2.12 - Drawings 12 of 17 - 00-EG-001 to 02-ED-051.pdf
PDF 19 MB Posted
- Solicitation number
- 36C77623B0038
About this file
This document provides details on a federal contract opportunity for infrastructure upgrades at a Veterans Affairs facility in New Orleans, Louisiana. The solicitation number is 36C77623B0038 and is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin. It involves construction services for NOLA EHRM Infrastructure Upgrades at the New Orleans location, as outlined in drawings numbered 00-EG-001 to 02-ED-051 contained in a 19MB PDF file. Responses are due by the date specified in the solicitation. The opportunity type is for an invitation for bids on a firm-fixed-price construction contract to be awarded to the responsible bidder with the lowest price. Small businesses, veteran-owned small businesses, service-disabled veteran-owned small businesses, and HUBZone small businesses are encouraged to respond.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00-EG-001
LEGEND, ABBREVIATION LIST, AND
GENERAL REQUIREMENTS
MER AJW
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
STAMP
LOCATION
1/ 2'
3' 0'
1'
1/ 2' 0'
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8' 0'
1/ 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2'
1' 0'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
3/ 0'
8'
4' 4'
Fi le
P at h
Revisions: Date:
10% BASIS OF DESIGN 07.08.2022 CONSULTANTS
TERPconsulting Fire + Life Safety 14241 E. 4th Avenue, Aurora CO, 80011 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04/25/2023
FULLY
SPRINKLEDSPRINKLED
PROGRAMMING
CONTRACTING
ACTIVITY
CENTAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
100% CONSTRUCTION
DOCUMENTS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
629-22-700
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
FINAL BID DOCUMENTS 04.25.2023
A, AMP AMPERE
ACP ACCESSIBLE CARD PATH
ADA AMERICAN DISABILITY ACT
AF AMP FRAME
AFC AVAILABLE FAULT CURRENT
AFCI ARC FAULT CIRCUIT INTERRUPTER
AFF ABOVE FINISHED FLOOR
AG ABOVE GROUND
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AL ALUMINUM
BCT BONDING CONDUCTOR FOR TLECOMMUNICATIONS
BKR BREAKER
C CONDUIT
CKT CIRCUIT
CO CONDUIT AND PULL-ROPE ONLY
COMM COMMUNICATION
CTRL CONTROL
CU COPPER
(E) EXISTING
EC, E.C. ELECTRICAL CONTRACTOR
ELEC ELECTRICAL
EM EMERGENCY
EQPT EQUIPMENT
(F) FUTURE
FA FIRE ALARM
FDR FEEDER
G, GND GROUND
GC, G.C. GENERAL CONTRACTOR
HH HANDHOLE
IDF INTERMEDIATE DISTRIBUTION FRAME
J-BOX JUNCTION BOX
LCP LIGHTING CONTROL PANEL
LIU LINE INTERFACE UNIT
LTG LIGHTING
LTS LIGHTS
LV LOW-VOLTAGE
MH MANHOLE
MM MULTI-MODE
N NEUTRAL
NEC NATIONAL ELECTRICAL CODE
OC ON-CENTER
OFCI OWNER-FURNISHED CONTRACTOR-INSTALLED
OFOI OWNER-FURNISHED OWNER-INSTALLED
OL OVERLOAD
P POLE
PB PULLBOX, PUSHBUTTON
PRI PRIMARY
(G) REVISED
REF REFERENCE, REFRIGERATOR
SEC SECONDARY
SM SINGLE-MODE
SOW SCOPE OF WORK
SPECS SPECIFICATIONS
SS STAINLESS STEEL
SW SWITCH
TEL TELEPHONE
TC TELECOMMUNICATION
TGB TELECOMMUNICATIONS BUS BAR
TMGB TELECOMMUNICATIONS MAIN GROUNDING BUS BAR
THRU THROUGH
(TYP) TYPICAL
UG UNDERGROUND
UNO UNLESS NOTED OTHERWISE
VLT VAULT
W WIRE, WATT
WP WEATHERPROOF
(X) EXISTING TO BE REMOVED
ABBREVIATION LIST GENERAL REQUIREMENTS
PRIMARY FIBER TAG. SEE NEW CAMPUS FIBER SCHEDULE
SECONDARY FIBER TAG. SEE NEW CAMPUS FIBER SCHEDULE
(N)MH-#X
xxxP
NEW MANHOLE
xxxS
(E)MH-#X EXISTING MANHOLE
P
S SECONDARY FIBER LOOP
PRIMARY FIBER LOOP
FIBER ROUTING, SUPPORTED WITH J-HOOKS
FIBER/CAT 6A ROUTING IN CONDUIT
J
C
TELECOMMUNICATIONS OUTLET, SUBNUMBER=QUANTITY OF DROPS
CJ CJ CAT 6A ROUTING, SUPPORTED WITH NEW J-HOOKS
C
WAP
TELECOMMUNICATIONS OUTLET, WIRELESS ACCESS POINT
SECURITY SYSTEM CARD READER/KEYPADCR
IS INERGEN SYSTEM SMOKE DETECTOR
IH INERGEN SYSTEM HEAD
SD FIRE ALARM SMOKE DETECTOR
PAGING SYSTEM SPEAKER
CAMERA
EXISTING REQUEST TO EXIT
TR ROOM
FIRE ALARM STROBE LIGHT
XXX-X-XX-PX
RACK NUMBER
PATCH PANEL LOCATON (RU#)
PORT NUMBER
TYPICAL TELECOMM OUTLET IDENTIFIERS:
TELECOMM OUTLET MOUNTED IN FLOOR BOX.
C
21. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND
RETURN FURNITURE, FIXTURES, AND EQUIPMENT WITHIN SPACES AS
REQUIRED TO COMPLETE EACH DAY'S WORK. THE VA WILL REMOVE,
OR SECURE, PHI, PPI, AND PERSONAL PROPERTY. COORDINATE THIS
WORK WITH THE COR.
22. PARTICULAR ATTENTION SHALL BE GIVEN TO THE PROTECTION OF
EXISTING STRUCTURE AND FINISHES TO PREVENT ANY DAMAGE OF
EXISTING FINISHES. ANY ACCIDENTAL DAMAGE INCURRED TO
EXISTING CONDITIONS WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO REPAIR OR CORRECT.
GENERAL REQUIREMENTS - CONT.
TELECOMMUNICATIONS OUTLET, VOICE ONLY
EQUIPMENT CALLOUT.
EQUIPMENT CONNECTION, SEE EQUIPMENT CONNECTION
SCHEDULES FOR SPECIFIC REQUIREMENTS.
HOME RUN
AHU-01
SPECIAL PURPOSE RECEPTACLE
4 PLEX RECEPTACLE
LIGHTING OR POWER PANEL
A
A
A
CONDUIT CONCEALED IN GROUND OR FLOOR
CONDUIT CONCEALED IN CEILING OR WALL
FLUSH FLOOR BOX WITH DEVICES AS INDICATED
J CODE SIZED JUNCTION BOX WITH COVER PLATE
DUPLEX RECEPTACLE, ISOLATED GROUND TYPE,
A = ABOVE COUNTER, E = EMERGENCY
DUPLEX RECEPTACLE, A = ABOVE COUNTER
DUPLEX RECEPTACLE, GFCI TYPE, A = ABOVE
COUNTER, E = EMERGENCY, IG = ISOLATED GROUND.
CONDUIT DOWN
MECHANICAL VAV BOX, SEE MECHANICAL EQUIPMENT
SCHEDULES FOR SPECIFIC REQUIREMENTS
A 4 PLEX RECEPTACLE, GFCI TYPE, A = ABOVE
COUNTER, E = EMERGENCY, IG = ISOLATED GROUND.
CONDUIT UP
F FUSED DISCONNECT SWITCH
DISCONNECT SWITCH
SINGLE-POLE SWITCH
LIGHT FIXTURE, SEE SCHEDULE FOR TYPE
LIGHT FIXTURE, SEE SCHEDULE FOR TYPE
LIGHT FIXTURE, SHADING INDICATES EMERGENCY BATTERY BACKUP
EXIT LIGHT, SHADING INDICATES SIGN DIRECTION
WALL MOUNTED LIGHT, SEE SCHEDULE FOR TYPE
EXIT LIGHT WITH ARROWS, SHADING INDICATES SIGN DIRECTION
OC
WALL MOUNT OCCUPANCY SENSOR SWITCH
LV LOW-VOLTAGE SWITCH
1. PROVIDE COMPLETE WORK FOR REQUIREMENTS AS DESCRIBED
ON LEGEND.
2. ALL FLUSH MOUNT EQUIPMENT, CABINETS, AND PANELBOARDS
SHALL HAVE FACTORY TYPE FLUSH MOUNT TRIM KIT FOR
COMPLETE INSTALLATION.
3. PROVIDE ALL MATERIAL AND LABOR RELATED TO THE
INSTALLATION OF ELECTRICAL DEVICES PENETRATING INTO OR
THROUGH FIRE RATED WALLS, FLOORS, OR CEILINGS SUCH THAT
THE FIRE RATING OF THE WALL IS MAINTAINED.
4. DO NOT TAKE MEASUREMENTS FROM PLANS FOR DEVICE
LOCATIONS. FIELD VERIFY EXACT DEVICE, EQUIPMENT
LOCATIONS, AND MOUNTING HEIGHTS WITH OWNER'S
REPRESENTATIVE FOR PROPER INSTALLATION.
5. BRANCH CIRCUIT HOME RUNS ARE NOT INDICATED WITH NUMBER
OF CONDUCTORS/ WIRES. PROVIDE ALL BRANCH CIRCUIT
CONDUCTORS/ WIRES AS REQUIRED FOR COMPLETE OPERATION
OF ALL DEVICES AND EQUIPMENT INDICATED. PROVIDE
INDIVIDUAL NEUTRALS FOR EACH CIRCUIT.
6. REFER TO EQUIPMENT SCHEDULES FOR WIRING REQUIREMENTS
NOT INDICATED ON POWER PLANS.
7. PROVIDE ALL WIRING TO PANELS AND POWER DISTRIBUTION
EQUIPMENT IN ACCORDANCE WITH ONE-LINE POWER DIAGRAM.
8. INCLUDE COST OF PROVIDING ALL ELECTRICAL CONNECTIONS AS
REQUIRED FOR FULL OPERATION OF ALL OWNER FURNISHED,
CONTRACTOR INSTALLED EQUIPMENT. SEE ARCHITECTURAL
DRAWINGS TO VERIFY LOCATIONS.
9. COORDINATE PAINTING WORK OF ELECTRICAL ITEMS WITH
GENERAL CONTRACTOR. SEE PAINTING SPECIFICATIONS FOR
REQUIREMENTS.
10. PROVIDE SEPARATE NEUTRALS FOR ALL BRANCH CIRCUITS.
11. WIRING SYSTEMS SHALL BE CONCEALED WHERE POSSIBLE,
EXCEPT IN ELECTRICAL ROOM, MECHANICAL ROOM, AND UTILITY
AREAS, OR AS OTHERWISE NOTED.
12. PROVIDE SURFACE METAL RACEWAY AS WIRING METHOD WHERE
OUTLETS AND WIRING CANNOT BE CONCEALED.
13. EXTERIOR MOUNTED ELECTRICAL DEVICES (SUCH AS
DISCONNECT SWITCH, STARTER, SPEAKER, FIRE ALARM HORN,
ETC.) AND COVERS SHALL BE NEMA-3R WEATHERPROOF RATED.
14. PROVIDE CONDUIT AND WIRE FROM ALL HVAC UNITS 2000 CFM OR
ABOVE TO FIRE ALARM PANEL FOR HVAC UNIT CONTROL.
CONDUIT AND WIRE MAY NOT BE INDICATED IN ELECTRICAL
DRAWINGS.
15. PROVIDE TEMPORARY POWER FOR CONSTRUCTION. TEMPORARY
POWER MAY BE IN THE FORM OF PORTABLE GENERATOR SET;
CONNECTION TO UTILITIES COMPANY'S POWER POLE OR
EXISTING FACILITY'S ELECTRICAL SYSTEM.
16. VERIFY WITH CABINET INSTALLER FOR ALL CABINET LOCATIONS,
DIMENSIONS, AND COUNTER HEIGHTS PRIOR TO OUTLET
ROUGH-IN. OUTLETS LOCATED ABOVE COUNTER SHALL BE
INSTALLED TO CENTERLINE ABOVE COUNTERTOP BACKSPLASH,
AS DIRECTED OR INDICATED IN SPECIFICATIONS. VERIFY HEIGHT
WITH OWNER'S REPRESENTATIVE OF ANY LOCATION THAT
CANNOT ACCOMMODATE MOUNTING HEIGHT.
17. INSTALLATION OF UNDERGROUND WIRING SYSTEMS SHALL
INCLUDE EXCAVATION, CUTTING, PATCHING, BACKFILL, AND
COMPACTION. DO NOT CUT OR DAMAGE ANY EXISTING UTILITIES,
STRUCTURAL MEMBERS, OR BUILDING FOUNDATIONS. VERIFY
EXISTING CONDITIONS PRIOR TO EXCAVATION WORK. INCLUDE
COST FOR UNDERGROUND LOCATOR SERVICE TO IDENTIFY
LOCATIONS OF EXISTING COMPONENTS. HAND EXCAVATE IN
LOCATIONS WHERE EXISTING UNDERGROUND COMPONENTS ARE
SUBJECT TO DAMAGE. REPAIR DAMAGE TO EXISTING UTILITIES
OR BUILDING STRUCTURE TO OWNER'S SATISFACTION AT THE
CONTRACTORS EXPENSE.
18. ALL ONE-LINE DIAGRAMS AND RACEWAY ROUTING ARE
SCHEMATIC AND DO NOT SHOW EXACT PHYSICAL ARRANGEMENT
OF EQUIPMENT ON DRAWINGS. ALL JUNCTION BOXES, AND
PULLBOXES SHOWN ARE MINIMUM REQUIREMENTS. PROVIDE
FITTINGS AND PULLBOXES OF ADEQUATE SIZE IN RACEWAY
SYSTEMS WHEREVER NECESSARY OR REQUIRED BY NATIONAL
ELECTRICAL CODE. PROVIDE EXPANSION JOINT FITTINGS FOR
RACEWAY PASSING THROUGH NEW OR EXISTING EXPANSION
JOINTS INSTALLED BETWEEN BUILDINGS. VERIFY EXACT
LOCATIONS AND DETAILS OF EXPANSION JOINTS PRIOR TO WORK.
COORDINATE ALL RACEWAY ROUTING, PULLBOXES, AND
EQUIPMENT LOCATIONS WITH OTHER TRADES TO AVOID
CONFLICTS OF EQUIPMENT INSTALLATIONS. ALL EMPTY
CONDUITS SHALL HAVE PULL WIRES.
19. CONDUIT OR OTHER ELECTRICAL COMPONENTS SHALL NOT BE
INSTALLED IN STRUCTURAL CONCRETE UNLESS SPECIFICALLY
INDICATED ON THE DRAWINGS OR APPROVED BY STRUCTURAL
ENGINEER.
20. PROVIDE ELECTRICAL CONNECTION FOR ALL FAN SPEED
SWITCHES. COORDINATE LOCATION OF CONNECTIONS WITH
MECHANICAL CONTRACTOR.
FEEDER SCHEDULE
1ɸ, 2W+G (3 WIRES TOTAL) 3ɸ, 4W+G (5 WIRES TOTAL)
CKT ID RACEWAY/WIRE CKT
AMPS CKT ID CONDUIT AND WIRE CKT
AMPS
[12-20] 3/4"C, 2#12, #12G 20 [34-20] 3/4"C, 4#12, #12G 20
[12-30] 3/4"C, 2#10, #10G 30 [34-30] 3/4"C, 4#10, #10G 30 [12-40] 3/4"C, 2#8, #10G 40 [34-40] 1"C, 4#8, #10G 40 [12-50] 3/4"C, 2#6, #10G 50 [34-50] 1"C, 4#6, #10G 50 [12-60] 1"C, 2#4, #10G 60 [34-60] 1-1/4"C, 4#4, #10G 60 [12-70] 1"C, 2#4, #8G 70 [34-70] 1-1/4"C, 4#4, #8G 70 [12-80] 1-1/4"C, 2#2, #8G 80 [34-80] 1-1/2"C, 4#2, #8G 80 [12-90] 1-1/4"C, 2#2, #8G 90 [34-90] 1-1/2"C, 4#2, #8G 90
[12-100] 1-1/4"C, 2#1, #8G 100 [34-100] 2"C, 4#1, #8G 100 [12-125] 1-1/4"C, 2#1, #6G 125 [34-125] 2"C, 4#1, #6G 125 [12-150] 1-1/4"C, 2#1/0, #6G 150 [34-150] 2"C, 4#1/0, #6G 150 [12-175] 1-1/2"C, 2#2/0, #6G 175 [34-175] 2"C, 4#2/0, #6G 175 [12-200] 1-1/2"C, 2#3/0, #6G 200 [34-200] 2"C, 4#3/0, #6G 200 [12-225] 2"C, 2#4/0, #4G 225 [34-225] 2-1/2"C, 4#4/0, #4G 225
[12-250] 2-1/2"C, 2-250KCM, #4G 250 [34-250] 3"C, 4-250KCM, #4G 250
[12-300] 2-1/2"C, 2-350KCM, #4G 300 [34-300] 3"C, 4-350KCM, #4G 300
[12-400] 2-SETS [2"C, 2#3/0, #3G] 400 [34-400] 2-SETS [2-1/2"C, 4#3/0, #3G] 400
3ɸ, 3W+G (4 WIRES TOTAL) [34-500] 2-SETS [3"C, 4-250KCM, #2G] 500
CKT ID CONDUIT AND WIRE CKT
AMPS
[34-600] 2-SETS [3"C, 4-350KCM, #1G] 600
[33-20] 3/4"C, 3#12, #12G 20 [34-700] 2-SETS [4"C, 4-500KCM, #1/0G] 700
[33-30] 3/4"C, 3#10, #10G 30 [34-800] 3-SETS [3"C, 4-300KCM, #1/0G] 800
[33-40] 3/4"C, 3#8, #10G 40 [34-1000] 3-SETS [4"C, 4-500KCM, #2/0G] 1000
[33-50] 1"C, 3#6, #10G 50 [34-1200] 4-SETS [3"C, 4-350KCM, #3/0G] 1200
[33-60] 1"C, 3#4, #10G 60 [34-1600] 4-SETS [4"C, 4-600KCM, #4/0G] 1600
[33-70] 1-1/4"C, 3#4, #8G 70 [34-2000] 5-SETS [4"C, 4-600KCM, 250KCM G] 2000
[33-80] 1-1/4"C, 3#2, #8G 80 480VΔ, 3ɸ, TRANSFORMER PRIMARY (3W+G)
[33-90] 1-1/4"C, 3#2, #8G 90 CKT ID CONDUIT AND WIRE CKT
AMPS
[33-100] 1-1/2"C, 3#1, #8G 100 [30H] 1"C, 3#4, #10G 60 [33-125] 1-1/2"C, 3#1, #6G 125 [45H] 1-1/2"C, 3#1, #8G 100 [33-150] 1-1/2"C, 3#1/0, #6G 150 [75H] 1-1/2"C, 3#1/0, #6G 150 [33-175] 2"C, 3#2/0, #6G 175 [112H] 2"C, 3#3/0, #6G 200
[33-200] 2"C, 3#3/0, #6G 200 [150H] 2-1/2"C, 3-250KCM, #4G 250
[33-225] 2"C, 3#4/0, #4G 225 [225H] 2-SETS [2"C, 3#3/0, #3G] 400
[33-250] 2-1/2"C, 3-250KCM, #4G 250 [300H] 2-SETS [3"C, 3-350KCM, #1G] 600
[33-300] 2-1/2"C, 3-350KCM, #4G 300 [500H] 3-SETS [3"C, 3-300KCM, #1/0G] 800
[33-400] 2-SETS [2"C, 3#3/0, #3G] 400 [15H] 3/4"C, 3#10, #10G 30
[33-500] 2-SETS [2-1/2"C, 3-250KCM, #2G] 500 208Y/120V, 3ɸ, TRANSFORMER SECONDARY (4W+G)
[33-600] 2-SETS [3"C, 3-350KCM, #1G] 600 CKT ID CONDUIT AND WIRE CKT
AMPS
[33-700] 2-SETS [3"C, 3-500KCM, #1/0G] 700 [30L] 2"C, 4#1, #6G 100
[33-800] 3-SETS [3"C, 3-300KCM, #1/0G] 800 [45L] 2"C, 4#1/0, #6G 150
[33-10000] 3-SETS [3"C, 3-500KCM, #2/0G] 1000 [75L] 2-1/2"C, 4#4/0, #2G 225
[33-1200] 4-SETS [3"C, 3-350KCM, #3/0G] 1200 [112L] 2-SETS [2-1/2"C, 4#3/0, #1/0G] 400
[33-1600] 4-SETS [4"C, 3-600KCM, #4/0G] 1600 [150L] 2-SETS [3"C, 4-350KCM, #2/0G] 600 [33-2000] 5-SETS [4"C, 3-600KCM, 250KCM G] 2000 [225L] 3-SETS [3"C, 4-300KCM, #2/0G] 800
[300L] 3-SETS [4"C, 4-500KCM, #3/0G] 1000
[500L] 4-SETS [4"C, 4-600KCM, #4/0G] 1600
[750L] 6-SETS [4"C, 4-600KCM, 250KCM G] 2500
[15L] 1-1/4"C, 4#4, #10G 60
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
SYMBOL LEGEND
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text S
AutoCAD SHX Text
REX
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
SYMBOL LEGEND
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
UP
DNDN
UP
DN
UPDNDNDN
UP
DN
UP
UP
DN
DN
UP
UP
UP
UP
DN DN
UP UP
TV
N
C L
CL
CL
UP
DN
UP
DN
UP
DN
DN
UP
CL
CL
CL
DN
UP
DN
DN
UPDN
UP
UP
UPDN
DN
DN
FD
FD
AP
DN
UP
CLCL
CL
UP
DN
DN
DN
UP
DN
UP
DNUP
FD FDFD FD
FD
FDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD FD FD FD FD FD FD
UP
FD
FD
FD
FD
FD
FD
FD
UP
FDFD
UP
UP
DN
DN
UP
DNUPUP
DN
DN
UPDNUP
UP
DNUPUP
DN
UP
DNDNDNDN
DN
DN
UP
DN
UP
FD
DN
UP
DN
UP
DN
UPUP
BLDG 10
AP
BLDG 1BLDG 9
BLDG 4 BLDG 3
BLDG 5
BLDG 6
BLDG 8
BLDG 7
BLDG 2
BLDG 11
Q D
E
F
G
B
P
K
M
N
J
H
L
C
(E)MH20
(E)EMH14
(E)MH21 (E)MH22
(E)MH25
(E)MH24
(E)MH23
(E)MH19
(E)EMH13(E)EMH12
(E)MH27
(E)EMH16
(E)MH26
(E)MH16
(E)MH17
(E)EMH11
(E)MH15
(E)EMH10
(E)EMH15
(E)EMH8
(E)MH14
(E)MH4
(E)EMH7
(E)MH13
(E)EMH9
(E)MH12
(E)EMH4
(E)EMH1
(E)EMH2
(E)MH5
(E)EMH6
(E)MH8
(E)MH9
(E)MH7
(E)EMH5
(E)UMH4
(E)UMH3
(E)UMH2
(E)UMH1
(E)MH2
(E)MH3
(E)MH6
(E)MH1
(E)UTILITY
SERVICE
ENTRANCE
(E)MH18
(E)UTILITY
SERVICE
ENTRANCE
(E)MH11
(E)MH10 (E)MH10
(E)EMH3
UP
DNDN
UP
DN
UPDNDNDN
UP
DN
UP
UP
DN
DN
UP
UP
UP
UP
DN DN
UP UP
TV
N
C L
CL
CL
UP
DN
UP
DN
UP
DN
DN
UP
CL
CL
CL
DN
UP
DN
DN
UPDN
UP
UP
UPDN
DN
DN
FD
FD
AP
DN
UP
CLCL
CL
UP
DN
DN
DN
UP
DN
UP
DNUP
FD FDFD FD
FD
FDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD FD FD FD FD FD FD
UP
FD
FD
FD
FD
FD
FD
FD
UP
FDFD
UP
UP
DN
DN
UP
DNUPUP
DN
DN
UPDNUP
UP
DNUPUP
DN
UP
DNDNDNDN
DN
DN
UP
DN
UP
FD
DN
UP
DN
UP
DN
UPUP
BLDG 10
AP
BLDG 1BLDG 9
BLDG 4 BLDG 3
BLDG 5
BLDG 6
BLDG 8
BLDG 7
BLDG 2
BLDG 11
Q D
E
F
G
B
P
K
M
N
J
H
L
C
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
STAMP
LOCATION
1/ 2'
3' 0'
1'
1/ 2' 0'
1' 4'
4' 8'
8' 8'
4' 2'
2'
1/ 8' 0'
1/ 0'
1/ 4' 0'
1' 2'
1' 1/ 2'
2'
1' 0'
3/ 8' 0'
1'
2' 4'
1/ 2' 0'
1/ 2'
1' 3'
6' 0'
1/ 4"
1/ 2"
3/ 0'
8'
4' 4'
Fi le
P at h
Revisions: Date:
10% BASIS OF DESIGN 07.08.2022 CONSULTANTS
TERPconsulting Fire + Life Safety 14241 E. 4th Avenue, Aurora CO, 80011 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04/25/2023
FULLY
SPRINKLEDSPRINKLED
PROGRAMMING
CONTRACTING
ACTIVITY
CENTAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
100% CONSTRUCTION
DOCUMENTS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
629-22-700
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
FINAL BID DOCUMENTS 04.25.2023
NOT USED
1. FOR REFERENCE ONLY
D1
DEMOLITION PLAN NOTES
GENERAL NOTES
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY ALL CONDITIONS.
SCALE: NTS
0 KEY PLAN
00-ES-000
OVERALL EXISTING ELECTRICAL SITE
PLAN
MER AJW
SCALE:
OVERALL EXISTING ELECTRICAL SITE PLAN
1/64"=1'-0"
30' 60'
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY ALL CONDITIONS.
MONITOR
1C163
CHF (OC)
1C220
A CHF (OC)
1C222
SECY (OC)
1B208
ITAC (OC)
1B141
CS (OC)
1B139
OFF CHF (FS)
1B151
BA (OC)
1C224
ADM (OC)
1B140
MA ASST (OC)
1C226
CUB (FS)
1B175D
CUB (FS)
1B175C
CUB (FS)
1B192A
CUB (FS)
1B192B
MEDIA (FS)
1B154
OFF A CHF (FS)
1B152
CUB CST SRV (FS)
1B150
CUB (FS)
1B192C
SEC/WAIT (FS)
1B153
CUB (CD)
1B173C
CUB (CD)
1B171CCUB (CD)
1B173D
CHF (CD)
1B159
A CHF (CD)
1B158
LD CODE (CD)
1B162
LD CODE (CD)
1B161
CUB (CD)
1B172B
CUB (CD)
1B172F
CUB (CD)
1B170A
CUB (CD)
1B170C
CUB (CD)
1B173B
CUB (CD)
1B171D
CUB (CD)
1B173A
CUB (CD)
1B170D
CUB (CD)
1B170B
CUB (CD)
1B171A
CUB (CD)
1B172C
CUB (CD)
1B172D
CUB (CD)
1B172E
SECY (CD)
1B160
WORK (CD)
1B157
A CHF (HIM)
1B143
CHF (HIM)
1B144
SECY (HIM)
1B201
CUB (HIM)
1B193B
CUB (HIM)
1B195D
CUB (HIM)
1B192F
CUB (HIM)
1B192D
CUB (HIM)
1B192E
WAIT/ROI (HIM)
1B200
CHF (WA)
1B137
A CHF (WA)
1B138
SECY (WA)
1B134
OP CTR (WA)
1B130
OFF SPV (WA)
1B132
A CHF (HE)
1C135
CUB (MCCF)
1B174A
CUB (MCCF)
1B175A
CUB (MCCF)
1B174B
CUB (MCCF)
1B175E
CUB (MCCF)
1B175B
BUS CTR (HE)
1C125
CUB (MCCF)
1B174D
T
1B176
CHIEF
1C203
A CHF
1C201
TECH
1C196A
WORKROOM
1C205
CUB (MCCF)
1B174C
SUPV (MCCF)
1B155
IP SUP (HE)
1C134
IP CLRK (HE)
1C124
SECY (MCCF)
1C132B
CUB PSA (HE)
1C130B
CUB PSA (HE)
1C130A
CUB PSA (HE)
1C130C
ADMIS (HE)
1C122
CUB ELIG (HE)
1C131
CUB PSA (HE)
1C132D
A CHF
1C199
ACCNT CHF
1C214 ACCNT CHF
1C213
ACCNT CHF
1C212
ACCNT CHF
1C211
COMP AUDITOR
1C215
COMP OFFICER
1C216
BDGT
1C192E
BDGT
1C192B
BDGT
1C192A
BDGT
1C192F
BDGT
1C217A
TECH
1C192D
TECH
1C192C
TECH
1C196F
TECH
1C200A
SECRY
1C194B
TECH
1C194A TECH
1C196ETECH
1C194F
TECH
1C217B
TECH
1C194D
TECH
1C196C
TECH
1C196D
TECH
1C194E
AUDITOR
1C193
AUDITOR
1C197
AUDITOR
1C195
RECPT
1C190A
T
1C186
T
1C219
AUDITOR
1C191
BREAK
1C210
SERVICE BAY
1C114
EC
1C223
EC
1B180
SERVICE BAY
1B123
TR
1C114C
1A104B
NORM ELEC
1C114A
DETAILS (HE)
1C136
WAIT (OC)
1C227
CUB CS (HE)
1C132C
STOR (HE)
1C126
EMER ELEC
1C114B
TR
1B123D
1B114A
EMER ELEC
1B123A
NORM ELEC
1B123B
SEC/WAIT
1B106
CONF/CLASS (OC)
1B135
T
1B204
CUB (FS)
1B191A
CUB (CD)
1B171B
T
1B178
TR
1C228
WAIT
1C190
SERV ELEV LOBB
1B120
PUB ELEV LOBBY
1B100
WORKROOM (HIM)
1B194
CUB (CD)
1B173E
CLINICAL SUPER (NSA)
1B102
CLINICAL SUPER (NSA)
1B103
T
1C141
T
1C143
WC
1C144
LOUNGE
1C145
RECPT
1C137
PANTRY
1C146
CHAPLAIN
1B105
CHAPLAIN
1B107
CHAPLAIN
1B109
EUCHARIST
1B111
QUIET
1B116
T
1B108
T
1B110
STOR
1B112
HK
1B114
STOR/FILE (FS)
1B190
ISO (HIM)
1B203
PV (HIM)
1B142
STOR
1C196B
SLEEP
1C166
T/S
1C166A
ST
1C181
T/S
1C179A
T/S
1C174A
SLEEP
1C174
SLEEP
1C165
SLEEP
1C175
T/S
1C165A
T/S
1C164A
SLEEP
1C164
SLEEP
1C177
T/S
1C177A
T/S
1C175A
SLEEP
1C179
SLEEP
1C162
T/S
1C162A
WAIT
1C160
CC
1C178
CONF
1C185
RETAIL AREA
1C101
VESTIBULE
1C150
ADMIS (HE)
1C123
STOR
1C221
WAIT
1C132A
POLY
1C161
EQUIP
1C168 T
1C160A
BREAK
1C169
ELEV
BS-1
FUTURE ELEV
BS-2
ELEV
BS-4
ELEV
BS-3
STAIR
STB-1
CORR
1B-C01 CORR
1B-C02
CORR
1B-C03
AISLE
1B-C08
CORR
1B-C07
CORR
1B-C05
CORR
1B-C06
AISLE
1B-C09
AISLE
1B-C10
AISLE
1B-C11
AISLE
1B-C12
AISLE
1B-C13
AISLE
1B-C14
AISLE
1B-C15
AISLE
1B-C16
AISLE
1C-C01A
AISLE
1C-C01B
AISLE
1C-C01C
AISLE
1C-C01D
AISLE
1C-C03
AISLE
1C-C04
AISLE
1C-C04AAISLE
1C-C04B
AISLE
1C-C05
AISLE
1C-C06
AISLE
1C-C07
AISLE
1C-C12
AISLE
1C-C11
AISLE
1C-C09
AISLE
1C-C08
AISLE
1C-C08A
SECY (HE)
1B172A
STOR
1C133
1C100
HK
1C139
VESTIBULE
1B121
CORR
1C101-K
CORR
1B-C02A
HK
1B206
NOUR
1C180
AISLE
1C-C010
AISLE
1C-C07A
SECURITY
1C114D
1C104A
UNASSIGNED
1B174G
CUB (HIM)
1B192H
SECURITY
1B123C
CORR
1C-C02
SECY/WAIT (OC)
1C225
TECH
1C196G
RETAIL PREP
1C101A
CORR
1B-C04
AISLE
1B-C04A
AISLE
1C-C00
CORR
1C-C01
CLEAN
1C167
SOILED
1C176
ASR
1B113
CONNECTOR HALL
1B115A
TR
1B179
1B145
IT/LVSR
1C190B
1C150A
CHAPEL
1B115
CLOSET
1B115B
01-ED-011
01-ED-011
(E) PNL 'LC143'
(E) PNL 'P1411'
(E) PNL 'R12113B' (E) PNL 'R12113A'
(E) PNL 'MGAP'
PNL 'R12123B'(E) PNL 'R12123A'
01-ED-011
(E) PNL 'ECR1211'
(E) PNL 'LC1411'
(E) PNL 'L1411'
(E) PNL 'D1411'
(E) XFMR 'T6'
(E) PNL 'D1211'
(E) PNL 'R12112A'
(E) PNL 'R12112B'
(E) PNL 'R12111A'
(E) PNL 'R12111B'
(E) PNL 'ECR1212'
(E) PNL 'LC1412'
(E) PNL 'L1412'
(E) PNL 'D1412'
(E) XFMR 'T6'
(E) PNL 'D1212'
(E) PNL 'R12122B'
(E) PNL 'R12122A'
(E) PNL 'R12121B'
(E) PNL 'R12121A'
01-ED-011
(E) PNL 'P1412'
(E) PNL 'EIT1211'
(X)EIT1211-23
(X)EIT1211-21
(X)EIT1211-19
(X)EIT1211-17
(X)EIT1211-15
(X)EIT1211-13
(X)EIT1211-1
(X)EIT1211-35
(X)EIT1211-33
(X)EIT1211-31
(X)EIT1211-29
(X)EIT1211-27
(X)EIT1211-25
(E)UNLABELED
(E)UNLABELED
(E)UNLABELED
MOUNTED ON
CABLE TRAY
(TYP.)
(X)EIT1211-9,114
TR
1B123D
1B114A
(E) PNL 'EIT1212'
(X)EIT1212-29
(X)EIT1212-27
(X)EIT1212-25
(X)EIT1212-23
(X)EIT1212-21
(X)EIT1212-19
(X)EIT1212-17
(X)EIT1212-15
(X)EIT1212-13
(E)UNLABELED
(E)UNLABELED
(E)UNLABELED
(E)EIT1212-24
2 3
MOUNTED ON
CABLE TRAY
(TYP.)
(X)EIT1212-1,3
TR
1C114C
1A104B
(E) PNL 'EIT1214'
(X)EIT1214-6
(X)EIT1214-7
(X)EIT1214-8
(X)EIT1214-1
MOUNTED ON
CABLE TRAY
(TYP.)
(E)UNLABELED
(E)UNLABELED
IT/LVSR
1C190B
1C150A
(X)EIT1214-9,11
(X)UNLABELED
(X)UNLABELED
(X)UNLABELED
MOUNTED ON
CABLE TRAY
(TYP.)
(X)EIT1213-2,4 4
TR
1B179
1B145 (E) PNL 'EIT1213' 5
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
01-ED-011
OVERALL FIRST FLOOR POWER
DEMOLITION PLAN - BLDG. 01
MER AJW
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 01 POWER OVERALL DEMOLITION PLAN - LEVEL 1
1/4" = 1'-0"4
ENLARGED POWER DEMO PLAN - TR 1B114A
1/4" = 1'-0"3
ENLARGED POWER DEMO PLAN - TR 1A104B
1/4" = 1'-0"2
ENLARGED POWER DEMO PLAN - LVSR 1C150A
PLAN NOTES
1 EXISTING ELECTRICAL RECEPTACLES TO BE REMOVED. CONTRACTOR TO REMOVE
EXISTING CONDUIT AND CONDUCTORS BACK TO SOURCE.
2 EXISTING ELECTRICAL RECEPTACLE TO REMAIN.
3 EXISTING ELECTRICAL PANEL TO REMAIN.
4 EXISTING UPS TO BE REMOVED. CONTRACTOR TO REMOVE EXISTING CONDUIT,
CONDUCTORS, AND JUNCTION BOXES BACK TO SOURCE.
5 EXISTING ELECTRICAL PANEL TO BE RELOCATED. REROUTE EXISTING CONDUIT AND
CONDUCTORS TO NEW LOCATION ON SHEET 01-EP-011
DEMOLITION GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN THE
CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. CONTRACTOR SHALL COORDINATE ALL INTERRUPTIONS SERVICES WITH THE COR PRIOR TO
INITIATION OF WORK. NO DEMOLITION SHALL OCCUR UNTIL AFTER THE NEW OR
REPLACEMENT SYSTEMS ARE IN PLACE AND READY FOR CUT OVER.
3. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE BY OWNER.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH ARCHITECTURAL.
5. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
6. PARTICULAR ATTENTION SHALL BE GIVEN TO THE PROTECTION OF EXISTING STRUCTURE
AND FINISHES TO PREVENT ANY DAMAGE OF EXISTING FINISHES. ANY ACCIDENTAL DAMAGE
INCURRED TO EXISTING CONDITIONS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO REPAIR OR CORRECT.
7. CONTRACTOR SHALL CONFIRM EXISTING CIRCUITING TO UPS EQUIPMENT AND RACK
MOUNTED RECEPTACLES IN EXISTING TELECOMMUNICATION ROOMS PRIOR TO
DEMOLITION. ANY EXISTING FEEDERS NOT SUPPLYING UPS EQUIPMENT OR RACK MOUNTED
RECEPTACLES TO REMAIN.
8. EXISTING RACK MOUNTED RECEPTACLES BEING UTILIZED TO REMAIN. CONTRACTOR TO
VERIFY RECEPTACLE UTLIZATION PRIOR TO DEMOLITION.
1/4" = 1'-0"5
ENLARGED POWER DEMO PLAN - LVSR 1B145
Revisions: Date:
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY ALL CONDITIONS.
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
CLEAN
2B120
COMM CENTER
2B118
CONSULT
2C126
NOUR
2C108
TR
2C114C
2C114B
RETHERM
2B101
CONSULT
2C124
HK
2B112
TR
2B123D
2B110A
STOR/EQUIP
2B103
CLEAN
2B155D
2B159
CHUTE
2B105
COMM CENTER
2C104
MED ROOM
2B155B
SOILED
2B155E
2B161
SERVICE BAY
2B123
SERVICE BAY
2C114
OFF PHY/CON/NRS
2C120
HOUSE STAFF
2B104
PHARMACIST
2C118
ST
2C119
SOC WRK
2C121
HK
2C122
SOC WRK
2C123
PHY/CON/NRS
2C112
STAFF LOUNGE
2B102
STAFF LOCKER
2B126
DIET
2C116
NOUR
2B122
HEAD NURSE
2C113
CARE PROVIDER
2C111
STOR/EQUIP
2C103
HEAD NURSE
2B116
EC
2B153
NORM ELEC
2C114A
EMER ELEC
2C114B
NORM ELEC
2B123B
EMER ELEC
2B123A
SOILED
2C152B
2C152
CLEAN
2C106
EC
2C154
PATIENT
2B146
PATIENT NEG
2B143
PATIENT
2B145
PATIENT POS
2B165
PATIENT
2B151
PATIENT
2B152
PATIENT
2B157
PATIENT
2B159
PATIENT
2B161
PATIENT
2B163
PATIENT
2B164
PATIENT
2B144 PATIENT
2B148
PATIENT
2B150 PATIENT
2B154
PATIENT
2B156 PATIENT
2B158
PATIENT
2B160
PATIENT
2B162
PATIENT
2C145
PATIENT
2C151
PATIENT
2C147
PATIENT
2C157
PATIENT
2C159
PATIENT
2C161
PATIENT
2C163
PATIENT
2C155
PATIENT
2C149
PATIENT
2C160
PATIENT POS
2C165PATIENT
2C141
PATIENT
2C144
PATIENT
2C146 PATIENT
2C148
PATIENT
2C150
PATIENT
2C153
PATIENT
2C156
PATIENT
2C158
PATIENT
2C164
PATIENT NEG
2C140
CONF/ REPORT
2B106
SUB-STATION
2B132H
SUB-STATION
2B130A
SUB-STATION
2B130C
SUB-STATION
2B130E
SUB-STATION
2B132D SUB-STATION
2B132F
SUPPLY
2B130B
SUPPLY
2B132G
SUPPLY
2B132E
SUB-STATION
2C131GSUB-STATION
2C131C
SUB-STATION
2C131E
SUB-STATION
2C131A
SUB-STATION
2C133A
SUB-STATION
2C133C
RESPITE
2B166
T
2C145A
T
2C162A T
2C160A
T
2C151A
T
2C155A
T
2C157A
T
2C159A
T
2C161A
T
2C163A
T
2C164A
T
2C149A
T
2C158A
T
2C156A
T
2C153A
T
2C148A T
2C146A
T
2C144A
ISO T
2C142AISO T
2C140A
T
2C143A
T
2C147A
T
2B146A
T
2B140A T
2B142A
T
2B147A T
2B145A
T
2B149A
T
2B151A
T
2B152A
T
2B159A
T
2B161A
T
2B163A
ISO T
2B165A
ISO T
2B141A
T
2B164A
T
2B162A
T
2B160A
T
2B158A
T
2B156A T
2B154A
T
2B150A
T
2B148A
T
2B144A
ISO T
2B143A
MALE
2C101B
ANTE POS
2C165B
X-RAY
2C105
X-RAY ALC
2B115
HC ST
2B126A
TYP T
2B167
ANTE POS
2B165B
PATIENT NEG
2B141
PATIENT
2B142
PATIENT (BAR)
2B140
PATIENT
2B147
PATIENT
2B149
PATIENT NEG
2C142 PATIENT
2C162
ISO T
2C165A
PATIENT
2C143
T
2C141A
PUB ELEV LOBBY
2B100
SERV ELEV LOBBY
2B107
SUPPLY
2C131B
SUPPLY
2C131D
SUPPLY
2C131H
SUPPLY
2C133B
ST
2B125
T
2C167
FEMALE
2C101A
RESPITE
2C166
CARE PROVIDER
2B114
CORR
2B-C01A
CORR
2B-C01
CORR
2B-C04
CORR
2B-C02
CORR
2B-C03
AISLE
2B-C03A
AISLE
BP-8
CORR
2C-C03
CORR
2C-C04
CORR
2B-C01B
CORR
2B-C05
ELEV
BS-1
FUTURE ELEV
BS-2
ELEV
BS-4
ELEV
BS-3
STAIR
STB-1
SHAFT
SHB01
SHAFT
SHB03
SHAFT
SHC06
SHAFT
SHC05B
SHAFT
SHC05A
SUB-STATION
2C133E
SUPPLY
2C133D
SUPPLY
2B132C
SUPPLY
2C131F
CC
2B130F
CC
2C105A
CC
2C165C
CC
2B165C
ON CALL
2B129
ON CALL
2B131
PC1
2C115
CLEAN
2C152C
2C154
MED ROOM
2C152E
AISLE
BP-8
STAIR
STC-4
STAIR
STC-3
SECURITY
2C114D
SECURITY
2B123C
PC1
2C109
SUB-STATION
2B132B
CORR
2B-C04B
HC T/S
2B129A
CLST
2B129B
CLST
2B131A T/S
2B131B
ALCOVE
2C-C03B
ALCOVE
2B-C02A
T
2B157A
SUPPLY
2B130D
SUPPLY
2B132A
CORR
2C-C05
SHAFT
SHC05C
WAITING
2A100A
TR
2B155C
2B153
TR
2C152G
2C160
ELEV
BP-5
ELEV
BP-6
ELEV
BP-7
01-ED-021
01-ED-021
01-ED-021
01-ED-021
(E) PNL 'R12223B'
(E) PNL 'ECR12222'
(E) PNL 'R12223A'
(E) PNL 'R12213B'
(E) PNL 'R12213A'
(E) PNL 'ECR12212'
(E) PNL 'LC1421'
(E) PNL 'L1421'
(E) PNL 'D1421'
(E) XFMR 'T6'
(E) PNL 'D1221'
(E) PNL 'R12212B'
(E) PNL 'R12212A'
(E) PNL 'R12211B'
(E) PNL 'R12211A'
(E) PNL 'ECR12211B'
(E) PNL 'ECR12211A'
(E) PNL 'ECD1221'
(E) PNL 'ELSL1421'
(E) XFMR 'T2'
(E) XFMR 'T5'
(E) PNL 'ELSR1221'
(E) PNL 'EQR1221'
(E) XFMR 'T3-1'
(E) PNL 'ECL1421'
(E) PNL 'D1222'
(E) XFMR 'T6'
(E) PNL 'D1422'
(E) PNL 'L1422'
(E) PNL 'LC1422'
(E) PNL 'R12221A'
(E) PNL 'ECR12221B'
(E) PNL 'ECR12221A'
(E) PNL 'ELSL1422'
(E) XFMR 'T2'
(E) PNL 'ELSR1222'
(E) PNL 'EQR1222'
(E) XFMR 'T5'
(E) XFMR 'T3-1'
(E) PNL 'R12222B'
(E) PNL 'R12222A'
(E) PNL 'R12221B'
(E) PNL 'ECL1422'
(E) PNL 'EIT1221'
(X)EIT1221-25
(X)EIT1221-27
(X)EIT1221-29
(X)EIT1221-31
(X)EIT1221-1,3
(X)EIT1221-13
(X)EIT1221-15
(X)EIT1221-17
(X)UNLABELED MOUNTED ON
CABLE TRAY
MOUNTED ON
CABLE TRAY
(TYP.)
(E)EIT1221-24
(E)EIT1221-24
(E)EIT1221-24
(E)EIT1221-26
(X)EIT1221-9,11
TR
2B123D
2B110A
(E)EIT1221-26 2
(E) PNL 'EIT1222'
(X)EIT1222-29
(X)EIT1222-27
(X)EIT1222-25
(X)EIT1222-23
(X)EIT1222-21
(X)EIT1222-19
(X)EIT1222-17
(X)EIT1222-15
(X)EIT1222-13
MOUNTED ON
CABLE TRAY
(TYP.)
(E)EIT1222-26
(E)EIT1222-24
(E)EIT1222-24
(E)EIT1222-26
(E)EIT1222-24
(X)EIT1222-1,3
(X)EIT1222-5,7
TR
2C114C
2C114B
(X)EIT1224-1
(X)EIT1224-5
(X)EIT1224-7
(E)UNLABELED
(E) PNL 'EIT1224'
MOUNTED ON
CABLE TRAY
(TYP.)
TR
2C152G
2C160
(X)EIT1224-6,8
(X)EIT1224-7
(X)EIT1223-7
(X)EIT1223-9,11
(E)EIT1223-6
(E)EIT1223-8
MOUNTED ON
CABLE TRAY
(TYP.)
(E)EIT1223-10
(E) PNL 'EIT1223'
(X)EIT1223-1,34
TR
2B155C
2B153
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
01-ED-021
OVERALL SECOND FLOOR POWER
DEMOLITION PLAN - BLDG. 01
MER AJW
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 01 POWER OVERALL DEMOLITION PLAN - LEVEL 2
1/4" = 1'-0"4
ENLARGED POWER DEMO PLAN - TR 2B110A
1/4" = 1'-0"3
ENLARGED POWER DEMO PLAN - TR 2C114B
1/4" = 1'-0"2
ENLARGED POWER DEMO PLAN - TR 2C160
1/4" = 1'-0"5
ENLARGED POWER DEMO PLAN - TR 2B153
PLAN NOTES
1 EXISTING ELECTRICAL RECEPTACLES TO BE REMOVED. CONTRACTOR TO REMOVE
EXISTING CONDUIT AND CONDUCTORS BACK TO SOURCE.
2 EXISTING ELECTRICAL RECEPTACLE TO REMAIN.
3 EXISTING ELECTRICAL PANEL TO REMAIN.
4 EXISTING UPS TO BE REMOVED. CONTRACTOR TO REMOVE EXISTING CONDUIT,
CONDUCTORS, AND JUNCTION BOXES BACK TO SOURCE.
5 EXISTING ELECTRICAL RECEPTACLES FEEDING ICE MACHINE AND UNDERCOUNTER
REFRIGERATOR TO BE REMOVED. CONDUIT AND CONDUCTORS TO BE REROUTED TO NEW
LOCATION ON ASSOCIATED 'EP' SHEET. CONTRACTOR TO TRACE CIRCUIT PRIOR TO
DEMOLITION.
DEMOLITION GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN THE
CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. CONTRACTOR SHALL COORDINATE ALL INTERRUPTIONS SERVICES WITH THE COR PRIOR TO
INITIATION OF WORK. NO DEMOLITION SHALL OCCUR UNTIL AFTER THE NEW OR
REPLACEMENT SYSTEMS ARE IN PLACE AND READY FOR CUT OVER.
3. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE BY OWNER.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH ARCHITECTURAL.
5. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
6. PARTICULAR ATTENTION SHALL BE GIVEN TO THE PROTECTION OF EXISTING STRUCTURE
AND FINISHES TO PREVENT ANY DAMAGE OF EXISTING FINISHES. ANY ACCIDENTAL DAMAGE
INCURRED TO EXISTING CONDITIONS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO REPAIR OR CORRECT.
7. CONTRACTOR SHALL CONFIRM EXISTING CIRCUITING TO UPS EQUIPMENT AND RACK
MOUNTED RECEPTACLES IN EXISTING TELECOMMUNICATION ROOMS PRIOR TO
DEMOLITION. ANY EXISTING FEEDERS NOT SUPPLYING UPS EQUIPMENT OR RACK MOUNTED
RECEPTACLES TO REMAIN.
8. EXISTING RACK MOUNTED RECEPTACLES BEING UTILIZED TO REMAIN. CONTRACTOR TO
VERIFY RECEPTACLE UTLIZATION PRIOR TO DEMOLITION.
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY ALL CONDITIONS.
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
EMER ELEC
3C114B
BLOOD GAS LAB
3C120
COMM CENTER
3C103
CONSULT
3C124
TR
3C114C
3C114B
CHUTE
3B105
COMM CENTER
3B118
HOUSE STAFF
3B104
HEAD NURSE
3C112
SOC WRK
3C121
SOC WRK
3C123
PHYS/CON/ NRS
3C110
STAFF LOCKER
3B126
DIET
3C116
CARE PROVIDER
3B114
HEAD NURSE
3B116
PHARMACIST
3C118
NOUR
3B122
TR
3B123D
3B110A
STOR/EQUIP
3B103
SERVICE BAY
3B123
SERVICE BAY
3C114
RETHERM
3B101
NORM ELEC
3B123B
EMER ELEC
3B123A
NORM ELEC
3C114A
SOILED
3C152B
3C152
CLEAN
3B120
FEMALE
3C101A
X-RAY ALC
3C104
PHYS/CON/ NRS
3C122
STOR/EQUIP
3C102
MALE
3C101B
X-RAY ALC
3B115
PATIENT NEG
3B141 PATIENT NEG
3B143
PATIENT
3B145
PATIENT
3B147
ISO T
3B165A
T
3B163A
T
3B161A
T
3B159A
PATIENT
3B149
T
3B157A
T
3B152A
PATIENT
3B151
PATIENT
3B140
PATIENT
3B142
PATIENT
3B144
PATIENT
3B146
PATIENT POS
3B165
T
3B164A T
3B160A
T
3B158A
T
3B156A T
3B162A
PATIENT
3B148
PATIENT
3B150
T
3B154A
T
3B151A
PATIENT
3B152
T
3B149A
T
3B147A T
3B145A
ISO T
3B141A
ISO T
3B143A
PATIENT
3B157
PATIENT
3B159
PATIENT
3B161
PATIENT
3B163
PATIENT
3B164
PATIENT
3B154
PATIENT
3B156
PATIENT
3B158
PATIENT
3B160
PATIENT
3B162
T
3B150A
T
3B148A T
3B146A
T
3B144A
T
3B142A
T
3B140A
EC
3C154
SUB-STATION
3B130A SUPPLY
3B130B
SUB-STATION
3B130C
SUPPLY
3B130D
SUB-STATION
3B130E
SUB-STATION
3B132DSUPPLY
3B132C
SUB-STATION
3B132HSUPPLY
3B132E
RESPITE
3B166
SUB-STATION
3B132F
SERV ELEV LOBBY
3B107
PUB ELEV LOBBY
3B100
HK
3B112
NOUR
3C108
CLEAN
3C106
SOILED
3B155E
3B161
EC
3B153
SUB-STATION
3C131A
SUB-STATION
3C131C
SUB-STATION
3C131E
SUB-STATION
3C133A
SUB-STATION
3C133C SUB-STATION
3C133E
T
3C163A
ISO T
3C140A
ISO T
3C142A
T
3C144A
T
3C146A
PATIENT
3C146
T
3C148A
PATIENT
3C148
PATIENT
3C150
T
3C150A
PATIENT
3C153
T
3C153A
T
3C156A
PATIENT
3C156
PATIENT
3C158
T
3C158A
T
3C162A
PATIENT
3C160
T
3C160A
T
3C141A
ISO T
3C165A
PATIENT
3C162
PATIENT
3C164
PATIENT
3C163
PATIENT
3C161PATIENT
3C159
PATIENT
3C157
SUPPLY
3C131B
SUPPLY
3C131D
SUPPLY
3C133B
RESPITE
3C166
T
3C164A
T
3C159A
T
3C161A T
3C157A
T
3C155A T
3C151A
T
3C149A
T
3C147A
T
3C145A T
3C143A
PATIENT NEG
3C140
PATIENT NEG
3C142
PATIENT
3C155
PATIENT
3C151
PATIENT
3C149
PATIENT
3C147
PATIENT
3C145
PATIENT
3C143
PATIENT
3C141
PATIENT POS
3C165
ANTE POS
3C165B
STAFF LOUNGE
3B102
ST
3B124
T
3B167
T
3C167
ANTE POS
3B165B
HC ST
3B126A
AISLE
3B-C01A
CORR
3B-C01
CORR
3B-C01B
CORR
3B-C02
CORR
3B-C05
CORR
3B-C03
CORR
3C-C03
CORR
3C-C04A
CORR
3C-C02
ELEV
BS-1
FUTURE ELEV
BS-2
ELEV
BS-4
ELEV
BS-3
STAIR
STB-1
SHAFT
SHB01
SHAFT
SHB03
SHAFT
SHC06
SHAFT
SHC05B
SHAFT
SHC05A
SUPPLY
3B132A
SUPPLY
3B132G
SUPPLY
3C133D
CC
3B130H
CC
3C109
HK
3C125
CC
3C165C
CC
3B165C
ST
3B227
CARE PROVIDER
3C230
CLEAN
3B155D
3B159
MED ROOM
3B155B AISLE
3B-C03A
CLEAN
3C152C
3C154
MED ROOM
3C152E
AISLE
3C-C02A
STAIR
STC-4
STAIR
STC-3
SECURITY
3C114D
SECURITY
3B123C
UNASSIGNED
3C117
PATIENT
3C144
CORR
3B-C04B
SUB-STATION
3B132B
SUPPLY
3C131F
SUB-STATION
3C131G
ALCOVE
3C-C03B
ALCOVE
3B-C02A
OFF PCI
3B131
HC ON CALL
3B129
HC T/S
3B129A
PHYS/CON/NRS
3B130
CLST
3B129B
CONSULT
3C126
SUPPLY
3C131H
SHAFT
SHC05C
CORR
3C-C06
WAITING
3A100A
TEL CLST
3B155C
3B153
TEL CLST
3C152D
3C160
CONF/ REPORT
1C190C
01-ED-031
01-ED-031
01-ED-031
01-ED-031
(E) PNL 'ECR12322'
(E) PNL 'R12323A'
(E) PNL 'R12323B'
(E) PNL 'ECR12312'
(E) PNL 'R12313B'
(E) PNL 'R12313A'
(E) PNL 'R12311A'
(E) PNL 'R12311B'
(E) PNL 'R12312A'
(E) PNL 'R12312B' (E) PNL 'L1431'
(E) PNL 'LC1431'
(E) PNL 'D1231'
(E) PNL 'ECD1231'
(E) PNL 'ECR12311B'
(E) PNL 'ECR12311A'
(E) XFMR 'T5'
(E) XFMR 'T3-1'
(E) PNL 'ECL1431'
(E) XFMR 'T6'
(E) XFMR 'T3-1'
(E) XFMR 'T5'
(E) PNL 'ECL1432'
(E) PNL 'ECD1232'(E) PNL 'ECR12321B'
(E) PNL 'ECR12321A'
(E) PNL 'R12322A'
(E) PNL 'R12322B'
(E) PNL 'LC1432'
(E) PNL 'L1432'
(E) PNL 'R12321B'
(E) PNL 'R12321A'
(E) XFMR 'T6'
(E) PNL 'D1232'
(E) PNL 'EIT1231B' (E) PNL 'EIT1231A'
(X)EIT1231A-27
(X)EIT1231A-29
(X)EIT1231A-31
(X)EIT1231A-1,3
(X)EIT1231A-13
(X)EIT1231A-15
(X)EIT1231A-17
(X)EIT1231A-19
(E)EIT1231A-26
(E)EIT1231A-24
(E)EIT1231A-24
(E)EIT1231A-26
(E)EIT1231A-24
MOUNTED ON
CABLE TRAY
(TYP.)
TR
3B123D
3B110A
(X)EIT1231B-1,3
(X)EIT1231A-21
(E) PNL 'EIT1232B'
(E) PNL 'EIT1232A'
(X)EIT1232A-27
(X)EIT1232A-25
(X)EIT1232A-23
(X)EIT1232A-21
(X)EIT1232A-19
(X)EIT1232A-17
(E)EIT1232A-24
(E)EIT1232A-24
(E)EIT1232A-26
(E)EIT1232A-24
MOUNTED ON
CABLE TRAY
(TYP.)
TR
3C114C
3C114B
(X)EIT1232A-1,3
(E)EIT1232A-262
(E)EIT1234-5
(E)EIT1234-6
(X)EIT1234-8
(X)EIT1234-1,3
MOUNTED ON
CABLE TRAY
(TYP.) (E) PNL 'EIT1234'
TEL CLST
3C152D
3C160
(X)EIT1234-9,114
(E)EIT1234-10 2
(X)EIT1233-6
(E)EIT1233-8
MOUNTED ON
CABLE TRAY
(TYP.)
(E) PNL 'EIT1233'
(X)EIT1233-5
TEL CLST
3B155C
3B153
(X)EIT1233-7,9
4 11
(E)EIT1233-102
(X)EIT1233-1,3
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
01-ED-031
OVERALL THIRD FLOOR POWER
DEMOLITION PLAN - BLDG. 01
MER AJW
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 01 POWER OVERALL DEMOLITION PLAN - LEVEL 3
1/4" = 1'-0"4
ENLARGED POWER DEMO PLAN - TR 3B110A
1/4" = 1'-0"3
ENLARGED POWER DEMO PLAN - TR 3C114B
1/4" = 1'-0"2
ENLARGED POWER DEMO PLAN - TR 3C160
1/4" = 1'-0"5
ENLARGED POWER DEMO PLAN - TR 3B153
DEMOLITION GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN THE
CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. CONTRACTOR SHALL COORDINATE ALL INTERRUPTIONS SERVICES WITH THE COR PRIOR TO
INITIATION OF WORK. NO DEMOLITION SHALL OCCUR UNTIL AFTER THE NEW OR
REPLACEMENT SYSTEMS ARE IN PLACE AND READY FOR CUT OVER.
3. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE BY OWNER.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH ARCHITECTURAL.
5. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
6. PARTICULAR ATTENTION SHALL BE GIVEN TO THE PROTECTION OF EXISTING STRUCTURE
AND FINISHES TO PREVENT ANY DAMAGE OF EXISTING FINISHES. ANY ACCIDENTAL DAMAGE
INCURRED TO EXISTING CONDITIONS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO REPAIR OR CORRECT.
7. CONTRACTOR SHALL CONFIRM EXISTING CIRCUITING TO UPS EQUIPMENT AND RACK
MOUNTED RECEPTACLES IN EXISTING TELECOMMUNICATION ROOMS PRIOR TO
DEMOLITION. ANY EXISTING FEEDERS NOT SUPPLYING UPS EQUIPMENT OR RACK MOUNTED
RECEPTACLES TO REMAIN.
8. EXISTING RACK MOUNTED RECEPTACLES BEING UTILIZED TO REMAIN. CONTRACTOR TO
VERIFY RECEPTACLE UTLIZATION PRIOR TO DEMOLITION.
PLAN NOTES
1 EXISTING ELECTRICAL RECEPTACLES TO BE REMOVED. CONTRACTOR TO REMOVE
EXISTING CONDUIT AND CONDUCTORS BACK TO SOURCE.
2 EXISTING ELECTRICAL RECEPTACLE TO REMAIN.
3 EXISTING ELECTRICAL PANEL TO REMAIN.
4 EXISTING UPS TO BE REMOVED. CONTRACTOR TO REMOVE EXISTING CONDUIT,
CONDUCTORS, AND JUNCTION BOXES BACK TO SOURCE.
5 EXISTING ELECTRICAL RECEPTACLES FEEDING ICE MACHINE AND UNDERCOUNTER
REFRIGERATOR TO BE REMOVED. CONDUIT AND CONDUCTORS TO BE REROUTED TO NEW
LOCATION ON ASSOCIATED 'EP' SHEET. CONTRACTOR TO TRACE CIRCUIT PRIOR TO
DEMOLITION.
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY ALL CONDITIONS.
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
SERVICE BAY
4B123
SERVICE BAY
4C114
CONSULT
4B105
NOUR
4B122
TR
4B123D
4B114A
RETHERM
4B121
CHUTE
4B104
COMM CENTER
4B118
STAFF LOUNGE
4B109
CONF/ REPORT
4B106
HOUSE STAFF
4B107
RESIDENT CONF
4B108
PCI
4B102
SOC WRK
4B110
CLEAN
4B155D
4B159
DIET
4B125
HEAD NURSE
4B114
CARE PROVIDER
4B116
STOR/EQUIP
4B103
HC ST
4B126ASTAFF LOCKER
4B126
EC
4B153
TR
4C114C
4C132B
NORM ELEC
4B123B
EMER ELEC
4B123A
EMER ELEC
4C114B
NORM ELEC
4C114A
PATIENT NEG
4B143
MED ROOM
4B155B
SOILED
4B155E
4B161
CLEAN
4B120
ISO T
4B141A
ISO T
4B143A
PATIENT
4B163
T
4B145A
PATIENT
4B161
T
4B147A
PATIENT
4B159
T
4B149A
PATIENT
4B157
T
4B151A
PATIENT
4B152
T
4B140A
PATIENT
4B164
T
4B142A
PATIENT
4B162
T
4B144A
PATIENT
4B160
T
4B146A T
4B148A
PATIENT
4B158
T
4B150A
PATIENT
4B156
T
4B154A
PATIENT
4B154
T
4B156A
PATIENT
4B151
T
4B158A
PATIENT
4B149
T
4B160A
PATIENT
4B147
T
4B162A
PATIENT
4B145
T
4B164A
PATIENT
4B142
PATIENT
4B140
T
4B163A
PATIENT
4B150
T
4B161A
PATIENT
4B148
T
4B159A
PATIENT
4B146
T
4B157A
PATIENT
4B144
T
4B152A
SUB-STATION
4B130A
SUB-STATION
4B130C
SUB-STATION
4B130E
SUB-STATION
4B132H
SUB-STATION
4B132D
SUB-STATION
4B132F
RESPITE
4B166
ANTE POS
4B165B
PATIENT NEG
4B141
PATIENT POS
4B165
PUB ELEV LOBBY
4B100
SERV ELEV LOBBY
4B111
X-RAY ALC
4B115
SUPPLY
4B130D
SUPPLY
4B132C
SUPPLY
4B130B
SUPPLY
4B132E
ISO T
4C134A
BED STATION ISO
4C134
BED STATION
4C128
BED STATION
4C130
BED STATION
4C132
T
4C135
CLEAN
4C137
SOILED
4C141
EQ CLEAN STOR
4C136
MED
4C127
DIALYSATE STOR
4C120
CH NURSE
4C126
STOR STERILE
4C123
WATER TREAT
4C110
EQUIP SERVICE
4C111
WC
4C113
CUB
4C122B
CC
4C118
LOCKER
4C112
ST
4C121
T
4B167
T/S
4C106A
T/S
4C105A
T/S
4C104A
ON CALL
4C107ON CALL
4C103
ON CALL
4C106
ON CALL
4C105
ST
4B127A
ISO T
4B165A
NOUR
4C139
OFF PHYSICIAN
4C124
CUB
4C122A
T/S
4C107A
HC T/S
4C103A
T/S
4C102A
ON CALL
4C102
ON CALL
4C104
EQUIP SOIL/PREP
4C138
NURSE STA
4C125
AISLE
4B-C01A
CORR
4B-C01
CORR
4B-C02
CORR
4B-C03
CORR
4B-C04
CORR
4B-C04A
CORR
4C-C01
CORR
4C-C02
CORR
4C-C03
CORR
4C-C04
CORR
4C-C05
CORR
4C-C06
AISLE
4C-C06A
ELEV
BS-1
FUTURE ELEV
BS-2
ELEV
BS-4
ELEV
BS-3
STAIR
STB-1
SHAFT
SHB01
SHAFT
SHB03
SHAFT
SHC06
SHAFT
SHC05B
SHAFT
SHC05A
SUPPLY
4B132A
SUPPLY
4B132G
SCALE
4C119
HK
4B112
CC
4B165C
P/C/N OFFICE
4B113
AISLE
4B-C03A
STAIR
STC-4
SECURITY
4B123C
SECURITY
4C114D
SUB-STATION
4B132B
CORR
4B-C01B
CORR
4B-C04B
CLST
4C107B
CLST
4C105B
CLST
4C103B
CLST
4C102B
CLST
4C104B
CLST
4C106B
CORR
4B-C05
ALCOVE
4B-C02A
ALCOVE
4C136A
ALCOVE
4C128A
MALE
4C101B
FEMALE
4C101A
SHAFT
SHC05C
TR
4B155C
4B153
(E)ECR12412
(E)R12413B (E)R12413A
01-ED-041
01-ED-041
01-ED-041
(E) XFMR 'T3-1'
(E) PNL 'ECL1441'
(E) XFMR 'T5'
(E) PNL 'ECD1241'
(E) PNL 'EQR1241'
(E) PNL 'ELSL1441'
(E) PNL 'ECR12411B'
(E) PNL 'ECR12411A'
(E) PNL 'R12412B'(E) PNL 'R12412A'
(E) PNL 'L1441'
(E) PNL 'LC1441'
(E) PNL 'D1241'
(E) PNL 'R12411B'
(E) PNL 'R12411A'
(E) XFMR 'T6'
(E) XFMR 'T3-1'
(E) PNL 'ECL1442'
(E) XFMR 'T5'
(E) PNL 'ECR12421B'
(E) PNL 'ECR12421A'
(E) PNL 'ELSL1442'
(E) PNL 'EQR1242'
(E) PNL 'LC1442'
(E) PNL 'L1442'
(E) XFMR 'T5'
(E) PNL 'R12421B'
(E) PNL 'R12421A'
(E) PNL 'EIT1241'
(E)EIT1241-26
(E)EIT1241-24
(E)EIT1241-24
(E)EIT1241-26
(E)EIT1241-24
(X)EIT1241-19
(X)EIT1241-21
(X)EIT1241-17
(X)EIT1241-15
(X)EIT1241-13
(X)EIT1241-29
(X)EIT1241-27
(X)EIT1241-25
MOUNTED ON
CABLE TRAY
(TYP.)
TR
4B123D
4B114A1
4 (X)EIT1241-1,3
(E) PNL 'EIT1242'(E)EIT1242-24
(E)EIT1242-26
(E)EIT1242-24
(E)EIT1242-26
(X)EIT1242-13
(X)EIT1242-15
(X)EIT1242-25
(E)EIT1242-1,3
MOUNTED ON
CABLE TRAY
(TYP.)
(X)EIT1242-5,7
TR
4C114C
4C132B
(E)EIT1242-242
(X)EIT1243-1
(X)EIT1243-5
(E)EIT1243-8
(E)EIT1243-6
MOUNTED ON
CABLE TRAY
(TYP.)
(E) PNL 'EIT1243'
TR
4B155C
4B153
(X)EIT1243-9,11
(E)EIT1243-102
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
01-ED-041
OVERALL FOURTH FLOOR POWER
DEMOLITION PLAN - BLDG. 01
MER AJW
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 01 POWER OVERALL DEMOLITION PLAN - LEVEL 4
1/4" = 1'-0"3
ENLARGED POWER DEMO PLAN - TR 4B114A
1/4" = 1'-0"2
ENLARGED POWER DEMO PLAN - TR 4C132B
1/4" = 1'-0"4
ENLARGED POWER DEMO PLAN - TR 4B153
DEMOLITION GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN THE
CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. CONTRACTOR SHALL COORDINATE ALL INTERRUPTIONS SERVICES WITH THE COR PRIOR TO
INITIATION OF WORK. NO DEMOLITION SHALL OCCUR UNTIL AFTER THE NEW OR
REPLACEMENT SYSTEMS ARE IN PLACE AND READY FOR CUT OVER.
3. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE BY OWNER.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH ARCHITECTURAL.
5. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
6. PARTICULAR ATTENTION SHALL BE GIVEN TO THE PROTECTION OF EXISTING STRUCTURE
AND FINISHES TO PREVENT ANY DAMAGE OF EXISTING FINISHES. ANY ACCIDENTAL DAMAGE
INCURRED TO EXISTING CONDITIONS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO REPAIR OR CORRECT.
7. CONTRACTOR SHALL CONFIRM EXISTING CIRCUITING TO UPS EQUIPMENT AND RACK
MOUNTED RECEPTACLES IN EXISTING TELECOMMUNICATION ROOMS PRIOR TO
DEMOLITION. ANY EXISTING FEEDERS NOT SUPPLYING UPS EQUIPMENT OR RACK MOUNTED
RECEPTACLES TO REMAIN.
8. EXISTING RACK MOUNTED RECEPTACLES BEING UTILIZED TO REMAIN. CONTRACTOR TO
VERIFY RECEPTACLE UTLIZATION PRIOR TO DEMOLITION.
PLAN NOTES
1 EXISTING ELECTRICAL RECEPTACLES TO BE REMOVED. CONTRACTOR TO REMOVE
EXISTING CONDUIT AND CONDUCTORS BACK TO SOURCE.
2 EXISTING ELECTRICAL RECEPTACLE TO REMAIN.
3 EXISTING ELECTRICAL PANEL TO REMAIN.
4 EXISTING UPS TO BE REMOVED. CONTRACTOR TO REMOVE EXISTING CONDUIT,
CONDUCTORS, AND JUNCTION BOXES BACK TO SOURCE.
5 EXISTING ELECTRICAL RECEPTACLES FEEDING ICE MACHINE AND UNDERCOUNTER
REFRIGERATOR TO BE REMOVED. CONDUIT AND CONDUCTORS TO BE REROUTED TO NEW
LOCATION ON ASSOCIATED 'EP' SHEET. CONTRACTOR TO TRACE CIRCUIT PRIOR TO
DEMOLITION.
UP
UP
F
F
F
O C
F
OC
MONITOR
1C163
CHF (OC)
1C220
A CHF (OC)
1C222
SECY (OC)
1B208
ITAC (OC)
1B141
CS (OC)
1B139
OFF CHF (FS)
1B151
BA (OC)
1C224
ADM (OC)
1B140
MA ASST (OC)
1C226
CUB (FS)
1B175D
CUB (FS)
1B175C
CUB (FS)
1B192A
CUB (FS)
1B192B
MEDIA (FS)
1B154
OFF A CHF (FS)
1B152
CUB CST SRV (FS)
1B150
CUB (FS)
1B192C
SEC/WAIT (FS)
1B153
CUB (CD)
1B173C
CUB (CD)
1B171CCUB (CD)
1B173D
CHF (CD)
1B159
A CHF (CD)
1B158
LD CODE (CD)
1B162
LD CODE (CD)
1B161
CUB (CD)
1B172B
CUB (CD)
1B172F
CUB (CD)
1B170A
CUB (CD)
1B170C
CUB (CD)
1B173B
CUB (CD)
1B171D
CUB (CD)
1B173A
CUB (CD)
1B170D
CUB (CD)
1B170B
CUB (CD)
1B171A
CUB (CD)
1B172C
CUB (CD)
1B172D
CUB (CD)
1B172E
SECY (CD)
1B160
WORK (CD)
1B157
A CHF (HIM)
1B143
CHF (HIM)
1B144
SECY (HIM)
1B201
CUB (HIM)
1B193B
CUB (HIM)
1B195D
CUB (HIM)
1B192F
CUB (HIM)
1B192D
CUB (HIM)
1B192E
WAIT/ROI (HIM)
1B200
CHF (WA)
1B137
A CHF (WA)
1B138
SECY (WA)
1B134
OP CTR (WA)
1B130
OFF SPV (WA)
1B132
A CHF (HE)
1C135
CUB (MCCF)
1B174A
CUB (MCCF)
1B175A
CUB (MCCF)
1B174B
CUB (MCCF)
1B175E
CUB (MCCF)
1B175B
BUS CTR (HE)
1C125
CUB (MCCF)
1B174D
T
1B176
CHIEF
1C203
A CHF
1C201
TECH
1C196A
WORKROOM
1C205
CUB (MCCF)
1B174C
SUPV (MCCF)
1B155
IP SUP (HE)
1C134
IP CLRK (HE)
1C124
SECY (MCCF)
1C132B
CUB PSA (HE)
1C130B
CUB PSA (HE)
1C130A
CUB PSA (HE)
1C130C
ADMIS (HE)
1C122
CUB ELIG (HE)
1C131
CUB PSA (HE)
1C132D
A CHF
1C199
ACCNT CHF
1C214 ACCNT CHF
1C213
ACCNT CHF
1C212
ACCNT CHF
1C211
COMP AUDITOR
1C215
COMP OFFICER
1C216
BDGT
1C192E
BDGT
1C192B
BDGT
1C192A
BDGT
1C192F
BDGT
1C217A
TECH
1C192D
TECH
1C192C
TECH
1C196F
TECH
1C200A
SECRY
1C194B
TECH
1C194A TECH
1C196ETECH
1C194F
TECH
1C217B
TECH
1C194D
TECH
1C196C
TECH
1C196D
TECH
1C194E
AUDITOR
1C193
AUDITOR
1C197
AUDITOR
1C195
RECPT
1C190A
T
1C186
T
1C219
AUDITOR
1C191
BREAK
1C210
SERVICE BAY
1C114
EC
1C223
EC
1B180
SERVICE BAY
1B123
TR
1C114C
1A104B
NORM ELEC
1C114A
DETAILS (HE)
1C136
WAIT (OC)
1C227
CUB CS (HE)
1C132C
STOR (HE)
1C126
EMER ELEC
1C114B
TR
1B123D
1B114A
EMER ELEC
1B123A
NORM ELEC
1B123B
SEC/WAIT
1B106
CONF/CLASS (OC)
1B135
T
1B204
CUB (FS)
1B191A
CUB (CD)
1B171B
T
1B178
TR
1C228
1C149
WAIT
1C190
SERV ELEV LOBB
1B120
PUB ELEV LOBBY
1B100
WORKROOM (HIM)
1B194
CUB (CD)
1B173E
CLINICAL SUPER (NSA)
1B102
CLINICAL SUPER (NSA)
1B103
T
1C141
T
1C143
WC
1C144
LOUNGE
1C145
RECPT
1C137
PANTRY
1C146
CHAPLAIN
1B105
CHAPLAIN
1B107
CHAPLAIN
1B109
EUCHARIST
1B111
QUIET
1B116
T
1B108
T
1B110
STOR
1B112
HK
1B114
STOR/FILE (FS)
1B190
ISO (HIM)
1B203
PV (HIM)
1B142
STOR
1C196B
SLEEP
1C166
T/S
1C166A
ST
1C181
T/S
1C179A
T/S
1C174A
SLEEP
1C174
SLEEP
1C165
SLEEP
1C175
T/S
1C165A
T/S
1C164A
SLEEP
1C164
SLEEP
1C177
T/S
1C177A
T/S
1C175A
SLEEP
1C179
SLEEP
1C162
T/S
1C162A
WAIT
1C160
CC
1C178
CONF
1C185
RETAIL AREA
1C101
VESTIBULE
1C150
ADMIS (HE)
1C123
STOR
1C221
WAIT
1C132A
POLY
1C161
EQUIP
1C168 T
1C160A
BREAK
1C169
ELEV
BS-1
FUTURE ELEV
BS-2
ELEV
BS-4
ELEV
BS-3
STAIR
STB-1
CORR
1B-C01 CORR
1B-C02
CORR
1B-C03
AISLE
1B-C08
CORR
1B-C07
CORR
1B-C05
CORR
1B-C06
AISLE
1B-C09
AISLE
1B-C10
AISLE
1B-C11
AISLE
1B-C12
AISLE
1B-C13
AISLE
1B-C14
AISLE
1B-C15
AISLE
1B-C16
AISLE
1C-C01A
AISLE
1C-C01B
AISLE
1C-C01C
AISLE
1C-C01D
AISLE
1C-C03
AISLE
1C-C04
AISLE
1C-C04AAISLE
1C-C04B
AISLE
1C-C05
AISLE
1C-C06
AISLE
1C-C07
AISLE
1C-C12
AISLE
1C-C11
AISLE
1C-C09
AISLE
1C-C08
AISLE
1C-C08A
SECY (HE)
1B172A
STOR
1C133
1C100
HK
1C139
VESTIBULE
1B121
CORR
1C101-K
CORR
1B-C02A
HK
1B206
NOUR
1C180
AISLE
1C-C010
AISLE
1C-C07A
SECURITY
1C114D
1C104A
UNASSIGNED
1B174G
CUB (HIM)
1B192H
SECURITY
1B123C
CORR
1C-C02
SECY/WAIT (OC)
1C225
TECH
1C196G
RETAIL PREP
1C101A
CORR
1B-C04
AISLE
1B-C04A
AISLE
1C-C00
CORR
1C-C01
CLEAN
1C167
SOILED
1C176
ASR
1B113
CONNECTOR HALL
1B115A
TR
1B179
1B145
IT/LVSR
1C190B
1C150A
CHAPEL
1B115
CLOSET
1B115B
01-EP-011
01-EP-011
(E) PNL 'LC1411'
(E) PNL 'L1411'
(E) PNL 'ECR1211'
(E) PNL 'D1411'
(E) PNL 'D1211'
(E) PNL 'R12112A'
(E) PNL 'R12112B'
(E) PNL 'P1411'
(E) PNL 'R12111A'
(E) PNL 'R12111B'
(E) XFMR 'T6'
(E) PNL 'LC143'
(E) PNL 'MGAP'
(E) PNL 'R12121B'
(E) PNL 'R12121A'
(E) PNL 'R12122A'
(E) PNL 'R12122B'
(E) PNL 'D1212'
(E) XFMR 'T6'
(E) PNL 'D1412'
(E) PNL 'LC1412'
(E) PNL 'L1412'
(E) PNL 'ECR1212'
(E) PNL 'R12123A'
(E) PNL 'R12123B'
(E) PNL 'R12113B'
(E) PNL 'R12113A'
01-EP-011
01-EP-011
(E) PNL 'P1412'
(E) PNL 'EIT1214'
60AS
60AF
ECR1212-37,39,41
ECR1212-33,35
(E)UNLABELED
(E)UNLABELED
(E)UNLABELED
(E) PNL 'EIT1211'
TR
1B123D
1B114A
EIT1211-1,3,5
EIT1211-7,9,11
R12112B-2,4,6
R12112B-8,10,12
60AS
60AF
(E)UNLABELED
(E)UNLABELED
(E)UNLABELED
(E)EIT1212-24
(E) PNL 'EIT1212'
TR
1C114C
1A104B
EIT1212-1,3,5
EIT1212-7,9,11
R12121B-38,40,42
R12121B-37,39,41
60AS
60AF
R12113B-37,39,41
TR
1B179
1B145
PNL 'EIT1213'
EIT1213-1,3,5
EIT1213-15
EIT1213-7,9,11
EIT1213-13
R12113B-35
S1 L1411-42 a
EIT1213-2
TR
1C228
1C149
EIT1214-19
EIT1214-21
EIT1214-7,9,11
R12123B-37,39,413
EIT1214-13,15,17 60AS
45AF
S1 L1412-42 a
EIT1214-6
LUMINAIRE SCHEDULE
TYPE DESCRIPTION MANUFACTURER MODEL # LAMP
TYPE
CRI DELIVERED
LUMENS
COLOR
TEMP
INPUT FINISH
WATTS
S1 STRIP LIGHT FIXTURE LITHONIA ZL1D SERIES LED 90 5337 3500 41
NOTES:
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .