This document provides technical specifications for an Electronic Health Record Modernization (EHRM) Infrastructure Upgrades construction project for the Southeast Louisiana Veterans Health Care System (SLVHCS) in New Orleans, Louisiana. The specifications cover general construction requirements, selective demolition, alterations to existing structures, and new construction work. Key aspects of the project include upgrades to mechanical, electrical, plumbing, fire protection, and telecommunications systems across multiple hospital campus buildings. The specifications establish standards for site access, operations and storage areas, tests and inspections, submittals, warranties, training and documentation requirements.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electronic Health Record Modernization (EHRM) Infrastructure Upgrades Design Project Contract No. 36C77621R0191 VA 629-22-700 New Orleans 100% Technical Specifications Divisions 00 thru 32 June 1, 2023
Southeast Louisiana Veterans Health Care System (SLVHCS) 2400 Canal Street New Orleans, Louisiana 70119 For US Department of Veterans Affairs
Program Contracting Activity Central (PCAC)
6100 Oak Tree Blvd., Suite 490
Independence, OH 44131
GDM
2600 The American Road
Rio Rancho, NM, 87124
575-300-1481
Celyn Dezmain, Project Manager
SLVHCS 100% FINAL BID DOCUMENTS
New Orleans, LA 06/01/2023
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 10 - 1 of 6
TABLE OF CONTENTS
SECTION 00 01 10
THE SPECIFICATIONS LISTED BELOW FORM A PART OF THE CONTRACT.
DIVISION 00 - SPECIAL SECTIONS # of Pages
00 01 10 Table of Contents……………………………………………………………………6
00 01 15 List of Drawing Sheets……………………………………………………22
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements…………………………………………………………26
01 11 00 Summary of Work…………………………………………………………………………4
01 15 00 Green Environmental Management System (GEMS) Awareness Training…………………………………………………………………6
01 32 16.15 Project Schedules…………………………………………………………………12
01 32 50 Building Information Modeling (BIM) Requirements………………………………………………………………………………12
01 33 23 Shop Drawings, Product Data, and Samples………8
01 33 23.01 Log of Submittals……………………………………………………………………8
01 35 26 Safety Requirements……………………………………………………………32
01 42 19 Reference Standards, Codes and Regulations…………………………………………………………………………………12
01 45 00 Quality Control………………………………………………………………………12
01 45 29 Testing Laboratory Services………………………………………10
01 45 35 Special Inspections………………………………………………………………6
01 57 19 Temporary Environmental Controls……………………………8
01 73 29 Cutting and Patching……………………………………………………………6
01 74 19 Construction Waste Management……………………………………8
01 81 13 Sustainable Construction Requirements………………8
01 81.13.01 Sustainability Guiding Principles…………………………2
01 91 00 General Commissioning Requirements……………………46
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Selective Demolition……………………………………………………………4
02 85 00 Mold Remediation……………………………………………………………………34
VA Project No. 629-22-700
00 01 10 - 2 of 6
DIVISION 03 – CONCRETE (NOT USED)
DIVISION 04 – MASONRY (NOT USED)
DIVISION 05 – METALS
05 50 00 Metal Fabrications…………………………………………………………………8
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry………………………………………………………………………10
06 20 00 Finish Carpentry………………………………………………………………………4
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 27 26 Fluid Applied Membrane Air and Moisture Barrier………………………………………………………………………………………………8
07 77 00 Wall Accessories………………………………………………………………………2
07 84 00 Firestopping…………………………………………………………………………………6
07 92 00 Joint Sealants…………………………………………………………………………10
DIVISION 08 – OPENINGS
08 11 10 Hollow Metal Doors and Frames……………………………………8
08 14 16 Flush Wood Veneer Doors……………………………………………………8
08 31 13 Access Doors and Frames……………………………………………………6
08 71 00 Door Hardware……………………………………………………………………………14
DIVISION 09 – FINISHES
09 06 00 Schedule for Finishes…………………………………………………………2
09 22 16 Non-Structural Metal Framing………………………………………8
09 29 00 Gypsum Board…………………………………………………………………………………6
09 51 00 Acoustical Ceiling Tile…………………………………………………10
09 65 13 Resilient Base……………………………………………………………………………4
09 65 36.13 Static Dissipative Resilient Flooring………………8
09 91 00 Painting…………………………………………………………………………………………10
DIVISION 10 – SPECIALTIES
10 14 00 Signage………………………………………………………………………………………………4
10 44 13 Fire Extinguisher Cabinets and Fire Extinguishers………………………………………………………………………………4
DIVISION 11 – EQUIPMENT (NOT USED)
VA Project No. 629-22-700
00 01 10 - 3 of 6
DIVISION 12 – FURNISHINGS (NOT USED)
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non- Structural Components………………………………………………………10
DIVISION 14– CONVEYING EQUIPMENT (NOT USED)
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression Systems……4
21 13 13 Wet-Pipe Sprinkler Systems…………………………………………12
21 13 45 Sprinkler Guards………………………………………………………………………2
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing…………………………34
22 05 23 General-Duty Valves for Plumbing Piping………10
22 07 11 Plumbing Insulation……………………………………………………………10
22 08 00 Commissioning of Plumbing Systems…………………………4
22 11 00 Facility Water Distribution………………………………………10
22 13 00 Facility Sanitary and Vent Piping………………………14
22 40 00 Plumbing Fixtures……………………………………………………………………6
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC……………………………………36
23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment…………………………………………10
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment………………………………………………………………………………8
23 05 93 Testing, Adjusting, and Balancing for
HVAC……………………………………………………………………………………………………10
23 07 11 HVAC and Boiler Plant Insulation…………………………16
23 08 00 Commissioning of HVAC Systems……………………………………6
23 09 23 Direct-Digital Control System for HVAC…………38
23 09 25 Data Cabinet Monitoring Systems……………………………18
23 21 13 Hydronic Piping………………………………………………………………………18
23 21 23 Hydronic Pumps……………………………………………………………………………6
23 23 00 Refrigerant Piping…………………………………………………………………8
VA Project No. 629-22-700
00 01 10 - 4 of 6
23 25 00 HVAC Water Treatment……………………………………………………………4
23 31 00 HVAC Ducts and Casings……………………………………………………10
23 37 00 Air Outlets and Inlets………………………………………………………4
23 81 23 Computer-Room Air Conditioners………………………………46
23 84 00 Humidity Control Equipment……………………………………………8
DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations…12
26 05 19 Low-Voltage Electrical Power Conductors and Cables………………………………………………………………………………………………10
26 05 26 Grounding and Bonding for Electrical Systems……………………………………………………………………………………………10
26 05 33 Raceway and Boxes for Electrical Systems……14
26 05 73 Overcurrent Protective Device Coordination Study……………………………………………………………………………………………………6
26 08 00 Commissioning of Electrical Systems……………………4
26 09 23 Lighting Controls……………………………………………………………………4
26 22 00 Low-Voltage Transformers…………………………………………………6
26 24 16 Panelboards……………………………………………………………………………………8
26 27 26 Wiring Devices……………………………………………………………………………8
26 29 21 Enclosed Switches and Circuit Breakers……………4
26 51 00 Interior Lighting…………………………………………………………………10
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations……………………………………………………………………………50
27 05 26 Grounding and Bonding for Communications Systems………………………………………………………………………………………………6
27 05 33 Conduits and Backboxes for Communications Systems……………………………………………………………………………………………12
27 05 36 Cable Trays for Communications Systems……………2
27 05 53 Identification for Communications System………2
27 08 00 Commissioning of Communications Systems…………4
VA Project No. 629-22-700
00 01 10 - 5 of 6
27 10 00 Structured Cabling…………………………………………………………………4
27 11 16 Communication Cabinets, Racks, Frames, and Enclosures………………………………………………………………………………………2
27 11 19 Communication Termination Blocks and Patch Panels…………………………………………………………………………………………………4
27 11 26 Communications Rack Mounted Power Protection and Power Strips………………………………………………………………………6
27 13 13.13 Communications Copper Cable Splicing and Terminations…………………………………………………………………………………2
27 13 23 Communications Optical Fiber Backbone Cabling………………………………………………………………………………………………4
27 13 23.13 Communications Optical Fiber Cable Splicing and Terminations………………………………………………………………………2
27 15 13 Communications Copper Horizontal Cabling………2
27 16 19 Communication Patch Cords, Station Cords and Cross Connect Wire…………………………………………………………………2
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security………………………………………………………………………………64
28 05 13 Conductors and Cables for Electronic Safety and Security………………………………………………………………………………20
28 05 26 Grounding and Bonding for Electronic Safety and Security…………………………………………………………………………………8
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security………………………………………………………………………………12
28 08 00 Commissioning of Electronic Safety and Security……………………………………………………………………………………………4
28 13 00 Physical Access Control System………………………………78
28 23 00 Video Surveillance………………………………………………………………30
DIVISION 31 – EARTHWORK
31 20 11 Earthwork………………………………………………………………………………………20
31 23 19 Dewatering………………………………………………………………………………………6
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements………………………………………………………………………………20
VA Project No. 629-22-700
00 01 10 - 6 of 6
32 90 00 Planting…………………………………………………………………………………………30
DIVISION 33 – UTILITIES (NOT USED)
DIVISION 34 – TRANSPORTATION (NOT USED)
DIVISION 48 – ELECTRICAL POWER GENERATION (NOT USED)
- - - E N D - - -
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 1 of 22
LIST OF DRAWING SHEETS
SECTION 00 01 15
The drawings listed below accompanying this specification form a part of the contract.
GENERAL
GI001 COVER SHEET
GI002 PROJECT INDEX
GI003 SYMBOLS, ABBREVIATIONS
000-AJ-601 PARTITION TYPES & DETAILS
000-AJ-602 TYPICAL PENETRATION DETAILS
000-AJ-603 TYPICAL PENETRATION DETAILS
000-AJ-604 TYPICAL INFECTION CONTROL
000-AJ-605 DOOR SCHEDULE, INFORMATION & DETAILS
000-AJ-606 ICRA CLASSIFICATION PROCESS
CIVIL
00-CG-001 GENERAL NOTES
00-CS-001 OVERALL EXISTING CIVIL SITE PLAN
00-CN-001 OVERALL B-CIRCUIT FIBER OPTIC SITE PLAN
00-CU-001 OVERALL B-CIRCUIT FIBER OPTICAL PLAN AND PROFILE – BLDG 2-9
00-CU-002 OVERALL B-CIRCUIT FIBER OPTIC PLAN AND PROFILE – BLDG 6-10 & 8-10
CJ-A101 CIVIL DETAILS
CJ-A102 CIVIL DETAILS
ARCHITECTURAL
01-AE-011 OVERALL FIRST FLOOR PLAN- BUILDINGS B & C
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 2 of 22
01-AE-021 OVERALL SECOND FLOOR PLAN- BUILDINGS B & C
01-AE-031 OVERALL THIRD FLOOR PLAN- BUILDINGS B & C
01-AE-041 OVERALL FOURTH FLOOR PLAN- BUILDINGS B & C
01-AC-011 LEVEL 1 REFLECTED CEILING PLAN BUILDINGS B & C
01-AC-021 LEVEL 2 REFLECTED CEILING PLAN BUILDINGS B & C
01-AC-031 LEVEL 3 REFLECTED CEILING PLAN BUILDINGS B & C
01-AC-041 LEVEL 4 REFLECTED CEILING PLAN BUILDINGS B & C
01-AJ-011 ENLARGED PLANS BUILDING C
01-AJ-014 ENLARGED PLANS BUILIDNG B
01-AJ-015 ENLARGED PLANS BUILIDNG C
01-AJ-025 ENLARGED PLANS BUILDING B
01-AJ-026 ENLARGED PLANS BUILDING B
01-AJ-027 ENLARGED PLANS BUILDING C
01-AJ-028 ENLARGED PLANS BUILDING C
01-AJ-035 ENLARGED PLANS BUILDING B
01-AJ-036 ENLARGED PLANS BUILDING B
01-AJ-037 ENLARGED PLANS BUILDING C
01-AJ-038 ENLARGED PLANS BUILDING C
01-AJ-044 ENLARGED PLANS BUILDING B
01-AJ-045 ENLARGED PLANS BUILDING B
02-AE-011 OVERALL FIRST FLOOR PLAN BUILDINGS D & E
02-AE-012 OVERALL FIRST FLOOR PLAN BUILDINGS F & G
02-AE-021 OVERALL SECOND FLOOR PLAN BUILDINGS D & E
02-AE-022 OVERALL SECOND FLOOR PLAN BUILDINGS F & G
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 3 of 22
02-AE-031 OVERALL THIRD FLOOR PLAN BUILDINGS D & E
02-AE-032 OVERALL THIRD FLOOR PLAN BUILDINGS F & G
02-AE-041 OVERALL FOURTH FLOOR PLAN BUILDINGS D & E
02-AE-042 OVERALL FOURTH FLOOR PLAN BUILDINGS F & G
02-AE-051 OVERALL FIFTH FLOOR PLAN BUILDINGS D & E
02-AE-052 OVERALL FIFTH FLOOR PLAN BUILDINGS F & G
02-AC-011 LEVEL 1 REFLECTIVE CEILING PLAN BUILDINGS D & E
02-AC-012 LEVEL 1 REFLECTIVE CEILING PLAN BUILDINGS F & G
02-AC-021 LEVEL 2 REFLECTIVE CEILING PLAN BUILDINGS D & E
02-AC-022 LEVEL 2 REFLECTIVE CEILING PLAN BUILDINGS F & G
02-AC-031 LEVEL 3 REFLECTIVE CEILING PLAN BUILDINGS D & E
02-AC-032 LEVEL 3 REFLECTIVE CEILING PLAN BUILDINGS F & G
02-AC-041 LEVEL 4 REFLECTIVE CEILING PLAN BUILDINGS D & E
02-AC-042 LEVEL 4 REFLECTIVE CEILING PLAN BUILDINGS F & G
02-AC-051 LEVEL 5 REFLECTIVE CEILING PLAN BUILDINGS D & E
02-AC-052 LEVEL 5 REFLECTIVE CEILING PLAN BUILDINGS F & G
02-AJ-035 ENLARGED PLANS BUILDING D
03-AE-011 OVERALL FIRST FLOOR PLAN BUIDINGS H & J
03-AE-021 OVERALL SECOND FLOOR PLAN BUIDINGS H & J
03-AE-031 OVERALL THIRD FLOOR PLAN BUIDINGS H & J
03-AE-041 OVERALL FOURTH FLOOR PLAN BUIDINGS H & J
03-AE-051 OVERALL FIFTH FLOOR PLAN BUIDING J
03-AE-061 OVERALL SIXTH FLOOR PLAN BUIDING J
03-AE-071 OVERALL SEVENTH FLOOR PLAN BUIDING J
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 4 of 22
03-AC-011 LEVEL 1 REFLECTIVE CEILING PLAN BUILDINGS H & J
03-AC-021 LEVEL 2 REFLECTIVE CEILING PLAN BUILDINGS H & J
03-AC-031 LEVEL 3 REFLECTIVE CEILING PLAN BUILDINGS H & J
03-AC-041 LEVEL 4 REFLECTIVE CEILING PLAN BUILDINGS H & J
03-AC-051 LEVEL 5 REFLECTIVE CEILING PLAN BUILDING J
03-AC-061 LEVEL 6 REFLECTIVE CEILING PLAN BUILDING J
03-AC-071 LEVEL 7 REFLECTIVE CEILING PLAN BUILDING J
03-AJ-013 ENLARGED PLANS BUILDING H
03-AJ-033 ENLARGED PLANS BUILDING H
03-AJ-043 ENLARGED PLANS BUILDING H
04-AE-011 OVERALL FIRST FLOOR PLAN BUILDING K
04-AJ-011 ENLARGED PLANS BUILDING K
04-AJ-012 ENLARGED PLANS BUILDING K
05-AE-011 OVERALL FIRST FLOOR PLAN BUILDING L
05-AJ-011 ENLARGED PLANS BUILDING L
05-AJ-012 ENLARGED PLANS BUILDING L
06-AE-011 OVERALL FIRST FLOOR PLAN BUILDING M
06-AE-021 OVERALL SECOND FLOOR PLAN BUILDING M
06-AE-031 OVERALL THIRD FLOOR PLAN BUILDING M
06-AE-041 OVERALL FOURTH FLOOR PLAN BUILDING M
07-AE-011 OVERALL FIRST FLOOR PLAN BUILDING N
07-AE-021 OVERALL SECOND FLOOR PLAN BUILDING N
07-AE-031 OVERALL THIRD FLOOR PLAN BUILDING N
07-AE-041 OVERALL FOURTH FLOOR PLAN BUILDING N
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 5 of 22
08-AE-011 OVERALL FIRST FLOOR PLAN BUILDING P
08-AE-021 OVERALL SECOND FLOOR PLAN BUILDING P
08-AE-031 OVERALL THIRD FLOOR PLAN BUILDING P
08-AE-041 OVERALL FOURTH FLOOR PLAN BUILDING P
09-AE-011 OVERALL FIRST FLOOR PLAN BUILDING Q
09-AE-021 OVERALL SECOND FLOOR PLAN BUILDING Q
09-AE-031 OVERALL THIRD FLOOR PLAN BUILDING Q
09-AE-041 OVERALL FOURTH FLOOR PLAN BUILDING Q
09-AE-051 OVERALL FIFTH FLOOR PLAN BUILDING Q
10-AE-011 OVERALL FIRST FLOOR PLAN BUILDING M SHOTGUN HOUSES
11-AE-011 OVERALL SECOND FLOOR PLAN FISHER HOUSE
MECHANICAL
00-MK-001 HVAC LEGEND, ABBREVIATIONS, AND GENERAL NOTES
00-MK-500 DETAILS
00-MK-501 DETAILS
00-MK-600 SCHEDULES
00-MK-601 SEQUENCE OF OPERATIONS
01-MH-011 FIRST FLOOR HVAC PLAN - BLDG B AND C
01-MH-021 SECOND FLOOR HVAC PLAN - BLDG B AND C
01-MH-031 THIRD FLOOR HVAC PLAN - BLDG B AND C
01-MH-041 FOURTH FLOOR HVAC PLAN - BLDG B AND C
01-MJ-011 ENLARGED FIRST FLOOR HVAC PLANS - BLDG B
01-MJ-012 ENLARGED FIRST FLOOR HVAC PLANS – BLDG C
01-MJ-013 ENLARGED FIRST FLOOR HVAC PLANS – BLDG C
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 6 of 22
01-MJ-021 ENLARGED SECOND FLOOR HVAC PLANS - BLDG B
01-MJ-022 ENLARGED SECOND FLOOR HVAC PLANS - BLDG B
01-MJ-023 ENLARGED FIRST FLOOR HVAC PLANS – BLDG C
01-MJ-024 ENLARGED SECOND FLOOR HVAC PLANS - BLDG C
01-MJ-031 ENLARGED THIRD FLOOR HVAC PLANS - BLDG B
01-MJ-032 ENLARGED THIRD FLOOR HVAC PLANS – BLDG B
01-MJ-033 ENLARGED THIRD FLOOR HVAC PLANS – BLDG C
01-MJ-034 ENLARGED THIRD FLOOR HVAC PLANS - BLDG C
01-MJ-041 ENLARGED FOURTH FLOOR HVAC PLANS - BLDG B AND C
01-MJ-042 ENLARGED FOURTH FLOOR HVAC PLANS - BLDG B
02-MH-011 FIRST FLOOR HVAC PLAN NORTH - BLDG D AND E
02-MH-012 FIRST FLOOR HVAC PLAN SOUTH - BLDG F AND G
02-MH-021 SECOND FLOOR HVAC PLAN NORTH - BLDG D AND E
02-MH-022 SECOND FLOOR HVAC PLAN SOUTH - BLDG F AND G
02-MH-031 THIRD FLOOR HVAC PLAN NORTH - BLDG D AND E
02-MH-032 THIRD FLOOR HVAC PLAN SOUTH - BLDG F AND G
02-MH-041 FOURTH FLOOR HVAC PLAN NORTH - BLDG D AND E
02-MH-042 FOURTH FLOOR HVAC PLAN SOUTH - BLDG F AND G
02-MH-051 FIFTH FLOOR HVAC PLAN NORTH - BLDG D AND E
02-MJ-011 ENLARGED FIRST FLOOR HVAC PLANS - BLDG D
02-MJ-012 ENLARGED FIRST FLOOR HVAC PLANS - BLDG E AND G
02-MJ-013 ENLARGED FIRST FLOOR HVAC PLANS - BLDG F
02-MJ-021 ENLARGED SECOND FLOOR HVAC PLANS - BLDG D AND E
02-MJ-022 ENLARGED SECOND FLOOR HVAC PLANS - BLDG F AND G
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 7 of 22
02-MJ-031 ENLARGED THIRD FLOOR HVAC PLANS - BLDG D
02-MJ-032 ENLARGED THIRD FLOOR HVAC PLANS - BLDG D AND E
02-MJ-033 ENLARGED THIRD FLOOR HVAC PLANS – BLDG F AND G
02-MJ-041 ENLARGED FOURTH FLOOR HVAC PLANS - BLDG D
02-MJ-042 ENLARGED FOURTH FLOOR HVAC PLANS - BLDG D AND E
02-MJ-043 ENLARGED FOURTH FLOOR HVAC PLANS – BLDG F AND G
02-MJ-051 ENLARGED FIFTH FLOOR HVAC PLANS - BLDG D
03-MH-011 FIRST FLOOR HVAC PLAN - BLDG H AND J
03-MH-021 SECOND FLOOR HVAC PLAN - BLDG H AND J
03-MH-031 THIRD FLOOR HVAC PLAN - BLDG H AND J
03-MH-041 FOURTH FLOOR HVAC PLAN - BLDG H AND J
03-MH-051 FIFTH FLOOR HVAC PLAN - BLDG H AND J
03-MH-061 SIXTH FLOOR HVAC PLAN - BLDG J
03-MH-071 SEVENTH FLOOR HVAC PLAN - BLDG J
03-MJ-011 ENLARGED FIRST FLOOR HVAC PLANS - BLDG J
03-MJ-012 ENLARGED FIRST FLOOR HVAC PLANS - BLDG H AND J
03-MJ-021 ENLARGED SECOND FLOOR HVAC PLANS - BLDG H AND J
03-MJ-022 ENLARGED SECOND FLOOR HVAC PLANS - BLDG J
03-MJ-031 ENLARGED THIRD FLOOR HVAC PLANS - BLDG H AND J
03-MJ-032 ENLARGED THIRD FLOOR HVAC PLANS - BLDG J
03-MJ-041 ENLARGED FOURTH FLOOR HVAC PLANS - BLDG H
03-MJ-042 ENLARGED FOURTH FLOOR HVAC PLANS - BLDG J
03-MJ-051 ENLARGED FIFTH FLOOR HVAC PLANS - BLDG J
03-MJ-061 ENLARGED SIXTH FLOOR HVAC PLANS - BLDG J
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 8 of 22
03-MJ-071 ENLARGED SEVENTH FLOOR HVAC PLANS - BLDG J
04-MH-011 FIRST FLOOR HVAC PLAN - BLDG K
04-MJ-011 ENLARGED HVAC PLANS - BLDG K
05-MH-011 FIRST FLOOR HVAC PLAN - BLDG L
05-MJ-011 ENLARGED HVAC PLANS - BLDG L
06-MH-011 FIRST FLOOR HVAC PLAN – BLDG M
06-MH-021 SECOND FLOOR HVAC PLAN - BLDG M
06-MH-031 THIRD FLOOR HVAC PLAN - BLDG M
06-MH-041 FOURTH FLOOR HVAC PLAN - BLDG M
06-MJ-011 ENLARGED HVAC PLANS - BLDG M
06-MJ-012 ENLARGED HVAC PLANS – BLDG M
07-MH-011 FIRST FLOOR HVAC PLAN - BLDG N
07-MH-021 SECOND FLOOR HVAC PLAN - BLDG N
07-MH-031 THIRD FLOOR HVAC PLAN - BLDG N
07-MH-041 FOURTH FLOOR HVAC PLAN - BLDG N
07-MJ-011 ENLARGED HVAC PLANS - BLDG N
07-MJ-021 ENLARGED HVAC PLANS - BLDG N
07-MJ-031 ENLARGED HVAC PLANS - BLDG N
07-MJ-041 ENLARGED HVAC PLANS - BLDG N
08-MH-011 FIRST FLOOR HVAC PLAN - BLDG P
08-MH-021 SECOND FLOOR HVAC PLAN - BLDG P
08-MH-031 THIRD FLOOR HVAC PLAN - BLDG P
08-MH-041 FOURTH FLOOR HVAC PLAN - BLDG P
08-MJ-011 ENLARGED HVAC PLANS - BLDG P
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 9 of 22
08-MJ-012 ENLARGED HVAC PLANS – BLDG P
09-MH-011 FIRST FLOOR HVAC PLAN - BLDG Q
09-MH-021 SECOND FLOOR HVAC PLAN - BLDG Q
09-MH-031 THIRD FLOOR HVAC PLAN - BLDG Q
09-MH-041 FOURTH FLOOR HVAC PLAN - BLDG Q
09-MH-051 FIFTH FLOOR HVAC PLAN - BLDG Q
09-MJ-011 ENLARGED HVAC PLANS - BLDG Q
09-MJ-012 ENLARGED HVAC PLANS - BLDG Q
10-MH-011 FIRST FLOOR HVAC PLAN - BLDG R
10-MJ-011 ENLARGED HVAC PLANS - BLDG R
TELECOMMUNICATIONS
00-TG-001 LEGEND, ABBREVIATION LIST, AND GENERAL NOTES
00-TS-000 TELECOMM EXISTING SITE PLAN
00-TS-001 TELECOMM SITE PLAN
00-TS-002 TELECOMM SITE PLAN
00-TN-041 FOURTH FLOOR TELECOMM PLAN – CONCOURSE FIBER RUN
00-TN-042 FOURTH FLOOR TELECOMM PLAN – CONCOURSE FIBER RUN
00-TN-043 FOURTH FLOOR TELECOMM PLAN – CONCOURSE FIBER RUN
01-TD-011 FIRST FLOOR TELECOMM DEMOLITION PLAN - BLDG. 01 AREA 1
01-TD-012 FIRST FLOOR TELECOMM DEMOLITION PLAN - BLDG. 01 AREA 2
01-TD-013 FIRST FLOOR TELECOMM DEMOLITION PLAN - BLDG. 01 AREA 3
01-TD-021 SECOND FLOOR TELECOMM DEMOLITION PLAN - BLDG. 01 AREA 1
01-TD-022 SECOND FLOOR TELECOMM DEMOLITION PLAN - BLDG. 01 AREA 2
01-TD-023 SECOND FLOOR TELECOMM DEMOLITION PLAN - BLDG. 01 AREA 3
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 10 of 22
01-TD-031 THIRD FLOOR TELECOMM DEMOLITION PLAN - BLDG. 01 AREA 1
01-TD-032 THIRD FLOOR TELECOMM DEMOLITION PLAN - BLDG. 01 AREA 2
01-TD-033 THIRD FLOOR TELECOMM DEMOLITION PLAN - BLDG. 01 AREA 3
01-TD-041 FOURTH FLOOR TELECOMM DEMOLITION PLAN - BLDG. 01 AREA 1
01-TD-042 FOURTH FLOOR TELECOM DEMOLITION PLAN – BLDG. 01 AREA 2
01-TN-011 FIRST FLOOR TELECOMM PLAN - BLDG. 01 AREA 1
01-TN-012 FIRST FLOOR TELECOMM PLAN – BLDG. 01 AREA 2
01-TN-013 FIRST FLOOR TELECOMM PLAN – BLDG. 01 AREA 3
01-TN-021 SECOND FLOOR TELECOMM PLAN - BLDG. 01 AREA 1
01-TN-022 SECOND FLOOR TELECOMM PLAN – BLDG. 01 AREA 2
01-TN-023 SECOND FLOOR TELECOMM PLAN – BLDG. 01 AREA 3
01-TN-031 THIRD FLOOR TELECOMM PLAN - BLDG. 01 AREA 1
01-TN-032 THIRD FLOOR TELECOMM PLAN – BLDG. 01 AREA 2
01-TN-033 THIRD FLOOR TELECOMM PLAN – BLDG. 01 AREA 3
01-TN-041 FOURTH FLOOR TELECOMM PLAN - BLDG. 01 AREA 1
01-TN-042 FOURTH FLOOR TELECOMM PLAN – BLDG. 01 AREA 2
02-TD-011 OVERALL FIRST FLOOR TELECOMM DEMOLITION PLAN NORTH - BLDG. 02
02-TD-012 OVERALL FIRST FLOOR TELECOMM DEMOLITION PLAN SOUTH - BLDG. 02
02-TD-021 OVERALL SECOND FLOOR TELECOMM DEMOLITION PLAN NORTH - BLDG. 02
02-TD-022 OVERALL SECOND FLOOR TELECOMM DEMOLITION PLAN SOUTH - BLDG. 02
02-TD-031 OVERALL THIRD FLOOR TELECOMM DEMOLITION PLAN NORTH - BLDG. 02
02-TD-032 OVERALL THIRD FLOOR TELECOMM DEMOLITION PLAN SOUTH - BLDG. 02
02-TD-041 OVERALL FOURTH FLOOR TELECOMM DEMOLITION PLAN NORTH - BLDG. 02
02-TD-042 OVERALL FOURTH FLOOR TELECOMM DEMOLITION PLAN SOUTH - BLDG. 02
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 11 of 22
02-TD-043 ENLARGED TELECOMM DEMO PLAN - MCR 4G110A
02-TD-051 OVERALL FIFTH FLOOR TELECOMM DEMOLITION PLAN NORTH - BLDG. 02
02-TD-052 OVERALL FIFTH FLOOR TELECOMM DEMOLITION PLAN SOUTH - BLDG. 02
02-TN-011 OVERALL FIRST FLOOR TELECOMM PLAN NORTH - BLDG. 02
02-TN-012 OVERALL FIRST FLOOR TELECOMM PLAN SOUTH - BLDG. 02
02-TN-021 OVERALL SECOND FLOOR TELECOMM PLAN NORTH - BLDG. 02
02-TN-022 OVERALL SECOND FLOOR TELECOMM PLAN SOUTH - BLDG. 02
02-TN-031 OVERALL THIRD FLOOR TELECOMM PLAN NORTH - BLDG. 02
02-TN-032 OVERALL THIRD FLOOR TELECOMM PLAN SOUTH - BLDG. 02
02-TN-041 OVERALL FOURTH FLOOR TELECOMM PLAN NORTH - BLDG. 02
02-TN-042 OVERALL FOURTH FLOOR TELECOMM PLAN SOUTH - BLDG. 02
02-TN-043 ENLARGED TELECOMM PLAN – MCR 4G110A
02-TN-044 OVERALL FOURTH FLOOR TELECOMM PLAN NORTH – BLDG. 02 INTERSTITIAL
02-TN-045 OVERALL FOURTH FLOOR TELECOMM PLAN NORTH – BLDG. 02 INTERSTITIAL
02-TN-051 OVERALL FIFTH FLOOR TELECOMM PLAN NORTH - BLDG. 02
03-TD-011 FIRST FLOOR TELECOMM DEMOLITION PLAN – BLDG. 03 AREA H
03-TD-012 FIRST FLOOR TELECOMM DEMOLITION PLAN – BLDG. 03 AREA J
03-TD-021 SECOND FLOOR TELECOMM DEMOLITION PLAN - BLDG.03 AREA H
03-TD-022 SECOND FLOOR TELECOMM DEMOLITION PLAN – BLDG.03 AREA J
03-TD-031 THIRD FLOOR TELECOMM DEMOLITION PLAN - BLDG. 03 AREA H
03-TD-032 THIRD FLOOR TELECOMM DEMOLITION PLAN – BLDG. 03 AREA J
03-TD-041 FOURTH FLOOR TELECOMM DEMOLITION PLAN - BLDG. 03 AREA H
03-TD-042 FOURTH FLOOR TELECOMM DEMOLITION PLAN – BLDG. 03 AREA J
03-TD-051 OVERALL FIFTH FLOOR TELECOMM DEMOLITION PLAN - BLDG. 03
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 12 of 22
03-TD-061 OVERALL SIXTH FLOOR TELECOMM DEMOLITION PLAN - BLDG. 03
03-TD-071 OVERALL SEVENTH FLOOR TELECOMM DEMOLITION PLAN - BLDG. 03
03-TN-011 FIRST FLOOR TELECOMM PLAN - BLDG. 03 AREA H
03-TN-012 FIRST FLOOR TELECOMM PLAN – BLDG. 03 AREA J
03-TN-021 SECOND FLOOR TELECOMM PLAN - BLDG. 03 AREA H
03-TN-022 SECOND FLOOR TELECOMM PLAN – BLDG. 03 AREA J
03-TN-031 THIRD FLOOR TELECOMM PLAN - BLDG. 03 AREA H
03-TN-032 THIRD FLOOR TELECOMM PLAN – BLDG. 03 AREA J
03-TN-041 FOURTH FLOOR TELECOMM PLAN - BLDG. 03 AREA H
03-TN-042 FOURTH FLOOR TELECOMM PLAN – BLDG. 03 AREA J
03-TN-051 FIFTH FLOOR TELECOMM PLAN - BLDG. 03 AREA J
03-TN-061 SIXTH FLOOR TELECOMM PLAN - BLDG. 03 AREA J
03-TN-071 SEVENTH FLOOR TELECOMM PLAN - BLDG. 03 AREA J
04-TD-011 OVERALL FIRST FLOOR TELECOMM DEMOLITION PLAN - BLDG. 04
04-TN-011 OVERALL FIRST FLOOR TELECOMM PLAN - BLDG. 04
04-TN-021 OVERALL SECOND FLOOR TELECOMM PLAN – BLDG. 04
04-TN-031 OVERALL THIRD FLOOR TELECOMM PLAN – BLDG. 04
04-TN-041 OVERALL FOURTH FLOOR TELECOMM PLAN – BLDG. 04
05-TD-011 OVERALL FIRST FLOOR TELECOMM DEMOLITION PLAN - BLDG. 05
05-TN-011 OVERALL FIRST FLOOR TELECOMM PLAN - BLDG. 05
05-TN-021 OVERALL SECOND FLOOR TELECOMM PLAN – BLDG. 05
05-TN-031 OVERALL THIRD FLOOR TELECOMM PLAN – BLDG. 05
05-TN-041 OVERALL FOURTH FLOOR TELECOMM PLAN – BLDG. 05
06-TD-011 OVERALL FIRST FLOOR TELECOMM DEMOLITION PLAN - BLDG. 06
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 13 of 22
06-TD-021 OVERALL SECOND FLOOR TELECOMM DEMOLITION PLAN - BLDG. 06
06-TD-031 OVERALL THIRD FLOOR TELECOMM DEMOLITION PLAN - BLDG. 06
06-TD-041 OVERALL FOURTH FLOOR TELECOMM DEMOLITION PLAN - BLDG. 06
06-TN-011 OVERALL FIRST FLOOR TELECOMM PLAN - BLDG. 06
06-TN-021 OVERALL SECOND FLOOR TELECOMM PLAN - BLDG. 06
06-TN-031 OVERALL THIRD FLOOR TELECOMM PLAN - BLDG. 06
06-TN-041 OVERALL FOURTH FLOOR TELECOMM PLAN - BLDG. 06
07-TD-011 OVERALL FIRST FLOOR TELECOMM DEMOLITION PLAN - BLDG. 07
07-TD-021 OVERALL SECOND FLOOR TELECOMM DEMOLITION PLAN - BLDG. 07
07-TD-031 OVERALL THIRD FLOOR TELECOMM DEMOLITION PLAN - BLDG. 07
07-TD-041 OVERALL FOURTH FLOOR TELECOMM DEMOLITION PLAN - BLDG. 07
07-TN-011 OVERALL FIRST FLOOR TELECOMM PLAN - BLDG. 07
07-TN-021 OVERALL SECOND FLOOR TELECOMM PLAN - BLDG. 07
07-TN-031 OVERALL THIRD FLOOR TELECOMM PLAN - BLDG. 07
07-TN-041 OVERALL FOURTH FLOOR TELECOMM PLAN - BLDG. 07
08-TD-011 OVERALL FIRST FLOOR TELECOMM DEMOLITION PLAN - BLDG. 08
08-TD-021 OVERALL SECOND FLOOR TELECOMM DEMOLITION PLAN - BLDG. 08
08-TD-031 OVERALL THIRD FLOOR TELECOMM DEMOLITION PLAN - BLDG. 08
08-TD-041 OVERALL FOURTH FLOOR TELECOMM DEMOLITION PLAN - BLDG. 08
08-TD-051 OVERALL FIFTH FLOOR TELECOMM DEMOLITION PLAN - BLDG. 08
08-TN-011 OVERALL FIRST FLOOR TELECOMM PLAN - BLDG. 08
08-TN-021 OVERALL SECOND FLOOR TELECOMM PLAN - BLDG. 08
08-TN-031 OVERALL THIRD FLOOR TELECOMM PLAN - BLDG. 08
08-TN-041 OVERALL FOURTH FLOOR TELECOMM PLAN - BLDG. 08
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 14 of 22
08-TN-051 OVERALL FIFTH FLOOR TELECOMM PLAN - BLDG. 08
09-TD-0B1 OVERALL BASEMENT TELECOMM DEMOLITION PLAN - BLDG. 09
09-TD-011 OVERALL FIRST FLOOR TELECOMM DEMOLITION PLAN - BLDG. 09
09-TD-021 OVERALL SECOND FLOOR TELECOMM DEMOLITION PLAN - BLDG. 09
09-TD-031 OVERALL THIRD FLOOR TELECOMM DEMOLITION PLAN - BLDG. 09
09-TD-041 OVERALL FOURTH FLOOR TELECOMM DEMOLITION PLAN - BLDG. 09
09-TD-051 OVERALL FIFTH FLOOR TELECOMM DEMOLITION PLAN - BLDG. 09
09-TN-0B1 OVERALL BASEMENT TELECOMM PLAN - BLDG. 09
09-TN-011 OVERALL FIRST FLOOR TELECOMM PLAN - BLDG. 09
09-TN-021 OVERALL SECOND FLOOR TELECOMM PLAN - BLDG. 09
09-TN-031 OVERALL THIRD FLOOR TELECOMM PLAN - BLDG. 09
09-TN-041 OVERALL FOURTH FLOOR TELECOMM PLAN - BLDG. 09
09-TN-051 OVERALL FIFTH FLOOR TELECOMM PLAN - BLDG. 09
10-TD-011 OVERALL FIRST FLOOR TELECOMM DEMOLITION PLAN - BLDG. 10
10-TN-011 OVERALL FIRST FLOOR TELECOMM PLAN - BLDG. 10
00-TJ-001 FIBER ONE LINE DIAGRAM
00-TJ-002 FIBER ONE LINE DIAGRAM
00-TJ-003 FIBER ONE LINE DIAGRAM
00-TJ-004 TELECOMM DETAILS
00-TJ-005 TELECOMM DETAILS
00-TJ-006 TELECOMM DETAILS
00-TJ-007 TELECOMM BONDING DETAILS
00-TJ-008 EXISTING TELECOMM RACK ELEVATIONS
00-TJ-009 EXISTING TELECOMM RACK ELEVATIONS
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 15 of 22
00-TJ-010 EXISTING TELECOMM RACK ELEVATIONS
00-TJ-011 EXISTING TELECOMM RACK ELEVATIONS
00-TJ-012 EXISTING TELECOMM RACK ELEVATIONS
00-TJ-013 EXISTING TELECOMM RACK ELEVATIONS
00-TJ-014 EXISTING TELECOMM RACK ELEVATIONS
00-TJ-015 EXISTING TELECOMM RACK ELEVATIONS
00-TJ-016 TELECOMM RACK ELEVATIONS
00-TJ-017 TELECOMM RACK ELEVATIONS
00-TJ-018 TELECOMM RACK ELEVATIONS
00-TJ-019 TELECOMM RACK ELEVATIONS
00-TJ-020 TELECOMM RACK ELEVATIONS
00-TJ-021 TELECOMM RACK ELEVATIONS
00-TJ-022 TELECOMM CABLE DEMOLITION SCHEDULES BLDG 1
00-TJ-023 TELECOMM CABLE DEMOLITION SCHEUDLES BLDG 1
00-TJ-024 TELECOMM CABLE DEMOLITION SCHEUDLES BLDG 1
00-TJ-025 TELECOMM CABLE DEMOLITION SCHEUDLES BLDG 3
00-TJ-026 TELECOMM CABLE DEMOLITION SCHEUDLES BLDG 3
00-TJ-027 TELECOMM CABLE DEMOLITION SCHEDUES BLDG 3
00-TJ-028 TELECOMM CABLE SCHEDULES BLDG 1
ELECTRICAL
00-EG-001 LEGEND, ABBREVIATION LIST, AND GENERAL NOTES
00-ES-000 OVERALL EXISTING ELECTRICAL SITE PLAN
01-ED-011 OVERALL FIRST FLOOR POWER DEMOLITION PLAN - BLDG. 01
01-ED-021 OVERALL SECOND FLOOR POWER DEMOLITION PLAN - BLDG. 01
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 16 of 22
01-ED-031 OVERALL THIRD FLOOR POWER DEMOLITION PLAN - BLDG. 01
01-ED-041 OVERALL FOURTH FLOOR POWER DEMOLITION PLAN - BLDG. 01
01-EP-011 OVERALL FIRST FLOOR POWER PLAN - BLDG. 01
01-EP-021 OVERALL SECOND FLOOR POWER PLAN - BLDG. 01
01-EP-031 OVERALL THIRD FLOOR POWER PLAN - BLDG. 01
01-EP-041 OVERALL FOURTH FLOOR POWER PLAN - BLDG. 01
02-ED-011 OVERALL FIRST FLOOR POWER DEMOLITION PLAN NORTH - BLDG. 02
02-ED-012 OVERALL FIRST FLOOR POWER DEMOLITION PLAN SOUTH - BLDG. 02
02-ED-021 OVERALL SECOND FLOOR POWER DEMOLITION PLAN NORTH - BLDG. 02
02-ED-022 OVERALL SECOND FLOOR POWER DEMOLITION PLAN SOUTH - BLDG. 02
02-ED-031 OVERALL THIRD FLOOR POWER DEMOLITION PLAN NORTH - BLDG. 02
02-ED-032 OVERALL THIRD FLOOR POWER DEMOLITION PLAN SOUTH - BLDG. 02
02-ED-041 OVERALL FOURTH FLOOR POWER DEMOLITION PLAN NORTH - BLDG. 02
02-ED-042 OVERALL FOURTH FLOOR POWER DEMOLITION PLAN SOUTH - BLDG. 02
02-ED-051 OVERALL FIFTH FLOOR POWER DEMOLITION PLAN NORTH - BLDG. 02
02-EP-011 OVERALL FIRST FLOOR POWER PLAN NORTH - BLDG. 02
02-EP-012 OVERALL FIRST FLOOR POWER PLAN SOUTH - BLDG. 02
02-EP-021 OVERALL SECOND FLOOR POWER PLAN NORTH - BLDG. 02
02-EP-022 OVERALL SECOND FLOOR POWER PLAN SOUTH - BLDG. 02
02-EP-031 OVERALL THIRD FLOOR POWER PLAN NORTH - BLDG. 02
02-EP-032 OVERALL THIRD FLOOR POWER PLAN SOUTH - BLDG. 02
02-EP-041 OVERALL FOURTH FLOOR POWER PLAN NORTH - BLDG. 02
02-EP-042 OVERALL FOURTH FLOOR POWER PLAN SOUTH - BLDG. 02
02-EP-051 OVERALL FIFTH FLOOR POWER PLAN NORTH - BLDG. 02
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 17 of 22
03-ED-011 OVERALL FIRST FLOOR POWER DEMOLITION PLAN - BLDG. 03
03-ED-021 OVERALL SECOND FLOOR POWER DEMOLITION PLAN - BLDG. 03
03-ED-031 OVERALL THIRD FLOOR POWER DEMOLITION PLAN - BLDG. 03
03-ED-041 OVERALL FOURTH FLOOR POWER DEMOLITION PLAN - BLDG. 03
03-ED-051 OVERALL FIFTH FLOOR POWER DEMOLITION PLAN - BLDG. 03
03-ED-061 OVERALL SIXTH FLOOR POWER DEMOLITION PLAN - BLDG. 03
03-ED-071 OVERALL SEVENTH FLOOR POWER DEMOLITION PLAN - BLDG. 03
03-EP-011 OVERALL FIRST FLOOR POWER PLAN - BLDG. 03
03-EP-021 OVERALL SECOND FLOOR POWER PLAN - BLDG. 03
03-EP-031 OVERALL THIRD FLOOR POWER PLAN - BLDG. 03
03-EP-041 OVERALL FOURTH FLOOR POWER PLAN - BLDG. 03
03-EP-051 OVERALL FIFTH FLOOR POWER PLAN - BLDG. 03
03-EP-061 OVERALL SIXTH FLOOR POWER PLAN - BLDG. 03
03-EP-071 OVERALL SEVENTH FLOOR POWER PLAN - BLDG. 03
04-ED-011 OVERALL FIRST FLOOR POWER DEMOLITION PLAN - BLDG. 04
04-EP-011 OVERALL FIRST FLOOR POWER PLAN - BLDG. 04
05-ED-011 OVERALL FIRST FLOOR POWER DEMOLITION PLAN - BLDG. 05
05-ED-041 OVERALL FOURTH FLOOR POWER DEMOLITION PLAN - BLDG. 05
05-EP-011 OVERALL FIRST FLOOR POWER PLAN - BLDG. 05
05-EP-041 OVERALL FOURTH FLOOR POWER PLAN – BLDG. 05
06-ED-011 OVERALL FIRST FLOOR POWER DEMOLITION PLAN - BLDG. 06
06-ED-021 OVERALL SECOND FLOOR POWER DEMOLITION PLAN - BLDG. 06
06-ED-031 OVERALL THIRD FLOOR POWER DEMOLITION PLAN - BLDG. 06
06-ED-041 OVERALL FOURTH FLOOR POWER DEMOLITION PLAN - BLDG. 06
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 18 of 22
06-EP-011 OVERALL FIRST FLOOR POWER PLAN - BLDG. 06
06-EP-021 OVERALL SECOND FLOOR POWER PLAN - BLDG. 06
06-EP-031 OVERALL THIRD FLOOR POWER PLAN - BLDG. 06
06-EP-041 OVERALL FOURTH FLOOR POWER PLAN - BLDG. 06
07-ED-011 OVERALL FIRST FLOOR POWER DEMOLITION PLAN - BLDG. 07
07-ED-021 OVERALL SECOND FLOOR POWER DEMOLITION PLAN - BLDG. 07
07-ED-031 OVERALL THIRD FLOOR POWER DEMOLITION PLAN - BLDG. 07
07-ED-041 OVERALL FOURTH FLOOR POWER DEMOLITION PLAN - BLDG. 07
07-EP-011 OVERALL FIRST FLOOR POWER PLAN - BLDG. 07
07-EP-021 OVERALL SECOND FLOOR POWER PLAN - BLDG. 07
07-EP-031 OVERALL THIRD FLOOR POWER PLAN - BLDG. 07
07-EP-041 OVERALL FOURTH FLOOR POWER PLAN - BLDG. 07
08-ED-011 OVERALL FIRST FLOOR POWER DEMOLITION PLAN - BLDG. 08
08-ED-021 OVERALL SECOND FLOOR POWER DEMOLITION PLAN - BLDG. 08
08-ED-031 OVERALL THIRD FLOOR POWER DEMOLITION PLAN - BLDG. 08
08-ED-041 OVERALL FOURTH FLOOR POWER DEMOLITION PLAN - BLDG. 08
08-EP-011 OVERALL FIRST FLOOR POWER PLAN - BLDG. 08
08-EP-021 OVERALL SECOND FLOOR POWER PLAN - BLDG. 08
08-EP-031 OVERALL THIRD FLOOR POWER PLAN - BLDG. 08
08-EP-041 OVERALL FOURTH FLOOR POWER PLAN - BLDG. 08
09-ED-011 OVERALL FIRST FLOOR POWER DEMOLITION PLAN - BLDG. 09
09-ED-021 OVERALL SECOND FLOOR POWER DEMOLITION PLAN - BLDG. 09
09-ED-031 OVERALL THIRD FLOOR POWER DEMOLITION PLAN - BLDG. 09
09-ED-041 OVERALL FOURTH FLOOR POWER DEMOLITION PLAN - BLDG. 09
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 19 of 22
09-ED-051 OVERALL FIFTH FLOOR POWER DEMOLITION PLAN - BLDG. 09
09-EP-011 OVERALL FIRST FLOOR POWER PLAN - BLDG. 09
09-EP-021 OVERALL SECOND FLOOR POWER PLAN - BLDG. 09
09-EP-031 OVERALL THIRD FLOOR POWER PLAN - BLDG. 09
09-EP-041 OVERALL FOURTH FLOOR POWER PLAN - BLDG. 09
09-EP-051 OVERALL FIFTH FLOOR POWER PLAN - BLDG. 09
10-ED-011 OVERALL FIRST FLOOR POWER DEMOLITION PLAN - BLDG. 10
10-EP-011 OVERALL FIRST FLOOR POWER PLAN - BLDG. 10
01-EJ-001 BUILDING 1 - NORMAL POWER RISER DIAGRAM
01-EJ-002 BUILDING 1 - EMERGENCY POWER RISER DIAGRAM
02-EJ-001 BUILDING 2 - NORMAL POWER RISER DIAGRAM
02-EJ-002 BUILDING 2 - NORMAL POWER RISER DIAGRAM
02-EJ-003 BUILDING 2 - EMERGENCY POWER RISER DIAGRAM
02-EJ-004 BUILDING 2 - EMERGENCY POWER RISER DIAGRAM
02-EJ-005 BUILDING 2 - EMERGENCY POWER RISER DIAGRAM
03-EJ-001 BUILDING 3 – NORMAL POWER RISER DIAGRAM
03-EJ-002 BUILDING 3 – EMERGENCY ONE-LINE DIAGRAM
03-EJ-003 BUILDING 3 – EMERGENCY ONE-LINE DIAGRAM
04-EJ-001 BUILDINGS 4 & 5 – NORMAL ONE-LINE DIAGRAM
04-EJ-002 BUILDINGS 4 & 5 – EMERGENCY ONE-LINE DIAGRAM
06-EJ-001 BUILDING 6 – NORMAL ONE-LINE DIAGRAM
06-EJ-002 BUILDING 6 – EMERGENCY ONE-LINE DIAGRAM
07-EJ-001 BUILDING 7 – NORMAL ONE-LINE DIAGRAM
07-EJ-002 BUILDING 7 – EMERGENCY ONE-LINE DIAGRAM
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 20 of 22
08-EJ-001 BUILDING 8 – NORMAL ONE-LINE DIAGRAM
08-EJ-002 BUILDING 8 – EMERGENCY ONE-LINE DIAGRAM
09-EJ-001 BUILDING 9 – NORMAL ONE-LINE DIAGRAM
09-EJ-002 BUILDING 9 – EMERGENCY ONE-LINE DIAGRAM
10-EJ-001 BUILDING 10 – NORMAL ONE-LINE DIAGRAM
00-EJ-001 - BUILDING 1 - ELECTRICAL PANEL SCHEDULES
00-EJ-002 - BUILDING 1 - ELECTRICAL PANEL SCHEDULES
00-EJ-003 - BUILDING 1 - ELECTRICAL PANEL SCHEDULES
00-EJ-004 - BUILDING 1 - ELECTRICAL PANEL SCHEDULES
00-EJ-005 - BUILDING 1 - ELECTRICAL PANEL SCHEDULES
00-EJ-006 - BUILDING 2 - ELECTRICAL PANEL SCHEDULES
00-EJ-007 - BUILDING 2 - ELECTRICAL PANEL SCHEDULES
00-EJ-008 - BUILDING 2 - ELECTRICAL PANEL SCHEDULES
00-EJ-009 - BUILDING 2 - ELECTRICAL PANEL SCHEDULES
00-EJ-010 - BUILDING 2 - ELECTRICAL PANEL SCHEDULES
00-EJ-011 - BUILDING 3 - ELECTRICAL PANEL SCHEDULES
00-EJ-012 - BUILDING 3 - ELECTRICAL PANEL SCHEDULES
00-EJ-013 - BUILDING 3 - ELECTRICAL PANEL SCHEDULES
00-EJ-014 - BUILDING 3 - ELECTRICAL PANEL SCHEDULES
00-EJ-015 - BUILDING 3 - ELECTRICAL PANEL SCHEDULES
00-EJ-016 - BUILDING 3 - ELECTRICAL PANEL SCHEDULES
00-EJ-017 - BUILDING 3 - ELECTRICAL PANEL SCHEDULES
00-EJ-018 - BUILDING 4 - ELECTRICAL PANEL SCHEDULES
00-EJ-019 - BUILDING 5 - ELECTRICAL PANEL SCHEDULES
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 21 of 22
00-EJ-020 - BUILDING 6 - ELECTRICAL PANEL SCHEDULES
00-EJ-021 - BUILDING 6 - ELECTRICAL PANEL SCHEDULES
00-EJ-022 - BUILDING 7 - ELECTRICAL PANEL SCHEDULES
00-EJ-023 - BUILDING 7 - ELECTRICAL PANEL SCHEDULES
00-EJ-024 - BUILDING 8 - ELECTRICAL PANEL SCHEDULES
00-EJ-025 - BUILDING 9 - ELECTRICAL PANEL SCHEDULES
00-EJ-026 - BUILDINGS 9 & 10 - ELECTRICAL PANEL SCHEDULES
FIRE PROTECTION
00-FP-000 FIRE PROTECTION GENERAL NOTES AND DETAILS
01-FP-100 OVERALL PLANS – BUILDINGS B & C
01-FP-110 ENLARGED PLANS – BUILDINGS B & C
01-FP-111 ENLARGED PLANS – BUILDINGS B & C
01-FP-112 ENLARGED PLANS – BUILDINGS B & C
02-FP-100 OVERALL PLANS – BUILDINGS D & E
02-FP-101 OVERALL PLANS – BUILDINGS F & G
02-FP-110 ENLARGED PLANS – BUILDINGS D & E
02-FP-111 ENLARGED PLANS – BUILDINGS F & G
03-FP-100 OVERALL PLANS – BUILDINGS H & J
03-FP-101 OVERALL PLANS – BUILDING J
03-FP-110 ENLARGED PLANS – BUILDINGS H & J
03-FP-111 ENLARGED PLANS – BUILDING J
04-FP-100 OVERALL PLAN – BUILDING K
04-FP-110 ENLARGED PLANS – BUILDING K
05-FP-100 OVERALL PLAN – BUILDING L
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades-New Orleans, LA VA Project No. 629-22-700
00 01 15 - 22 of 22
05-FP-110 ENLARGED PLANS – BUILDING L
06-FP-100 OVERALL PLANS – BUILDING M
06-FP-110 ENLARGED PLANS – BUILDING M
07-FP-100 OVERALL PLANS – BUILDING N
07-FP-110 ENLARGED PLANS – BUILDING N
08-FP-100 OVERALL PLANS – BUILDING P
08-FP-110 ENLARGED PLANS – BUILDING P
09-FP-100 OVERALL PLANS – BUILDING Q
09-FP-110 ENLARGED PLANS - BUILDING Q
10-FP-100 OVERALL PLAN – BUILDING M SHOTGUN HOUSES
10-FP-110 ENLARGED PLAN – BUILDING M SHOTGUN HOUSES
11-FP-100 OVERALL PLAN – FISHER HOUSE
11-FP-110 ENLARGED PLAN – FISHER HOUSE
- - - END - - -
Electronic Heath Records Modernization (EHRM) 01 00 00 - 1 of 26 Infrastructure Upgrades-New Orleans, LA GENERAL REQUIREMENTS VA Project No. 629-22-700
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1
1.1 SAFETY REQUIREMENTS
A. Refer to Section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and partly removal of portions of existing structures, and furnish labor and materials and perform work for New Orleans Medical Center project No. 629-22- 700 as required by drawings and specifications.
B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the contracting officer.
C. Offices of GDM of Oregon (GDM), of DuPont, Washington, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by COR or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratories or commissioning authority testing laboratory retained by the Contractor, the Contractor shall notify the COR in sufficient time to enable testing laboratories or commissioning authority personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
F. Prior to commencing work, general contractor shall provide proof that a qualified "competent person" (CP) per OSHA 29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.
G. Training:
1. All employees of general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and/or other relevant competency training, as determined by
Electronic Heath Records Modernization (EHRM) 01 00 00 - 2 of 26 the VA COR with input from the Infection Control Risk Assessment (ICRA) team.
2. Submit training records of all such employees for approval before the start of work.
H. Terms used in this contract such as Veterans Affairs (VA) and Government; Contracting Officer (CO) or Contracting Officer's Representative (COR) may be used interchangeably, and refer to the same entity.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, General Construction:
1. Work includes general construction, alterations, necessary removal and/or modifications of existing structures and construction, patching and finishing work, commissioning,and certain other items.
2. Work includes all labor, material, equipment, and supervision to perform the required Plumbing work on this project including:
a. Modification of existing plumbing systems.
b. Installation of new plumbing fixtures.
3. Work includes all labor, material, equipment and supervision to perform the required Mechanical work on this project including:
a. Installation of new CRAC units, dehumidifiers, and other mechanical equipment.
b. Modifications to existing mechanical systems.
c. Modifications to existing DDC controls.
d. Setup, programing, adjustment, and commissioning of new & modified systems.
4. Work includes all labor, material, equipment and supervision to perform the required electrical and telecommunications systems construction work on this project including:
a. Provide new power connections for new mechanical equipment.
b. Provide new power connections for MDF/IDF rack locations.
c. Provide new UPS units for MDF/IDF locations.
d. Provide all telecommunication connections to all new rack locations. Fiber and Cabling.
Electronic Heath Records Modernization (EHRM) 01 00 00 - 3 of 26
5. Work includes all labor, material, equipment and supervision to perform the required fire protection systems construction work on this project including:
a. Modify existing fire lines as need to create new telecommunication rooms.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give two weeks’ notice to the COR so that security escort or arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the COR.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the COR.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
Electronic Heath Records Modernization (EHRM) 01 00 00 - 4 of 26
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation.
3. The General Contractor shall provide temporary lock cylinders for use by the contractors during the construction period.
a. Lock cores shall be compatible with existing door hardware.
b. Existing lock cores are dormakaba 6 pin cores with VA keyway.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the COR upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of COR.
5. All paper waste or electronic media such as CD’s and USB flash drives, etc. shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify COR and VA Police immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
Electronic Heath Records Modernization (EHRM) 01 00 00 - 5 of 26
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access.
Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of permits (10) shall be issued to the General Contractor and subcontractors for parking on campus in designated areas only.
F. Personal Conduct:
1. Every person who enters the SLVHCS’s grounds is expected to conduct themselves in a professional responsible manner without the need to enumerate every expected or prohibited behavior.
2. Weapons, ammunition, explosives, and alcoholic beverages are prohibited on the SLVHCS’s grounds.
3. There shall be no solicitations or sales of any kind on the SLVHCS’s grounds.
4. VA reserves the right to refuse to permit employment on the Work or require dismissal from the Work of any subcontractor who, by reason of previous unsatisfactory work on Department of Veterans Affairs project or for any other reason, is considered by the COR to be incompetent or otherwise objectionable.
5. See VA Acquisition Regulation(VAAR)852.236-80 for additional stipulation.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on SLVHCS premises to areas authorized or approved by the COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the COR and shall be built with labor and materials furnished by the Contractor without expense to the Government.
The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the COR, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the COR, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the COR.
Electronic Heath Records Modernization (EHRM) 01 00 00 - 6 of 26
When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. See FAR 52.236-10 for additional stipulations.
E. Working space and space available for storing materials shall be as shown on the drawings.
F. Workers are subject to rules of SLVHCS applicable to their conduct.
G. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
H. Execute work so as to interfere as little as possible with normal functioning of SLVHCS as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.
1. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by the COR where required by limited working space.
2. Do not store materials and equipment in other than assigned areas.
3. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than 2 work days.
a. Provide unobstructed access to SLVHCS areas required to remain in operation.
4. Where access by SLVHCS personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
I. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of…