION DOCUMENTS

04.25.2023100% CONSTRUCTION DOCUMENTS

04-25-2023

A u to d e s k D o c s /2

-0

N e w

O rl e a n s

E H

R M

/2 -0

N e w O rl e a n s E

H R

M

M e c h

.r v t

00-MK-600

SCHEDULES

JB KT

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

100% CONSTRUCTION

DOCUMENTS

1. ASJ SHALL INCLUDE VAPOR BARRIER.

NOTES:

SUPPLY & RETURN AIR DUCT INSULATION IN UNCONDITIONED SPACE 12.00 - - 4.40 - X FIBERGLASS WITH ASJ 1

SUPPLY & RETURN AIR DUCT INSIDE BUILDING 6.00 - - 2.00 - X FIBERGLASS WITH ASJ 1

OUTSIDE AIR TO INDOOR CONDENSING UNIT, INSIDE CONDITIONED SPACE 12.00 - - 4.40 - X FIBERGLASS WITH ASJ 1

OUTSIDE AIR TO INDOOR CONDENSING UNIT, IN UNCONDITIONED SPACE 21.00 - - 7.70 - X FIBERGLASS WITH ASJ 1

INDOOR CONDENSING UNIT EXHAUST, INSIDE CONDITIONED SPACE 6.00 - - 2.00 - X FIBERGLASS WITH ASJ 1

INDOOR CONDENSING UNIT EXHAUST, IN UNCONDITIONED SPACE 6.00 - - 2.00 - X FIBERGLASS WITH ASJ 1

(MIN) (MAX) (MIN, 1") (IN) INSIDE DUCT OUTSIDE DUCT

APPLICATION R-VALUE K-VALUE NRC THICKNESS INSULATION LOCATION TYPE NOTES

DUCT INSULATION & LINING SCHEDULE

1. PROVIDE WITH TEMPERING VALVE. TEMPERING VALVE TO BE LOCATED IN WALL WITH AN ACCESS PANEL OR EXPOSED UNDER SINK.

NOTES:

01-P-504 LAVATORY STAINLESS STEEL, 18"X18", UNDERMOUNT, GOOSENECK FAUCET, WRIST BLADE HANDLES 2.00 - 1.50 0.50 0.50 0.50 - UNDERMOUNT - WHITE - - - - 1

WASTE INDW VENT HW CW GPM GPF (LBS) W AMP VOLT PHASE

SYMBOL FIXTURE DESCRIPTION PLUMBING CONNECTIONS (IN) FLOW MOUNTING WEIGHT FINISH ELECTRICAL NOTES

PLUMBING FIXTURE SCHEDULE

1. PROVIDE WITH ECM MOTOR

NOTES:

03-CP-41 BELL AND GOSSETT ECOCIRC 20-18 03-CRAC-41 INLINE CENTRIFUGAL 8 - 15.00 4.50 - 4,800 0.06 100 120 1 INLINE 10 1

03-CP-31 BELL AND GOSSETT ECOCIRC 20-18 03-CRAC-31 INLINE CENTRIFUGAL 8 - 15.00 4.50 - 4,800 0.06 100 120 1 INLINE 10 1

03-CP-21 BELL AND GOSSETT ECOCIRC XL 36-45 03-CRAC-21 INLINE CENTRIFUGAL 13 - 28.00 8.40 - 4,600 0.16 200 120 1 INLINE 16 1

03-CP-11 BELL AND GOSSETT ECOCIRC 20-18 03-CRAC-11 INLINE CENTRIFUGAL 8 - 15.00 4.50 - 4,800 0.06 100 120 1 INLINE 10 1

02-CP-31 BELL AND GOSSETT ECOCIRC 20-18 02-CRAC-31 INLINE CENTRIFUGAL 8 - 15.00 4.50 - 4,800 0.06 100 120 1 INLINE 10 1

01-CP-41 BELL AND GOSSETT ECOCIRC 20-18 01-CRAC-32 INLINE CENTRIFUGAL 8 - 15.00 4.50 - 4,800 0.06 100 120 1 INLINE 10 1

01-CP-32 BELL AND GOSSETT ECOCIRC 20-18 01-CRAC-32 INLINE CENTRIFUGAL 8 - 15.00 4.50 - 4,800 0.06 100 120 1 INLINE 10 1

01-CP-31 BELL AND GOSSETT ECOCIRC 20-18 01-CRAC-31 INLINE CENTRIFUGAL 8 - 15.00 4.50 - 4,800 0.06 100 120 1 INLINE 10 1

01-CP-22 BELL AND GOSSETT ECOCIRC 20-18 01-CRAC-22 INLINE CENTRIFUGAL 8 - 15.00 4.50 - 4,800 0.06 100 120 1 INLINE 10 1

01-CP-21 BELL AND GOSSETT ECOCIRC 20-18 01-CRAC-21 INLINE CENTRIFUGAL 8 - 15.00 4.50 - 4,800 0.06 100 120 1 INLINE 10 1

01-CP-13 BELL AND GOSSETT ECOCIRC 20-18 01-CRAC-13 INLINE CENTRIFUGAL 8 - 15.00 4.50 - 4,800 0.06 100 120 1 INLINE 10 1

01-CP-12 BELL AND GOSSETT ECOCIRC XL 55-45 01-CRAC-12 INLINE CENTRIFUGAL 13 - 40.00 12.00 - 4,600 0.50 500 208 1 INLINE 22 1

01-CP-11 BELL AND GOSSETT ECOCIRC 20-18 01-CRAC-11 INLINE CENTRIFUGAL 8 - 15.00 4.50 - 4,800 0.06 100 120 1 INLINE 10 1

GPM (DESIGN) GPM (MIN) (FT) HEAD (FT) (FT) HP W VOLT PHASE (LBS)

SYMBOL MANUFACTURER MODEL SERVICE TYPE FLOW HEAD CONTROL NPSHR RPM ELECTRICAL MOUNTING WEIGHT NOTES

PUMP SCHEDULE

4. PROVIDE WITH WALL MOUNTED THERMOSTAT/HUMIDITY SENSOR.

3. PROVIDE WITH BACNET DDC INTERFACE.

2. PROVIDE WITH CONDENSATE PUMP. CONDENSATE PUMP SHALL BE POWERED BY INDOOR UNIT.

1. COMPUTER ROOM AIR CONDITIONING UNIT WITH DEDICATED HUMIDIFICATION AND DEHUMIDIFICATION CAPABILITIES.

NOTES:

05-CRAC-14 BLDG K ROOM 1L108 LIEBERT MMD24E CEILING 21.3 19.1 - - - - 966 0.40 0.00 208 1 22.3 27.9 30 225 1,2,3,4

05-CRAC-13 BLDG K ROOM 1L107 LIEBERT MMD24E CEILING 21.3 19.1 - - - - 966 0.40 0.00 208 1 22.3 27.9 30 225 1,2,3,4

05-CRAC-12 BLDG K ROOM 1L110 LIEBERT DME027E WALL 21.8 21.5 - - - - 1098 0.40 0.00 208 1 22.3 27.9 30 225 1,2,3,4

05-CRAC-11 BLDG L ROOM 1L110 LIEBERT DME027E WALL 21.8 21.5 - - - - 1098 0.40 0.00 208 1 22.3 27.9 30 225 1,2,3,4

04-CRAC-14 BLDG K ROOM 1K104 LIEBERT DME027E WALL 21.8 21.5 - - - - 1098 0.40 0.00 208 1 22.3 27.9 30 225 1,2,3,4

04-CRAC-13 BLDG K ROOM 1K104 LIEBERT DME027E WALL 21.8 21.5 - - - - 1098 0.40 0.00 208 1 22.3 27.9 30 225 1,2,3,4

04-CRAC-12 BLDG K ROOM 1K103 LIEBERT DME027E WALL 21.8 21.5 - - - - 1098 0.40 0.00 208 1 22.3 27.9 30 225 1,2,3,4

04-CRAC-11 BLDG K ROOM 1K103 LIEBERT DME027E WALL 21.8 21.5 - - - - 1098 0.40 0.00 208 1 22.3 27.9 30 225 1,2,3,4

03-CRAC-41 BLDG H ROOM 4H113 LIEBERT PW011UC FLOOR 40.2 33.8 45 55 7.5 4.1 2000 0.75 0.20 208 3 35.3 44.1 45 575 1,2,3,4

03-CRAC-31 BLDG H ROOM 3H130A LIEBERT PW011UC FLOOR 40.2 33.8 45 55 7.5 4.1 2000 0.75 0.20 208 3 35.3 44.1 45 575 1,2,3,4

03-CRAC-21 BLDG H ROOM 2H200C LIEBERT MM92C DUCTED CONCEALED 60.8 50.0 45 55 13.3 16 2500 2.00 0.20 208 3 43.2 54 60 498 1,2,4

03-CRAC-11 BLDG H ROOM 1H211 LIEBERT PW011UC FLOOR 40.2 33.8 45 55 7.5 4.1 2000 0.75 0.20 208 3 35.3 44.1 45 575 1,2,3,4

02-CRAC-31 BLDG D ROOM 3D101-E LIEBERT PW011UC FLOOR 40.2 33.8 45 55 7.5 4.1 2000 0.75 0.20 208 3 35.3 44.1 45 575 1,2,3,4

01-CRAC-41 BLDG B ROOM 4B161A LIEBERT PW011UC FLOOR 40.2 33.8 45 55 7.5 4.1 2000 0.75 0.20 208 3 35.3 44.1 45 575 1,2,3,4

01-CRAC-32 BLDG C ROOM 3C152A LIEBERT PW011UC FLOOR 40.2 33.8 45 55 7.5 4.1 2000 0.75 0.20 208 3 35.3 44.1 45 575 1,2,3,4

01-CRAC-31 BLDG B ROOM 3B161A LIEBERT PW011UC FLOOR 40.2 33.8 45 55 7.5 4.1 2000 0.75 0.20 208 3 35.3 44.1 45 575 1,2,3,4

01-CRAC-22 BLDG C ROOM 2C152A LIEBERT PW011UC FLOOR 40.2 33.8 45 55 7.5 4.1 2000 0.75 0.20 208 3 35.3 44.1 45 575 1,2,3,4

01-CRAC-21 BLDG B ROOM 2B161A LIEBERT PW011UC FLOOR 40.2 33.8 45 55 7.5 4.1 2000 0.75 0.20 208 3 35.3 44.1 45 575 1,2,3,4

01-CRAC-13 BLDG C ROOM 1C228 LIEBERT PW011UC FLOOR 40.2 33.8 45 55 7.5 4.1 2000 0.75 0.20 208 3 35.3 44.1 45 575 1,2,3,4

01-CRAC-12 BLDG C ROOM 1C114C LIEBERT MM92C DUCTED CONCEALED 60.8 50.0 45 55 13.3 16 2500 2.00 0.20 208 3 43.2 54 60 498 1,2,4

01-CRAC-11 BLDG B ROOM 1B179 LIEBERT PW011UC FLOOR 40.2 33.8 45 55 7.5 4.1 2000 0.75 0.20 208 3 35.3 44.1 45 575 1,2,3,4

MBH MBH °F °F FT CFM HP ESP (IN WG) VOLT PHASE FLA MCA MOCP (LBS)

SYMBOL SERVES MANUFACTURER MODEL TYPE TOTAL COOLING SENSIBLE COOLING CHILL WATER SUPPLY CHILL WATER RETURN GPM WATER PD SUPPLY FAN ELECTRICAL WEIGHT NOTES

COMPUTER ROOM INDOOR UNIT

1. PROVIDE WITH PROTECTIVE CAGE.

NOTES:

05-DHU-02 MUNTERS HC-150 BLDG L ROOM 1L110 150 55 3.2 6 6 - 2.90 - 208 1 70 1

05-DHU-01 MUNTERS HC-150 BLDG L ROOM 1L107 150 55 3.2 6 6 - 2.90 - 208 1 70 1

04-DHU-02 MUNTERS HC-150 BLDG K ROOM 1K104 150 55 3.2 6 6 - 2.90 - 208 1 70 1

04-DHU-01 MUNTERS HC-150 BLDG K ROOM 1K103 150 55 3.2 6 6 - 2.90 - 208 1 70 1

(CFM) (GR/HR) SUPPLY RETURN KW AMP VOLT PHASE (LBS)

SYMBOL MANUFACTURER MODEL SPACE SERVED CFM REACTIVATION AIRFLOW LOAD RUNOUT SIZE (INCH) DRAIN ELECTRICAL WEIGHT NOTES

DEHUMIDIFIER SCHEDULE

NOTES:

05-CU-14 05-CRAC-14 LIEBERT PFH027A_PLN AIR-COOLED 2 2.69 93.3 208 1 20.5 24.8 30 241

05-CU-13 05-CRAC-13 LIEBERT PFH027A_PLN AIR-COOLED 2 2.69 93.3 208 1 20.5 24.8 30 241

05-CU-12 05-CRAC-12 LIEBERT PFH027A_PLN AIR-COOLED 2 2.69 93.3 208 1 20.5 24.8 30 241

05-CU-11 05-CRAC-11 LIEBERT PFH027A_PLN AIR-COOLED 2 2.69 93.3 208 1 20.5 24.8 30 241

04-CU-14 04-CRAC-14 LIEBERT PFH027A_PLN AIR-COOLED 2 2.69 93.3 208 1 20.5 24.8 30 241

04-CU-13 04-CRAC-13 LIEBERT PFH027A_PLN AIR-COOLED 2 2.69 93.3 208 1 20.5 24.8 30 241

04-CU-12 04-CRAC-12 LIEBERT PFH027A_PLN AIR-COOLED 2 2.69 93.3 208 1 20.5 24.8 30 241

04-CU-11 04-CRAC-11 LIEBERT PFH027A_PLN AIR-COOLED 2 2.69 93.3 208 1 20.5 24.8 30 241

TONS DB ( °F) VOLT PHASE FLA MCA MOCP (LBS)

SYMBOL SERVES MANUFACTURER MODEL TYPE NOMINAL SCOP DESIGN TEMP ELECTRICAL WEIGHT NOTES

COMPUTER ROOM AIR CONDITIONER SYSTEMS - CONDENSING UNIT SCHEDULE

NOTES:

WC-2 BROAN 643FA SUPPLY PAINT TO MATCH EXISTING EXTERIOR COLOR

WC-1 BROAN 643 EXHAUST PAINT TO MATCH EXISTING EXTERIOR COLOR

SYMBOL MANUFACTURER MODEL FINISH NOTES

WALL CAP SCHEDULE

3. PROVIDE WITH VAPOR BARRIER.

2. PROVIDE WITH ALUMINUM JACKETING IN ALL EXTERIOR LOCATIONS.

1. PROVIDE WITH PVC JACKETING IN ALL EXPOSED LOCATIONS (UTILITY ROOMS, STORAGE ROOMS, ETC.).

NOTES:

REFRIGERANT PIPING 0-150 0.25-0.29 125 1.50 1.50 2.00 - - FLEXIBLE ELASTOMERIC 2,3

HYDRONIC PIPING 40-140 0.21-0.28 100 1.50 1.50 2.00 2.00 2.00 FIBERGLASS W/ ASJ 1,2,3

CW 40-60 0.28-0.27 75 0.50 0.50 1.00 1.00 1.00 FIBERGLASS W/ ASJ 1,2,3

CONDENSATE DRAIN 40-60 0.21-0.27 75 - 1.00 1.00 1.00 1.00 FLEXIBLE ELASTOMERIC 2,3

( °F) K FACTOR MRT ( °F) <1" 1" - 1-1/4" 1-1/2" - 3" 4" - 8" >8"

APPLICATION TEMP RANGE INSULATION CONDUCTIVITY NOMINAL PIPE SIZE (IN) TYPE NOTES

PIPE INSULATION SCHEDULE

5. PROVIDE MANUAL AIR DAMPERS AT EACH BRANCH DUCT TO A SINGLE DIFFUSER, REGISTER OR GRILLE.

4. COORDINATE AIR TERMINAL TYPE WITH THE ARCHITECTURAL REFLECTED CEILING PLAN.

3. FURNISH ALL PRODUCTS OF A SINGLE MANUFACTURER.

2. PROVIDE ALL RETURN, EXHAUST AND TRANSFER GRILLES AND REGISTERS WITH FIXED 35 º OR 45 º DEFLECTION BLADES UNLESS OTHERWISE NOTED.

1. REFER TO PLANS FOR SIZE AND QUANTITY.

NOTES:

EG-1 PRICE 630 EXHAUST DUCT/GYP BOARD GRILLE PRIME COAT 1,2,3,4,5

TG-1 PRICE 630 TRANSFER DUCT/GYP BOARD GRILLE PRIME COAT 1,2,3,4

RG-1 PRICE 630 RETURN DUCT/GYP BOARD GRILLE PRIME COAT 1,2,3,4,5

SD-1 PRICE 620 SUPPLY DUCT/GYP BOARD GRILLE PRIME COAT 1,3,4,5

SYMBOL MANUFACTURER MODEL SERVICE MOUNTING TYPE STYLE MATERIAL NOTES

AIR INLETS AND OUTLETS SCHEDULE

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP 629-22-700

LOCATION

''1

10% BASIS OF DESIGN 07.08.2022 CONSULTANT

CONSULTANT: A/E:

GDM

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

FOR OFFICIAL USE ONLY (FOUO)

04-25-2023

FULLY

SPRINKLED

GDM

1584 MCNEIL ST, SUITE 200

DUPONT, WA 98327

P: 360.318.7095

JESSE BARKSDALE, LEED-AP, CPD

WWW.GDM-AE.COM

35% SCHEMATIC DESIGN 11.10.2022

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

65% DESIGN DEVELOPMENT 01.13.2023

03.17.202395% CONSTRUCTION DOCUMENTS

04.25.2023100% CONSTRUCTION DOCUMENTS

04-25-2023

A u to d e s k D o c s /2

-0

N e w

O rl e a n s

E H

R M

/2 -0

N e w O rl e a n s E

H R

M

M e c h

.r v t

00-MK-601

SEQUENCE OF OPERATIONS

JB ADR

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

100% CONSTRUCTION

DOCUMENTS

SEQUENCE OF OPERATIONS

1. NEW COMPUTER ROOM AIR CONDITIONING UNIT — TR SPACES

1.1 DESCRIPTION: COMPUTER ROOM AIR CONDITIONING UNITS SHALL PROVIDE TEMPERATURE AND

HUMIDITY CONTROL FOR THE SPACES THAT THEY SERVE USING MANUFACTURER’S CONTROL

SEQUENCES.

1.2 SPACE CONDITIONING: CRAC UNITS SHALL RECEIVE TEMPERATURE AND HUMIDITY SETPOINTS FROM THE BUILDING DDC SYSTEM. THE UNITS SHALL OPERATE DURING BOTH OCCUPIED AND UNOCCUPIED HOURS USING MANUFACTURER’S PREPROGRAMMED SEQUENCES TO HEAT, COOL, DEHUMIDIFY, AND HUMIDIFY THE SPACE TO MAINTAIN CONDITION REQUIREMENTS SPECIFIED FOR THE DATA CENTER

EQUIPMENT.

1.3 SPACE CONDITION MONITORING: THE DDC SYSTEM SHALL MONITOR THE SPACE USING DEDICATED TEMPERATURE AND HUMIDITY SENSORS. IF CONDITIONS IN THE SPACE ARE ABOVE OR BELOW THE

ALLOWABLE CONDITIONS (USER ADJUSTABLE MIN AND MAX SETPOINTS FOR TEMPERATURE AND

HUMIDITY) FOR 5 MIN (ADJUSTABLE) OR MORE, AN ALARM SHALL BE INITIATED ON THE DDC SYSTEM.

1.4 FIRE SHUTDOWN: THE HVAC SYSTEM WILL SHUTDOWN ON A FIRE ALARM SIGNAL FROM THE BUILDING FIRE ALARM SYSTEM. THIS IS DONE THRU AN INTERLOCKING SAFETY RELAY THAT REMOVES CONTROL

POWER TO THE DDC.

1.4.1 FANS SHALL BE DEACTIVATED.

1.4.2 COMPRESSORS SHALL BE DEACTIVATED.

1.5 HUMIDITY SENSOR AND TEMPERATURE SENSOR

1.5.1 DDC MONITORING (TE): DDC TO MONITOR AND TREND THE ROOM TEMPERATURE.

1.5.2 DDC MONITORING (HE): DDC TO MONITOR AND TREND THE ROOM RELATIVE HUMIDITY.

1.5.3 ALARM: TEMPERATURE SENSOR (TE): DDC TO MONITOR TEMPERATURE AND SEND AN ALARM IF

TEMPERATURE OUTSIDE TEMPERATURE SETPOINT BY 5°F FOR MORE THAN 5 MINUTES (USER

ADJUSTABLE FOR TIME AND VALUE OUTSIDE RANGE).

1.5.4 ALARM: HUMIDITY SENSOR (HE): DDC TO MONITOR RELATIVE HUMIDITY AND SEND AN ALARM

UPON FAILURE TO MEET HUMIDITY SETPOINTS.

1.6 HUMIDITY AND TEMPERATURE SEPOINTS — TR SPACES

1.6.1 TEMPERATURE

1.6.1.1 LOW TEMPERATURE SETPOINT: 64°F

1.6.1.2 HIGH TEMPERATURE SETPOINT: 81°F

1.6.2 HUMIDITY

1.6.2.1 LOW HUMIDITY SETPOINT: 30% RH

1.6.2.2 HIGH HUMIDITY SETPOINT: 60% RH

2. EXISTING HVAC SYSTEMS — TR SPACES

2.1 DESCRIPTION: EXISITNG HVAC SYSTEMS INCLUDING VAV, COMPUTER ROOM AIR CONDITIONING UNITS OR OTHERS SHALL REMAIN IN OPERATION TO PROVIDE TEMPERATURE AND HUMIDITY CONTROL FOR

THE SPACES THAT THEY SERVE. EXISTING CONTROL SEQUENCES TO REMAIN UNCHANGED, WITH

UPDATED SETPOINTS BELOW.

2.2 SPACE CONDITION MONITORING: THE DDC SYSTEM SHALL MONITOR THE SPACE USING NEW

DEDICATED TEMPERATURE AND HUMIDITY SENSORS. IF CONDITIONS IN THE SPACE ARE ABOVE OR

BELOW THE ALLOWABLE CONDITIONS (USER ADJUSTABLE MIN AND MAX SETPOINTS FOR

TEMPERATURE AND HUMIDITY) FOR 5 MIN (ADJUSTABLE) OR MORE, AN ALARM SHALL BE INITIATED ON

THE DDC SYSTEM.

2.3 HUMIDITY AND TEMPERATURE SENSORS

2.3.1 DDC MONITORING (TE): DDC TO MONITOR AND TREND THE ROOM TEMPERATURE.

2.3.2 DDC MONITORING (HE): DDC TO MONITOR AND TREND THE ROOM RELATIVE HUMIDITY.

2.3.3 ALARM: TEMPERATURE SENSOR (TE): DDC TO MONITOR TEMPERATURE AND SEND AN ALARM IF

TEMPERATURE OUTSIDE TEMPERATURE SETPOINT BY 5°F FOR MORE THAN 5 MINUTES (USER

ADJUSTABLE FOR TIME AND VALUE OUTSIDE RANGE).

2.3.4 ALARM: HUMIDITY SENSOR (HE): DDC TO MONITOR RELATIVE HUMIDITY AND SEND AN ALARM

UPON FAILURE TO MEET HUMIDITY SETPOINTS.

2.4 HUMIDITY AND TEMPERATURE SEPOINTS — TR SPACES

2.4.1 TEMPERATURE

2.4.1.1 LOW TEMPERATURE SETPOINT: 64°F

2.4.1.2 HIGH TEMPERATURE SETPOINT: 81°F

2.4.2 HUMIDITY

2.4.2.1 LOW HUMIDITY SETPOINT: 30% RH

2.4.2.2 HIGH HUMIDITY SETPOINT: 60% RH

3. COMPUTER ROOM AIR CONDITIONING UNIT SPACES WITH DEHUMIDIFIER UNITS: 1K103, 1K104, 1L107, 1L110 — TR

SPACES

3.1 DESCRIPTION: COMPUTER ROOM AIR CONDITIONING UNITS SHALL PROVIDE TEMPERATURE AND

HUMIDITY CONTROL FOR THE SPACES THAT THEY SERVE USING MANUFACTURER’S CONTROL

SEQUENCES.

3.2 SPACE CONDITIONING: CRAC UNITS SHALL RECEIVE TEMPERATURE AND HUMIDITY SETPOINTS FROM THE BUILDING DDC SYSTEM. THE UNITS SHALL OPERATE DURING BOTH OCCUPIED AND UNOCCUPIED HOURS USING MANUFACTURER’S PREPROGRAMMED SEQUENCES TO HEAT, COOL, DEHUMIDIFY, AND HUMIDIFY THE SPACE TO MAINTAIN CONDITION REQUIREMENTS SPECIFIED FOR THE DATA CENTER

EQUIPMENT.

3.2.1 CRAC UNITS SHALL BE THE FIRST STAGE OF DEHUMIDIFICATION.

3.2.2 DEHUMIDIFIER UNITS SHALL BE SECOND STAGE OF DEHUMIDIFICATION. UNIT SETPOINTS

SHALL BE ADJUSTED SO THAT DEHUMIDIFIERS ACTIVATE IF CRAC UNITS CANNOT MAINTAIN

REQUIRED SPACE HUMIDITY RANGE.

3.3 SPACE CONDITION MONITORING: THE DDC SYSTEM SHALL MONITOR THE SPACE USING DEDICATED TEMPERATURE AND HUMIDITY SENSORS. IF CONDITIONS IN THE SPACE ARE ABOVE OR BELOW THE

ALLOWABLE CONDITIONS (USER ADJUSTABLE MIN AND MAX SETPOINTS FOR TEMPERATURE AND

HUMIDITY) FOR 5 MIN (ADJUSTABLE) OR MORE, AN ALARM SHALL BE INITIATED ON THE DDC SYSTEM.

3.4 FIRE SHUTDOWN: THE HVAC SYSTEM WILL SHUTDOWN ON A FIRE ALARM SIGNAL FROM THE BUILDING FIRE ALARM SYSTEM. THIS IS DONE THRU AN INTERLOCKING SAFETY RELAY THAT REMOVES CONTROL

POWER TO THE DDC.

3.4.1 FANS SHALL BE DEACTIVATED.

3.4.2 COMPRESSORS SHALL BE DEACTIVATED.

3.4.3 DEHUMIDIFICATION UNIT SHALL BE DEACTIVATED.

3.5 HUMIDITY SENSOR AND TEMPERATURE SENSOR

3.5.1 DDC MONITORING (TE): DDC TO MONITOR AND TREND THE ROOM TEMPERATURE.

3.5.2 DDC MONITORING (HE): DDC TO MONITOR AND TREND THE ROOM RELATIVE HUMIDITY.

3.5.3 ALARM: TEMPERATURE SENSOR (TE): DDC TO MONITOR TEMPERATURE AND SEND AN ALARM IF

TEMPERATURE OUTSIDE TEMPERATURE SETPOINT BY 5°F FOR MORE THAN 5 MINUTES (USER

ADJUSTABLE FOR TIME AND VALUE OUTSIDE RANGE).

3.5.4 ALARM: HUMIDITY SENSOR (HE): DDC TO MONITOR RELATIVE HUMIDITY AND SEND AN ALARM

UPON FAILURE TO MEET HUMIDITY SETPOINTS.

3.6 HUMIDITY AND TEMPERATURE SEPOINTS — TR SPACES

3.6.1 TEMPERATURE

3.6.1.1 LOW TEMPERATURE SETPOINT: 75°F

3.6.1.2 HIGH TEMPERATURE SETPOINT: 81°F

3.6.2 HUMIDITY

3.6.2.1 LOW HUMIDITY SETPOINT: 30% RH

3.6.2.2 HIGH HUMIDITY SETPOINT: 60% RH

4. CONNECT TO RUN INDICATION DRY CONTACT.

3. PROVIDE RELAY AS NECESSARY TO ENABLE/DISABLE POWER TO UNIT.

2. SPACE TEMPERATURE AND HUMIDITY MAY BE PROVIDED AS SEPARATE SENSORS OR COMBINED SENSOR UNITS.

1. PROVIDE GATEWAY IF REQUIRED TO CONNECT FACTORY UNIT CONTROLLER TO DDC SYSTEM.

NOTES:

RUN INDICATION X 4

UNIT ALARM X 5

ENABLE/DISABLE X 3

DEHUMIDIFICATION UNIT

SPACE HUMIDITY AND TEMPERATURE X X X X X X X 2

HUMIDITY AND TEMPERATURE SENSOR X X X X

UNIT ALARM X

FIRE ALARM SHUTDOWN X X X

UNIT ENABLE COMMAND X X X X

SCHEDULE COMMAND X X X

COOLING SETPOINT X X X

SPACE AIR TEMPERATURE SETPOINT X X X

HUMIDIFIER COMMAND X X X

SUPPLY FAN STATUS X X X X X

RETURN AIR HUMIDITY X X X

RETURN AIR TEMPERATURE X X X

COMPUTER ROOM AIR CONDITIONING UNIT X X 1

T E

M P

E R

A T

U R

E

P R

E S

S U

R E

R E

LA

T

IV

E

H U

M

ID

IT

Y

G P

M

C F

M

P E

R C

E N

T

B T

U H

R

K W

K W

H

S E

T P

O

IN

T

S T

A T

U S

O N

/O F

F

F

IL

T E

R S

T A

T U

S

S T

A T

U S

O P

E N

/C

LO

S E

D

S T

A T

U S

N O

. O F

S T

A R

T S

T

IM

E D

O V

E R

R

ID

E

O N

/O F

F

O P

E N

/C

LO

S E

LO

C

K O

U T

E N

A B

LE

/D

IS

A

B

LE

H

IG

H A

N A

LO

G

LO

W

A N

A

LO

G

H

IG

H B

IN

A

R Y

LO

W

B

IN

A R

Y

P R

O O

F

S E

N S

O R

F A

IL

F

LO

W F

A

IL

C O

M M

U N

IC

A

T

IO

N S

F A

IL

D

IA

G N

O S

T

IC

S

G E

N E

R A

L A

LA

R

M

G R

A P

H

IC

S

T R

E N

D

IN

G

T

IM

E S

C H

E D

U

LI

N G

INPUT OUTPUT INPUT OUTPUT ALARMS PROGRAMS

SYSTEM POINT DESCRIPTION ANALOG BINARY SYSTEM FEATURES NOTES

SYSTEM POINTS LIST - HVAC SYSTEMS

UP

UP

UP

01-MJ-011

01-MJ-013

01-MJ-012

01-MJ-011

01-MJ-012

01 B

01 9.2

01 4

01 4.2

01-MJ-013

01 2

01 G 01 H 01 J 01 K 01 L 01 M01 F01 C01 D01 A01 A.4

M.1 01 E

01 E

01 1

01 8

01 9

01 7

01 9.6

01 1.4

01 3

01-MJ-011

01-MJ-011

01 5

01 6

01 6.3

01 8.2

CHF (OC)

1C220

A CHF (OC)

1C222

SECY (OC)

1B208

ITAC (OC)

1B141

CS (OC)

1B139

OFF CHF (FS)

1B151

BA (OC)

1C224

ADM (OC)

1B140

MA ASST (OC)

1C226

CUB (FS)

1B193A

CUB (FS)

1B175C

CUB (FS)

1B192A

MEDIA (FS)

1B154

OFF A CHF

(FS)

1B152

CUB CST SRV

(FS)

1B150

SEC/WAIT (FS)

1B153

CHF (CD)

1B159

A CHF (CD)

1B158

LD CODE (CD)

1B162

LD CODE (CD)

1B161

CUB (CD)

1B172B

CUB (CD)

1B170A

CUB (CD)

1B170C

CUB (CD)

1B173B

CUB (CD)

1B173A

CUB (CD)

1B170D

CUB (CD)

1B170B

CUB (CD)

1B171A

CUB (CD)

1B172C

SECY (CD)

1B160

WORK (CD)

1B157

A CHF (HIM)

1B143

CHF (HIM)

1B144

SECY (HIM)

1B201

CUB (HIM)

1B195A

CUB (HIM)

1B193B

WAIT/ROI

(HIM)

1B200

CHF (WA)

1B137

A CHF (WA)

1B138

SECY (WA)

1B134

OP CTR (WA)

1B130

OFF SPV (WA)

1B132

A CHF (HE)

1C135

CUB (MCCF)

1B174A

CUB (MCCF)

1B175A

CUB (MCCF)

1B174B

BUS CTR (HE)

1C125

T

1B176

CHIEF

1C203

A CHF

1C201

TECH

1C196A

WORKROOM

1C205

SUPV (MCCF)

1B155

IP SUP (HE)

1C134

IP CLRK (HE)

1C124

SECY (MCCF)

1C132B

CUB PSA (HE)

1C130B

CUB PSA (HE)

1C130A

CUB PSA (HE)

1C130C

ADMIS (HE)

1C122

CUB ELIG (HE)

1C131

CUB PSA (HE)

1C132D

A CHF

1C199

ACCNT CHF

1C214 ACCNT CHF

1C213

ACCNT CHF

1C212

ACCNT CHF

1C211

COMP

AUDITOR

1C215

COMP

OFFICER

1C216

BDGT

1C192E

BDGT

1C192B

BDGT

1C192A

BDGT

1C192F

BDGT

1C217A

TECH

1C192D

TECH

1C192C

TECH

1C200A

TECH

1C194A

TECH

1C217B

TECH

1C196C

AUDITOR

1C193

AUDITOR

1C197

AUDITOR

1C195

RECPT

1C190A

T

1C186

T

1C219

AUDITOR

1C191

BREAK

1C210

SERVICE BAY

1C114

EC

1C223

EC

1B180

SERVICE BAY

1B123

TR

1C114C

1A104B

NORM ELEC

1C114A

DETAILS (HE)

1C136

WAIT (OC)

1C227

CUB CS (HE)

1C132C

STOR (HE)

1C126

EMER ELEC

1C114B

TR

1B123D

1B114A

EMER ELEC

1B123A

NORM ELEC

1B123B

SEC/WAIT

1B106

CONF/CLASS

(OC)

1B135

T

1B204

CUB (FS)

1B191A

T

1B178

TR

1C228

1C149

WAIT

1C190

SERV ELEV

LOBB

1B120

PUB ELEV

LOBBY

1B100

WORKROOM

(HIM)

1B194

CLINICAL

SUPER (NSA)

1B102

CLINICAL

SUPER (NSA)

1B103

T

1C141

T

1C143

WC

1C144

LOUNGE

1C145

RECPT

1C137

PANTRY

1C146

CHAPLAIN

1B105

CHAPLAIN

1B107

CHAPLAIN

1B109

EUCHARIST

1B111

QUIET

1B116

T

1B108

T

1B110

STOR

1B112

HK

1B114

STOR/FILE

(FS)

1B190

ISO (HIM)

1B203

PV (HIM)

1B142

STOR

1C196B

SLEEP

1C166 T/S

1C166A

ST

1C181

T/S

1C179A

T/S

1C174A

SLEEP

1C174

SLEEP

1C165 SLEEP

1C175

T/S

1C165A

T/S

1C164A

SLEEP

1C164

SLEEP

1C177

T/S

1C177A

T/S

1C175A

SLEEP

1C179SLEEP

1C162

T/S

1C162A

WAIT

1C160

CC

1C178 CONF

1C185

RETAIL AREA

1C101

VESTIBULE

1C150

ADMIS (HE)

1C123

STOR

1C221

WAIT

1C132A

MONITOR

1C163

POLY

1C161

EQUIP

1C168 T

1C160A

BREAK

1C169

ELEV

BS-1

FUTURE ELEV

BS-2

ELEV

BS-4

ELEV

BS-3

STAIR

STB-1

CORR

1B-C01

CORR

1B-C02

CORR

1B-C03

AISLE

1B-C08

CORR

1B-C07

CORR

1B-C05

CORR

1B-C06

AISLE

1B-C09

AISLE

1B-C10

AISLE

1B-C11

AISLE

1B-C12

AISLE

1B-C13

AISLE

1B-C14

AISLE

1B-C15

AISLE

1B-C16

AISLE

1C-C01A

AISLE

1C-C01B

AISLE

1C-C01C

AISLE

1C-C01D

AISLE

1C-C03

AISLE

1C-C04

AISLE

1C-C04AAISLE

1C-C04B

AISLE

1C-C05

AISLE

1C-C06

AISLE

1C-C07

AISLE

1C-C12

AISLE

1C-C11

AISLE

1C-C09

AISLE

1C-C08

AISLE

1C-C08A

SECY (HE)

1B172A

STOR

1C133

HK

1C139

VESTIBULE

1B121

CORR

1C101-K

CORR

1B-C02A

HK

1B206

NOUR

1C180

AISLE

1C-C010

AISLE

1C-C07A

SECURITY

1C114D

1C104A

UNASSIGNED

1B174GSECURITY

1B123C

CORR

1C-C02

SECY/WAIT

(OC)

1C225

RETAIL PREP

1C101A

CORR

1B-C04

AISLE

1B-C04A

AISLE

1C-C00

CORR

1C-C01

CLEAN

1C167

SOILED

1C176

CONNECTOR

HALL

1B115A

TR

1B179

1B145

IT/LVSR

1C190B

CHAPEL

1B115

CLOSET

1B115B

1-1/4" CHS/R UP. SEE 2/01-MJ-021

FOR CONTINUATION

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP 629-22-700

LOCATION

''1

10% BASIS OF DESIGN 07.08.2022 CONSULTANT

CONSULTANT: A/E:

GDM

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

04-25-2023

FULLY

SPRINKLED

GDM

1584 MCNEIL ST, SUITE 200

DUPONT, WA 98327

P: 360.318.7095

JESSE BARKSDALE, LEED-AP, CPD

WWW.GDM-AE.COM

35% SCHEMATIC DESIGN 11.10.2022

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

65% DESIGN DEVELOPMENT 01.13.2023

03.17.202395% CONSTRUCTION DOCUMENTS

04.25.2023100% CONSTRUCTION DOCUMENTS

04-25-2023

A u to d e s k D o c s /2

-0

N e w

O rl e a n s

E H

R M

/2 -0

N e w O rl e a n s E

H R

M

M e c h

.r v t

01-MH-011

FIRST FLOOR HVAC PLAN - BUILDINGS B

AND C

JB KT

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"1

FIRST FLOOR HVAC PLAN BUILDINGS B & C

KEY PLAN

D

E

F

G

K

H

J1 J2

M3 M1 M2

N1 N2

P

Q B1 B2

C1 C2

NORTH

B & C

DN

UP

DN

UP

DN

DN

UP

01-MJ-022

01-MJ-022

01-MJ-024

01-MJ-024

01-MJ-021

01-MJ-021

01-MJ-023

01-MJ-023

01 B

01 9.2

01 4

01 4.2

01 2

01 G 01 H 01 J 01 K 01 L 01 M01 F01 C01 D01 A01 A.4

M.1 01 E

01 1

01 8

01 10

01 9

01 7

01 9.6

01 1.4

01 3

01 5

01 6

01 6.3

01 8.2

CLEAN

2B120

COMM

CENTER

2B118

CONSULT

2C126

NOUR

2C108

TR

2C114C

2C114B

RETHERM

2B101

CONSULT

2C124

HK

2B112

TR

2B123D

2B110A

STOR/EQUIP

2B103

CLEAN

2B155D

2B159

CHUTE

2B105

COMM

CENTER

2C104

MED ROOM

2B155B

SOILED

2B155E

2B161

SERVICE BAY

2B123

SERVICE BAY

2C114

OFF

PHY/CON/NRS

2C120

HOUSE STAFF

2B104

PHARMACIST

2C118

ST

2C119

SOC WRK

2C121

HK

2C122

SOC WRK

2C123

PHY/CON/NRS

2C112

STAFF

LOUNGE

2B102

STAFF

LOCKER

2B126

DIET

2C116

NOUR

2B122

HEAD NURSE

2C113

CARE

PROVIDER

2C111

STOR/EQUIP

2C103

HEAD NURSE

2B116

EC

2B153

NORM ELEC

2C114A

EMER ELEC

2C114B

NORM ELEC

2B123B

EMER ELEC

2B123A

SOILED

2C152B

2C152

CLEAN

2C106

EC

2C154

PATIENT

2B146

PATIENT NEG

2B143

PATIENT

2B145

PATIENT POS

2B165

PATIENT

2B151

PATIENT

2B152

PATIENT

2B157

PATIENT

2B159

PATIENT

2B161

PATIENT

2B163

PATIENT

2B164

PATIENT

2B144 PATIENT

2B148

PATIENT

2B150 PATIENT

2B154

PATIENT

2B156

PATIENT

2B158

PATIENT

2B160

PATIENT

2B162

PATIENT

2C145 PATIENT

2C151

PATIENT

2C147 PATIENT

2C157

PATIENT

2C159

PATIENT

2C161

PATIENT

2C163

PATIENT

2C155

PATIENT

2C149

PATIENT

2C160

PATIENT POS

2C165

PATIENT

2C141

PATIENT

2C144 PATIENT

2C146 PATIENT

2C148

PATIENT

2C150

PATIENT

2C153

PATIENT

2C156

PATIENT

2C158

PATIENT

2C164

PATIENT NEG

2C140

CONF/

REPORT

2B106

SUB-STATION

2B132H

SUB-STATION

2B130A

SUB-STATION

2B130C

SUB-STATION

2B130E

SUB-STATION

2B132D

SUB-STATION

2B132F

SUB-STATION

2C131GSUB-STATION

2C131C

SUB-STATION

2C131ESUB-STATION

2C131A

SUB-STATION

2C133A

SUB-STATION

2C133C

RESPITE

2B166

2B172

T

2C145A

T

2C162A T

2C160A

T

2C151A T

2C155A

T

2C157A

T

2C159A T

2C161A

T

2C163A

T

2C164A

T

2C149A

T

2C158A

T

2C156A

T

2C153A

T

2C148A T

2C146A

T

2C144A

ISO T

2C142A

ISO T

2C140A

T

2C143A

T

2C147A

T

2B146A

T

2B140A T

2B142A

T

2B147A T

2B145A

T

2B149A

T

2B151A

T

2B152A

T

2B159A

T

2B161A

T

2B163A

ISO T

2B165A

ISO T

2B141A

T

2B164A

T

2B162A T

2B160A

T

2B158AT

2B156A

T

2B154A

T

2B150A T

2B148A

T

2B144A

ISO T

2B143A

MALE

2C101B

ANTE POS

2C165B

X-RAY

2C105

X-RAY ALC

2B115

HC ST

2B126A

TYP T

2B167

ANTE POS

2B165B

PATIENT NEG

2B141

PATIENT

2B142

PATIENT

(BAR)

2B140

PATIENT

2B147

PATIENT

2B149

PATIENT NEG

2C142 PATIENT

2C162

ISO T

2C165A

PATIENT

2C143

T

2C141A

PUB ELEV

LOBBY

2B100

SERV ELEV

LOBBY

2B107

SUPPLY

2C131D

ST

2B125

T

2C167

FEMALE

2C101A

RESPITE

2C166

2C172

CARE

PROVIDER

2B114

CORR

2B-C01A

CORR

2B-C01

CORR

2B-C04

CORR

2B-C02

CORR

2B-C03

AISLE

2B-C03A

CORR

2C-C03

CORR

2C-C04

CORR

2B-C01B

CORR

2B-C05

ELEV

BS-1

FUTURE ELEV

BS-2

ELEV

BS-4

ELEV

BS-3

STAIR

STB-1

SHAFT

SHB01

SHAFT

SHB03

SHAFT

SHC06

SHAFT

SHC05B

SHAFT

SHC05A

SUB-STATION

2C133E

CC

2C105A

CC

2C165C

CC

2B165C

ON CALL

2B129

ON CALL

2B131

PC1

2C115

CLEAN

2C152C

2C154

MED ROOM

2C152ESTAIR

STC-4

STAIR

STC-3

SECURITY

2C114D

SECURITY

2B123C

PC1

2C109

SUB-STATION

2B132B

CORR

2B-C04B

HC T/S

2B129A

CLST

2B129B

CLST

2B131A T/S

2B131B

ALCOVE

2C-C03B

T

2B157A

SUPPLY

2B132A

CORR

2C-C05

SHAFT

SHC05C

WAITING

2A100A

TR

2B155C

TR

2C152G

ELEV

BP-5

ELEV

BP-6

ELEV

BP-7

AISLE

BP-8

TR

2C152A

TR

2B155F

NURISHMENT

STATION

2B132C

01-MJ-022

01-MJ-024

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP 629-22-700

LOCATION

''1

10% BASIS OF DESIGN 07.08.2022 CONSULTANT

CONSULTANT: A/E:

GDM

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

04-25-2023

FULLY

SPRINKLED

GDM

1584 MCNEIL ST, SUITE 200

DUPONT, WA 98327

P: 360.318.7095

JESSE BARKSDALE, LEED-AP, CPD

WWW.GDM-AE.COM

35% SCHEMATIC DESIGN 11.10.2022

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

65% DESIGN DEVELOPMENT 01.13.2023

03.17.202395% CONSTRUCTION DOCUMENTS

04.25.2023100% CONSTRUCTION DOCUMENTS

04-25-2023

A u to d e s k D o c s /2

-0

N e w

O rl e a n s

E H

R M

/2 -0

N e w O rl e a n s E

H R

M

M e c h

.r v t

01-MH-021

SECOND FLOOR HVAC PLAN - BUILDINGS B

AND C

JB KT

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"1

SECOND FLOOR HVAC PLAN BUILDINGS B & C

KEY PLAN

D

E

F

G

K

H

J1 J2

M3 M1 M2

N1 N2

P

Q B1 B2

C1 C2

NORTH

DN

UP

DN

DN

DN

UP

UP

01-MJ-032

01-MJ-032

01-MJ-034

01-MJ-034

01-MJ-031

01-MJ-031

01-MJ-033

01-MJ-033

01 B

01 9.2

01 4

01 4.2

01 2

01 G 01 H 01 J 01 K 01 L 01 M01 F01 C01 D01 A01 A.4

M.1 01 E

01 1

01 8

01 10

01 9

01 7

01 9.6

01 1.4

01 3

01 5

01 6

01 6.3

01 8.2

BLOOD GAS

LAB

3C120

COMM

CENTER

3C103

CONSULT

3C124

TR

3C114C

3C114B

CHUTE

3B105

COMM

CENTER

3B118

HOUSE STAFF

3B104

HEAD NURSE

3C112

SOC WRK

3C121

SOC WRK

3C123

PHYS/CON/

NRS

3C110

STAFF

LOCKER

3B126

DIET

3C116

CARE

PROVIDER

3B114

HEAD NURSE

3B116

PHARMACIST

3C118

NOUR

3B122

TR

3B123D

3B110A

STOR/EQUIP

3B103

SERVICE BAY

3B123

SERVICE BAY

3C114

RETHERM

3B101

NORM ELEC

3B123B

EMER ELEC

3B123A

EMER ELEC

3C114B

NORM ELEC

3C114A

SOILED

3C152B

3C152

CLEAN

3B120

FEMALE

3C101A

X-RAY ALC

3C104

PHYS/CON/

NRS

3C122

STOR/EQUIP

3C102

MALE

3C101B

X-RAY ALC

3B115

PATIENT NEG

3B141 PATIENT NEG

3B143

PATIENT

3B145

PATIENT

3B147

ISO T

3B165A

T

3B163A

T

3B161A

T

3B159A

PATIENT

3B149

T

3B157A

T

3B152A

PATIENT

3B151

PATIENT

3B140

PATIENT

3B142

PATIENT

3B144

PATIENT

3B146

PATIENT POS

3B165

T

3B164A

T

3B160AT

3B158A

T

3B156A

T

3B162A

PATIENT

3B148

PATIENT

3B150

T

3B154A

T

3B151A

PATIENT

3B152

T

3B149A

T

3B147A T

3B145A

ISO T

3B141A

ISO T

3B143A

PATIENT

3B157

PATIENT

3B159

PATIENT

3B161

PATIENT

3B163

PATIENT

3B164

PATIENT

3B154

PATIENT

3B156

PATIENT

3B158

PATIENT

3B160

PATIENT

3B162

T

3B150A

T

3B148A T

3B146A

T

3B144A

T

3B142A

T

3B140A

EC

3C154

SUB-STATION

3B130A SUPPLY

3B130B

SUB-STATION

3B130C

SUPPLY

3B130D

SUB-STATION

3B130E SUB-STATION

3B132D

SUPPLY

3B132E

RESPITE

3B166

3B172

SERV ELEV

LOBBY

3B107

PUB ELEV

LOBBY

3B100

HK

3B112

NOUR

3C108

CLEAN

3C106

SOILED

3B155E

3B161

EC

3B153

SUB-STATION

3C131A

SUB-STATION

3C131C

SUB-STATION

3C131E

SUB-STATION

3C133A

SUB-STATION

3C133C SUB-STATION

3C133E

T

3C163A

ISO T

3C140A

ISO T

3C142A T

3C144A

T

3C146A

PATIENT

3C146

T

3C148A

PATIENT

3C148

PATIENT

3C150

T

3C150A

PATIENT

3C153

T

3C153A

T

3C156A

PATIENT

3C156

PATIENT

3C158

T

3C158A

T

3C162A

PATIENT

3C160

T

3C160A

T

3C141A

ISO T

3C165A

PATIENT

3C162

PATIENT

3C164

PATIENT

3C163

PATIENT

3C161PATIENT

3C159

PATIENT

3C157

SUPPLY

3C131D

SUPPLY

3C133B

RESPITE

3C166

3C172

T

3C164A

T

3C159A

T

3C161A T

3C157A

T

3C155A T

3C151A

T

3C149A

T

3C147A

T

3C145A T

3C143A

PATIENT NEG

3C140

PATIENT NEG

3C142

PATIENT

3C155

PATIENT

3C151

PATIENT

3C149

PATIENT

3C147

PATIENT

3C145

PATIENT

3C143

PATIENT

3C141

PATIENT POS

3C165

ANTE POS

3C165B

STAFF

LOUNGE

3B102

ST

3B124

T

3B167

T

3C167

ANTE POS

3B165B

HC ST

3B126A

AISLE

3B-C01A

CORR

3B-C01

CORR

3B-C01B

CORR

3B-C02

CORR

3B-C05

CORR

3B-C03

CORR

3C-C03

CORR

3C-C04A

CORR

3C-C02

ELEV

BS-1

FUTURE ELEV

BS-2

ELEV

BS-4

ELEV

BS-3

STAIR

STB-1

SHAFT

SHB01

SHAFT

SHB03

SHAFT

SHC06

SHAFT

SHC05B

SHAFT

SHC05A

SUPPLY

3B132A

SUPPLY

3C133D

TR

3B161A

CC

3B130H

TR

3C152A

CC

3C109

HK

3C125

CC

3C165C

CC

3B165C

ST

3B227

CARE

PROVIDER

3C230

CLEAN

3B155D

3B159

MED ROOM

3B155B

AISLE

3B-C03A

CLEAN

3C152C

3C154

MED ROOM

3C152E

AISLE

3C-C02A

STAIR

STC-4

STAIR

STC-3

SECURITY

3C114D

SECURITY

3B123C

UNASSIGNED

3C117

PATIENT

3C144

CORR

3B-C04B

SUB-STATION

3B132B

SUB-STATION

3C131G

AISLE

3B-C04A

ALCOVE

3C-C03B

ALCOVE

3B-C02A

OFF PCI

3B131

HC ON CALL

3B129

HC T/S

3B129A

PHYS/CON/NRS

3B130

CLST

3B129B

CONSULT

3C126

SUPPLY

3C131H

SHAFT

SHC05C

CORR

3C-C06

WAITING

3A100A

TEL CLST

3B155C

TEL CLST

3C152D

CONF/

REPORT

1C190C

NURISHMENT

STATION

3C131F

NURISHMENT

STATION

3B132C

2" CHR

2" CHS

2" CHR

2" CHS

01-MJ-034

01-MJ-032

2" EXPANSION LOOPS

WITH +/- 4" MOVEMENT

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP 629-22-700

LOCATION

''1

10% BASIS OF DESIGN 07.08.2022 CONSULTANT

CONSULTANT: A/E:

GDM

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

04-25-2023

FULLY

SPRINKLED

GDM

1584 MCNEIL ST, SUITE 200

DUPONT, WA 98327

P: 360.318.7095

JESSE BARKSDALE, LEED-AP, CPD

WWW.GDM-AE.COM

35% SCHEMATIC DESIGN 11.10.2022

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

65% DESIGN DEVELOPMENT 01.13.2023

03.17.202395% CONSTRUCTION DOCUMENTS

04.25.2023100% CONSTRUCTION DOCUMENTS

04-25-2023

A u to d e s k D o c s /2

-0

N e w

O rl e a n s

E H

R M

/2 -0

N e w O rl e a n s E

H R

M

M e c h

.r v t

01-MH-031

THIRD FLOOR HVAC PLAN - BUILDINGS B

AND C

JB KT

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"1

THIRD FLOOR HVAC PLAN BUILDINGS B & C

KEY PLAN

D

E

F

G

K

H

J1 J2

M3 M1 M2

N1 N2

P

Q B1 B2

C1 C2

NORTH

UPDN

DN

DN

UP

01-MJ-041

01-MJ-041

01-MJ-041

01-MJ-041

01-MJ-042

01-MJ-042

01 B

01 9.2

01 4

01 4.2

01 2

01 G 01 H 01 J 01 K 01 L 01 M01 F01 C 01 D01 A01 A.4

M.1 01 E

01 E

01 1

01 8

01 10

01 9

01 7

01 9.6

01 1.4

01 3

01 5

01 6

01 6.3

01 8.2

SERVICE BAY

4B123

SERVICE BAY

4C114

CONSULT

4B105

NOUR

4B122

TR

4B123D

4B114A

RETHERM

4B121

CHUTE

4B104

COMM

CENTER

4B118

STAFF

LOUNGE

4B109

CONF/

REPORT

4B106

HOUSE STAFF

4B107

RESIDENT

CONF

4B108

PCI

4B102

SOC WRK

4B110

CLEAN

4B155D

4B159

DIET

4B125

HEAD NURSE

4B114

CARE

PROVIDER

4B116

WAITING

4A100A

STOR/EQUIP

4B103

HC ST

4B126A

STAFF

LOCKER

4B126

EC

4B153

TR

4C114C

4C132B

NORM ELEC

4B123B

EMER ELEC

4B123A

EMER ELEC

4C114B

NORM ELEC

4C114A

PATIENT NEG

4B143

MED ROOM

4B155B

SOILED

4B155E

4B161

CLEAN

4B120

ISO T

4B141A

ISO T

4B143A

PATIENT

4B163

T

4B145A

PATIENT

4B161

T

4B147A

PATIENT

4B159

T

4B149A

PATIENT

4B157

T

4B151A

PATIENT

4B152

T

4B140A

PATIENT

4B164

T

4B142A

PATIENT

4B162

T

4B144A

PATIENT

4B160

T

4B146A T

4B148A

PATIENT

4B158

T

4B150A

PATIENT

4B156

T

4B154A

PATIENT

4B154

T

4B156A

PATIENT

4B151

T

4B158A

PATIENT

4B149

T

4B160A

PATIENT

4B147

T

4B162A

PATIENT

4B145

T

4B164A

PATIENT

4B142

PATIENT

4B140

T

4B163A

PATIENT

4B150

T

4B161A

PATIENT

4B148

T

4B159A

PATIENT

4B146

T

4B157A

PATIENT

4B144

T

4B152A

SUB-STATION

4B130A

SUB-STATION

4B130C

SUB-STATION

4B130E

SUB-STATION

4B132H

This is the start of the file's text. The full file is on GovTribe.