2.5 - Drawings 05 of 17 - 02-AC-011 to 03-AE-071.pdf
PDF 16 MB Posted
- Solicitation number
- 36C77623B0038
About this file
This file is related to drawings for a federal construction contract opportunity issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation seeks construction services for infrastructure upgrades at New Orleans VA Medical Center, as outlined in drawings 05 of 17 totaling 16MB in file size. Offerors should respond to solicitation number 36C77623B0038 by the specified deadline to be considered for the base period of work and four optional years of award valued at an estimated $6-10 million.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FD
AP
AP
AP
AP
AP
AP
AP
AP
C L
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
CL
CL
C L C L
C L
AP
CL
KEY PLAN
NORTH
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
ADMIN CONF ROOM
1D146
MULTIPURPOSE ROOM
1E168
PROGRAM ANALYST
1E149
NURSE MGR
1E150
NURSE MGR
1D148
OFFICE MGR
1E148
CLER
1D153E
CLER
1D153B
CLER
1D149A
CLER
1D150A
CLER
1D150B
CLER
1D153D
CLIN SVS
1D149B
PROG
1E147A
PROG
1E147B
PROG
1E146H
AN
1E142D
AN
1E142B
RETAIL AREA
1E129
TR
1E127A
RN
1D237B
CLERICAL
1D125B
SECY/ WAITING
1D126
SUPER
1D131
SUPER
1D127
SUPER
1D128
ASST CHIEF
1D133
ASST CHIEF
1D132CHIEF
1D134
SUPER
1D129
SUPER
1D130
CHECK-IN/ LOUNGE
1D121
MALE TOILET/ SHOWER
1D115
EMS MALE LOCKER
1D119
FEMALE TOILET/
SHOWER
1D117
EMER ELEC
1D227B
NORM ELEC
1D227A
SECY/ WAITING
1E145
EQUIP STOR
1D157
CONF ROOM
1D156
ADMIN OFFICER
1D154
MED DIRECTOR
1D147
MSA
1E147D
PSAS
1E143A
PSAS
1E144E
PSAS
1E142F
RN
1E137C
RN
1E135D
RN
1E135G
PSAO
1E144B
RNO
1E137H
RN
1E135A
RN
1E135E
RN
1E135B
RN
1E137F
RN
1E135FRN
1E135C
RN
1E137E
RN
1E137D
PSAS
1E144F
PSAO
1E143B
CLER
1D150E
CLER
1D151A
CLER
1D151B
CLER
1D150F
CLER
1D150D
CLER
1D152H
CLER
1D153C
CLER
1D150G
CLER
1D153A
CLIN SVS
1D149D
CLIN SVS
1D149C
CLER
1D150C
CLER
1D151C
CLER
1D151D
CLER
1D152F
CLER
1D152D
CLER
1D152E
MSA
1E146F
MSA
1E147I
MSA
1E147J
MSA
1E147E
MSA
1E146D
PROG
1E147G
PROG
1E146C
PROG
1E147H
PROG
1E146I
PROG
1E146B
PROG
1E147F
CLERICAL
1D125A
CLERICAL
1D125C
CLERICAL
1D125D
COPY/ WORK
1D160
HK
1E126
REPAIR
1D104
CLERICAL
1D106
RECEIVING & CLEANING
1D107
CHIEF BIOMED
1D113
SUPERV BIOMED
1D111
BIOMED ENG
1D112
STORAGE
1D108
PAT ELEV LOBBY
1D221
TR
1D223A
CHUTE RM
1D225
SERV ELEV LOBBY
1D220
CLER
1D152B
CLER
1D152A
CLER
1D152C
CLER
1D152G
BED REPAIR
1D116
HK
1D139
ST
1D141
ST
1D140
NORM ELEC
1E127C
ST
1D142
STAFF LOUNGE
1D145
ENTERAL RN
1D161
SOILED
1D158
EC
1E130
EC
1D120
STORAGE
1E124
OPT OFFICE
1E120
OPT EXAM
1E118
OPT EXAM
1E119
FITTING DISPLAY
1E121
COUNSELOR
1E114
COUNSELOR
1E112
COUNSELOR
1E113 COUNSELOR
1E111
WALK-IN COOLER
1E128
RECEIVING
1E122
SECY/WAIT
1E110
CLEAN
1D159IND HYGIENE LAB
1D163
COPY/WORK
1E136
ELEV EQUIP
1D137B BIOMED ENG
1D109
PUB ELEV LOBBY
1D138
COPY
1D105
VESTIBULE
1D135
CORR
1E-C04A
CORR
1D-C05
CORR
1D-C09
CORR
1D-C06
CORR
1D-C03A
CORR
1D-C01
CORR
1D-C10B
CORR
1D-C08
CORR
1D-C04
CORR
1D-C07
CORR
1E-C06
CORR
1E-C01
CORR
1E-101
STORAGE
1E125
WC STORAGE
1D101
UNASSIGNED
1D136
CORR
1D-C11
UNASSIGNED
1D110
CORR
1DC10
EMS STORAGE
1D219
EMS FEMALE LOCKER
1D118UNASSIGNED
1D120A
AISLE
1DC14
HK
1E105
HK
1D217
RES LOUNGE
1D162
CLERICAL
1E115
DISPLAY
1E129B
RN
1E137J
SECURITY
1D223B
HC SHOWER
1D117A
SHOWER
1D117B
HC SHOWER
1D115A
SHOWER
1D115B
CORR
1D-C10A
CORR
1E-C04B
ELEV
DP-09
SECURITY
1E127B
FAMILY
1E107
MALE
1E108
FEMALE
1E109
WC STORAGE
1E1O6B
UNASSIGNED
1E105A
FIRE COMMAND CTR
1E103
EMER ELEC
1E127D
MECHANICAL
1D137A
CORR
1D-C01A
AISLE
1E110A
VESTIBULE
1E127
INTERSTITIAL STAIR
1D227
OFFICER
1E165
CHIEF OF SERVICE
1E164
VOLUNTEERS LOUNGE
1E167
OFFICER
1E166
WG,VAVS
ORGANIZATION
1E161C
VOLUNTEERS STORAGE
1E162
RECEPT/SECRY
1E161D
SIGN IN
1E161E
AISLE
1E160
RN
1D237A
RNO
1D237C
RNO
1D237D
AN
1D239A
AN
1D239B
AN
1D239C
AN
1D239D
AN
1D239E
RN
1D239F
RN
1D239G
RN
1D239H
RN
1D239I
RN
1D239J
CONFERENCE
2D119C
CONFERENCE
2D119D
SHAFT
SHE06
SHAFT
SHE07
ELEV
DS-02
CONCESSION
1E117B
CONCESSION
1E117A
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
02-AC-011
D & E
LEVEL 1 REFLECTIVE CEILING PLAN
BUILDINGS D & E
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
3/32" = 1'-0"F1
FIRST FLOOR REFLECTIVE CEILING PLAN BUILDINGS D & E
NORTH
Revisions: Date:
C L
CL
C L
CL
CL
CL
CL
C L C L
C L C L
CL
C L
C L
C L C L
AP
AP
C L
C L C L
CL
CL
CLCL
CL
AP
AP
AP
AP
AP
AP
CL
AP
AP
AP
AP
AP
AP
AP
AP
KEY PLAN
NORTH
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
SERV ELEV LOBBY
1F193
COMP ADP STOR
1G167
PUB ELEV LOBBY
1F100
CONFERENCE
TRAINING
1G199
FEMALE
1G100A
STAFF LOUNGE
1G228
STAFF LOUNGE
1F131
1F127
DOCK
1F126
EC
1G195
DISHWASHING
1F104
OPEN DINING
1F101
TR
1G227C
EMER ELEC
1G227B
NORM ELEC
1G227A
DRY GOODS STOR
1F106
NON-FOOD STOR
1F109
MALE TOILET &
LOCKERS
1F120
FEMALE TOILET &
LOCKERS
1F121
HK
1F103A
PREP KITCHEN
1F105
TRAY RETURN
1F103
REFRIG
1F107
ASSIST CHIEF FOOD
1F111
VCS CHIEF
1F110
ASSIST CHIEF RETAIL
1F118
ASSIST CHIEF RETAIL
1F117
CLERK
1F112B
RECEPTION
1F115
TR
1F227B
AN
1F140
NORM ELEC
1F227C
EMER ELEC
1F227D
MALE
1G100B
CONFERENCE
1G138
UNASSIGNED
1F133
PAGERS CELLS
1G184LAPTOPS
1G191
PROF STAFF
1G182
WORK AREA
1G174
PROGRAM
1G176
PROGRAM
1G183
HELP
1G188A
HELP
1G190
HELP
1G188B
PC TECH
1G185D
PC TECH
1G166A
PC TECH
1G165
PC TECH
1G185E
PC TECH
1G185B
PC TECH
1G185H
PC TECH
1G185I
PC TECH
1G185C
PC TECH
1G185G
PC TECH
1G166B
CONFERENCE
1G196
OFFICE ASST CH
1G169
REF LIB
1G186
OFFICE SEC CH
1G171
OFFICE SEC CH
1G172
PROF STAFF
1G178G
PROF STAFF
1G178A
PROF STAFF
1G175
OFFICE CIO
1G168
COPY ROOM
1G173
SECY
1G177
PROF STAFF
1G178F
ST
1G181
PROF STAFF
1G178E
PROF STAFF
1G178D
PROF STAFF
1G178H
PROF STAFF
1G178C
PROF STAFF
1G178B
ST
1G180
HK
1G125
CUSTOMER SERVICE
1G189
SECY/ WAITING
1G162
ID ISSUE WAIT
1G149
ID/REG ISSUE
1G148
EVIDENCE
1G151
MALE LOCKER
1G141A
DETECTIVE
1G159
CLER
1G161G
ID/KEY STORAGE
1G147ARMORY
1G145
ARMORY STORAGE
1G146
COPIER
1G150
HOLDING
1G160
SECURITY COMMAND
CENTER
1G139
FEMALE LOCKER
1G140A
CLER
1G161K
CLER
1G161H
CLER
1G161A
CLER
1G161D
CLER
1G161B
CLER
1G161C
CLER
1G161E
CLER
1G161I
CLER
1G161J
CLER
1G161F
HC T/S
1G141C
HC T/S
1G140B
T/S 1G141B
ST
1G121
ST
1G122
REFRIG
1F108
MONEY COUNT
1F116
CLERK
1F112C
CLERK
1F112D
CLERK
1F112E
CANTEEN EQUIP
1F130
CHUTE RM
1F132
CORR
1F-C05A
CORR
1F-C03A
FOOD SERV ELEV
LOBBY
1F125
HK
1F129
CORR
1F-C06
CORR
1G-C02A
CORR
1G-C04
CORR
1G-C03
CORR
1G-C02C
CORR
1F-C02A
WC STORAGE
1G198
STAIR
STF-02
ELEV
FP-03
ELEV
FP-04
ELEV
FS-07
CORR
1G-02B
CORR
1F-C03B
CORR
1FC03
CORR
1G-C08
CORR
1G-C09
PC TECH
1G185F
PC TECH
1G185A
CORR
1G-C18
HK
1F178 D
SECURITY
1F227A
SECURITY
1G227D
CONDIMENTS
1F101A
CONDIMENTS
1F101B
OFFICE
1G135
CLERICAL
1G132 RECPT/WAIT
1G131
LOCKERS
1G129
CHIEF
1G133
AO OFFICE
1G134
COPY
1G130
STRETCHER STOR
1G128
DISPATCH
1G123A
UNASSIGNED
1G120
T 1G102
T 1G101
CORR
1G-C15
CORR
1G-C16
CORR
1F-C02B
UNASSIGNED
1G161L
STOR
1G138A
STOR
1G138B
PRIVATE DINNING
1F101D
CANTEEN LOBBY
1F101F
CHIEF OF SERVICE
1G152
ELEV
FP-05
ELEV
FS-06
SHAFT
SHF04
SCC RACK ROOM
1G139A
UNASSIGNED
1G197
VESTIBULE
3F175
PSAS
1F144G
PSAS
1F144H
PSAS
1F143C
PSAS
1F143F
PROG
1F146J
AN
1F142C
PSAS
1F143G
AN
1F142E
PSAO
1F143E
RN
1F143H
PROG
1F147C
AN
1F142A
MSA
1F146E
PSAO
1F143D
CUB
1F146H
CUB
1F147A
CUB
1F147B
EC
1F128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
02-AC-012
F & G
LEVEL 1 REFLECTIVE CEILING PLAN
BUILDINGS F & G
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
3/32" = 1'-0"F1
FIRST FLOOR REFLECTIVE CEILING PLAN BUILDINGS F & G
AP
AP
AP
AP
AP
AP
AP
AP
C L
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
CL
CL
C L C L
C L
AP
CL
KEY PLAN
NORTH
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
ELEV
DP-09
ACUTE-9
2E158
TRIAGE
2D172
ACUTE-2
2E146
NURSE MANAGER
2E181
DECONTAM
2E178
MH-1
2E186
MH-2
2E187
WORK
2E152B
ST
2D102
ISO/GYN ACUTE-10
2E159
ACUTE-1
2E147
T/D 2E125
RADIOLOGY
2E132
RADIOLOGY
2E130
T/D 2E126
CT SCAN
2E129
CONTROL
2E128
SCR
2E109
EQUIP
2E135
CONTROL
2E107
HK
2E170
EQUIPMENT
2E133
T 2D121A
OBSERV-7
2D145
OBSERV-4
2D135
T 2D137A
OBSERV-2
2D139
T 2D139A
T 2D125A
OBSERV-12
2D117
OBSERV-8
2D127
LOCKERS
2D101C
OBSERV-10
2D121
T 2E167A
OBSERV-5
2D131
NURSE STATION
2D153
T 2D145A
NURSE STATION
2D114FAST TRACK-1
2D159
FAST TRACK-2
2D107
FAST TRACK-3
2D108
FAST TRACK-7
2E194
FAST TRACK-6
2D115
FAST TRACK-4
2D109
SOILED
2D150
SUB WAIT
2D142
MH WORK/OFFICE
2E188
ELIG
2D164
ELIG
2D165
ALCOVE
2E160
PHARMACY
2E190
RECEPT
2D179
COMPLEX TREATMENT
2E165
ACUTE-11
2E166
ACUTE-3
2E145
ACUTE-4
2E144
ACUTE-5
2E140
ACUTE-6
2E155
ACUTE-7
2E156
ACUTE-8
2E157
MEDS
2E154
WORK
2E152C
BLOOD GAS
2E164CONSULT
2E180
NOURISH
2D155
PACS
2E152E
MULTI-PURPOSE
2E175
CLEAN
2E149
EMT/LAW
2D181
VENDING
2D177
T 2D127A
OBSERV-3
2D137
OBSERV-11
2D119
RADIOLOGY
2D162
OBSERV-1
2D143
OBSERV-9
2D125
OBSERV-6
2D129
RES CONF/WORK
2E193
AOD OFFICE
2E183
CHIEF
2D105
SECY
2D104
STAFF LOUNGE
2D101B
TRIAGE
2E150
TRIAGE
2D171
TRIAGE
2D170
ENTRANCE VESTIBULE
2E184
ST
2E192
SUB WAIT
2D183
SCR
2E137
EQUIP ALC
2D136
EQUIP ALC
2D140
EQUIP ALCOVE
2D118
EQUIP ALC
2D126
EQUIP ALC
2D130
PACS
2D116
T 2D131A
HC PATIENT T/S
2E169
NURSE STATION
2E152A
ISO ACUTE-12
2E167
MED
2D156
EQUIP ALC
2D152
T 2E148
TR
2D223A
CHUTE RM
2D225
HK
2E138
SECURITY
2D182
T 2D143A
EQUIP ALC
2D144
WAITING
2D178
CLEAN SUPPLY
2D161
RAD EQUIP
2E106
COPY/WORK
2D103
EQUIP ALCOVE
2D120
EQUIP ALC
2D128
MH T
2E168
RAD STRETCHER/WC
2E134
T 2D157
T 2D117A
WC/STRETCH STOR
2E179
MEDICAL & RT EQUIP
2D160
HC ST/S
2D151
ST
2D158
MOBILE X-RAY
2D100A
MOBILE NM
2D100B
EQUIP ALC
2D138
STAFF WORK
2E136
DRESS
2E115
CC
2E139
RAD ELEC RM
2E105
NORM ELEC
2D227A
EMER ELEC
2D227B
T 2E159A
SUB WAIT
2D113
FAST TRACK-8
2E195
FAST TRACK-5
2D112
T 2D163
WC/STRETCH STORAGE
2D180
HK
2E104
MEDICAL & RT EQUIP
2D166
EC
2E174
ALCOVE
2E151
NURSE STATION
2E152D
COPY/WORK
2E153
CLEAN
2D141
EC
2D154
DRESS
2E116
COPY/WORK
2E182
PHARM PICK-UP
2E191
SERVICE BAY
2D227
CORR
2D-C03
CORR
2D-C05A
CORR
2D-C06
CORR
2D-C07
CORR
2D-C08
CORR
2D-C05B
CORR
2D-C09
CORR
2E-C07
CORR
2D-C18
CORR
2D-C15
CORR
2D-C10
CORR
2D-C12
CORR
2D-C01
CORR
2E-C12
CORR
2E-C02
CORR
2E-C05
CORR
2E-C09
CORR
2E-C10
CORR
2E-C11
CORR
2E-C08
CORR
2E-C06
SHAFT
SHE06
SHAFT
SHE07
SHAFT
SHD02B
CORR
2E-C01
ENTRANCE VESTIBULE
2E176
SHAFT
SHD03
HK
2D217
MALE
2D173
FEMALE
2D176
FEMALE
2D175
MALE
2D174
TR
2E189
CT SCAN
2E108
CT SCAN
2E110
CONTROL
2E111
CT PREP/WORK
2E114
CT PREP
2E127
DRESS
2E117
SECURITY
2D223B
DRESS
2E118
DRESS
2E119
T/D 2E124
T/D 2E120
WAITING
2D178B
CORR
2D-C17B
CLEAN
2E102
ST
2E101A
LOCKER ROOM
2E101
TR
2E227A
NORM ELEC
2E227C
EMER ELEC
2E227D
ST
2E101B
SCRUB VENDING
2E101C
SECURITY
2E227B
INTERVIEW
2E103A
INTERVIEW
2E103B
CLEAN
2D106
CONFERENCE
2D101A
CORR
2D-C16
PAT ELEV LOBBY
2D221
ALCOVE
2D100C
CORR
2D-C01A
T 2D135A
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
02-AC-021
D & E
LEVEL 2 REFLECTIVE CEILING PLAN
BUILDINGS D & E
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
3/32" = 1'-0"F1
SECOND FLOOR REFLECTIVE CEILING PLAN BUILDINGS D & E
C L
CL
CL
CL
CL
C L C L
C L C L
CL
C L
C L
C L C L
AP
AP
C L
C L C L
CL
CL
CLCL
CL
AP
AP
AP
AP
AP
AP
CL
AP
AP
AP
AP
AP
AP
AP
AP
KEY PLAN
NORTH
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
SERVICE BAY
2F227
CC
2G119B
T/D 2F144
T/D 2F146
T/D 2F145
DRESS
2F140
DRESS
2F127
T/D 2F143
DRESS
2F139
DRESS
2F137
ULTRASOUND
2F151ULTRASOUND
2F148
ULTRASOUND
2F147
ULTRASOUND
2F150
RADIOLOGY
2F136
RADIOLOGY
2F135
RADIOLOGY
2F122
SCR
2G117
CLEAN
2G116
SOILED HOLD
2G115
MRI
2G129
MRI
2G128
CONTROL
2G131
SCR
2G127
GAS/CRY ROOM
2G125
DRESS
2G194
DRESS
2G185
DRESS
2G191
DRESS
2G195
STRESS
2G193
STRESS
2G186
STRESS
2G196
STRESS
2G197
STRESS
2G199
STRESS
2G190
ECHO
2G141
ECHO
2G140
STRESS ECHO
2G139
PERIPHERAL VASCULAR
2G182
VASC TREAD
2G181
STRESS ECHO
2G138
ECHO
2G136
EKG/ HOLTER
VIEW/WORK
2G192
DOSE ADMIN NM
2G159
TILT TABLE
2G180
CARD EQUIP
2G183
SECY/ WAIT
2F184
CHIEF
2F185
ASST CHIEF RAD
2F190
RADIOLOGIST
2F189
RADIOLOGIST
2F188
RADIOLOGIST
2F187
RADIOLOGIST
2F192
RADIOLOGIST
2F199
CHIEF TECH
2F200
SECTION CHIEF
2F201
PHYSICIST OFF
2F162
COPY ROOM
2F160
PROF
2F186
PROF
2F202
CHIEF TECH
2F168
SCHED
2F198
SCHED
2F197
PAT HOLD
2F155I
EQUIP CALIB (NM)
2F180
SECRETARY
2F195
STAFF PHYS
2F161
TELE-NM
2F163
T 2G143
T/D 2G168
T 2G202
NUCLEAR MED
2G164
NUCLEAR MED
2G151
DRESS
2G160
PET-CT
2G167
THYROID UPTAKE
2G170
SCR
2G167B
HOT LAB
2G158
CONTROL
2G167A
NUCLEAR MED
2G149
NUCLEAR MED
2G150
SUB-WAITING
2G201
RAD RES CONF
2F178
RAD CONF
2G178
BIOSAFETY LAB
2F167
WORK AREA
2F120
PUB ELEV LOBBY
2F222
SERVICE BAY
2G227
SERV ELEV LOBBY
2F229
INTERVIEW NM
2G189
DRESS
2G120
DRESS
2G114
DRESS
2G121
STAFF WORK
2G119A CARD RECEPT
2G101C
ULTRASOUND
2F133
NUC MED RECEPTION
2G101A
TR
2G229A
EMER ELEC
2G227B
NORM ELEC
2G227A
TR
2F227A
CHUTE RM
2F181
BONE DENS
2F132
MEDS
2F149
RADIOLOGY
2F123
SOILED
2F193
QA
2F194A
QA
2F194B
QA
2F194D
DATA PROCESS
2F196
CLERICAL
2F194C
VIEW
2F183C
ST
2F169
ST
2F170
PACS ADMIN
2F183B
PACS ADMIN
2F183A
PET READ
2G175
CC
2G156
ECHO READING
2G187
TEE ROOM
2F165
STORAGE ECHO
2G137
SUB-WAIT CARDIO
2G123
CONTROL
2G130
PAT HOLD
2G113
PAT HOLD
2G112
T 2G118
LINEN
2G124
EQUIP STORAGE
2G122
BIO-MED WORK
2F179
TEE RECOVERY BAY
2F155H
HK
2G126
REF STOR
2G154
PHYSICIST
2G105
DRESS
2G198
HK
2G169
RECEPTION
2G101B
DRESS
2F128
DRESS
2F138
STRET/WC
2G107
TEE SCOPE HOLD
2F166
STAFF WORK
2F155G
T 2F157
T 2G157
DRESS
2G155
DRESS
2G150A
DRESS
2G152
LINEN
2G163
PAT HOLD
2F155E
T 2G142
PAT HOLD
2F155B
PAT HOLD
2F155A
NURSE STATION
2F155C
PAT HOLD
2F155D
T/D 2F134
ST
2F158
ST
2F159
AMBULETTE
2G145
AMBULETTE
2G144
DRESS
2F117
DRESS
2G111
CLEAN
2F191
LINEN
2G148A
CONTROL RM
2G153
CC
2G184
EC
2G177
EC
2F174
MALE
2G100B
FEMALE
2G100A
EMER ELEC
2F227D
NORM ELEC
2F227C
LOUNGE
2G176
RAD WASTE
2F177
CARD EQUIP
2G188
DRESS
2G200
MRI WAITING
2G110
AISLE
2F-C12
PAT HOLD
2F155F
T 2F156
T 2G165
SERVICE BAY
2G228
CORR
2F-C08
CORR
2F-C04
CORR
2F-C03
CORR
2F-C09
CORR
2F-C10B
CORR
2F-C11
CORR
2F-C06 CORR
2F-C05
CORR
2F-C07B
UNASSIGNED
2G230
CORR
2G-C02
CORR
2G-C03
CORR
2G-C05A
CORR
2G-C07
CORR
2G-C06B
CORR
2G-C10
CORR
2G-C08A
CORR
2G-C09
CORR
2G-C11
CORR
2G-C04
CORR
2G-C06A
CORR
2G-C05B
CONTROL
2F175
CORR
2G-C08B
CORR
2G-C06C
EXAM
2F164
CORR
2F-C10A
RESIDENT WORK
2F176
EC
SHD12
HK
2G106
DRESS
2F116
SECURITY
2F227B
SECURITY
2G229B
DRESS
2F115
DRESS
2F126
DRESS
2F125
DRESS
2F124
DRESS
2F113
DRESS
2F114
ST
2F119
ST
2F118
ALC
2F131
ALC
2F130
SOILED HOLD
2G166
COPY/WORK
2G103
CORR
2F-C16
WORK
2F111
CC
2G146
ALCOVE
2G147
LINEN
2G148B
LINEN
2G148C
EC
2G183A
CLOS
2G128.1
CLOS
2G129.1
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
02-AC-022
F & G
LEVEL 2 REFLECTIVE CEILING PLAN
BUILDINGS F & G
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
3/32" = 1'-0"F1
SECOND FLOOR REFLECTIVE CEILING PLAN BUILDINGS F & G
AP
AP
AP
AP
AP
AP
AP
AP
C L
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
AP
C L C L
C L
AP
KEY PLAN
NORTH
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
SHAFT
SHE06
SHAFT
SHE07
SHAFT
SHD02B
SHAFT
SHD03
CONTROL
3E138
OPERATING ROOM
3E144
CLEAN-UP
3E141
STRETCHER
3E144A
MALE LOCKER
3D145
FEMALE LOCKER
3D150
RES CONF/ CLASSROOM
3D170
PURCH AGENT
3D118A
CONF ROOM
3D146
CHIEF SURGICAL
3D104
SECY/ WAIT
3D103
NM
3D126
NM
3D127
SECTION HEAD
3D114
SECTION HEAD
3D113
SECTION HEAD
3D111
SECTION HEAD
3D107
OR COORD
3D130
CLER
3D119B
ASSIST CHIEF
3D102
ANESTHES CHIEF
3D105
ANESTH
3D133D
SECTION HEAD
3D109
SECTION HEAD
3D110
SECTION HEAD
3D108
SECTION HEAD
3D106
SECTION HEAD
3D112
CLIN COORD
3D124
CLIN COORD
3D125
WORK/ STORAGE
3D147
RES WORK
3D137
DICT
3D138
CLER
3D119A
CLER
3D135B
ANESTH
3D133A RECPT
3D139
CLEAN CART
3D149
CLER
3D135A
SECY/ WAIT
3D136
CLER
3D119C
CLER
3D144F
CLIN COORD
3D123
WAITING
3D140
HK
3D165
T/S 3D150A
HC SHOWER
3D150B
ST
3D145A
ST
3D145C
HC SHWR
3D145B
BLOOD GAS
3E142
CC
3D164
NURSE WORK
3D163
ANESTH
3D134A
ANESTH
3D134D
ANESTH
3D133E
ANESTH
3D133B
ANESTH
3D134E
ANESTH
3D134B
ANESTH
3D134C
PURCH AGENT
3D118B
ANESTH
3D133C
CC
3E156
EC
3D131
SERVICE BAY
3D227
EMER ELEC
3D227B
NORM ELEC
3D227A
SERVICE BAY
3E227
PAT ELEV LOBBY
3D221
TR
3D223A
CHUTE RM
3D225
SERV ELEV LOBBY
3D220
PRE/REC
3E104
RECOV
3E117
RECOV
3E121
NURSE STATION
3E127
T 3E102
RECOV
3E115
PRE/REC
3E103
RECOV
3E110
RECOV
3E109
ISO RECOV
3E108
RECOV
3E116 CLEAN
3E131
MEDICINE PREP
3E129
ST
3E125
RECOV
3E111
ISO PRE/REC
3E105
NURSE STATION
3E128
RECOV
3E120
EQUIP STOR
3E101
T 3E124
NOURISH
3E122
SOILED
3E100
NURSE STATION
3E130
PRE/REC
3E106
CLER
3D119D
CORR
3D-C05
CORR
3D-C04
CORR
3D-C06
CORR
3D-C01
CORR
3D-C07
CORR
3D-C08A
CORR
3D-C08B
CORR
3D-C09
CORR
3D-C03A
CORR
3D-C03B
CORR
3E-C11
CORR
3E-C05
CORR
3E-C10
CORR
3E-C01
CORR
3E-C03
CORR
3E-C04
CORR
3E-C06A
CORR
3E-C07
CORR
3E-C08B
CORR
3E-C09
STAIR
STD-14
ELEV
DS-12 HK
3D141
CLEAN CORE
3D176
CLER
3D119E
STAFF LOUNGE
3D153
CORR
3D-C14
SHAFT
SHD03C
RECOV
3E118
HK
3D217
SECURITY
3D223B
RECOV
3E119
EQUIP ALCOVE
3E107
STRETCHER
3E126
SCRUBS ALC
3D100B
SCRUBS ALC
3D100A
STAFF LOUNGE
3D152
CORR
3E-C06B
PAIN
3E135
PAIN
3E136
PAIN
3E137
TR
3E227A
NORM ELEC
3E227D
EMER ELEC
3E227C
CORR
3E-C02
SECURITY
3E227B
EQ
3E-CO2A
EQ
3E-CO2B
PYXIS
3E-CO2C
ST
3D120
ST
3D121
NM
3D128
ELEC
3E148B
OPERATING ROOM
3E146
OPERATING ROOM
3D160
OPERATING ROOM
3D162
OPERATING ROOM
3D172
OPERATING ROOM
3D174
OPERATING ROOM
3E149
CYSTO ROOM
3E151
STRETCHER
3E146A
STRETCHER
3D160A
STRETCHER
3E162A
STRETCHER
3D172A
STRETCHER
3D174A
STRETCHER
3E149A
STRETCHER
3E151A
NEURO EQUIPMENT
3D173
EQUIP STOR
3D175
EQUIP STOR
3E150
SPECIAL RECORD
3E152
X-RAY STORAGE
3E145
STORAGE ORTHO
3E147
PUMP ROOM
3D161
CLEAN CORE
3E148
CLEAN SUPPLIES
3D176A
SCRUB
3E144B
SCRUB
3E146B
SCRUB
3D160B
SCRUB
3D162B
SCRUB
3D172B
SCRUB
3D174B
SCRUB
3E149B
SCRUB
3E151B
EQUIP STOR
3E153
PACS WORK
3E154
ANESTHESIA
3E155
DECONTAM
3E143
INSTRUMENT PREP
STORAGE
3E148A
GAS CYLINDER
3D171
BIOMED
3D167
FROZEN SECTION
3D166
SOILED
3D148
CORR
3D-C01A
SHAFT
1D-C01C
SHAFT
1D-C01D
02-AJ-035
F4
TR
3D101-E
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
02-AC-031
D & E
LEVEL 3 REFLECTIVE CEILING PLAN
BUILDINGS D & E
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
3/32" = 1'-0"F1
THIRD FLOOR REFLECTIVE CEILING PLAN BUILDINGS D & E
C L C L
C L C L
C L
CL
C L
C L
C L C L
AP
AP
C L
C L C L
CL
AP
AP
AP
AP
AP
AP
CL
AP
AP
AP
AP
AP
AP
AP
AP
KEY PLAN
NORTH
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
PROCEDURE ROOM EP
3F171
CARDIAC CATH
3F166
CONTROL
3F166B
SCR
3F164A
SCR
3F166A
HYBRID CONTROL
3F168B
CARDIAC CATH HYBRID
3F168
SCR
3F171D
CONTROL
3F171C
SCR
3F169D
SCR
3F168A
CARDIAC CATH
3F164
CONTROL
3F164BIR PROCEDURE
3F167
SCR
3F167D
IR PROCEDURE
3F169
CONTROL
3F169C
CONTROL
3F167C
INSTRUMENT ROOM
3F165B
VIEWING- PACS
3F182A
IR CORE
3F165
STAFF LOCKERS
3G193
INSTRUMENT ROOM
3F165C
INSTRUMENT ROOM
3F165D
STORAGE PACEMAKER
3F165E
CATH EQUIP CLEAN-UP
3F172
CATH EQUIP STOR
3F174
GI ASSIST
3G145O
PHYS
3G146C
RN TECH
3G145K
ADMIN
3G146A
CONSULT
3F101
PHYS
3G145C
PHYS
3G145F
PHYS
3G145E
PHYS
3G145D
SCRUB
3F171B
STRETCHER
3F171A
SCRUB
3F169B
STRETCHER
3F169A
SCRUB
3F167B
STRETCHER
3F167A
HYBRID SCRUB
3F168C
SCRUB
3F166C
STRETCHER
3F166D
SCRUB
3F164C
STRETCHER
3F164D
SERVICE BAY
3F227
TR
3F227A
PHYS
3G145A
SECY
3G146B
RN TECH
3G145N
RN TECH
3G145L
RN TECH
3G145M
STAFF LOCKERS
3G192
GI ASSIST
3G145J
GI ASSIST
3G145I
MALE
3G100B
EQUIP STOR
3G108
STAFF LOUNGE
3G194
CHUTE RM
3F184
PULM RECEPT
3G101
EC
3G186
NORM ELEC
3F227C
EMER SWITCH
3F227D
SERVICE BAY
3G228
NURSES STATION
3G124
STRETCHER STORAGE
3G152
DIG DISEASE
RESIDENTS
3G185
DICT/ VIEW
3G178
DG CLER
3G145P
PHYS
3G145B
T 3G127
PHYS
3G145G
CC
3G128
SERVICE BAY
3G227
TR
3G227A
EMER ELEC
3G227D
NORM ELEC
3G227C
NORM ELEC
3F180
FEMALE
3G100A
RT
3G110E
RT
3G110D
RT
3G110C
RT
3G110B
T 3G126
ISOL
3G103
ISOL
3G104
PULM SCREEN
3G106
PFT
3G105
EXERCISE PHYS
3G102
CYLINDER
3G108C
CC
3G107
PHYS LOUNGE
3G191
RT
3G110A
PRE/REC
3F136
PRE/REC
3F106
PRE/REC
3F149
PRE/REC
3F146
PRE/REC
3F150
PRE/REC
3F138
PRE/REC
3F144
NURSES STATION
3F125
PRE/REC
3F154
T 3F137
PREP/ INDUCT
3F145 PRE/REC
3F142
PRE/REC
3F127
PRE/REC
3F126
PRE/REC
3F155
PRE/REC
3F152
NURSES STATION
3F153
T 3F140
PRE/REC
3F129
PRE/REC
3F128
PRE/REC
3F107
PRE/REC
3F120
PRE/REC
3F147
PRE/REC
3F119
PRE/REC
3F143
PRE/REC
3F139
PRE/REC
3F151
PRE/REC
3F159
PRE/REC
3F141
T 3F148
HW
3F125A
HW
3F153A
HW
3F155A
PRE/REC
3F135
PRE/REC
3F157
NURSES STATION
3F156
SOILED
3F160
PRE/REC
3F158
STORAGE/ COPY
3G144
RES CONF/ CLASSROOM
3G181
OFFICE CHIEF CARDIO
3G138
CHIEF RESIDENT
3G137
OFFICE NURSE MGR
3G139
CONFERENCE ROOM
(CL)
3G180
SECY/WAIT
3G136
TEST
3G129
SOILED
3G134
RECOVERY
3G116
RECOVERY
3G122
RECOVERY
3G121
RECOVERY
3G118
CLEAN
3G125
RECOVERY
3G120
RECOVERY
3G117
GENERAL ENDO
3G169
EUS/COMPLEX
3G167
GENERAL ENDO
3G168
ERCP
3G166
CLEAN SCOPE
STORAGE
3G160
SCOPE STORE
3G158
STRETCHER STORAGE
3G171
T 3G165
T 3G175
CLEAN
3G162
SOILED
3G161
COPY/ WORK
3G179
PROCEDURE BRONCH
3G153
GENERAL ENDO
3G156
GENERAL ENDO
3G155
CONTROL
3G153A
DG PRIVATE INTERVIEW
3G141
DG CHIEF OFFICE
3G140
DG NURSE MANAGER
3G143
DG SECY/ FILES
3G142
RECOVERY
3G115
RECOVERY
3G119
LINEN STOR
3G157
EQUIP CLEAN-UP
3G159
STRETCHER STORAGE
3G170
STRETCHER STORAGE
3G154
HK
3G190
BLOOD GAS
3G135
CLEAN
3G133
FULL CYLINDER
3G151
RECOVERY
3G123
PHYS
3G145H
HC ST/S
3G192C
ST
3G176
ST
3G177
EMPTY CYLINDER
3G150
HK
3F178
UNASSIGNED
3F186
PUB ELEV LOBBY
3F220
CORR
3F-C01B
CORR
3F-C02B
CORR
3F-C05B
CORR
3F-C05A
CORR
3F-C06
CORR
3F-C07B
CORR
3F-C08
CORR
3F-C09B
CORR
3G-C02C
CORR
3G-C02B
CORR
3G-C01
CORR
3G-C03B
CORR
3G-C11
CORR
3G-C07B
CORR
3G-C08A
CORR
3G-C09
CORR
3G-C10
CORR
3G-C08B
CORR
3G-C03A
CORR
3G-C04 CORR
3G-C06
CORR
3G-C05
SOILED
3F176
CORR
3G-C13
TRAINING/ WORK
3G187
UNASSIGNED
3F182B
SECURITY
3F227B
SECURITY
3G227B
CORR
3F-C07A
ALCOVE
3F187
MED PREP
3G163
PHYS WORK
3G164
HC ST/S
3G193C
LINEN STOR
3G157A
CUB
1F147O
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
02-AC-032
F & G
LEVEL 3 REFLECTIVE CEILING PLAN
BUILDINGS F & G
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
3/32" = 1'-0"F1
THIRD FLOOR REFLECTIVE CEILING PLAN BUILDINGS F & G
KEY PLAN
NORTH
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
SHAFT
SHE06
SHAFT
SHE07
SHAFT
SHD02B
SHAFT
SHD03
ELEV
DS-12
SHAFT
SHD03C
SHAFT
1D-C01C
SHAFT
1D-C01D
HK
4D162
STORAGE ACTIVE
4D109
CLERICAL
4D126B
TEACH COORD
4D104C
CONFERENCE
4D141
CHIEF
4D125
SECY/ WAITING
4D121
LOCKERS
4D132
LOUNGE
4D140
IP CHEMO IV PREP
4D128
RECEIVING
BREAKDOWN
4D110
ANTE ROOM
4D131
ASST CHIEF
4D174
SECT LDR
4D173
CHIEF
4D175
STEAM STERILIZERS
4D163
CART WASH SERVICE
4D150
MANUAL EQUIP WASH
4D151
DECONTAMINATION
4D146
DETERGENT
4D149
SOILED TRANSITION
4D145
DISPATCH
4D158
PREP/ ASSEMBLY
4D155
ASEPTIC TRANSFER
4D130
STORAGE
4D150A
SUPER
4D123
VAULT
4D120
STORAGE BULK
4E110
STORAGE FLAMMABLE
4E114
STORAGE REFRIG
4E108
SPEC ACCESS
4E103A
HEMA COAG/ROUTINE
LAB
4E125E
URINE
4E125D
RECEIVING INVENTORY
4D111
BIO MED CIMN
4E135
STORAGE SF & AS
4D113
REFRIG/ FREEZER
4D112
REPACKAGING EXTEMP
4D106
REFRIG/ FREEZER IV AD
4D129
STAT COUNTER
4D114
CLERICAL
4D104F
CLERICAL
4D104E
CLERICAL
4D126A
QM
4D134
COPY/WORK
4D104D
MED ASSIGN
4D115
DISPENSING SECURE
4D119
DRUG INFO
4D126
INTERN
4D136A
INTERN
4D136B
INTERN
4D136C
INTERN
4D136D
INTERN
4D136E
STUDY
4D136F
STUDY
4D136G
WORK/ STOR (IDP)
4D118
ASST CHIEF
4D124
CLIN COOR
4D133
SPEC PROJ
4D135
SERVER
4D122
VENDOR INSTRUMENT
4D171
CLERICAL
4D172
CLERICAL
4D176
STORAGE EQUIP & TEST
4D152
BULK STORAGE
4D159
STERILE
INSTRUMENTATION
4D157
HK
4D148
BREAKOUT RECEIVE
4D170
HK
4D139
NORM ELEC
4D180
EC
4E136
EMS STORAGE
4E137
EMER ELEC
4D227B
SERVICE BAY
4D227
NORM ELEC
4D227A
PAT ELEV LOBBY
4D221
TR
4D223A
CHUTE RM
4D225
SERV ELEV LOBBY
4D220
ST
4D132A
ST
4D138
MED TECH
4E107
ST
4E113
ST
4E112
CONF TRAIN
4D169 LINEN & PACKS
4D160
HC S T/S
4D168
LOCKERS
4D165
LOCKERS
4D166
HC S T/S
4D167
CLEAN STOR
4E115
CHEM STOR
4E137A
CART COOLING
4D161
TOXICOLOGY
4E127
MED TECH
4E120
CORR
4E-C01
CORR
4E-C02
SERVICE BAY
4E227E
CORR
4E-C04A
CORR
4E-C05A
CORR
4E-C07A
CORR
4E-C08B
CORR
4E-C09A
CORR
4E-C09B
CORR
4D-C01
CORR
4D-C03
CORR
4D-C04B
CORR
4D-C04A
CORR
4D-C05
CORR
4D-C07
STAIR
STD-18
STUDENT
4E118B
STUDENT
4E118A
CORR
4D-C08
CORR
4D-C09
CORR
4D-C10
CORR
4E-C04B
EMS STORAGE
4D100
CORR
4D-C14
CORR
4E-C08A H CYLINDER
4E138
STORAGE
4D177
COPY
4D178
HK
4D217
HK
4E106
SECURITY
4D223B
CORR
4D-C12
ST
4E117
EMER COMMAND
CENTER
4E145
STORAGE
4E101
TR
4E227A
SERVICE BAY
4E227
NORM ELEC
4E227D EMER ELEC
4E227C
SECURITY
4E227B
MED TECH (CHEMISTRY)
4E121
MED TECH (NIGHT
SUPER)
4E111
MED TECH
(HEMATOLOGY)
4E109
MED TECH (BB)
4E105
CONFERENCE
4E102
CLIN CHEM
4E125
BLOOD BANK
4E129A
STORAGE STERILE &
PREP
4E116
CLST
4E125A
CLASS/LAB
4E119
CORR
4D-C01A
SCOPE CLEANING
4D146A
CONFERENCE
2D119E
CONFERENCE
2D119F
CONFERENCE
2D119G
ELEV
DS-02
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
02-AC-041
D & E
LEVEL 4 REFLECTIVE CEILING PLAN
BUILDINGS D & E
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
3/32" = 1'-0"F1
FOURTH FLOOR REFLECTIVE CEILING PLAN BUILDINGS D & E
KEY PLAN
NORTH
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
HC T/SH
4F119
HC T/SH
4F121
ST
4F114A
TELE PBX
4G108
MORTUARY REFRIG
4F107AUTOPSY ROOM
4F109
SLIDE/BLOCK RECORDS
STOR
4F106
HISTOLOGY
4F104
CYTOLOGY
4F128
MED TECH
4F133
AP ADP
4F104A
TEACH AUTOPSY
4F111
GROSS SPECIMEN STOR
4F123
AMP INSTR
4F144
MED TECH
4F117
TANKS
4F129
PARASITOLOGY
4F127
IMUNOPATHOLOGY
4F134
PRE-AMP REAGENT
PREP
4F139
PRE-AMP SPEC PROC
4F141
HK
4F158
LOCKERS
4F114
LOUNGE
4F122
CONFERENCE
4F116
DATA PROCESS
4F156CLERICAL
4F149B
SECTION CHIEF
4F150
ADMIN OFFICER (AOD)
4F154
STAFF PATH
4F159
STAFF PATH
4F157 STAFF PATH
4F155
CHIEF OF SERV
4F148
STAFF PATH
4F153
COPY
4F147
ADP
4F144A
HK
4F132
LOCKERS
4F130
SECTION CHIEF
4F152
FLUORO MICRO
4F131
MB MYCOLOGY/ TB
4F136
MB CLINICAL MICRO
4F138
ST
4F145
CHUTE RM
4F120
PATH/ RESIDENT
4F118
TR
4G227A
EMER ELEC
4G227D
NORM ELEC
4G227C
MAIN COMPUTER ROOM
4G110A
NETWK
4G106B
NETWK
4G106J
PBX
4G106P
PBX
4G106N
TELE UPS
4G108A
PBX
4G106L
COMPUTER ROOM MIS
4G110C
COMP ACTIVE STOR
4G110E
PBX
4G106M
PBX
4G106O
NETWK
4G106D
NETWK
4G106C
IMAGE
4G106T
IMAGE
4G106Q
IMAGE
4G106R
NETWK
4G106E
IMAGE
4G106S
NETWK
4G106K
TRAIN/ CONF RM
4G140
SUPV TECH
4G121A
SUPV TECH
4G121B
SUPV TECH
4G121C
PRIVATE MEETING RM
4G142
CHIEF NUTRITION
4G148
RECEPT
4G151
ASST CHIEF NUTRITION
4G146
CLINICAL ADM SEC
CHIEF
4G144 SUPV TECH
4G121D
CLERK
4G149B
CLERK
4G149A
WALK-IN MEAT FREEZER
4G125B
WALK-IN MEAT THAWING
4G125A
DIET TECH COMM
CENTER
4G147
PATIENT PROD MGR
4G150
WALK-IN FOOD BANK
4G123
DIET TECH COMM
CENTER
4G145
RECEIVING
4G136
MAIN KITCHEN PATIENT
TRAY SERIVCE
4G126
MAIN KITCHEN
SANITATION
4G122
MAIN KITCHEN FOOD
PREP
4G124
DRY GOODS STOR
4G130
DHCP COMPUTER
4G110B
EC
4G138
EC
4F112
KITCHEN ELEC RM
4G120
TR
4F227A
SERVICE BAY
4F227
NORM ELEC
4F227C
EMER ELEC
4F227D
REFRIG
4F142
VISTA
4G106G
VISTA
4G106I
VISTA
4G106H
SECTION CHIEF
4G103
VEST
4G-C03D
SECTION CHIEF
4G101
STAFF LOUNGE
4G134
HK
4G104
ST
4F143
FEMALE
4G139
MALE
4G137
SERVICE BAY
4G228
REFRIG - BEV/BAK
4G128
DAIRY REFRIG
4G127
WALK-IN PRODUCE
4G129
PRODUCT REFRIG
4G131
FOOD SERV ELEV
LOBBY
4F110
FEMALE
4A100A
MALE
4A100B
UPS ELEC RM
4G110D
HK
4G119B
CORR
4G-C01B
CORR
4G-C01A
CORR
4G-C04
CORR
4F-C02B
CORR
4F-C02A
CORR
4F-C03
CORR
4F-C04
CORR
4F-C05
CORR
4F-C07
CORR
4F-C08
CORR
4F-C09A
CORR
4F-C09B
CORR
4F-C10A
CORR
4F-C10B
CORR
4G-C05B
CORR
4G-C06
CORR
4G-C05A
CORR
4G-C07
CORR
4G-C05
TEAM SPACE
4G106U
SECURITY
4F227B
SECURITY
4G227B
CLERICAL
4F149A
BACK-UP SECURITY
COMMAND CENTER
4G105
STOR
4G119A
ELEV LOBBY
4F222
SERV ELEV LOBBY
4F229
CORR
4F-C01
CABLE VAULT
4G108B
SCC RACK ROOM
4G105A
OFFICE
4F226A
OPERATORS ROOM
4F226
LOUNGE
4F226B
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
02-AC-042
F & G
LEVEL 4 REFLECTIVE CEILING PLAN
BUILDINGS F & G
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
3/32" = 1'-0"F1
FOURTH FLOOR REFLECTIVE CEILING PLAN BUILDINGS F & G
KEY PLAN
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
NORM ELEC
5D122A
EMER ELEC
5D122B
EXAM
5D131
INTERVIEW CONSULT
5D129
S/WC
5D127
HEAD NURSE
5D115
CLEAN
5D121
COMM CTR
5D151A
NOUR
5D120C
DINING
5D120B
DAYROOM
5D122
SOILED
5D101
MED
5D151B
KITCHEN
5D120A
TRASH/LINEN CHUTE
5D225
RECYCLING AREA
5D116
TR
5D223A
CC
5D151D
SW
5D109
HOUSE STAFF
5D102
PSYCH
5D103
INTERN CONSULT
5D104
PHYSICIAN ASST
5D113
DIET/PHAR
5D106
PSYCH
5D105
PSYCH
5D107
SW
5D111
T/SHAVE
5D150
SEMI-PVT PATIENT
5D149
T BAR
5D149A
PATIENT
5D162
T 5D160A
PATIENT
5D164
T 5D162A
T 5D164A
SEMI-PVT PATIENT
5D147
T 5D155A
PATIENT
5D158
T 5D142A
PATIENT
5D156
PATIENT
5D157
PATIENT
5D159
T 5D157A
PATIENT
5D160
T 5D156A
PATIENT
5D144
T 5D148A
PATIENT
5D146
T 5D146A
SEMI-PVT PATIENT
5D163
T 5D158A
PATIENT
5D142
T 5D147A
PATIENT
5D148
T 5D144A
T 5D161A
T 5D163A
PATIENT
5D161
GROUP
5D165
QUIET
5D136
CONF/ REPORT
5D153
WARD CLERK
5D151C
ISOLATION
5D137B
RESTRAINT
5D137A
ANTE
5D137
PATIENT LAUNDRY
5D152
T 5D137C
PATIENT
5D155
T 5D159A
T 5D125
WAITING
5D126
EQUIP STOR
5D132
HK & EMS STOR
5D141
STAFF LOUNGE
5D143
CONF/ CLASS
5D128
STOR
5D128A
STOR PATIENT
5D124
T 5D126A
STAFF LOCKER
5D145
ST
5D145A
T 5D140A
RELAX
5D123 SERV/PAT ELEV LOBBY
5D221
ST
5D108
MECHANICAL
PENTHOUSE
5E227
NORM ELEC
5E229A
EMER ELEC
5E229B
SERVICE BAY
5E229
ELEV
DS-02
DEN
5D167
DEN
5D166
CORR
5D-C02
SALLYPORT
5D-C01A
CORR
5D-C01B
CORR
5D-C04
CORR
5D-C05
CORR
5D-C07
CORR
5D-C08
CORR
5D-C09
CORR
5D-C10
CORR
5D-C13
CORR
5D-C14
CORR
5D-C15
UNASSIGNED
5D120
SHAFT
SHD20
PATIENT
5D140
SECURITY
5D223B
CYLINDER GAS
5E230
PIPE CLOSET
5E231
CONFERENCE
2D119B
CONFERENCE
2D119H
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
02-AC-051
D & E
LEVEL 5 REFLECTIVE CEILING PLAN
BUILDINGS D & E
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
3/32" = 1'-0"F1
FIFTH FLOOR REFLECTIVE CEILING PLAN BUILDINGS D & E
KEY PLAN
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
ELEV LOBBY
5F230
COMPUTER UPS
5G102
EMER SWITCH
5G104
MECHANICAL
PENTHOUSE
5G228
MECHANICAL
PENTHOUSE
5F227
ELEV MACHINE RM
5F123
ELEV MACHINE RM
5F229
MECHANICAL
PENTHOUSE
5G-228
VESTIBULE
5G228A
EQUIP. ROOM
5G228B
ELEC SWITCH
5G103
MECH
5F125
CUB
1F147L
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
02-AC-052
F & G
LEVEL 5 REFLECTIVE CEILING PLAN
BUILDINGS F & G
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
3/32" = 1'-0"F1
FIFTH FLOOR REFLECTIVE CEILING PLAN BUILDINGS F & G
N A
C
RE
TH
F
OC
CR
C1
VD VD
S
SERVICE BAY
3D227
7D
7D
B7
02-AJ-035
F7
02-AJ-035
TR
3D227
3D101C
2A
1R
3D101C
18R 19R
2R 10R 11R
12R
47R
115R
2A
/4
10' - 7 1/2"
123R
10R 12R
10R
12R
10R
12R
2A
SERVICE BAY
3D227
4R
TR
3D227
3D101C
27R
28R 10R
2R
119R
27R
47R
SIM
F
IE
L D
V E
R
IF
Y W
IT
H
E X
IS
T
IN
G
D U
C T
S
/4
10R
119R
SIM
2R
47R
27R
GENERAL NOTE DEMOLITION
A. FIELD VERIFY ALL EXISTING CONDITIONS, PRIOR TO START OF DEMOLITION. BRING SIGNIFICANT
DISCREPANCIES TO THE ATTENTION OF THE COR. FOR REVIEW.
B. COORDINATE DEMOLITION TIMING WITH THE COR. PRIOR TO START.
C. PROTECT EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING DEMOLITION, INCLUDING
MECHANICAL & FIRE SUPPRESSION SYSTEMS.
D. UPON COMPLETION OF DEMOLITION, PREPARE SUBSTRATE AS REQUIRED TO RECEIVE NEW FINISH
PER ARCHITECTURAL DRAWINGS. REPAIR ANY DAMAGE INCURRED DURING OR PRIOR TO THE
START OF WORK TO MATCH EXISTING CONDITION INCLUDING FIREPROOF MATERIALS.
E. SALVAGE AND RETURN TO C.O.R. EXISTING LIGHT FIXTURES TO BE REMOVED PER DRAWINGS.
F. EXISTING WALL MOUNTED DEVICES TO REMAIN UNLESS NOTED OTHERWISE, INCLUDED BUT NOT
LIMITED TO THERMOSTATS, LIGHT SWITCHES, OUTLETS, DATA PORTS, INTERIOR DEVICES, ETC.
FOLLOW ELECTRICAL, MECHANICAL, AND TELECOMMUNICATION DRAWINGS.
G. REMOVE EXISTING SIGNAGE, COORDINATE WITH C.O.R. ANY REQUIRED NEW SIGNAGE.
H. FOLLOW MECHANICAL DRAWINGS FOR GRILL, DIFFUSER, AND REGISTER DEMOLITION, CAP AND
REPAIR AS REQUIRED.
I. RELOCATE EXISTING WATER, DRAIN, CONDENSATE, & STEAM LINES OUTSIDE NEW T.R., REFER TO
PLUMBING DRAWINGS FOR COORDINATION.
GENERAL NOTES ARCHITECTURAL
A. THE COR. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO PENETRATE WALLS. INSTALLED PER
MANUFACTURERS REQUIREMENTS TO MATCH RATING OF WALL.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. FOLLOW INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. FOLLOW SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. FOLLOW SHEET 000-AJ-605 FOR ALL FINISHES
GENERAL NOTES REFLECTED CEILING
A. RESTORE AFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL NOTES INFECTION CONTROL
A. ALL AREAS ON THIS PLAN SHALL BE CONSIDERED CONSTRUCTION TYPE D, LOW RISK GROUP AND
INFECTION CONTROL, PRECAUTION CLASS III. WHERE CORRIDOR IS SHOWN WITH IN AREA OF
HIGHER PRECAUTION CLASS, CORRIDOR SHALL MEET THE MORE STRINGENT REQUIREMENT.
B. ALL OTHER AREAS ON THIS SHEET PLAN SHALL BE CONSIDERED CONSTRUCTION TYPE C, LOW
RISK GROUP AND INFECTION CONTROL PRECAUTION CLASS II UNLESS OTHERWISE NOTED.
C. REFER TO SHEET GI003 FOR SYMBOLS AND ABBREVIATIONS.
GENERAL SHEET NOTES
KEYED NOTES - DEMOLITION
KEYED NOTES
KEYED NOTES - RENOVATION
Room Name
LEGEND
LEGACY ROOM NUMBER
SIGNAGE ROOM NUMBER
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .