2.13 - Drawings 13 of 17 - 02-EP-011 to 03-EP-071.pdf

PDF 13 MB Posted

Attached to
NOLA EHRM Infrastructure Upgrades Construction - New Orleans, LA 629-22-700
Solicitation number
36C77623B0038
Issued by

About this file

This document provides details for a federal contract opportunity for infrastructure upgrades at a Veterans Affairs facility in New Orleans, Louisiana. The solicitation number is 36C77623B0038 and is being issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas for NOLA EHRM Infrastructure Upgrades Construction. The opportunity type is a solicitation for upgrades to infrastructure systems at the New Orleans VA facility, including drawings of existing conditions. The size of the attached file with construction drawings is 13MB. No other details are provided on products, services, response dates, or pricing terms for this infrastructure upgrade opportunity.

View the file

Other files

File Type Posted
36C77623B0038 0007.pdf PDF
Tech Questions Tracker - NOLA - 8-25-23.pdf PDF
Brand Name JA - NOLA EHRM.pdf PDF
Tech Questions Tracker - NOLA - 8-23-23.pdf PDF
36C77623B0038 0006.pdf PDF
36C77623B0038 0005.pdf PDF
Tech Questions Tracker - NOLA - 8-9-23.pdf PDF
36C77623B0038 0004.pdf PDF
Specs and Drawings - NOLA EHRM - Addendum No 2.pdf PDF
36C77623B0038 0003.pdf PDF
Specs and Drawings - NOLA EHRM - Addendum No 1.pdf PDF
36C77623B0038 0002.pdf PDF
NOLA EHRM Site Visit Sign-In Sheet 19 July 23.pdf PDF
36C77623B0038 0001.pdf PDF
Site Visit Instructions.pdf PDF
2.12 - Drawings 12 of 17 - 00-EG-001 to 02-ED-051.pdf PDF
2.2 - Drawings 02 of 17 - 000-AJ-601 to 000-AJ-606.pdf PDF
2.4 - Drawings 04 of 17 - 01-AE-011 to 02-AE-052.pdf PDF
2.17 - Drawings 17 of 17 - 04-FP-100 to 11-FP-110.pdf PDF
1 - Specifications.pdf PDF
2.10 - Drawings 10 of 17 - 04-TD-011 to 08-TD-051.pdf PDF
2.5 - Drawings 05 of 17 - 02-AC-011 to 03-AE-071.pdf PDF
2.16 - Drawings 16 of 17 - 00-FP-000 to 03-FP-111.pdf PDF
2.11 - Drawings 11 of 17 - 08-TN-011 to 00-TJ-028.pdf PDF
2.9 - Drawings 09 of 17 - 02-TN-011 to 03-TN-071.pdf PDF
IFB 36C77623B0038 - 6-29-23.pdf PDF
6 - Contractor Safety and Environmental Record.docx DOCX document
4 - DBA Wage Rates - Orleans County - 06-16-23.pdf PDF
2.1 - Drawings 01 of 17 - GI001 to GI003.pdf PDF
2.6 - Drawings 06 of 17 - 03-AC-011 to 11-AE-011.pdf PDF
2.8 - Drawings 08 of 17 - 00-TG-001 to 02-TD-052.pdf PDF
2.14 - Drawings 14 of 17 - 04-ED-011 to 10-EP-011.pdf PDF
2.15 - Drawings 15 of 17 - 01-EJ-001 to 00-EJ-026.pdf PDF
2.7 - Drawings 07 of 17 - 00-MK-001 to 10-MJ-011.pdf PDF
3 - HVAC Load Calculations.pdf PDF
5 - Limitations on Subcontracting - Construction.docx DOCX document
2.3 - Drawings 03 of 17 - 00-CG-001 to CJ-A102.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPUPUPUP

UPUP

UP

UP

F

F

NORTH

KEY PLAN

KEY PLAN

Q B

C

D

E

F

G

J

H

K

L M

P

N

S H

O T

G U

N

F

IS

H E

R

ADMIN CONF ROOM

1D146

MULTIPURPOSE ROOM

1E168

PROGRAM ANALYST

1E149

NURSE MGR

1E150

NURSE MGR

1D148

OFFICE MGR

1E148

CLER

1D153E

CLER

1D153B

CLER

1D149A

CLER

1D150A

CLER

1D150B

CLER

1D153D

CLIN SVS

1D149B

PROG

1E147A

PROG

1E147B

PROG

1E146H

AN

1E142D

AN

1E142B

RETAIL AREA

1E129

TR

1E127A

1E110A

RN

1D237B

CLERICAL

1D125B

SECY/ WAITING

1D126

SUPER

1D131

SUPER

1D127

SUPER

1D128

ASST CHIEF

1D133

ASST CHIEF

1D132

CHIEF

1D134

SUPER

1D129

SUPER

1D130

CHECK-IN/ LOUNGE

1D121

MALE TOILET/ SHOWER

1D115

EMS MALE LOCKER

1D119

FEMALE TOILET/

SHOWER

1D117

EMER ELEC

1D227B

NORM ELEC

1D227A

SECY/ WAITING

1E145

EQUIP STOR

1D157

CONF ROOM

1D156

ADMIN OFFICER

1D154

MED DIRECTOR

1D147

MSA

1E147D

PSAS

1E143A

PSAS

1E144E

PSAS

1E142F RN

1E137C

RN

1E135D

RN

1E135G

PSAO

1E144B

RNO

1E137H

RN

1E135A

RN

1E135E

RN

1E135B

RN

1E137FRN

1E135FRN

1E135C

RN

1E137E

RN

1E137D

PSAS

1E144F

PSAO

1E143B

CLER

1D150E

CLER

1D151A

CLER

1D151B

CLER

1D150F

CLER

1D150D

CLER

1D152H

CLER

1D153C

CLER

1D150G

CLER

1D153A

CLIN SVS

1D149D

CLIN SVS

1D149C

CLER

1D150C

CLER

1D151C

CLER

1D151D

CLER

1D152F

CLER

1D152D

CLER

1D152E

MSA

1E146F

MSA

1E147I

MSA

1E147J

MSA

1E147E

MSA

1E146D

PROG

1E147G PROG

1E146C

PROG

1E147H

PROG

1E146I

PROG

1E146B

PROG

1E147F

CLERICAL

1D125A

CLERICAL

1D125C

CLERICAL

1D125D

COPY/ WORK

1D160

HK

1E126

REPAIR

1D104

CLERICAL

1D106

RECEIVING & CLEANING

1D107

CHIEF BIOMED

1D113

SUPERV BIOMED

1D111

BIOMED ENG

1D112

STORAGE

1D108

PAT ELEV LOBBY

1D221

TR

1D223A

1D110A

CHUTE RM

1D225

SERV ELEV LOBBY

1D220

CLER

1D152B

CLER

1D152A

CLER

1D152C

CLER

1D152G

BED REPAIR

1D116

HK

1D139

ST

1D141

ST

1D140

NORM ELEC

1E127C

ST

1D142

STAFF LOUNGE

1D145

ENTERAL RN

1D161

SOILED

1D158

EC

1E130

EC

1D120

STORAGE

1E124

OPT OFFICE

1E120

OPT EXAM

1E118

OPT EXAM

1E119

FITTING DISPLAY

1E121

COUNSELOR

1E114

COUNSELOR

1E112

COUNSELOR

1E113

COUNSELOR

1E111

WALK-IN COOLER

1E128

RECEIVING

1E122

SECY/WAIT

1E110

CLEAN

1D159

IND HYGIENE LAB

1D163

COPY/WORK

1E136

ELEV EQUIP

1D137B BIOMED ENG

1D109

PUB ELEV LOBBY

1D138

COPY

1D105

VESTIBULE

1D135

CORR

1E-C04A

CORR

1D-C05

CORR

1D-C09

CORR

1D-C06

CORR

1D-C03A

CORR

1D-C01

CORR

1D-C10B

CORR

1D-C08

CORR

1D-C04

CORR

1D-C07

CORR

1E-C06

CORR

1E-C01

CORR

1E-101

STORAGE

1E125

WC STORAGE

1D101

UNASSIGNED

1D136

CORR

1D-C11

UNASSIGNED

1D110

CORR

1DC10

EMS STORAGE

1D219

EMS FEMALE LOCKER

1D118UNASSIGNED

1D120A

AISLE

1DC14

HK

1E105

HK

1D217

RES LOUNGE

1D162

CLERICAL

1E115

DISPLAY

1E129B

RN

1E137J

SECURITY

1D223B

HC SHOWER

1D117A

SHOWER

1D117B

HC SHOWER

1D115A

SHOWER

1D115B

CORR

1D-C10A

CORR

1E-C04B

ELEV

DP-09

SECURITY

1E127B

FAMILY

1E107

MALE

1E108

FEMALE

1E109

WC STORAGE

1E1O6B

UNASSIGNED

1E105A

FIRE COMMAND CTR

1E103

EMER ELEC

1E127D

MECHANICAL

1D137A

CORR

1D-C01A

AISLE

1E110A

VESTIBULE

1E127

INTERSTITIAL STAIR

1D227

OFFICER

1E165

CHIEF OF SERVICE

1E164

VOLUNTEERS LOUNGE

1E167

OFFICER

1E166

WG,VAVS

ORGANIZATION

1E161C

VOLUNTEERS STORAGE

1E162

RECEPT/SECRY

1E161D SIGN IN

1E161E

AISLE

1E160

RN

1D237A

RNO

1D237C

RNO

1D237D

AN

1D239A

AN

1D239B

AN

1D239C

AN

1D239D

AN

1D239E

RN

1D239F

RN

1D239G

RN

1D239H

RN

1D239I

RN

1D239J

CONFERENCE

2D119C

CONFERENCE

2D119D

ELEV

DS-02

CONCESSION

1E117B

CONCESSION

1E117A

(E) PNL 'R22123B'

(E) PNL 'R22123A'

(E) PNL 'R22113A'

(E) PNL 'R22113B'

(E) PNL 'R22114'

(E) PNL 'D2411'

(E) XFMR 'T7'

(E) PNL 'D2211'

(E) PNL 'R22111A'

(E) PNL 'R22111B'

(E) PNL 'R22112' (E) PNL 'P2411'

(E) PNL 'LC2411'

(E) PNL 'L2411'

(E) PNL 'EC4R2211'

(E) XFMR 'T6'

(E) PNL 'D2212'

(E) PNL 'R22121A'

(E) PNL 'R22121B'

(E) PNL 'R22122'

(E) PNL 'P2412'

(E) PNL 'LC2412'

(E) PNL 'L2412'

(E) PNL 'D2412'

(E) PNL 'EC3R2212'

02-EP-011

02-EP-011

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E) PNL 'EIT2211'

TR

1D223A

1D110A

R22112-21,23,25

EIT2211-16,18,20

R22112-18,20,22EIT2211-32,34,36

60AS

60AF

TR

1E127A

1E110A

(E)EIT2212-24

(E)EIT2212-24

(E)UNLABELED

(E)UNLABELED

(E) PNL 'EIT2212'

EIT2212-5,7,9

R22121B-37,39,41

EIT2212-11,13,15

R22121B-38,40,42

60AS

60AF

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

CONSULTANTS

FOR OFFICIAL USE ONLY (FOUO)

04-25-2023

FULLY

SPRINKLED

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver

10% BASIS OF DESIGN 07.08.2022

35% SCHEMATIC DESIGN 11.10.2022

65% DESIGN DEVELOPMENT 01.13.2023

95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

TERP consulting Fire + Life Safety

14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011

FINAL BID DOCUMENTS 04.25.2023

A u to d e s k D o c s /2

-0

N e w O rl e a n s

E H

R M

/2 -0

N

O L

A E

H R

M

C O

N C

O U

R S

E

E le c I n t-

R

.r v t

02-EP-011

OVERALL FIRST FLOOR POWER PLAN

NORTH - BLDG. 02

MER AJW

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

FINAL BID DOCUMENTS 629-22-700

3/32" = 1'-0"1

BLDG. 02 POWER OVERALL PLAN - LEVEL 1 NORTH

GENERAL NOTES

1. COORDINATE EXACT LOCATION OF MECHANICAL AND TELECOMMUNICATIONS EQUIPMENT

WITH THE CORRESPONDING DISCIPLINE'S DRAWINGS.

2. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,

FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S

WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.

COORDINATE THIS WORK WITH THE COR.

3. REFER TO ASSOCIATED TN SHEET FOR RACK QUANTITIES IN EXISTING AND NEW TR

SPACES.

4. ASSUMED CAPACITY AND LOAD AVAILABLE TO PANELS BEING USED IN SCOPE OF WORK.

CONTRACTOR TO VERIFY SUFFICIENT LOAD IS AVAILABLE PRIOR TO ADDING EQUIPMENT TO

ASSOCIATED PANELS TO AVOID POTENTIAL PANEL OVERLOAD.

PLAN NOTES

1 CONTRACTOR TO PROVIDE NEW 208V, 60A, 3-PHASE POWER TERMINATING IN HARD-WIRED

JUNCTION BOX FOR NEW RACK POWER. JUNCTION BOX TO BE MOUNTED DIRECTLY ON

CABLE TRAY. REFER TO ELECTRICAL FEEDER SCHEDULE ON 00-EG-001 FOR CONDUIT AND

CONDUCTOR SIZING REQUIREMENTS.

2 CONTRACTOR TO PROVIDE NEW L21-20R RECEPTACLE FOR NEW RACK POWER.

RECEPTACLE TO BE MOUNTED DIRECTLY ON CABLE TRAY. PROVIDE 3#12 PHASE

CONDUCTORS, 1#12 NEUTRAL & 1#12 GROUND. ROUTE CONDUCTORS IN 3/4" CONDUIT.

1/4" = 1'-0"2

ENLARGED POWER PLAN - TR 1D110A

1/4" = 1'-0"3

ENLARGED POWER PLAN - TR 1E110A

Revisions: Date:

UP

UP

UP

UP

F

F

SERV ELEV LOBBY

1F193

COMP ADP STOR

1G167

PUB ELEV LOBBY

1F100

CONFERENCE

TRAINING

1G199

FEMALE

1G100A

STAFF LOUNGE

1G228

STAFF LOUNGE

1F131

MAIL

1F127

EC

1F128

EC

1G195

DISHWASHING

1F104

OPEN DINING

1F101

TR

1G227C

1G110

EMER ELEC

1G227B

NORM ELEC

1G227A

DRY GOODS STOR

1F106

NON-FOOD STOR

1F109

MALE TOILET &

LOCKERS

1F120

FEMALE TOILET &

LOCKERS

1F121

HK

1F103A

PREP KITCHEN

1F105

TRAY RETURN

1F103

REFRIG

1F107

ASSIST CHIEF FOOD

1F111

VCS CHIEF

1F110

ASSIST CHIEF RETAIL

1F118

ASSIST CHIEF RETAIL

1F117

CLERK

1F112B

RECEPTION

1F115

TR

1F227B

1F108

AN

1F140

NORM ELEC

1F227C EMER ELEC

1F227D

MALE

1G100B

CONFERENCE

1G138

UNASSIGNED

1F133

PAGERS CELLS

1G184

LAPTOPS

1G191

PROF STAFF

1G182

WORK AREA

1G174

PROGRAM

1G176

PROGRAM

1G183

HELP

1G188A

HELP

1G190

HELP

1G188B

PC TECH

1G185D

PC TECH

1G166A

PC TECH

1G165

PC TECH

1G185E

PC TECH

1G185B

PC TECH

1G185H

PC TECH

1G185I

PC TECH

1G185C

PC TECH

1G185G

PC TECH

1G166B

CONFERENCE

1G196

OFFICE ASST CH

1G169

REF LIB

1G186

OFFICE SEC CH

1G171

OFFICE SEC CH

1G172

PROF STAFF

1G178G

PROF STAFF

1G178A

PROF STAFF

1G175

OFFICE CIO

1G168

COPY ROOM

1G173

SECY

1G177

PROF STAFF

1G178F

ST

1G181

PROF STAFF

1G178E

PROF STAFF

1G178D

PROF STAFF

1G178H

PROF STAFF

1G178C

PROF STAFF

1G178B

ST

1G180

HK

1G125

CUSTOMER SERVICE

1G189

SECY/ WAITING

1G162

ID ISSUE WAIT

1G149

ID/REG ISSUE

1G148

EVIDENCE

1G151

MALE LOCKER

1G141A

DETECTIVE

1G159

CLER

1G161G

ID/KEY STORAGE

1G147

ARMORY

1G145

ARMORY STORAGE

1G146

COPIER

1G150HOLDING

1G160

SECURITY COMMAND

CENTER

1G139

FEMALE LOCKER

1G140A

CLER

1G161K

CLER

1G161H

CLER

1G161A

CLER

1G161D

CLER

1G161B

CLER

1G161C

CLER

1G161E

CLER

1G161I

CLER

1G161J

CLER

1G161F

HC T/S

1G141C

HC T/S

1G140B

T/S

1G141B

ST

1G121

ST

1G122

REFRIG

1F108

MONEY COUNT

1F116

CLERK

1F112C

CLERK

1F112D

CLERK

1F112E

CANTEEN EQUIP

1F130

CHUTE RM

1F132

CORR

1F-C05A

CORR

1F-C03A

FOOD SERV ELEV

LOBBY

1F125

HK

1F129

CORR

1F-C06

CORR

1G-C02A

CORR

1G-C04

CORR

1G-C03

CORR

1G-C02C

CORR

1F-C02A

WC STORAGE

1G198

STAIR

STF-02

ELEV

FP-03

ELEV

FP-04

ELEV

FS-07

CORR

1G-02B

CORR

1F-C03B

CORR

1FC03

CORR

1G-C08

CORR

1G-C09

PC TECH

1G185F

PC TECH

1G185A

CORR

1G-C18

HK

1F178 D

SECURITY

1F227A

SECURITY

1G227D

CONDIMENTS

1F101A

CONDIMENTS

1F101B

OFFICE

1G135

CLERICAL

1G132

RECPT/WAIT

1G131

LOCKERS

1G129

CHIEF

1G133

AO OFFICE

1G134

COPY

1G130

STRETCHER STOR

1G128

DISPATCH

1G123A

UNASSIGNED

1G120

T

1G102

T

1G101

CORR

1G-C15

CORR

1G-C16

CORR

1F-C02B

UNASSIGNED

1G161L

STOR

1G138A

STOR

1G138B

PRIVATE DINNING

1F101D

CHIEF OF SERVICE

1G152

ELEV

FP-05

ELEV

FS-06

SHAFT

SHF04

SCC RACK ROOM

1G139A

UNASSIGNED

1G197

VESTIBULE

3F175

PSAS

1F144G

PSAS

1F144H

PSAS

1F143C

PSAS

1F143F

PROG

1F146J

AN

1F142C

PSAS

1F143G

AN

1F142E

PSAO

1F143E

RN

1F143H

PROG

1F147C

AN

1F142A

MSA

1F146E

PSAO

1F143D

CUB

1F146H

CUB

1F147A

CUB

1F147B

(E) PNL 'R22133A'

(E) PNL 'R22133B'

(E) PNL 'K24141'

(E) PNL 'KD2414'

(E) PNL 'K22141B'

(E) PNL 'EQ1P2431'

(E) PNL 'K22141A'

(E) PNL 'K22142B'

(E) PNL 'K22142A'

(E) XFMR 'T8' (E) PNL 'K22143'

(E) PNL 'KD2214'

(E) PNL 'R22143A'

(E) PNL 'R22143B'

(E) PNL 'D2414'

(E) PNL 'R22142A'

(E) PNL 'P2414'

(E) PNL 'R22142B'

(E) PNL 'R22141A'

(E) PNL 'R22141B'

(E) PNL 'LC2414'

(E) PNL 'L2414'

(E) XFMR 'T7'

(E) PNL 'D2214'

(E) PNL 'EC1R2214'

02-EP-012

(E) XFMR 'T6'

(E) PNL 'D2213'

(E) PNL 'D2413'

(E) PNL 'R22132B'

(E) PNL 'R22132A'

(E) PNL 'P2413' (E) PNL 'R22131A'

(E) PNL 'R22131B'

(E) PNL 'L2413'

(E) PNL 'LC2413'

(E) PNL 'EC2R2213-2'02-EP-012

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E) PNL 'EIT2214' TR

1G227C

1G110

R22141A-23,25,27

EIT2214-9,11,13

R22141A-29,31,33

EIT2214-15,17,19

60AS

60AF

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E) PNL 'EIT2213'

TR

1F227B

1F108

EIT2213-5,7,9

R22131B-37,39,411

60AS

60AF

NORTH

KEY PLAN

KEY PLAN

Q B

C

D

E

F

G

J

H

K

L M

P

N

S H

O T

G U

N

F

IS

H E

R

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

CONSULTANTS

FOR OFFICIAL USE ONLY (FOUO)

04-25-2023

FULLY

SPRINKLED

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver

10% BASIS OF DESIGN 07.08.2022

35% SCHEMATIC DESIGN 11.10.2022

65% DESIGN DEVELOPMENT 01.13.2023

95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

TERP consulting Fire + Life Safety

14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011

FINAL BID DOCUMENTS 04.25.2023

A u to d e s k D o c s /2

-0

N e w O rl e a n s

E H

R M

/2 -0

N

O L

A E

H R

M

C O

N C

O U

R S

E

E le c I n t-

R

.r v t

02-EP-012

OVERALL FIRST FLOOR POWER PLAN

SOUTH - BLDG. 02

MER AJW

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

FINAL BID DOCUMENTS 629-22-700

3/32" = 1'-0"1

BLDG. 02 POWER OVERALL PLAN - LEVEL 1 SOUTH

GENERAL NOTES

1. COORDINATE EXACT LOCATION OF MECHANICAL AND TELECOMMUNICATIONS EQUIPMENT

WITH THE CORRESPONDING DISCIPLINE'S DRAWINGS.

2. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,

FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S

WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.

COORDINATE THIS WORK WITH THE COR.

3. REFER TO ASSOCIATED TN SHEET FOR RACK QUANTITIES IN EXISTING AND NEW TR

SPACES.

4. ASSUMED CAPACITY AND LOAD AVAILABLE TO PANELS BEING USED IN SCOPE OF WORK.

CONTRACTOR TO VERIFY SUFFICIENT LOAD IS AVAILABLE PRIOR TO ADDING EQUIPMENT TO

ASSOCIATED PANELS TO AVOID POTENTIAL PANEL OVERLOAD.

1/4" = 1'-0"2

ENLARGED POWER PLAN - TR 1G110

1/4" = 1'-0"3

ENLARGED POWER PLAN - TR 1F108

PLAN NOTES

1 CONTRACTOR TO PROVIDE NEW 208V, 60A, 3-PHASE POWER TERMINATING IN HARD-WIRED

JUNCTION BOX FOR NEW RACK POWER. JUNCTION BOX TO BE MOUNTED DIRECTLY ON

CABLE TRAY. REFER TO ELECTRICAL FEEDER SCHEDULE ON 00-EG-001 FOR CONDUIT AND

CONDUCTOR SIZING REQUIREMENTS.

2 CONTRACTOR TO PROVIDE NEW L21-20R RECEPTACLE FOR NEW RACK POWER.

RECEPTACLE TO BE MOUNTED DIRECTLY ON CABLE TRAY. PROVIDE 3#12 PHASE

CONDUCTORS, 1#12 NEUTRAL & 1#12 GROUND. ROUTE CONDUCTORS IN 3/4" CONDUIT.

DNDNDNDN

DNDN

UP

UP

UP

F

F F

NORTH

KEY PLAN

KEY PLAN

Q B

C

D

E

F

G

J

H

K

L M

P

N

S H

O T

G U

N

F

IS

H E

R

ELEV

DP-09

ACUTE-9

2E158

TRIAGE

2D172

ACUTE-2

2E146

NURSE MANAGER

2E181

DECONTAM

2E178

MH-1

2E186

MH-2

2E187

WORK

2E152B

ST

2D102

ISO/GYN ACUTE-10

2E159

ACUTE-1

2E147

T/D

2E125

RADIOLOGY

2E132

RADIOLOGY

2E130

T/D

2E126

CT SCAN

2E129

CONTROL

2E128

SCR

2E109

EQUIP

2E135

CONTROL

2E107

HK

2E170

EQUIPMENT

2E133

T

2D121A

OBSERV-7

2D145

OBSERV-4

2D135 T

2D137A

OBSERV-2

2D139

T

2D139A

T

2D125A

OBSERV-12

2D117

OBSERV-8

2D127

LOCKERS

2D101C

OBSERV-10

2D121

T

2E167A

OBSERV-5

2D131

NURSE STATION

2D153

T

2D145A

NURSE STATION

2D114

FAST TRACK-1

2D159

FAST TRACK-2

2D107

FAST TRACK-3

2D108

FAST TRACK-7

2E194

FAST TRACK-6

2D115

FAST TRACK-4

2D109

SOILED

2D150

SUB WAIT

2D142

MH WORK/OFFICE

2E188

ELIG

2D164

ELIG

2D165

ALCOVE

2E160

PHARMACY

2E190

RECEPT

2D179

COMPLEX TREATMENT

2E165ACUTE-11

2E166

ACUTE-3

2E145

ACUTE-4

2E144

ACUTE-5

2E140

ACUTE-6

2E155

ACUTE-7

2E156

ACUTE-8

2E157

MEDS

2E154

WORK

2E152C

BLOOD GAS

2E164

CONSULT

2E180

NOURISH

2D155

PACS

2E152E

MULTI-PURPOSE

2E175

CLEAN

2E149

EMT/LAW

2D181

VENDING

2D177

T

2D127A

OBSERV-3

2D137

OBSERV-11

2D119

RADIOLOGY

2D162

OBSERV-1

2D143

OBSERV-9

2D125

OBSERV-6

2D129

RES CONF/WORK

2E193

AOD OFFICE

2E183

CHIEF

2D105

SECY

2D104

STAFF LOUNGE

2D101B

TRIAGE

2E150

TRIAGE

2D171

TRIAGE

2D170

ENTRANCE VESTIBULE

2E184

ST

2E192

SUB WAIT

2D183

SCR

2E137

EQUIP ALC

2D136

EQUIP ALC

2D140

EQUIP ALCOVE

2D118

EQUIP ALC

2D126

EQUIP ALC

2D130

PACS

2D116

T

2D131A

HC PATIENT T/S

2E169

NURSE STATION

2E152A

ISO ACUTE-12

2E167

MED

2D156

EQUIP ALC

2D152

T

2E148

TR

2D223A

2D106A

CHUTE RM

2D225

HK

2E138

SECURITY

2D182

T

2D143A

EQUIP ALC

2D144

WAITING

2D178

CLEAN SUPPLY

2D161

RAD EQUIP

2E106

COPY/WORK

2D103

EQUIP ALCOVE

2D120

EQUIP ALC

2D128

MH T

2E168

RAD STRETCHER/WC

2E134

T

2D157

T

2D117A

WC/STRETCH STOR

2E179

MEDICAL & RT EQUIP

2D160

HC ST/S

2D151

ST

2D158

MOBILE X-RAY

2D100A

MOBILE NM

2D100B

EQUIP ALC

2D138

STAFF WORK

2E136

DRESS

2E115

CC

2E139

RAD ELEC RM

2E105

NORM ELEC

2D227A

EMER ELEC

2D227B

T

2E159A

SUB WAIT

2D113

FAST TRACK-8

2E195

FAST TRACK-5

2D112

T

2D163

WC/STRETCH STORAGE

2D180

HK

2E104

MEDICAL & RT EQUIP

2D166

EC

2E174

ALCOVE

2E151

NURSE STATION

2E152D

COPY/WORK

2E153

CLEAN

2D141

EC

2D154

DRESS

2E116

COPY/WORK

2E182

PHARM PICK-UP

2E191

SERVICE BAY

2D227

CORR

2D-C03

CORR

2D-C05A

CORR

2D-C06

CORR

2D-C07

CORR

2D-C08

CORR

2D-C05B

CORR

2D-C09

CORR

2E-C07

CORR

2D-C18CORR

2D-C15

CORR

2D-C10

CORR

2D-C12

CORR

2D-C01

CORR

2E-C12

CORR

2E-C02

CORR

2E-C05

CORR

2E-C09

CORR

2E-C10

CORR

2E-C11

CORR

2E-C08

CORR

2E-C06

SHAFT

SHE06

SHAFT

SHE07

SHAFT

SHD02B

CORR

2E-C01

ENTRANCE VESTIBULE

2E176

SHAFT

SHD03

HK

2D217

MALE

2D173

FEMALE

2D176

FEMALE

2D175

MALE

2D174

TR

2E189

CT SCAN

2E108

CT SCAN

2E110

CONTROL

2E111

CT PREP/WORK

2E114

CT PREP

2E127

DRESS

2E117

SECURITY

2D223B

DRESS

2E118

DRESS

2E119

T/D

2E124

T/D

2E120

WAITING

2D178B

CORR

2D-C17B

CLEAN

2E102

ST

2E101ALOCKER ROOM

2E101

TR

2E227A

2E108A

NORM ELEC

2E227C EMER ELEC

2E227D

ST

2E101B

SCRUB VENDING

2E101C

SECURITY

2E227B

INTERVIEW

2E103A

INTERVIEW

2E103B

CLEAN

2D106

CONFERENCE

2D101A

CORR

2D-C16

PAT ELEV LOBBY

2D221

ALCOVE

2D100C

CORR

2D-C01A

T

2D135A

ELEV

DS-02

RADIOLOGY

2F105

RADIOLOGY

2F104 R/F

2F103

R/F

2F102

INTERVIEW

2F101

(E) PNL 'EIT2221'

02-EP-021

02-EP-021

(E) PNL 'R22223B'

(E) PNL 'R22223A'

(E) PNL 'EC3R22222A'

(E) PNL 'EC3R22222B'

(E) PNL 'D2421'

(E) XFMR 'T6'

(E) PNL 'D2221'

(E) PNL 'R22211A'

(E) PNL 'R22211B'

(E) PNL 'R22212A'

(E) PNL 'R22212B'

(E) PNL 'L2421'

(E) PNL 'EQ4R2221' (E) PNL 'ELS2421'

(E) PNL 'ELS2221'

(E) XFMR 'T2'

(E) PNL 'EC4R22211A'

(E) PNL 'EC4R22211B'

(E) PNL 'EC4D2221'

(E) XFMR 'T3'

(E) XFMR 'T3'

(E) PNL 'EC4L2421'

(E) PNL 'D2222'

(E) XFMR 'T6'

(E) PNL 'D2422'

(E) PNL 'L2422'

(E) PNL 'R22222'

(E) PNL 'R22221B'

(E) PNL 'R22221A'

(E) PNL 'ELS2222'

(E) PNL 'ELS2422'

(E) XFMR 'T2'

(E) XFMR 'T6'

(E) PNL 'EC3D2222'

(E) PNL 'EC3R22221B'

(E) PNL 'EC3R22221A'

(E) XFMR 'T3'

(E) PNL 'EC3L2422'

(E) PNL 'EQ4R2222'

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E) PNL 'EIT2222' TR

2E227A

2E108A

EIT2222-1,3,5

R22221B-18,20,22

60AS

60AF

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

TR

2D223A

2D106A

EIT2221-16,18,20

R22212B-37,39,41

60AS

60AF

R22212B-38,40,42

EIT2221-32,34,36

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

CONSULTANTS

FOR OFFICIAL USE ONLY (FOUO)

04-25-2023

FULLY

SPRINKLED

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver

10% BASIS OF DESIGN 07.08.2022

35% SCHEMATIC DESIGN 11.10.2022

65% DESIGN DEVELOPMENT 01.13.2023

95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

TERP consulting Fire + Life Safety

14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011

FINAL BID DOCUMENTS 04.25.2023

A u to d e s k D o c s /2

-0

N e w O rl e a n s

E H

R M

/2 -0

N

O L

A E

H R

M

C O

N C

O U

R S

E

E le c I n t-

R

.r v t

02-EP-021

OVERALL SECOND FLOOR POWER PLAN

NORTH - BLDG. 02

MER AJW

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

FINAL BID DOCUMENTS 629-22-700

3/32" = 1'-0"1

BLDG. 02 POWER OVERALL PLAN - LEVEL 2 NORTH

PLAN NOTES

1 CONTRACTOR TO PROVIDE NEW 208V, 60A, 3-PHASE POWER TERMINATING IN HARD-WIRED

JUNCTION BOX FOR NEW RACK POWER. JUNCTION BOX TO BE MOUNTED DIRECTLY ON

CABLE TRAY. REFER TO ELECTRICAL FEEDER SCHEDULE ON 00-EG-001 FOR CONDUIT AND

CONDUCTOR SIZING REQUIREMENTS.

2 CONTRACTOR TO PROVIDE NEW L21-20R RECEPTACLE FOR NEW RACK POWER.

RECEPTACLE TO BE MOUNTED DIRECTLY ON CABLE TRAY. PROVIDE 3#12 PHASE

CONDUCTORS, 1#12 NEUTRAL & 1#12 GROUND. ROUTE CONDUCTORS IN 3/4" CONDUIT.

1/4" = 1'-0"2

ENLARGED POWER PLAN - TR 2E108A

1/4" = 1'-0"3

ENLARGED POWER PLAN - TR 2D106A

GENERAL NOTES

1. COORDINATE EXACT LOCATION OF MECHANICAL AND TELECOMMUNICATIONS EQUIPMENT

WITH THE CORRESPONDING DISCIPLINE'S DRAWINGS.

2. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,

FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S

WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.

COORDINATE THIS WORK WITH THE COR.

3. REFER TO ASSOCIATED TN SHEET FOR RACK QUANTITIES IN EXISTING AND NEW TR

SPACES.

4. ASSUMED CAPACITY AND LOAD AVAILABLE TO PANELS BEING USED IN SCOPE OF WORK.

CONTRACTOR TO VERIFY SUFFICIENT LOAD IS AVAILABLE PRIOR TO ADDING EQUIPMENT TO

ASSOCIATED PANELS TO AVOID POTENTIAL PANEL OVERLOAD.

DN

UP

DN

DN

UP

UP

UP

UP

UP

MIN. DOOR SIZE

MIN. DOOR SIZE

TABLE

F

F

SERVICE BAY

2F227

CC

2G119B

T/D

2F144

T/D

2F146 T/D

2F145

DRESS

2F140

DRESS

2F127

T/D

2F143

DRESS

2F139

DRESS

2F137

ULTRASOUND

2F151ULTRASOUND

2F148

ULTRASOUND

2F147

ULTRASOUND

2F150

RADIOLOGY

2F136

RADIOLOGY

2F135

RADIOLOGY

2F122

SCR

2G117

CLEAN

2G116

SOILED HOLD

2G115

MRI

2G129

MRI

2G128

CONTROL

2G131

SCR

2G127

GAS/CRY ROOM

2G125

DRESS

2G194

DRESS

2G185

DRESS

2G191

DRESS

2G195

STRESS

2G193

STRESS

2G186

STRESS

2G196

STRESS

2G197

STRESS

2G199

STRESS

2G190

ECHO

2G141

ECHO

2G140

STRESS ECHO

2G139

PERIPHERAL VASCULAR

2G182

VASC TREAD

2G181

STRESS ECHO

2G138

ECHO

2G136

EKG/ HOLTER

VIEW/WORK

2G192

DOSE ADMIN NM

2G159

TILT TABLE

2G180

CARD EQUIP

2G183

SECY/ WAIT

2F184

CHIEF

2F185

ASST CHIEF RAD

2F190

RADIOLOGIST

2F189RADIOLOGIST

2F188

RADIOLOGIST

2F187

RADIOLOGIST

2F192RADIOLOGIST

2F199

CHIEF TECH

2F200

SECTION CHIEF

2F201

PHYSICIST OFF

2F162

COPY ROOM

2F160

PROF

2F186

PROF

2F202

CHIEF TECH

2F168

SCHED

2F198

SCHED

2F197

PAT HOLD

2F155I

EQUIP CALIB (NM)

2F180

SECRETARY

2F195

STAFF PHYS

2F161

TELE-NM

2F163

T

2G143

T/D

2G168

T

2G202

NUCLEAR MED

2G164

NUCLEAR MED

2G151

DRESS

2G160

PET-CT

2G167

THYROID UPTAKE

2G170

SCR

2G167B

HOT LAB

2G158

CONTROL

2G167A

NUCLEAR MED

2G149

NUCLEAR MED

2G150

SUB-WAITING

2G201

RAD RES CONF

2F178

RAD CONF

2G178

BIOSAFETY LAB

2F167

WORK AREA

2F120

PUB ELEV LOBBY

2F222

SERVICE BAY

2G227

SERV ELEV LOBBY

2F229

INTERVIEW NM

2G189 DRESS

2G120

DRESS

2G114

DRESS

2G121

STAFF WORK

2G119A

CARD RECEPT

2G101C

ULTRASOUND

2F133

NUC MED RECEPTION

2G101A

TR

2G229A

2G108

EMER ELEC

2G227B

NORM ELEC

2G227A

TR

2F227A

2F105B

CHUTE RM

2F181

BONE DENS

2F132

MEDS

2F149

RADIOLOGY

2F123

SOILED

2F193

QA

2F194A

QA

2F194B

QA

2F194D

DATA PROCESS

2F196

CLERICAL

2F194C

VIEW

2F183C

ST

2F169

ST

2F170

PACS ADMIN

2F183B

PACS ADMIN

2F183A

PET READ

2G175

CC

2G156

ECHO READING

2G187

TEE ROOM

2F165

STORAGE ECHO

2G137

SUB-WAIT CARDIO

2G123

CONTROL

2G130

PAT HOLD

2G113

PAT HOLD

2G112

T

2G118

LINEN

2G124

EQUIP STORAGE

2G122

BIO-MED WORK

2F179

TEE RECOVERY BAY

2F155H

HK

2G126

REF STOR

2G154

PHYSICIST

2G105

DRESS

2G198

HK

2G169

RECEPTION

2G101B

DRESS

2F128

DRESS

2F138

STRET/WC

2G107

TEE SCOPE HOLD

2F166

STAFF WORK

2F155G

T

2F157

T

2G157

DRESS

2G155

DRESS

2G150A

DRESS

2G152

LINEN

2G163

PAT HOLD

2F155E

T

2G142

PAT HOLD

2F155B

PAT HOLD

2F155A

NURSE STATION

2F155C

PAT HOLD

2F155D

T/D

2F134

ST

2F158

ST

2F159

AMBULETTE

2G145

AMBULETTE

2G144

DRESS

2F117

DRESS

2G111

CLEAN

2F191

LINEN

2G148A

CONTROL RM

2G153

CC

2G184

EC

2G177

EC

2F174

MALE

2G100B

FEMALE

2G100A

EMER ELEC

2F227D

NORM ELEC

2F227C

LOUNGE

2G176

RAD WASTE

2F177

CARD EQUIP

2G188

DRESS

2G200

MRI WAITING

2G110

AISLE

2F-C12

PAT HOLD

2F155F

T

2F156

T

2G165

SERVICE BAY

2G228

CORR

2F-C08

CORR

2F-C04

CORR

2F-C03

CORR

2F-C09

CORR

2F-C10B

CORR

2F-C11

CORR

2F-C06 CORR

2F-C05

CORR

2F-C07B

UNASSIGNED

2G230

CORR

2G-C02

CORR

2G-C03

CORR

2G-C05A

CORR

2G-C07

CORR

2G-C06B

CORR

2G-C10

CORR

2G-C08A

CORR

2G-C09

CORR

2G-C11

CORR

2G-C04

CORR

2G-C06A

CORR

2G-C05B

CONTROL

2F175

CORR

2G-C08B

CORR

2G-C06C

EXAM

2F164

CORR

2F-C10A

RESIDENT WORK

2F176

EC

SHD12

HK

2G106

DRESS

2F116

SECURITY

2F227B

SECURITY

2G229B

DRESS

2F115

DRESS

2F126

DRESS

2F125

DRESS

2F124

DRESS

2F113

DRESS

2F114

ST

2F119

ST

2F118

ALC

2F131

ALC

2F130

SOILED HOLD

2G166

COPY/WORK

2G103

CORR

2F-C16

WORK

2F111

CC

2G146

ALCOVE

2G147

LINEN

2G148B

LINEN

2G148C

EC

2G183A

CLOS

2G128.1

CLOS

2G129.1

(E) PNL 'R22234'

(E) PNL 'R22233B'

(E) PNL 'R22233A'

(E) PNL 'EC2R22232A'

(E) PNL 'EC2R22232B'

(E) PNL 'EC1R22242B'

(E) PNL 'EC1R22242A'

(E) PNL 'R22243A'

(E) PNL 'R22243B'

(E) PNL 'UNLABELED'

(E) PNL 'UNLABELED'

(E) PNL 'XD2424'

(E) PNL 'R22245'

(E) PNL 'R22244'

(E) PNL 'UNLABELED'

(E) PNL 'UNLABELED'

(E) PNL 'UNLABELED'

PNL 'UNLABELED' PNL 'UNLABELED'

(E) PNL 'UNLABELED'

(E) PNL 'UNLABELED'

(E) PNL 'XD2423'

(E) PNL 'D2423'

(E) XFMR 'T6'

(E) PNL 'D2223'

(E) PNL 'R22232B'

(E) PNL 'P2423'

(E) PNL 'R22232A'

(E) PNL 'R2231B2'

(E) PNL 'R22231A'

(E) PNL 'LC2423'

(E) PNL 'L2423'

(E) PNL 'EC2R22231B'

(E) PNL 'EC2R22231A'

(E) PNL 'EC2D2223'

(E) XFMR 'T5'

(E) XFMR 'T3'

(E) PNL 'EC2L2423'

(E) XFMR 'T2'

(E) PNL 'ELS2223'

(E) PNL 'ELS2423'

(E) PNL 'EQ1R2223'

02-EP-022

(E) PNL 'D2424'

(E) PNL 'R22242'

(E) PNL 'P2424'

(E) PNL 'R22241A'

(E) PNL 'R22241B'

(E) PNL 'D2224'

(E) XFMR 'T7'

(E) PNL 'LC2424'

(E) PNL 'L2424'

(E) XFMR 'T6'

(E) XFMR 'T3-1'

(E) PNL 'EC1D2224'

(E) PNL 'EC1L2424'

(E) PNL 'EQ5R2224'

(E) PNL 'EC1R22241'

(E) XFMR 'T2'

(E) PNL 'ELS2224'

(E) PNL 'ELS2424'

02-EP-022

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E) PNL 'EIT2224'

TR

2G229A

2G108

R22232B-7,9,11

EIT2224-1,3,5

R22232B-13,15,17

EIT2224-7,9,11

60AS

60AF

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E) PNL 'EIT2223'

TR

2F227A

2F105B

EIT2223-1,3,5 R22232B-1,3,5

1 1

60AS

60AF

NORTH

KEY PLAN

KEY PLAN

Q B

C

D

E

F

G

J

H

K

L M

P

N

S H

O T

G U

N

F

IS

H E

R

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

CONSULTANTS

FOR OFFICIAL USE ONLY (FOUO)

04-25-2023

FULLY

SPRINKLED

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver

10% BASIS OF DESIGN 07.08.2022

35% SCHEMATIC DESIGN 11.10.2022

65% DESIGN DEVELOPMENT 01.13.2023

95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

TERP consulting Fire + Life Safety

14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011

FINAL BID DOCUMENTS 04.25.2023

A u to d e s k D o c s /2

-0

N e w O rl e a n s

E H

R M

/2 -0

N

O L

A E

H R

M

C O

N C

O U

R S

E

E le c I n t-

R

.r v t

02-EP-022

OVERALL SECOND FLOOR POWER PLAN

SOUTH - BLDG. 02

MER AJW

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

FINAL BID DOCUMENTS 629-22-700

3/32" = 1'-0"1

BLDG. 02 POWER OVERALL PLAN - LEVEL 2 SOUTH

PLAN NOTES

1 CONTRACTOR TO PROVIDE NEW 208V, 60A, 3-PHASE POWER TERMINATING IN HARD-WIRED

JUNCTION BOX FOR NEW RACK POWER. JUNCTION BOX TO BE MOUNTED DIRECTLY ON

CABLE TRAY. REFER TO ELECTRICAL FEEDER SCHEDULE ON 00-EG-001 FOR CONDUIT AND

CONDUCTOR SIZING REQUIREMENTS.

2 CONTRACTOR TO PROVIDE NEW L21-20R RECEPTACLE FOR NEW RACK POWER.

RECEPTACLE TO BE MOUNTED DIRECTLY ON CABLE TRAY. PROVIDE 3#12 PHASE

CONDUCTORS, 1#12 NEUTRAL & 1#12 GROUND. ROUTE CONDUCTORS IN 3/4" CONDUIT.

1/4" = 1'-0"2

ENLARGED POWER PLAN - TR 2G108

1/4" = 1'-0"3

ENLARGED POWER PLAN - TR 2F105B

GENERAL NOTES

1. COORDINATE EXACT LOCATION OF MECHANICAL AND TELECOMMUNICATIONS EQUIPMENT

WITH THE CORRESPONDING DISCIPLINE'S DRAWINGS.

2. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,

FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S

WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.

COORDINATE THIS WORK WITH THE COR.

3. REFER TO ASSOCIATED TN SHEET FOR RACK QUANTITIES IN EXISTING AND NEW TR

SPACES.

4. ASSUMED CAPACITY AND LOAD AVAILABLE TO PANELS BEING USED IN SCOPE OF WORK.

CONTRACTOR TO VERIFY SUFFICIENT LOAD IS AVAILABLE PRIOR TO ADDING EQUIPMENT TO

N A

C

F

F

F

F

OC

NORTH

KEY PLAN

KEY PLAN

Q B

C

D

E

F

G

J

H

K

L M

P

N

S H

O T

G U

N

F

IS

H E

R

SHAFT

SHE06

SHAFT

SHE07

SHAFT

SHD02B

SHAFT

SHD03

CONTROL

3E138

OPERATING ROOM

3E144

CLEAN-UP

3E141

STRETCHER

3E144A

MALE LOCKER

3D145

FEMALE LOCKER

3D150

RES CONF/ CLASSROOM

3D170

PURCH AGENT

3D118A

CONF ROOM

3D146

NM

3D126

NM

3D127

OR COORD

3D130

CLER

3D119B

ANESTH

3D133D

CLIN COORD

3D124

CLIN COORD

3D125

WORK/ STORAGE

3D147

RES WORK

3D137

CLER

3D119A

CLER

3D135B

ANESTH

3D133A

RECPT

3D139

CLEAN CART

3D149

CLER

3D135A

SECY/ WAIT

3D136

CLER

3D119C

CLER

3D144F

CLIN COORD

3D123

WAITING

3D140

HK

3D165

T/S

3D150A

HC SHOWER

3D150B

ST

3D145A

ST

3D145C

HC SHWR

3D145B

BLOOD GAS

3E142

CC

3D164

NURSE WORK

3D163

ANESTH

3D134A

ANESTH

3D134D

ANESTH

3D133E

ANESTH

3D133B

ANESTH

3D134E

ANESTH

3D134B

ANESTH

3D134C

PURCH AGENT

3D118B

ANESTH

3D133C

CC

3E156

EC

3D131

SERVICE BAY

3D227

EMER ELEC

3D227B

NORM ELEC

3D227A

SERVICE BAY

3E227

PAT ELEV LOBBY

3D221

TR

3D223A

3D104A

CHUTE RM

3D225

PRE/REC

3E104

RECOV

3E117

RECOV

3E121

NURSE STATION

3E127

T

3E102

RECOV

3E115

PRE/REC

3E103

RECOV

3E110

RECOV

3E109

ISO RECOV

3E108

RECOV

3E116

CLEAN

3E131

MEDICINE PREP

3E129

ST

3E125

RECOV

3E111 ISO PRE/REC

3E105

NURSE STATION

3E128

RECOV

3E120

EQUIP STOR

3E101

T

3E124

NOURISH

3E122

SOILED

3E100

NURSE STATION

3E130

PRE/REC

3E106

CLER

3D119D

CORR

3D-C05

CORR

3D-C04

CORR

3D-C06

CORR

3D-C01

CORR

3D-C07

CORR

3D-C08A

CORR

3D-C08B

CORR

3D-C09

CORR

3D-C03A

CORR

3D-C03B

CORR

3E-C11

CORR

3E-C05

CORR

3E-C10 CORR

3E-C01

CORR

3E-C03

CORR

3E-C04

CORR

3E-C06A

CORR

3E-C07

CORR

3E-C08B

CORR

3E-C09

STAIR

STD-14

ELEV

DS-12

HK

3D141

CLEAN CORE

3D176

CLER

3D119E

STAFF LOUNGE

3D153

CORR

3D-C14

SHAFT

SHD03C

RECOV

3E118

HK

3D217

SECURITY

3D223B

RECOV

3E119

EQUIP ALCOVE

3E107

STRETCHER

3E126

SCRUBS ALC

3D100B

SCRUBS ALC

3D100A

STAFF LOUNGE

3D152

CORR

3E-C06B

PAIN

3E135

PAIN

3E136

PAIN

3E137

TR

3E227A

3E102A

NORM ELEC

3E227D EMER ELEC

3E227C

CORR

3E-C02

SECURITY

3E227B

EQ

3E-CO2A

EQ

3E-CO2B

PYXIS

3E-CO2C

ST

3D120

ST

3D121

NM

3D128

ELEC

3E148B

OPERATING ROOM

3E146

OPERATING ROOM

3D160

OPERATING ROOM

3D162

OPERATING ROOM

3D172

OPERATING ROOM

3D174

OPERATING ROOM

3E149

CYSTO ROOM

3E151

STRETCHER

3E146A

STRETCHER

3D160A

STRETCHER

3E162A

STRETCHER

3D172A

STRETCHER

3D174A

STRETCHER

3E149A

STRETCHER

3E151A

NEURO EQUIPMENT

3D173

EQUIP STOR

3D175

EQUIP STOR

3E150

SPECIAL RECORD

3E152

X-RAY STORAGE

3E145

STORAGE ORTHO

3E147

PUMP ROOM

3D161

CLEAN CORE

3E148

CLEAN SUPPLIES

3D176A

SCRUB

3E144B

SCRUB

3E146B

SCRUB

3D160B

SCRUB

3D162B

SCRUB

3D172B

SCRUB

3D174B

SCRUB

3E149B

SCRUB

3E151B

EQUIP STOR

3E153

PACS WORK

3E154

ANESTHESIA

3E155

DECONTAM

3E143

INSTRUMENT PREP

STORAGE

3E148A

GAS CYLINDER

3D171 BIOMED

3D167

FROZEN SECTION

3D166

SOILED

3D148

CORR

3D-C01A

SHAFT

1D-C01C

SHAFT

1D-C01D

ELEV

DS-02

(E) DIST BOARD 'EC4D24312'

(E) DIST BOARD 'EC4D24311'

(E) PNL 'R22313A'

(E) PNL 'R22313B'

(E) PNL 'EC3P2231'

(E) PNL 'EC4P2231'

(E) PNL 'EC3P2232'

(E) PNL 'EC4P2232'

(E) PNL 'EC3P2236'

(E) PNL 'EC4P2236'

(E) PNL 'EC3P2235'

(E) PNL 'EC4P2235'

(E) DIST BOARD 'EC3D24321'

(E) DIST BOARD 'EC4D24322'

(E) PNL 'R22323'

(E) PNL 'EC4R22322B'

(E) PNL 'EC4R22322A'

(E) PNL 'EC4P2238'

(E) PNL 'EC3P2238'

(E) PNL 'EC4P2237'

(E) PNL 'EC3P2237'

(E) PNL 'EC4P2234'

(E) PNL 'EC3P2234'

(E) PNL 'EC3P2233'

(E) PNL 'EC4P2233'

(E) PNL 'D2232'

(E) PNL 'R22321A'

(E) PNL 'R22321B'

(E) PNL 'R22322'

(E) PNL 'LC2432'

(E) PNL 'L2432' (E) PNL 'EC3L2432'

(E) XFMR 'T6'

(E) PNL 'EC3D22321'

(E) PNL 'EC3R22321A'

(E) PNL 'EC3R22321B'

(E) XFMR 'T6'

(E) XFMR 'T5-1'

(E) PNL 'R22311'

(E) PNL 'R22312A'

(E) PNL 'R22312B'

(E) PNL 'D2231'

(E) PNL 'LC2431'

(E) PNL 'L2431'(E) XFMR 'T6'

(E) XFMR 'T4-1'

(E) PNL 'EC4R22311B'

(E) PNL 'EC4R22311A'

(E) XFMR 'T4'

(E) PNL 'EC4L2431'

02-EP-031

02-EP-031

(E) PNL 'EIT2231'

02-EP-031

TR

3D227

3D101C

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E) PNL 'EIT2232'

TR

3E227A

3E102A

EIT2232-9,11,13

R22322-23,25,27

60AS

60AF

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E)EIT2231-6

TR

3D223A

3D104A

R22312B-21,23,25

EIT2231-16,18,20

EIT2231-32,34,36

R22312B-27,29,31

60AS

60AF

60AS

60AF

EIT2232-23

EIT2232-21

EIT2232-15,17,19

R22312B-33,35,37

60AS

45AF

TR

3D227

3D101C

S1 L2431-42 a

EC4R22311B-38,40,42

EC4R22311B-365

LUMINAIRE SCHEDULE

TYPE DESCRIPTION MANUFACTURER MODEL # LAMP

TYPE

CRI DELIVERED

LUMENS

COLOR

TEMP

INPUT FINISH

WATTS

S1 STRIP LIGHT FIXTURE LITHONIA ZL1D SERIES LED 90 5337 3500 41

NOTES:

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

CONSULTANTS

FOR OFFICIAL USE ONLY (FOUO)

04-25-2023

FULLY

SPRINKLED

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver

10% BASIS OF DESIGN 07.08.2022

35% SCHEMATIC DESIGN 11.10.2022

65% DESIGN DEVELOPMENT 01.13.2023

95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

TERP consulting Fire + Life Safety

14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011

FINAL BID DOCUMENTS 04.25.2023

A u to d e s k D o c s /2

-0

N e w O rl e a n s

E H

R M

/2 -0

N

O L

A E

H R

M

C O

N C

O U

R S

E

E le c I n t-

R

.r v t

02-EP-031

OVERALL THIRD FLOOR POWER PLAN

NORTH - BLDG. 02

MER AJW

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

FINAL BID DOCUMENTS 629-22-700

3/32" = 1'-0"1

BLDG. 02 POWER OVERALL PLAN - LEVEL 3 NORTH

PLAN NOTES

1 CONTRACTOR TO PROVIDE NEW 208V, 60A, 3-PHASE POWER TERMINATING IN HARD-WIRED

JUNCTION BOX FOR NEW RACK POWER. JUNCTION BOX TO BE MOUNTED DIRECTLY ON

CABLE TRAY. REFER TO ELECTRICAL FEEDER SCHEDULE ON 00-EG-001 FOR CONDUIT AND

CONDUCTOR SIZING REQUIREMENTS.

2 CONTRACTOR TO PROVIDE NEW L21-20R RECEPTACLE FOR NEW RACK POWER.

RECEPTACLE TO BE MOUNTED DIRECTLY ON CABLE TRAY. PROVIDE 3#12 PHASE

CONDUCTORS, 1#12 NEUTRAL & 1#12 GROUND. ROUTE CONDUCTORS IN 3/4" CONDUIT.

3 CONTRACTOR TO PROVIDE NEW 60A DISCONNECT WITH NEW 45A FUSES FOR NEW

MECHANICAL HVAC UNIT. REFER TO ELECTRICAL FEEDER SCHEDULE ON 00-EG-001 FOR

CONDUIT AND CONDUCTOR SIZING REQUIREMENTS.

4 EXISTING RELOCATED ALARM PANEL/MONITOR. REROUTE AND EXTEND EXISTING CONDUIT

AND CONDUCTORS.

5 CONTRACTOR TO PROVIDE NEW 120V POWER FOR NEW CIRC PUMP. REFER TO ELECTRICAL

FEEDER SCHEDULE ON 00-EG-001 FOR CONDUIT AND CONDUCTOR SIZING REQUIREMENTS.

6 CONTRACTOR TO PROVIDE NEW LIGHT FIXTURE. REFER TO FIXTURE SCHEDULE ON THIS

SHEET FOR ADDITIONAL INFORMATION.

1/4" = 1'-0"2

ENLARGED POWER PLAN - TR 3E102A

1/4" = 1'-0"3

ENLARGED POWER PLAN - TR 3D104A

GENERAL NOTES

1. COORDINATE EXACT LOCATION OF MECHANICAL AND TELECOMMUNICATIONS EQUIPMENT

WITH THE CORRESPONDING DISCIPLINE'S DRAWINGS.

2. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,

FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S

WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.

COORDINATE THIS WORK WITH THE COR.

3. REFER TO ASSOCIATED TN SHEET FOR RACK QUANTITIES IN EXISTING AND NEW TR

SPACES.

4. ASSUMED CAPACITY AND LOAD AVAILABLE TO PANELS BEING USED IN SCOPE OF WORK.

CONTRACTOR TO VERIFY SUFFICIENT LOAD IS AVAILABLE PRIOR TO ADDING EQUIPMENT TO

ASSOCIATED PANELS TO AVOID POTENTIAL PANEL OVERLOAD.

1/4" = 1'-0"4

ENLARGED POWER PLAN - TR 3D101C

DNDNDNDN

UP

UP

DN

DN

UP

UP

UP

UP

UP

M in im u m

D is ta n c e t o W a ll

MSA

Level of floor +/- 1/16" per 39" within this area.

F

F

PROCEDURE ROOM EP

3F171

CARDIAC CATH

3F166

CONTROL

3F166B

SCR

3F164A

SCR

3F166A

HYBRID CONTROL

3F168B

CARDIAC CATH HYBRID

3F168

SCR

3F171D

CONTROL

3F171C

SCR

3F169D

SCR

3F168A

CARDIAC CATH

3F164

CONTROL

3F164B

IR PROCEDURE

3F167

SCR

3F167D

IR PROCEDURE

3F169

CONTROL

3F169C

CONTROL

3F167C

INSTRUMENT ROOM

3F165B

VIEWING- PACS

3F182A

IR CORE

3F165

STAFF LOCKERS

3G193

INSTRUMENT ROOM

3F165C

INSTRUMENT ROOM

3F165D

STORAGE PACEMAKER

3F165E

CATH EQUIP CLEAN-UP

3F172

CATH EQUIP STOR

3F174

GI ASSIST

3G145O

PHYS

3G146C

RN TECH

3G145K

ADMIN

3G146A

CONSULT

3F101

PHYS

3G145C

PHYS

3G145F

PHYS

3G145E

PHYS

3G145D

SCRUB

3F171B

STRETCHER

3F171A

SCRUB

3F169B

STRETCHER

3F169A

SCRUB

3F167B

STRETCHER

3F167A

HYBRID SCRUB

3F168C

SCRUB

3F166C

STRETCHER

3F166D

SCRUB

3F164C

STRETCHER

3F164D

SERVICE BAY

3F227

TR

3F227A

3F109

PHYS

3G145A

SECY

3G146B

RN TECH

3G145N

RN TECH

3G145L

RN TECH

3G145M

STAFF LOCKERS

3G192

GI ASSIST

3G145J

GI ASSIST

3G145I

MALE

3G100B

EQUIP STOR

3G108

STAFF LOUNGE

3G194

CHUTE RM

3F184

PULM RECEPT

3G101

EC

3G186

NORM ELEC

3F227C

EMER SWITCH

3F227D

SERVICE BAY

3G228

NURSES STATION

3G124

STRETCHER STORAGE

3G152

DIG DISEASE

RESIDENTS

3G185

DICT/ VIEW

3G178

DG CLER

3G145P

PHYS

3G145B

T

3G127

PHYS

3G145G

CC

3G128

SERVICE BAY

3G227

TR

3G227A

3G114

EMER ELEC

3G227D

NORM ELEC

3G227C

NORM ELEC

3F180

FEMALE

3G100A

RT

3G110E

RT

3G110D

RT

3G110C

RT

3G110B

T

3G126

ISOL

3G103

ISOL

3G104

PULM SCREEN

3G106

PFT

3G105

EXERCISE PHYS

3G102

CYLINDER

3G108C

CC

3G107

PHYS LOUNGE

3G191

RT

3G110A

PRE/REC

3F136

PRE/REC

3F106

PRE/REC

3F149

PRE/REC

3F146

PRE/REC

3F150

PRE/REC

3F138

PRE/REC

3F144

NURSES STATION

3F125

PRE/REC

3F154

T

3F137

PREP/ INDUCT

3F145

PRE/REC

3F142

PRE/REC

3F127

PRE/REC

3F126

PRE/REC

3F155

PRE/REC

3F152

NURSES STATION

3F153

T

3F140

PRE/REC

3F129

PRE/REC

3F128

PRE/REC

3F107

PRE/REC

3F120

PRE/REC

3F147

PRE/REC

3F119

PRE/REC

3F143

PRE/REC

3F139

PRE/REC

3F151

PRE/REC

3F159

PRE/REC

3F141

T

3F148

HW

3F125A

HW

3F153A

HW

3F155A

PRE/REC

3F135

PRE/REC

3F157

NURSES STATION

3F156

SOILED

3F160

PRE/REC

3F158

STORAGE/ COPY

3G144

RES CONF/ CLASSROOM

3G181

OFFICE CHIEF CARDIO

3G138

CHIEF RESIDENT

3G137

OFFICE NURSE MGR

3G139

CONFERENCE ROOM

(CL)

3G180

SECY/WAIT

3G136

TEST

3G129

SOILED

3G134

RECOVERY

3G116

RECOVERY

3G122

RECOVERY

3G121

RECOVERY

3G118

CLEAN

3G125

RECOVERY

3G120

RECOVERY

3G117

GENERAL ENDO

3G169

EUS/COMPLEX

3G167

GENERAL ENDO

3G168

ERCP

3G166

CLEAN SCOPE

STORAGE

3G160

SCOPE STORE

3G158

STRETCHER STORAGE

3G171

T

3G165

T

3G175

CLEAN

3G162

SOILED

3G161

COPY/ WORK

3G179

PROCEDURE BRONCH

3G153

GENERAL ENDO

3G156

GENERAL ENDO

3G155

CONTROL

3G153A

DG PRIVATE INTERVIEW

3G141

DG CHIEF OFFICE

3G140

DG NURSE MANAGER

3G143

DG SECY/ FILES

3G142

RECOVERY

3G115

RECOVERY

3G119

LINEN STOR

3G157

EQUIP CLEAN-UP

3G159

STRETCHER STORAGE

3G170

STRETCHER STORAGE

3G154

HK

3G190

BLOOD GAS

3G135

CLEAN

3G133

FULL CYLINDER

3G151

RECOVERY

3G123

PHYS

3G145H

HC ST/S

3G192C

ST

3G176

ST

3G177

EMPTY CYLINDER

3G150

HK

3F178

UNASSIGNED

3F186 PUB ELEV LOBBY

3F220

CORR

3F-C01B

CORR

3F-C02B

CORR

3F-C05B

CORR

3F-C05A

CORR

3F-C06

CORR

3F-C07B

CORR

3F-C08

CORR

3F-C09B

CORR

3G-C02C

CORR

3G-C02B

CORR

3G-C01

CORR

3G-C03B

CORR

3G-C11

CORR

3G-C07B

CORR

3G-C08A

CORR

3G-C09

CORR

3G-C10

CORR

3G-C08B

CORR

3G-C03A

CORR

3G-C04 CORR

3G-C06

CORR

3G-C05

SOILED

3F176

CORR

3G-C13

TRAINING/ WORK

3G187

UNASSIGNED

3F182B

SECURITY

3F227B

SECURITY

3G227B

CORR

3F-C07A

ALCOVE

3F187

MED PREP

3G163

PHYS WORK

3G164

HC ST/S

3G193C

LINEN STOR

3G157A

(E) PNL 'EC2R22332A'

(E) PNL 'EC2R22332B'

(E) PNL 'EC2D24332'

(E) PNL 'R22333B'

(E) PNL 'R22333A'

(E) PNL 'EC1R22343B'

(E) PNL 'EC1R22343A'

(E) PNL 'EC1D24331'

(E) PNL 'EQ3D2433'

(E) XFMR 'T4'

(E) XFMR 'T4'

(E) PNL 'EC1P2232'

(E) PNL 'EC2P2232'

(E) PNL 'EC1P2231'

(E) PNL 'EC2P2231'

(E) PNL 'EC1P2233'

(E) PNL 'EC2P2233'

(E) PNL 'EC1R22342B'

(E) PNL 'EC1R22342A'

(E) PNL 'R22343A'

(E) PNL 'R22343B'

(E) PNL 'EQ5P24342'

(E) PNL 'EC2P2234'

(E) PNL 'EC1P2234'

(E) PNL 'EC2P2235'

(E) PNL 'EC1P2235'

(E) PNL 'EC2P2236'

(E) PNL 'EC1P2236'

(E) PNL 'R22332B'

(E) PNL 'R22332A'

(E) PNL 'R22331B'

(E) PNL 'R22331A'

(E) PNL 'D2233'

(E) PNL 'LC2433'

(E) PNL 'L2433'

(E) XFMR 'T6'

(E) XFMR 'T5-1'

(E) PNL 'EC2L2433'

(E) XFMR 'T5'

(E) PNL 'EC2D2233'

(E) PNL 'EC2R22331A'

(E) PNL 'EC2R22331B'

(E) PNL 'EC2R22333'

02-EP-032

02-EP-032

(E) PNL 'EQ5P24341'

(E) PNL 'R22341A'

(E) PNL 'R22341B'

(E) PNL 'R22342A' (E) PNL 'R22342B'

(E) PNL 'LC2434'

(E) PNL 'L2434'

(E) XFMR 'T7'

(E) PNL 'D2234'

(E) PNL 'EC1R22341A'

(E) PNL 'EC1R22341B'

(E) PNL 'EC1L2434'

(E) XFMR 'T4-1'

(E) XFMR 'T6'

(E) PNL 'EC1D2234'

(E)UNLABELED (E)UNLABELED

(E)UNLABELED

(E) PNL 'EIT2234'

TR

3G227A

3G114

EIT2234-5,7,9

R22342B-3,5,7

EIT2234-11,13,15

R22342B-9,11,13

60AS

60AF

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E) PNL 'EIT2233'

TR

3F227A

3F109

R22331B-37,39,41

EIT2233-13,15,17

1 1

60AS

60AF

NORTH

KEY PLAN

KEY PLAN

Q B

C

D

E

F

G

J

H

K

L M

P

N

S H

O T

G U

N

F

IS

H E

R

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

CONSULTANTS

FOR OFFICIAL USE ONLY (FOUO)

04-25-2023

FULLY

SPRINKLED

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver

10% BASIS OF DESIGN 07.08.2022

35% SCHEMATIC DESIGN 11.10.2022

65% DESIGN DEVELOPMENT 01.13.2023

95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

TERP consulting Fire + Life Safety

14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011

FINAL BID DOCUMENTS 04.25.2023

A u to d e s k D o c s /2

-0

N e w O rl e a n s

E H

R M

/2 -0

N

O L

A E

H R

M

C O

N C

O U

R S

E

E le c I n t-

R

.r v t

02-EP-032

OVERALL THIRD FLOOR POWER PLAN

SOUTH - BLDG. 02

MER AJW

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

FINAL BID DOCUMENTS 629-22-700

3/32" = 1'-0"1

BLDG. 02 POWER OVERALL PLAN - LEVEL 3 SOUTH

GENERAL NOTES

1. COORDINATE EXACT LOCATION OF MECHANICAL AND TELECOMMUNICATIONS EQUIPMENT

WITH THE CORRESPONDING DISCIPLINE'S DRAWINGS.

2. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,

FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S

WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.

COORDINATE THIS WORK WITH THE COR.

3. REFER TO ASSOCIATED TN SHEET FOR RACK QUANTITIES IN EXISTING AND NEW TR

SPACES.

4. ASSUMED CAPACITY AND LOAD AVAILABLE TO PANELS BEING USED IN SCOPE OF WORK.

CONTRACTOR TO VERIFY SUFFICIENT LOAD IS AVAILABLE PRIOR TO ADDING EQUIPMENT TO

ASSOCIATED PANELS TO AVOID POTENTIAL PANEL OVERLOAD.

PLAN NOTES

1 CONTRACTOR TO PROVIDE NEW 208V, 60A, 3-PHASE POWER TERMINATING IN HARD-WIRED

JUNCTION BOX FOR NEW RACK POWER. JUNCTION BOX TO BE MOUNTED DIRECTLY ON

CABLE TRAY. REFER TO ELECTRICAL FEEDER SCHEDULE ON 00-EG-001 FOR CONDUIT AND

CONDUCTOR SIZING REQUIREMENTS.

2 CONTRACTOR TO PROVIDE NEW L21-20R RECEPTACLE FOR NEW RACK POWER.

RECEPTACLE TO BE MOUNTED DIRECTLY ON CABLE TRAY. PROVIDE 3#12 PHASE

CONDUCTORS, 1#12 NEUTRAL & 1#12 GROUND. ROUTE CONDUCTORS IN 3/4" CONDUIT.

1/4" = 1'-0"2

ENLARGED POWER PLAN - TR 3G114

1/4" = 1'-0"3

ENLARGED POWER PLAN - TR 3F109

DN

UP

UP

UP

F

FF

NORTH

KEY PLAN

KEY PLAN

Q B

C

D

E

F

G

J

H

K

L M

P

N

S H

O T

G U

N

F

IS

H E

R

SHAFT

SHE06

SHAFT

SHE07

SHAFT

SHD02B

SHAFT

SHD03

ELEV

DS-12

SHAFT

SHD03C

SHAFT

1D-C01C

SHAFT

1D-C01D

HK

4D162

STORAGE ACTIVE

4D109

CLERICAL

4D126B

TEACH COORD

4D104C

CONFERENCE

4D141

CHIEF

4D125

SECY/ WAITING

4D121

LOCKERS

4D132

LOUNGE

4D140

IP CHEMO IV PREP

4D128

RECEIVING

BREAKDOWN

4D110

ANTE ROOM

4D131

ASST CHIEF

4D174

SECT LDR

4D173

CHIEF

4D175

STEAM STERILIZERS

4D163

CART WASH SERVICE

4D150

MANUAL EQUIP WASH

4D151

DECONTAMINATION

4D146

DETERGENT

4D149

SOILED TRANSITION

4D145

DISPATCH

4D158

PREP/ ASSEMBLY

4D155 ASEPTIC TRANSFER

4D130

STORAGE

4D150A

SUPER

4D123

VAULT

4D120

STORAGE BULK

4E110

STORAGE FLAMMABLE

4E114

STORAGE REFRIG

4E108

SPEC ACCESS

4E103A

HEMA COAG/ROUTINE

LAB

4E125E

URINE

4E125D

RECEIVING INVENTORY

4D111

BIO MED CIMN

4E135

STORAGE SF & AS

4D113

REFRIG/ FREEZER

4D112

REPACKAGING EXTEMP

4D106

REFRIG/ FREEZER IV AD

4D129

STAT COUNTER

4D114

CLERICAL

4D104F

CLERICAL

4D104E

CLERICAL

4D126A

QM

4D134

COPY/WORK

4D104D

MED ASSIGN

4D115

DISPENSING SECURE

4D119

DRUG INFO

4D126

INTERN

4D136A

INTERN

4D136B

INTERN

4D136C

INTERN

4D136D

INTERN

4D136E

STUDY

4D136F

STUDY

4D136G

WORK/ STOR (IDP)

4D118

ASST CHIEF

4D124

CLIN COOR

4D133

SPEC PROJ

4D135

SERVER

4D122

VENDOR INSTRUMENT

4D171

CLERICAL

4D172

CLERICAL

4D176

STORAGE EQUIP & TEST

4D152

BULK STORAGE

4D159

STERILE

INSTRUMENTATION

4D157

HK

4D148

BREAKOUT RECEIVE

4D170

HK

4D139

NORM ELEC

4D180

EC

4E136

EMS STORAGE

4E137

EMER ELEC

4D227B

SERVICE BAY

4D227

NORM ELEC

4D227A

PAT ELEV LOBBY

4D221

TR

4D223A

4D104A

CHUTE RM

4D225

SERV ELEV LOBBY

4D220

ST

4D132A

ST

4D138

MED TECH

4E107

ST

4E113

ST

4E112

CONF TRAIN

4D169

LINEN & PACKS

4D160

HC S T/S

4D168

LOCKERS

4D165

LOCKERS

4D166

HC S T/S

4D167

CLEAN STOR

4E115

CHEM STOR

4E137A

CART COOLING

4D161

TOXICOLOGY

4E127

MED TECH

4E120

CORR

4E-C01

CORR

4E-C02

SERVICE BAY

4E227E

CORR

4E-C04A

CORR

4E-C05A

CORR

4E-C07A

CORR

4E-C08B

CORR

4E-C09A

CORR

4E-C09B

CORR

4D-C01

CORR

4D-C03

CORR

4D-C04B

CORR

4D-C04A

CORR

4D-C05

CORR

4D-C07

STAIR

STD-18

STUDENT

4E118B

STUDENT

4E118A

CORR

4D-C08

CORR

4D-C09

CORR

4D-C10

CORR

4E-C04B

EMS STORAGE

4D100

CORR

4D-C14

CORR

4E-C08A H CYLINDER

4E138

STORAGE

4D177

COPY

4D178

HK

4D217

HK

4E106

SECURITY

4D223B

CORR

4D-C12

ST

4E117

EMER COMMAND

CENTER

4E145

STORAGE

4E101

TR

4E227A

4E201A

SERVICE BAY

4E227

NORM ELEC

4E227D

EMER ELEC

4E227C

SECURITY

4E227B

MED TECH (CHEMISTRY)

4E121

MED TECH (NIGHT

SUPER)

4E111

MED TECH

(HEMATOLOGY)

4E109

MED TECH (BB)

4E105

CONFERENCE

4E102

CLIN CHEM

4E125

BLOOD BANK

4E129A

STORAGE STERILE &

PREP

4E116

CLST

4E125A

CLASS/LAB

4E119

CORR

4D-C01A

SCOPE CLEANING

4D146A

CONFERENCE

2D119E

CONFERENCE

2D119F

CONFERENCE

2D119G

ELEV

DS-02

(E)T3-1 MOUNTED

ABOVE T5

(E)T2 MOUNTED ABOVE T4

(E) PNL 'R22412B'

(E) PNL 'R22412A'

(E) PNL 'R22422'

(E) PNL 'EIT2241'

02-EP-041

(E) PNL 'R22411A'

(E) PNL 'R22411B'

(E) PNL 'D2241'

(E) PNL 'LC2441'

(E) PNL 'L2441'

(E) XFMR 'T6'

(E) PNL 'ELS2441'

(E) PNL 'ELS2241'

(E) XFMR 'T2'

(E) PNL 'EC4R2241A'

(E) PNL 'EC4R2241B'

(E) PNL 'EQ4P2441'

(E) XFMR 'T5'

(E) PNL 'EC4L2441'

(E) PNL 'EQ4R2241B'

(E) PNL 'EQ4R2241A'

(E) PNL 'D22421'

(E) PNL 'R22421'

(E) XFMR 'T6'

(E) PNL 'L2442'

(E) PNL 'LC2442'

(E) PNL 'EQ4R2242'

(E) PNL 'EC3L2442'

(E) XFMR 'T3-1'

(E) XFMR 'T4'

(E) PNL 'EC3R2242'

(E) PNL 'EQ4D2244'

(E) XFMR 'T6'

(E) PNL 'ELS2242'

(E) PNL 'ELS2442'

02-EP-041

(E) PNL 'EIT2242'

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

TR

4E227A

4E201A

EIT2242-9,11,13

R22421-25,27,29

60AS

60AF

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

TR

4D223A

4D104A

EIT2241-19,21,23

R22421-24,26,28

EIT2241-16,18,20

R22421-30,32,34

60AS

60AF

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

CONSULTANTS

FOR OFFICIAL USE ONLY (FOUO)

04-25-2023

FULLY

SPRINKLED

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver

10% BASIS OF DESIGN 07.08.2022

35% SCHEMATIC DESIGN 11.10.2022

65% DESIGN DEVELOPMENT 01.13.2023

95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

TERP consulting Fire + Life Safety

14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011

FINAL BID DOCUMENTS 04.25.2023

A u to d e s k D o c s /2

-0

N e w O rl e a n s

E H

R M

/2 -0

N

O L

A E

H R

M

C O

N C

O U

R S

E

E le c I n t-

R

.r v t

02-EP-041

OVERALL FOURTH FLOOR POWER PLAN

NORTH - BLDG. 02

MER AJW

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

FINAL BID DOCUMENTS 629-22-700

3/32" = 1'-0"1

BLDG. 02 POWER OVERALL PLAN - LEVEL 4 NORTH

PLAN NOTES

1 CONTRACTOR TO PROVIDE NEW 208V, 60A, 3-PHASE POWER TERMINATING IN HARD-WIRED

JUNCTION BOX FOR NEW RACK POWER. JUNCTION BOX TO BE MOUNTED DIRECTLY ON

CABLE TRAY. REFER TO ELECTRICAL FEEDER SCHEDULE ON 00-EG-001 FOR CONDUIT AND

CONDUCTOR SIZING REQUIREMENTS.

2 CONTRACTOR TO PROVIDE NEW L21-20R RECEPTACLE FOR NEW RACK POWER.

RECEPTACLE TO BE MOUNTED DIRECTLY ON CABLE TRAY. PROVIDE 3#12 PHASE

CONDUCTORS, 1#12 NEUTRAL & 1#12 GROUND. ROUTE CONDUCTORS IN 3/4" CONDUIT.

1/4" = 1'-0"2

ENLARGED POWER PLAN - TR 4E201A

1/4" = 1'-0"3

ENLARGED POWER PLAN - TR 4D104A

GENERAL NOTES

1. COORDINATE EXACT LOCATION OF MECHANICAL AND TELECOMMUNICATIONS EQUIPMENT

WITH THE CORRESPONDING DISCIPLINE'S DRAWINGS.

2. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,

FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S

WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.

COORDINATE THIS WORK WITH THE COR.

3. REFER TO ASSOCIATED TN SHEET FOR RACK QUANTITIES IN EXISTING AND NEW TR

SPACES.

4. ASSUMED CAPACITY AND LOAD AVAILABLE TO PANELS BEING USED IN SCOPE OF WORK.

CONTRACTOR TO VERIFY SUFFICIENT LOAD IS AVAILABLE PRIOR TO ADDING EQUIPMENT TO

UP

DN

UP

UP

UP

UP

UP

F

F

HC T/SH

4F119

HC T/SH

4F121

ST

4F114A

TELE PBX

4G108

MORTUARY REFRIG

4F107

AUTOPSY ROOM

4F109

SLIDE/BLOCK RECORDS

STOR

4F106

HISTOLOGY

4F104

CYTOLOGY

4F128

MED TECH

4F133

AP ADP

4F104A

TEACH AUTOPSY

4F111

GROSS SPECIMEN STOR

4F123

AMP INSTR

4F144

MED TECH

4F117

TANKS

4F129

PARASITOLOGY

4F127

IMUNOPATHOLOGY

4F134

PRE-AMP REAGENT

PREP

4F139

PRE-AMP SPEC PROC

4F141

HK

4F158

LOCKERS

4F114

LOUNGE

4F122

CONFERENCE

4F116

DATA PROCESS

4F156

CLERICAL

4F149B

SECTION CHIEF

4F150

ADMIN OFFICER (AOD)

4F154

STAFF PATH

4F159

STAFF PATH

4F157

STAFF PATH

4F155

CHIEF OF SERV

4F148

STAFF PATH

4F153

COPY

4F147

ADP

4F144A

HK

4F132

LOCKERS

4F130

SECTION CHIEF

4F152

FLUORO MICRO

4F131

MB MYCOLOGY/ TB

4F136

MB CLINICAL MICRO

4F138

ST

4F145

CHUTE RM

4F120

PATH/ RESIDENT

4F118

TR

4G227A

4G103

EMER ELEC

4G227D

NORM ELEC

4G227C

MAIN COMPUTER ROOM

4G110A

NETWK

4G106B

NETWK

4G106J

PBX

4G106P

PBX

4G106N

TELE UPS

4G108A

PBX

4G106L

COMPUTER ROOM MIS

4G110C

COMP ACTIVE STOR

4G110E

PBX

4G106M

PBX

4G106O

NETWK

4G106D

NETWK

4G106C

IMAGE

4G106T

IMAGE

4G106Q

IMAGE

4G106R

NETWK

4G106E

IMAGE

4G106S

NETWK

4G106K

TRAIN/ CONF RM

4G140

SUPV TECH

4G121A

SUPV TECH

4G121B

SUPV TECH

4G121CPRIVATE MEETING RM

4G142

CHIEF NUTRITION

4G148

RECEPT

4G151

ASST CHIEF NUTRITION

4G146

CLINICAL ADM SEC

CHIEF

4G144

SUPV TECH

4G121D

CLERK

4G149B

CLERK

4G149A

WALK-IN MEAT FREEZER

4G125B

WALK-IN MEAT THAWING

4G125A

DIET TECH COMM

CENTER

4G147

PATIENT PROD MGR

4G150

WALK-IN FOOD BANK

4G123

DIET TECH COMM

CENTER

4G145

RECEIVING

4G136

MAIN KITCHEN PATIENT

TRAY SERIVCE

4G126

MAIN KITCHEN

SANITATION

4G122

MAIN KITCHEN FOOD

PREP

4G124

DRY GOODS STOR

4G130

DHCP COMPUTER

4G110B

EC

4G138

EC

4F112

KITCHEN ELEC RM

4G120

TR

4F227A

4F101

SERVICE BAY

4F227

NORM ELEC

4F227C

EMER ELEC

4F227D

REFRIG

4F142

VISTA

4G106G

VISTA

4G106I

VISTA

4G106H

SECTION CHIEF

4G103

VEST

4G-C03D

SECTION CHIEF

4G101

STAFF LOUNGE

4G134

HK

4G104

ST

4F143

FEMALE

4G139

MALE

4G137

SERVICE BAY

4G228

REFRIG - BEV/BAK

4G128

DAIRY REFRIG

4G127

WALK-IN PRODUCE

4G129

PRODUCT REFRIG

4G131

FOOD SERV ELEV

LOBBY

4F110

FEMALE

4A100A

MALE

4A100B

UPS ELEC RM

4G110D

HK

4G119B

CORR

4G-C01B

CORR

4G-C01A

CORR

4G-C04

CORR

4F-C02B

CORR

4F-C02A

CORR

4F-C03

CORR

4F-C04

CORR

4F-C05

CORR

4F-C07

CORR

4F-C08

CORR

4F-C09A

CORR

4F-C09B

CORR

4F-C10A

CORR

4F-C10B

CORR

4G-C05B CORR

4G-C06

CORR

4G-C05A

CORR

4G-C07

CORR

4G-C05

TEAM SPACE

4G106U

SECURITY

4F227B

SECURITY

4G227B

CLERICAL

4F149A

BACK-UP SECURITY

COMMAND CENTER

4G105

STOR

4G119A

ELEV LOBBY

4F222

SERV ELEV LOBBY

4F229

CORR

4F-C01

CABLE VAULT

4G108B

SCC RACK ROOM

4G105A

OFFICE

4F226A

OPERATORS ROOM

4F226LOUNGE

4F226B

(E)ELS - DISCONNECT

(E) PNL 'R22432A'

(E) PNL 'R22432B'

(E) PNL 'EQ1R22431'

(E) PNL 'UNLABELED'

(E) PNL 'UNLABELED'

(E) PNL 'UNLABELED'

(E) XFMR 'T6'

(E) XFMR 'T4'

(E) PNL 'EQ2R22441'

(E) PNL 'EQ1P2444'

(E) PNL 'K24441'

(E) PNL 'KD2244'

(E) PNL 'K22441B'

(E) PNL 'K22441A'

(E) PNL 'K22443'

(E) PNL 'K22442A'

(E) PNL 'K22442B'

(E) PNL 'KD2444'

(E) DIST BOARD 'DPUPS241'

02-EP-042

(E) PNL 'R22442'

(E) PNL 'R22441A'

(E) PNL 'R22441B'

(E) PNL 'LC2444'

(E) PNL 'L2444'

(E) XFMR 'T6'

(E) PNL 'D2244' (E) XFMR 'T2'

(E) PNL 'ELS2444'

(E) XFMR 'T5'

(E) XFMR 'T3-1'

(E) PNL 'EC1L2444'

(E) XFMR 'T4'

(E) PNL 'EC1R2244'

(E) PNL 'EQ5R2244'

(E) PNL 'ELS2244'

(E) PNL 'R22431B'

(E) XFMR 'T6'

(E) PNL 'D22431'

(E) PNL 'R22431A'

(E) PNL 'LC2443'

(E) PNL 'L2443'

(E) PNL 'ELS2243'

(E) PNL 'ELS2443'

(E) XFMR 'T2'

(E) XFMR 'T3-1'

(E) PNL 'EC2L2443'

(E) XFMR 'T6'

(E) PNL 'EQ1D2246'

(E) PNL 'EQ1R22431'

(E) XFMR 'T5-1'

02-EP-042

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E) PNL 'EIT2244'

TR

4G227A

4G103 2

EIT2244-19,21,23

EIT2244-13,15,17

R22442-6,8,10

R22442-12,14,16

60AS

60AF

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E)UNLABELED

(E) PNL 'EIT2243'

TR

4F227A

4F101

EIT2243-9,11,13

R22431B-1,3,5

60AS

60AF

NORTH

KEY PLAN

KEY PLAN

Q B

C

D

E

F

G

J

H

K

L M

P

N

S H

O T

G U

N

F

IS

H E

R

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

CONSULTANTS

FOR OFFICIAL USE ONLY (FOUO)

04-25-2023

FULLY

SPRINKLED

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver

10% BASIS OF DESIGN 07.08.2022

35% SCHEMATIC DESIGN 11.10.2022

65% DESIGN DEVELOPMENT 01.13.2023

95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

TERP consulting Fire + Life Safety

14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011

FINAL BID DOCUMENTS 04.25.2023

A u to d e s k D o c s /2

-0

N e w O rl e a n s

E H

R M

/2 -0

N

O L

A E

H R

M

C O

N C

O U

R S

E

E le c I n t-

R

.r v t

02-EP-042

OVERALL FOURTH FLOOR POWER PLAN

SOUTH - BLDG. 02

MER AJW

VA NEW ORLEANS (EHRM) ELECTRONIC

HEALTH RECORD MODERNIZATION

INFRASTRUCTURE UPGRADES

2400 CANAL STREET, NEW ORLEANS, LA 70119

FINAL BID DOCUMENTS 629-22-700

3/32" = 1'-0"1

BLDG. 02 POWER OVERALL PLAN - LEVEL 4 SOUTH

GENERAL NOTES

1. COORDINATE EXACT LOCATION OF MECHANICAL AND TELECOMMUNICATIONS EQUIPMENT

WITH THE CORRESPONDING DISCIPLINE'S DRAWINGS.

2. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,

FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S

WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.

COORDINATE THIS WORK WITH THE COR.

3. REFER TO ASSOCIATED TN SHEET FOR RACK QUANTITIES IN EXISTING AND NEW TR

SPACES.

4. ASSUMED CAPACITY AND LOAD AVAILABLE TO PANELS BEING USED IN SCOPE OF WORK.

CONTRACTOR TO VERIFY SUFFICIENT LOAD IS AVAILABLE PRIOR TO ADDING EQUIPMENT TO

ASSOCIATED PANELS TO AVOID POTENTIAL PANEL OVERLOAD.

PLAN NOTES

1 CONTRACTOR TO PROVIDE NEW 208V, 60A, 3-PHASE POWER TERMINATING IN HARD-WIRED

JUNCTION BOX FOR NEW RACK POWER. JUNCTION BOX TO BE MOUNTED DIRECTLY ON

CABLE TRAY. REFER TO ELECTRICAL FEEDER SCHEDULE ON 00-EG-001 FOR CONDUIT AND

CONDUCTOR SIZING REQUIREMENTS.

2 CONTRACTOR TO PROVIDE NEW L21-20R RECEPTACLE FOR NEW RACK POWER.

RECEPTACLE TO BE MOUNTED DIRECTLY ON CABLE TRAY. PROVIDE 3#12 PHASE

CONDUCTORS, 1#12 NEUTRAL & 1#12 GROUND. ROUTE CONDUCTORS IN 3/4" CONDUIT.

1/4" = 1'-0"2

ENLARGED POWER PLAN - TR 4G103

1/4" = 1'-0"3

ENLARGED POWER PLAN - TR 4F101

UP

DN

F F

NORTH

KEY PLAN

KEY PLAN

Q B

C

D

E

F

G

J

H

K

L M

P

N

S H

O T

G U

N

F

IS

H E

R

NORM ELEC

5D122A

EMER ELEC

5D122B

EXAM

5D131

INTERVIEW CONSULT

5D129

S/WC

5D127

HEAD NURSE

5D115

CLEAN

5D121

COMM CTR

5D151A

NOUR

5D120C

DINING

5D120B

DAYROOM

5D122

SOILED

5D101

MED

5D151B

KITCHEN

5D120A

TRASH/LINEN CHUTE

5D225RECYCLING AREA

5D116

TR

5D223A

5D122A

CC

5D151D

SW

5D109

HOUSE STAFF

5D102

PSYCH

5D103

INTERN CONSULT

5D104

PHYSICIAN ASST

5D113

DIET/PHAR

5D106

PSYCH

5D105

PSYCH

5D107

SW

5D111

T/SHAVE

5D150

SEMI-PVT PATIENT

5D149

T BAR

5D149A

PATIENT

5D162

T

5D160A

PATIENT

5D164

T

5D162A

T

5D164A

SEMI-PVT PATIENT

5D147

T

5D155A

PATIENT

5D158

T

5D142A

PATIENT

5D1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .