2.4 - Drawings 04 of 17 - 01-AE-011 to 02-AE-052.pdf
PDF 18 MB Posted
- Solicitation number
- 36C77623B0038
About this file
This document provides details on a federal contract opportunity for infrastructure upgrades at a Veterans Affairs facility in New Orleans, Louisiana. The solicitation number is 36C77623B0038 and is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The opportunity type is a solicitation for construction services related to electrical, heating, ventilation and air conditioning infrastructure upgrades at the New Orleans VA medical center. The solicitation includes 17 drawings related to the project scope across various buildings. Responses are due based on the standard solicitation timeline and award will be made to a single contractor to complete the upgrades by the specified deadline.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UP
RE
TH
TH
RE
RE
TH
TH
RE
RE
RE
RE
RE
RE
RE
RE
RE
CR
OC
O
CC
R
CHF (OC)
1C220
A CHF (OC)
1C222
SECY (OC)
1B208
ITAC (OC)
1B141
CS (OC)
1B139
OFF CHF (FS)
1B151
BA (OC)
1C224
ADM (OC)
1B140
MA ASST (OC)
1C226
CUB (FS)
1B191C
CUB (FS)
1B191B
CUB (FS)
1B193A
CUB (FS)
1B192A
CUB (FS)
1B192B
MEDIA (FS)
1B154
OFF A CHF (FS)
1B152
CUB CST SRV (FS)
1B150
CUB (FS)
1B192C
CUB (FS)
1B191D
SEC/WAIT (FS)
1B153
CHF (CD)
1B159
A CHF (CD)
1B158
LD CODE (CD)
1B162
LD CODE (CD)
1B161
SECY (CD)
1B160
WORK (CD)
1B157
A CHF (HIM)
1B143
CHF (HIM)
1B144
SECY (HIM)
1B201
CUB (HIM)
1B195A
CUB (HIM)
1B193D
CUB (HIM)
1B193B
CUB (HIM)
1B195B
CUB (HIM)
1B195D
CUB (HIM)
1B195C
CUB (HIM)
1B192F
CUB (HIM)
1B192D
CUB (HIM)
1B192E
CUB (HIM)
1B193CWAIT/ROI (HIM)
1B200
CHF (WA)
1B137
A CHF (WA)
1B138
SECY (WA)
1B134
OP CTR (WA)
1B130
OFF SPV (WA)
1B132
A CHF (HE)
1C135
BUS CTR (HE)
1C125
T 1B176
CHIEF
1C203
A CHF
1C201
WORKROOM
1C205
SUPV (MCCF)
1B155
IP SUP (HE)
1C134
IP CLRK (HE)
1C124
ADMIS (HE)
1C122
A CHF
1C199
ACCNT CHF
1C214 ACCNT CHF
1C213
ACCNT CHF
1C212
ACCNT CHF
1C211
COMP AUDITOR
1C215
COMP OFFICER
1C216
BDGT
1C217A
TECH
1C217B
AUDITOR
1C193
AUDITOR
1C197
AUDITOR
1C195
RECPT
1C190A
T 1C186
T 1C219
AUDITOR
1C191
BREAK
1C210
SERVICE BAY
1C114
EC
1C223
EC
1B180
SERVICE BAY
1B123
TR
1C114C
NORM ELEC
1C114A
DETAILS (HE)
1C136
WAIT (OC)
1C227
STOR (HE)
1C126
EMER ELEC
1C114B
TR
1B123D
EMER ELEC
1B123A
NORM ELEC
1B123B
SEC/WAIT
1B106
CONF/CLASS (OC)
1B135
T 1B204
CUB (FS)
1B191A
T 1B178
TR
1C228
WAIT
1C190
SERV ELEV LOBB
1B120
PUB ELEV LOBBY
1B100
WORKROOM (HIM)
1B194
CLINICAL SUPER (NSA)
1B102CLINICAL SUPER (NSA)
1B103
T 1C141
T 1C143
WC
1C144
LOUNGE
1C145
RECPT
1C137
PANTRY
1C146
CHAPLAIN
1B105
CHAPLAIN
1B107
CHAPLAIN
1B109
EUCHARIST
1B111
QUIET
1B116
T 1B108
T 1B110
STOR
1B112
HK
1B114
STOR/FILE (FS)
1B190
ISO (HIM)
1B203
PV (HIM)
1B142
SLEEP
1C166
T/S 1C166A
ST
1C181
T/S 1C179A
T/S 1C174A
SLEEP
1C174
SLEEP
1C165
SLEEP
1C175
T/S 1C165A
T/S 1C164A
SLEEP
1C164
SLEEP
1C177
T/S 1C177A
T/S 1C175A
SLEEP
1C179
SLEEP
1C162
T/S 1C162A
WAIT
1C160
CC
1C178 CONF
1C185
RETAIL AREA
1C101
VESTIBULE
1C150
ADMIS (HE)
1C123
STOR
1C221
MONITOR
1C163
POLY
1C161
EQUIP
1C168
T 1C160A
BREAK
1C169
ELEV
BS-1
FUTURE ELEV
BS-2
ELEV
BS-4
ELEV
BS-3
CORR
1B-C01
CORR
1B-C02
CORR
1B-C03
AISLE
1B-C08
CORR
1B-C05
CORR
1B-C06
AISLE
1B-C09
AISLE
1B-C10
AISLE
1B-C11
AISLE
1B-C12
AISLE
1B-C13
AISLE
1C-C01A
AISLE
1C-C01C
AISLE
1C-C01D
AISLE
1C-C03
AISLE
1C-C04
AISLE
1C-C04AAISLE
1C-C04B
AISLE
1C-C05
AISLE
1C-C06
AISLE
1C-C08
AISLE
1C-C08A
STOR
1C133
HK
1C139
VESTIBULE
1B121
CORR
1C101-K
CORR
1B-C02A
HK
1B206
NOUR
1C180
SECURITY
1C114D
UNASSIGNED
1B174G
CUB (HIM)
1B192H
SECURITY
1B123C
CORR
1C-C02
SECY/WAIT (OC)
1C225
RETAIL PREP
1C101A
CORR
1B-C04
AISLE
1B-C04A
AISLE
1C-C00
CORR
1C-C01
CLEAN
1C167
SOILED
1C176
ASR
1B113
CONNECTOR HALL
1B115A
TR
1B179
IT/LVSR
1C190B
CHAPEL
1B115
CLOSET
1B115B
01-AJ-011
D3
01-AJ-011
D1
01-AJ-014
C1
01-AJ-014
C4
01-AJ-015
C1
01-AJ-015
C3
GENERAL SHEET NOTES
NORTH
ROOM ALLOCATION LEGEND
EXISTING TO REMAIN
KEYED NOTES
KEY PLAN
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
NEW LOCATION
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
01-AE-011
B & C
OVERALL FIRST FLOOR PLAN - BUILDINGS
B & C
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
3/32" = 1'-0"F1 FIRST FLOOR OVERALL PLAN BUILDING H & J
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
NORTH
Revisions: Date:
DN
UP
DN
UP
DN
DN
UP
RE
TH
TH
RE
RE
TH
TH
RE
RE
RE
RE
RE
RE
RE
CR
CR
OC
OC
CLEAN
2B120
COMM CENTER
2B118
CONSULT
2C126
NOUR
2C108
TR
2C114C
RETHERM
2B101
CONSULT
2C124
HK
2B112
TR
2B123D
STOR/EQUIP
2B103
CLEAN
2B155D
CHUTE
2B105
COMM CENTER
2C104
MED ROOM
2B155B
SOILED
2B155E
SERVICE BAY
2B123
SERVICE BAY
2C114
OFF PHY/CON/NRS
2C120
HOUSE STAFF
2B104
PHARMACIST
2C118
SOC WRK
2C121
HK
2C122
SOC WRK
2C123
PHY/CON/NRS
2C112
STAFF LOUNGE
2B102
STAFF LOCKER
2B126
DIET
2C116
NOUR
2B122
HEAD NURSE
2C113
CARE PROVIDER
2C111
STOR/EQUIP
2C103
HEAD NURSE
2B116
EC
2B153
NORM ELEC
2C114A
EMER ELEC
2C114B
NORM ELEC
2B123B
EMER ELEC
2B123A
SOILED
2C152B
CLEAN
2C106
EC
2C154
PATIENT
2B146
PATIENT NEG
2B143
PATIENT
2B145
PATIENT POS
2B165
PATIENT
2B151
PATIENT
2B152
PATIENT
2B157
PATIENT
2B159
PATIENT
2B161
PATIENT
2B163
PATIENT
2B164
PATIENT
2B144
PATIENT
2B148
PATIENT
2B150
PATIENT
2B154
PATIENT
2B156
PATIENT
2B158
PATIENT
2B160
PATIENT
2B162
PATIENT
2C145
PATIENT
2C151
PATIENT
2C147
PATIENT
2C157
PATIENT
2C159
PATIENT
2C161
PATIENT
2C163
PATIENT
2C155
PATIENT
2C149
PATIENT
2C160
PATIENT POS
2C165
PATIENT
2C141
PATIENT
2C144
PATIENT
2C146
PATIENT
2C148
PATIENT
2C150
PATIENT
2C153
PATIENT
2C156
PATIENT
2C158
PATIENT
2C164PATIENT NEG
2C140
CONF/ REPORT
2B106
SUB-STATION
2B132H
SUB-STATION
2B130A
SUB-STATION
2B130C
SUB-STATION
2B130E
SUB-STATION
2B132D
SUB-STATION
2B132F
SUPPLY
2B130B
SUPPLY
2B132G
SUPPLY
2B132E
SUB-STATION
2C131G
SUB-STATION
2C131C
SUB-STATION
2C131E
SUB-STATION
2C131A
SUB-STATION
2C133A
SUB-STATION
2C133C
RESPITE
2B166
T 2C145A
T 2C162A
T 2C160A
T 2C151A
T 2C155A
T 2C157A
T 2C159A
T 2C161A
T 2C163A
T 2C164A
T 2C149A
T 2C158A
T 2C156A
T 2C153A
T 2C148A
T 2C146A
T 2C144A
ISO T
2C142A
ISO T
2C140A
T 2C143A
T 2C147A
T 2B146A
T 2B140A
T 2B142A
T 2B147A
T 2B145A
T 2B149A
T 2B151A
T 2B152A
T 2B159A
T 2B161A
T 2B163A
ISO T
2B165A
ISO T
2B141A
T 2B164A
T 2B162A
T 2B160A
T 2B158A
T 2B156A
T 2B154A
T 2B150A
T 2B148A
T 2B144A
ISO T
2B143A
MALE
2C101B
ANTE POS
2C165B
X-RAY
2C105
X-RAY ALC
2B115
HC ST
2B126A
TYP T
2B167
ANTE POS
2B165B
PATIENT NEG
2B141
PATIENT
2B142
PATIENT (BAR)
2B140
PATIENT
2B147
PATIENT
2B149
PATIENT NEG
2C142
PATIENT
2C162
ISO T
2C165A
PATIENT
2C143
T 2C141A
PUB ELEV LOBBY
2B100
SERV ELEV LOBBY
2B107
SUPPLY
2C131B
SUPPLY
2C131D
SUPPLY
2C131H
SUPPLY
2C133B
ST
2B125
T 2C167
FEMALE
2C101A
RESPITE
2C166
CARE PROVIDER
2B114
CORR
2B-C01A
CORR
2B-C01
CORR
2B-C04
CORR
2B-C02
CORR
2B-C03
AISLE
2B-C03A
CORR
2C-C03
CORR
2C-C04
CORR
2B-C01B
CORR
2B-C05
ELEV
FUTURE ELEV ELEV
ELEV
SHAFT
SHAFT
SHAFT
SHC06
SHAFT
SHAFT
SUB-STATION
2C133E
SUPPLY
2C133D
SUPPLY
2C131F
CC
2B130F
CC
2C105A
CC
2C165C
CC
2B165C
ON CALL
2B129
ON CALL
2B131
PC1
2C115
CLEAN
2C152C
MED ROOM
2C152E
SECURITY
2C114D
SECURITY
2B123C
PC1
2C109
SUB-STATION
2B132B
CORR
2B-C04B
HC T/S
2B129A
CLST
2B129B
CLST
2B131A
T/S 2B131B
ALCOVE
2C-C03B
ALCOVE
2B-C02A
T 2B157A
SUPPLY
2B130D
SUPPLY
2B132A
CORR
2C-C05
SHAFT
TR
2B155C
TR
2C152G
ST
2C119
01-AJ-025
C1
01-AJ-025
C3
01-AJ-027
C1
01-AJ-027
C4
01-AJ-026
B1
01-AJ-028
B1
TR
2B161A
TR
2C152A AISLE
BP-8
01-AJ-026
D1
01-AJ-028
D1
GENERAL SHEET NOTES
NORTH
ROOM ALLOCATION LEGEND
EXISTING TO REMAIN
KEYED NOTES
KEY PLAN
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
NEW LOCATION
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
01-AE-021
B & C
OVERALL SECOND FLOOR PLAN -
BUILDINGS B & C
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
3/32" = 1'-0"F1 SECOND FLOOR OVERALL PLAN BUILDING H & J
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
DN
UP
DN
DN
DN
UP
UP
RE
TH
TH
RE
RE
TH
RE
RE
RE
RE
TH
RE
RE
RE
CR
CR
OC
OC
BLOOD GAS LAB
3C120
COMM CENTER
3C103
CONSULT
3C124
TR
3C114C
CHUTE
3B105
COMM CENTER
3B118
HOUSE STAFF
3B104
HEAD NURSE
3C112
SOC WRK
3C121
SOC WRK
3C123
PHYS/CON/ NRS
3C110
STAFF LOCKER
3B126
DIET
3C116
CARE PROVIDER
3B114
HEAD NURSE
3B116
PHARMACIST
3C118
NOUR
3B122
TR
3B123D
STOR/EQUIP
3B103
SERVICE BAY
3B123
SERVICE BAY
3C114
RETHERM
3B101
NORM ELEC
3B123B
EMER ELEC
3B123A
EMER ELEC
3C114B
NORM ELEC
3C114A
SOILED
3C152B
CLEAN
3B120
FEMALE
3C101A
X-RAY ALC
3C104
PHYS/CON/ NRS
3C122
STOR/EQUIP
3C102
MALE
3C101B
X-RAY ALC
3B115
PATIENT NEG
3B141 PATIENT NEG
3B143
PATIENT
3B145
PATIENT
3B147
ISO T
3B165A
T 3B163A
T 3B161A
T 3B159A
PATIENT
3B149
T 3B157A
T 3B152A
PATIENT
3B151
PATIENT
3B140
PATIENT
3B142
PATIENT
3B144
PATIENT
3B146
PATIENT POS
3B165
T 3B164A
T 3B160A
T 3B158A
T 3B156A
T 3B162A
PATIENT
3B148
PATIENT
3B150
T 3B154A
T 3B151A
PATIENT
3B152
T 3B149A
T 3B147A
T 3B145A
ISO T
3B141A
ISO T
3B143A
PATIENT
3B157
PATIENT
3B159
PATIENT
3B161
PATIENT
3B163
PATIENT
3B164
PATIENT
3B154
PATIENT
3B156
PATIENT
3B158
PATIENT
3B160
PATIENT
3B162
T 3B150A
T 3B148A
T 3B146A
T 3B144A
T 3B142A
T 3B140A
EC
3C154
SUB-STATION
3B130A SUPPLY
3B130B
SUB-STATION
3B130C
SUPPLY
3B130D
SUB-STATION
3B130E
SUB-STATION
3B132D
SUB-STATION
3B132HSUPPLY
3B132E
RESPITE
3B166
SUB-STATION
3B132F
SERV ELEV LOBBY
3B107
PUB ELEV LOBBY
3B100
HK
3B112
NOUR
3C108
CLEAN
3C106
SOILED
3B155E
EC
3B153
SUB-STATION
3C131A
SUB-STATION
3C131C
SUB-STATION
3C131E
SUB-STATION
3C133A
SUB-STATION
3C133C SUB-STATION
3C133E
T 3C163A
ISO T
3C140A
ISO T
3C142A
T 3C144A
T 3C146A
PATIENT
3C146
T 3C148A
PATIENT
3C148
PATIENT
3C150
T 3C150A
PATIENT
3C153
T 3C153A
T 3C156A
PATIENT
3C156
PATIENT
3C158
T 3C158A
T 3C162A
PATIENT
3C160
T 3C160A
T 3C141A
ISO T
3C165A
PATIENT
3C162
PATIENT
3C164
PATIENT
3C163
PATIENT
3C161PATIENT
3C159
PATIENT
3C157
SUPPLY
3C131B
SUPPLY
3C131D
SUPPLY
3C133B
RESPITE
3C166
T 3C164A
T 3C159A
T 3C161A
T 3C157A
T 3C155A
T 3C151A
T 3C149A
T 3C147A
T 3C145A
T 3C143A
PATIENT NEG
3C140
PATIENT NEG
3C142
PATIENT
3C155
PATIENT
3C151
PATIENT
3C149
PATIENT
3C147
PATIENT
3C145
PATIENT
3C143
PATIENT
3C141
PATIENT POS
3C165
ANTE POS
3C165B
STAFF LOUNGE
3B102
ST
3B124
T 3B167
T 3C167
ANTE POS
3B165B
HC ST
3B126A
AISLE
3B-C01A
CORR
3B-C01
CORR
3B-C01B
CORR
3B-C02
CORR
3B-C05
CORR
3B-C03
CORR
3C-C03
CORR
3C-C04A
CORR
3C-C02
ELEV
BS-1
FUTURE ELEV
BS-2
ELEV
ELEV
STAIR
STB-1
SHAFT
SHB01
SHAFT
SHAFT
SHAFT
SHAFT
SUPPLY
3B132A
SUPPLY
3B132G
SUPPLY
3C133D
TR
3B161A
CC
3B130H
TR
3C152A
CC
3C109
HK
3C125
CC
3C165C
CC
3B165C
ST
3B227
CARE PROVIDER
3C230
CLEAN
3B155D
MED ROOM
3B155B AISLE
3B-C03A
CLEAN
3C152C
MED ROOM
3C152E
AISLE
3C-C02A
STAIR
STC-4
STAIR
STC-3
SECURITY
3C114D
SECURITY
3B123C
UNASSIGNED
3C117
PATIENT
3C144
CORR
3B-C04B
SUB-STATION
3B132B
SUB-STATION
3C131G
ALCOVE
3C-C03B
ALCOVE
3B-C02A
OFF PCI
3B131
HC ON CALL
3B129
HC T/S
3B129A
PHYS/CON/NRS
3B130
CLST
3B129B
CONSULT
3C126
SUPPLY
3C131H
SHAFT
CORR
3C-C06
WAITING
3A100A
TEL CLST
3B155C
TEL CLST
3C152D
CONF/ REPORT
1C190C
01-AJ-035
C1
01-AJ-035
C4
01-AJ-037
C1
01-AJ-037
C4
01-AJ-036
B1
01-AJ-038
B1
01-AJ-038
D1
01-AJ-036
D1
GENERAL SHEET NOTES
NORTH
ROOM ALLOCATION LEGEND
EXISTING TO REMAIN
KEYED NOTES
KEY PLAN
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
NEW LOCATION
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
01-AE-031
B & C
OVERALL THIRD FLOOR PLAN - BUILDINGS
B & C
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
3/32" = 1'-0"F1 THIRD FLOOR OVERALL PLAN BUILDING H & J
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
UPDN
DN
DN
UP
TH
RE
RE
TH
TH
RE
RE
RE
RE
RE
RE
RE
CR
OC
SERVICE BAY
4B123
SERVICE BAY
4C114
CONSULT
4B105
NOUR
4B122
TR
4B123D
RETHERM
4B121
CHUTE
4B104
COMM CENTER
4B118
STAFF LOUNGE
4B109
CONF/ REPORT
4B106
HOUSE STAFF
4B107
RESIDENT CONF
4B108
PCI
4B102
SOC WRK
4B110
CLEAN
4B155D
DIET
4B125
HEAD NURSE
4B114
CARE PROVIDER
4B116
STOR/EQUIP
4B103
HC ST
4B126A
STAFF LOCKER
4B126
EC
4B153
TR
4C114C
NORM ELEC
4B123B
EMER ELEC
4B123A
EMER ELEC
4C114B
NORM ELEC
4C114A
PATIENT NEG
4B143
MED ROOM
4B155B
SOILED
4B155E
CLEAN
4B120
ISO T
4B141A
ISO T
4B143A
PATIENT
4B163
T 4B145A
PATIENT
4B161
T 4B147A
PATIENT
4B159
T 4B149A
PATIENT
4B157
T 4B151A
PATIENT
4B152
T 4B140A
PATIENT
4B164
T 4B142A
PATIENT
4B162
T 4B144A
PATIENT
4B160
T 4B146A
T 4B148A
PATIENT
4B158
T 4B150A
PATIENT
4B156
T 4B154A
PATIENT
4B154
T 4B156A
PATIENT
4B151
T 4B158A
PATIENT
4B149
T 4B160A
PATIENT
4B147
T 4B162A
PATIENT
4B145
T 4B164A
PATIENT
4B142
PATIENT
4B140
T 4B163A
PATIENT
4B150
T 4B161A
PATIENT
4B148
T 4B159A
PATIENT
4B146
T 4B157A
PATIENT
4B144
T 4B152A
SUB-STATION
4B130A
SUB-STATION
4B130C
SUB-STATION
4B130E
SUB-STATION
4B132H
SUB-STATION
4B132D
SUB-STATION
4B132F
RESPITE
4B166
ANTE POS
4B165B
PATIENT NEG
4B141
PATIENT POS
4B165
PUB ELEV LOBBY
4B100
SERV ELEV LOBBY
4B111
X-RAY ALC
4B115
SUPPLY
4B130D
SUPPLY
4B130B
SUPPLY
4B132E
ISO T
4C134A
BED STATION ISO
4C134
BED STATION
4C128
BED STATION
4C130
BED STATION
4C132
T 4C135
CLEAN
4C137
SOILED
4C141
EQ CLEAN STOR
4C136
MED
4C127
DIALYSATE STOR
4C120
CH NURSE
4C126
STOR STERILE
4C123
WATER TREAT
4C110
EQUIP SERVICE
4C111
WC
4C113
CUB
4C122B
CC
4C118
LOCKER
4C112
ST
4C121
T 4B167
T/S 4C106A
T/S 4C105A
T/S 4C104A
ON CALL
4C107
ON CALL
4C103
ON CALL
4C106
ON CALL
4C105
ST
4B127A
ISO T
4B165A
NOUR
4C139
OFF PHYSICIAN
4C124
CUB
4C122A
T/S 4C107A
HC T/S
4C103A
T/S 4C102A
ON CALL
4C102
ON CALL
4C104
EQUIP SOIL/PREP
4C138
NURSE STA
4C125
AISLE
4B-C01A
CORR
4B-C01
CORR
4B-C02 CORR
4B-C03
CORR
4B-C04
CORR
4B-C04A
CORR
4C-C01
CORR
4C-C02
CORR
4C-C03
CORR
4C-C04
CORR
4C-C05
CORR
4C-C06
AISLE
4C-C06A
ELEV
BS-1
FUTURE ELEV
BS-2
ELEV
BS-4
ELEV
BS-3
STAIR
STB-1
SHAFT
SHB01
SHAFT
SHB03
SHAFT
SHC06
SHAFT
SHC05B
SHAFT
SHC05A
SUPPLY
4B132A
SUPPLY
4B132G
SCALE
4C119
HK
4B112
CC
4B165C
P/C/N OFFICE
4B113
AISLE
4B-C03A
TR
4B161A
STAIR
STC-4
SECURITY
4B123C
SECURITY
4C114D
SUB-STATION
4B132B
CORR
4B-C01B
CORR
4B-C04B
CLST
4C107B
CLST
4C105B
CLST
4C103B
CLST
4C102B
CLST
4C104B
CLST
4C106B
CORR
4B-C05
ALCOVE
4B-C02A
ALCOVE
4C136A
ALCOVE
4C128A
MALE
4C101B
FEMALE
4C101A
SHAFT
SHC05C
TR
4B155C
01-AJ-044
C1
01-AJ-044
C3
01-AJ-045
B1
01-AJ-045
D1
GENERAL SHEET NOTES
NORTH
ROOM ALLOCATION LEGEND
EXISTING TO REMAIN
KEYED NOTES
KEY PLAN
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
NEW LOCATION
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
01-AE-041
B & C
OVERALL FOURTH FLOOR PLAN -
BUILDINGS B & C
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
3/32" = 1'-0"F1 FOURTH FLOOR OVERALL PLAN BUILDING H & J
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
C L
KEY PLAN
NORTH
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
01-AJ-011
D5
CHF (OC)
1C220
A CHF (OC)
1C222
SECY (OC)
1B208
ITAC (OC)
1B141
CS (OC)
1B139
OFF CHF (FS)
1B151
BA (OC)
1C224
ADM (OC)
1B140
MA ASST (OC)
1C226
MEDIA (FS)
1B154
OFF A CHF (FS)
1B152
CUB CST SRV (FS)
1B150
SEC/WAIT (FS)
1B153
CHF (CD)
1B159
A CHF (CD)
1B158
LD CODE (CD)
1B162
LD CODE (CD)
1B161
SECY (CD)
1B160
WORK (CD)
1B157
A CHF (HIM)
1B143
CHF (HIM)
1B144
SECY (HIM)
1B201
CHF (WA)
1B137
A CHF (WA)
1B138
SECY (WA)
1B134
OP CTR (WA)
1B130
OFF SPV (WA)
1B132
A CHF (HE)
1C135
BUS CTR (HE)
1C125
T 1B176
CHIEF
1C203
A CHF
1C201
WORKROOM
1C205
SUPV (MCCF)
1B155
IP SUP (HE)
1C134
IP CLRK (HE)
1C124
ADMIS (HE)
1C122
A CHF
1C199
ACCNT CHF
1C214
ACCNT CHF
1C213 ACCNT CHF
1C212
ACCNT CHF
1C211
COMP AUDITOR
1C215
COMP OFFICER
1C216
BDGT
1C217A
TECH
1C217B
AUDITOR
1C193
AUDITOR
1C197
AUDITOR
1C195
RECPT
1C190A
T 1C186
T 1C219
AUDITOR
1C191
BREAK
1C210
SERVICE BAY
1C114
EC
1C223
EC
1B180
SERVICE BAY
1B123
TR
1C114C
NORM ELEC
1C114A
DETAILS (HE)
1C136
WAIT (OC)
1C227
STOR (HE)
1C126
EMER ELEC
1C114B
TR
1B123D
EMER ELEC
1B123A
NORM ELEC
1B123B
SEC/WAIT
1B106
CONF/CLASS (OC)
1B135
T 1B204
T 1B178
TR
1C228
WAIT
1C190
SERV ELEV LOBB
1B120
PUB ELEV LOBBY
1B100
WORKROOM (HIM)
1B194
CLINICAL SUPER (NSA)
1B102CLINICAL SUPER (NSA)
1B103
T 1C141
T 1C143
WC
1C144
LOUNGE
1C145
RECPT
1C137
PANTRY
1C146
CHAPLAIN
1B105
CHAPLAIN
1B107
CHAPLAIN
1B109
EUCHARIST
1B111
QUIET
1B116
T 1B108
T 1B110
STOR
1B112
HK
1B114
STOR/FILE (FS)
1B190
ISO (HIM)
1B203
PV (HIM)
1B142
SLEEP
1C166
T/S 1C166A
ST
1C181
T/S 1C179A
T/S
1C174A SLEEP
1C174
SLEEP
1C165
SLEEP
1C175
T/S 1C165A
T/S 1C164A
SLEEP
1C164
SLEEP
1C177
T/S 1C177A
T/S 1C175A
SLEEP
1C179
SLEEP
1C162
T/S 1C162A
WAIT
1C160 CC
1C178 CONF
1C185
RETAIL AREA
1C101
VESTIBULE
1C150
ADMIS (HE)
1C123
STOR
1C221
MONITOR
1C163
POLY
1C161
EQUIP
1C168
T 1C160A
BREAK
1C169
ELEV
BS-1
FUTURE ELEV
BS-2
ELEV
BS-4
ELEV
BS-3
STAIR
STB-1
CORR
1B-C01
CORR
1B-C02
CORR
1B-C03
CORR
1B-C05
AISLE
1B-C09
AISLE
1B-C10
AISLE
1B-C11
AISLE
1B-C13
AISLE
1C-C01D
AISLE
1C-C03
AISLE
1C-C04
AISLE
1C-C04A
AISLE
1C-C04B
AISLE
1C-C05
AISLE
1C-C06
AISLE
1C-C08
AISLE
1C-C08A
STOR
1C133
HK
1C139
VESTIBULE
1B121
CORR
1C101-K
CORR
1B-C02A
HK
1B206
NOUR
1C180
AISLE
1C-C07A
SECURITY
1C114D
UNASSIGNED
1B174G
SECURITY
1B123C
CORR
1C-C02
SECY/WAIT (OC)
1C225
RETAIL PREP
1C101A
CORR
1B-C04
AISLE
1B-C04A
AISLE
1C-C00
CORR
1C-C01
CLEAN
1C167
SOILED
1C176
ASR
1B113 CONNECTOR HALL
1B115A
TR
1B179
IT/LVSR
1C190B
CHAPEL
1B115
CLOSET
1B115B
01-AJ-011
D7
01-AJ-014
F1
01-AJ-014
F4
01-AJ-015
C6
01-AJ-015
C8
7"
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
01-AC-011
B & C
LEVEL 1 REFLECTED CEILING PLAN
BUILDINGS B & C
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
3/32" = 1'-0"F1
FIRST FLOOR REFLECTIVE CEILING PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
NN NN NNNNNNN
N
N
N
N
N N
N
N
N
N
NN NN NNNNNNNNN
N N N N NN N N N N N N N
N N N N N N N N
N
KEY PLAN
NORTH
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
CLEAN
2B120
COMM CENTER
2B118
CONSULT
2C126
NOUR
2C108
TR
2C114C
RETHERM
2B101
CONSULT
2C124
HK
2B112
TR
2B123D
STOR/EQUIP
2B103
CLEAN
2B155D
CHUTE
2B105
COMM CENTER
2C104
MED ROOM
2B155B
SOILED
2B155E
SERVICE BAY
2B123
SERVICE BAY
2C114
OFF PHY/CON/NRS
2C120
HOUSE STAFF
2B104
PHARMACIST
2C118
ST
2C119
SOC WRK
2C121
HK
2C122
SOC WRK
2C123
PHY/CON/NRS
2C112
STAFF LOUNGE
2B102
STAFF LOCKER
2B126
DIET
2C116
NOUR
2B122
HEAD NURSE
2C113
CARE PROVIDER
2C111
STOR/EQUIP
2C103
HEAD NURSE
2B116
EC
2B153
NORM ELEC
2C114A
EMER ELEC
2C114B
NORM ELEC
2B123B
EMER ELEC
2B123A
SOILED
2C152B
CLEAN
2C106
EC
2C154
PATIENT
2B146
PATIENT NEG
2B143
PATIENT
2B145
PATIENT POS
2B165
PATIENT
2B151
PATIENT
2B152
PATIENT
2B157
PATIENT
2B159
PATIENT
2B161
PATIENT
2B163
PATIENT
2B164
PATIENT
2B144
PATIENT
2B148
PATIENT
2B150
PATIENT
2B154
PATIENT
2B156
PATIENT
2B158
PATIENT
2B160 PATIENT
2B162
PATIENT
2C145
PATIENT
2C151
PATIENT
2C147
PATIENT
2C157
PATIENT
2C159
PATIENT
2C161
PATIENT
2C163
PATIENT
2C155
PATIENT
2C149
PATIENT
2C160
PATIENT POS
2C165
PATIENT
2C141
PATIENT
2C144
PATIENT
2C146
PATIENT
2C148
PATIENT
2C150
PATIENT
2C153
PATIENT
2C156
PATIENT
2C158
PATIENT
2C164
PATIENT NEG
2C140
CONF/ REPORT
2B106
SUB-STATION
2B132H
SUB-STATION
2B130A
SUB-STATION
2B130C
SUB-STATION
2B130E
SUB-STATION
2B132D SUB-STATION
2B132F
SUPPLY
2B130B
SUPPLY
2B132G
SUPPLY
2B132E
SUB-STATION
2C131G
SUB-STATION
2C131C
SUB-STATION
2C131E
SUB-STATION
2C131A SUB-STATION
2C133A
SUB-STATION
2C133C
RESPITE
2B166
T 2C145A
T 2C162A
T 2C160A
T 2C151A
T 2C155A
T 2C157A
T 2C159A
T 2C161A
T 2C163A
T 2C164A
T 2C149A
T 2C158A
T 2C156A
T 2C153A
T 2C148A
T 2C146A
T 2C144A
ISO T
2C142A
ISO T
2C140A
T 2C143A
T 2C147A
T 2B146A
T 2B140A
T 2B142A
T 2B147A
T 2B145A
T 2B149A
T 2B151A
T 2B152A
T 2B159A T
2B161A
T 2B163A
ISO T
2B165A
ISO T
2B141A
T 2B164A
T 2B162A
T 2B160A
T 2B158A
T
2B156AT
2B154A T
2B150A
T 2B148A
T 2B144A
ISO T
2B143A
MALE
2C101B
ANTE POS
2C165B
X-RAY
2C105
X-RAY ALC
2B115
HC ST
2B126A
TYP T
2B167
ANTE POS
2B165B
PATIENT NEG
2B141
PATIENT
2B142
PATIENT (BAR)
2B140
PATIENT
2B147
PATIENT
2B149
PATIENT NEG
2C142
PATIENT
2C162
ISO T
2C165A
PATIENT
2C143
T 2C141A
PUB ELEV LOBBY
2B100
SERV ELEV LOBBY
2B107
SUPPLY
2C131B SUPPLY
2C131D
SUPPLY
2C131H
SUPPLY
2C133B
ST
2B125
T 2C167
FEMALE
2C101A
RESPITE
2C166
CARE PROVIDER
2B114
CORR
2B-C01A
CORR
2B-C01
CORR
2B-C04
CORR
2B-C02
CORR
2B-C03
AISLE
2B-C03A
CORR
2C-C03
CORR
2C-C04
CORR
2B-C01B
CORR
2B-C05
ELEV
BS-1
FUTURE ELEV
BS-2
ELEV
BS-4
ELEV
BS-3
STAIR
STB-1
SHAFT
SHB01
SHAFT
SHB03
SHAFT
SHC06
SHAFT
SHC05B
SHAFT
SHC05A
SUB-STATION
2C133E
SUPPLY
2C133D
SUPPLY
2B132C
SUPPLY
2C131F
CC
2B130F
CC
2C105A
CC
2C165C
CC
2B165C
ON CALL
2B129
ON CALL
2B131
PC1
2C115
CLEAN
2C152C
MED ROOM
2C152E
STAIR
STC-4
STAIR
STC-3
SECURITY
2C114D
SECURITY
2B123C
PC1
2C109
SUB-STATION
2B132B
CORR
2B-C04B
HC T/S
2B129ACLST
2B129B
CLST
2B131A T/S
2B131B
ALCOVE
2C-C03B
ALCOVE
2B-C02A
T 2B157A
SUPPLY
2B130D
SUPPLY
2B132A
CORR
2C-C05
SHAFT
SHC05C
WAITING
2A100A
TR
2B155C
TR
2C152G
01-AJ-025
F1
01-AJ-025
F4
01-AJ-027
F1
01-AJ-027
F4
TR
2C152A
AISLE
BP-8
TR
2B161A
01-AJ-026
F1
01-AJ-028
F1
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
01-AC-021
B & C
LEVEL 2 REFLECTED CEILING PLAN
BUILDINGS B & C
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
0' 4' 8' 16'
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
3/32" = 1'-0"F1
SECOND FLOOR REFLECTIVE CEILING PLAN BUILDINGS B & C
N N N N N N
N N N N N N
N N
N N N N N N N
N N N N N
NN NN N
NN NN NNN
NNNNNN
NNNNNN
KEY PLAN
NORTH
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
BLOOD GAS LAB
3C120
COMM CENTER
3C103
CONSULT
3C124
TR
3C114C
CHUTE
3B105
COMM CENTER
3B118
HOUSE STAFF
3B104
HEAD NURSE
3C112
SOC WRK
3C121
SOC WRK
3C123
PHYS/CON/ NRS
3C110
STAFF LOCKER
3B126
DIET
3C116
CARE PROVIDER
3B114
HEAD NURSE
3B116
PHARMACIST
3C118
NOUR
3B122
TR
3B123D
STOR/EQUIP
3B103
SERVICE BAY
3B123
SERVICE BAY
3C114
RETHERM
3B101
NORM ELEC
3B123B
EMER ELEC
3B123A
EMER ELEC
3C114B
NORM ELEC
3C114A
SOILED
3C152B
CLEAN
3B120
FEMALE
3C101A
X-RAY ALC
3C104
PHYS/CON/ NRS
3C122
STOR/EQUIP
3C102
MALE
3C101B
X-RAY ALC
3B115
PATIENT NEG
3B141
PATIENT NEG
3B143
PATIENT
3B145
PATIENT
3B147
ISO T
3B165A
T 3B163A
T 3B161A
T 3B159A
PATIENT
3B149
T 3B157A
T 3B152A
PATIENT
3B151
PATIENT
3B140
PATIENT
3B142
PATIENT
3B144
PATIENT
3B146
PATIENT POS
3B165
T 3B164A
T 3B160A
T 3B158A
T 3B156A
T 3B162A
PATIENT
3B148
PATIENT
3B150
T 3B154A
T 3B151A
PATIENT
3B152
T 3B149A
T 3B147A
T 3B145A
ISO T
3B141A
ISO T
3B143A
PATIENT
3B157
PATIENT
3B159
PATIENT
3B161
PATIENT
3B163
PATIENT
3B164
PATIENT
3B154
PATIENT
3B156
PATIENT
3B158
PATIENT
3B160
PATIENT
3B162
T 3B150A
T 3B148A
T 3B146A
T 3B144A
T 3B142A
T 3B140A
EC
3C154
SUB-STATION
3B130A SUPPLY
3B130B
SUB-STATION
3B130C
SUPPLY
3B130D
SUB-STATION
3B130E
SUB-STATION
3B132DSUPPLY
3B132C
SUB-STATION
3B132HSUPPLY
3B132E
RESPITE
3B166
SUB-STATION
3B132F
SERV ELEV LOBBY
3B107
PUB ELEV LOBBY
3B100
HK
3B112
NOUR
3C108
CLEAN
3C106
SOILED
3B155E
EC
3B153
SUB-STATION
3C131A
SUB-STATION
3C131C
SUB-STATION
3C131E
SUB-STATION
3C133A
SUB-STATION
3C133C SUB-STATION
3C133E
T 3C163A
ISO T
3C140A
ISO T
3C142A
T 3C144A
T 3C146A
PATIENT
3C146
T 3C148A
PATIENT
3C148
PATIENT
3C150
T 3C150A
PATIENT
3C153
T 3C153A
T 3C156A
PATIENT
3C156
PATIENT
3C158
T 3C158A
T 3C162A
PATIENT
3C160
T 3C160A
T
3C141A ISO T
3C165A
PATIENT
3C162
PATIENT
3C164
PATIENT
3C163
PATIENT
3C161
PATIENT
3C159
PATIENT
3C157
SUPPLY
3C131B
SUPPLY
3C131D
SUPPLY
3C133B
RESPITE
3C166
T 3C164A
T 3C159A
T 3C161A
T 3C157A
T 3C155A
T 3C151A
T 3C149A
T 3C147A
T 3C145A
T 3C143A
PATIENT NEG
3C140
PATIENT NEG
3C142
PATIENT
3C155
PATIENT
3C151
PATIENT
3C149
PATIENT
3C147
PATIENT
3C145
PATIENT
3C143
PATIENT
3C141
PATIENT POS
3C165
ANTE POS
3C165B
STAFF LOUNGE
3B102
ST
3B124
T 3B167
T 3C167
ANTE POS
3B165B
HC ST
3B126A
AISLE
3B-C01A
CORR
3B-C01
CORR
3B-C01B
CORR
3B-C02
CORR
3B-C05
CORR
3B-C03
CORR
3C-C03
CORR
3C-C04A
CORR
3C-C02
ELEV
BS-1
FUTURE ELEV
BS-2
ELEV
BS-4
ELEV
BS-3
STAIR
STB-1
SHAFT
SHB01
SHAFT
SHB03
SHAFT
SHC06
SHAFT
SHC05B
SHAFT
SHC05A
SUPPLY
3B132A
SUPPLY
3B132G
SUPPLY
3C133D
TR
3B161A
CC
3B130H
TR
3C152A
CC
3C109
HK
3C125
CC
3C165C
CC
3B165C
ST
3B227
CARE PROVIDER
3C230
CLEAN
3B155D
MED ROOM
3B155B
AISLE
3B-C03A
CLEAN
3C152C
MED ROOM
3C152E
AISLE
3C-C02A
STAIR
STC-4
STAIR
STC-3
SECURITY
3C114D
SECURITY
3B123C
UNASSIGNED
3C117
PATIENT
3C144
CORR
3B-C04B
SUB-STATION
3B132B
SUPPLY
3C131F
SUB-STATION
3C131G
ALCOVE
3C-C03B
ALCOVE
3B-C02A
OFF PCI
3B131
HC ON CALL
3B129
HC T/S
3B129A
PHYS/CON/NRS
3B130
CLST
3B129B
CONSULT
3C126
SUPPLY
3C131H
SHAFT
SHC05C
CORR
3C-C06
WAITING
3A100A
TEL CLST
3B155C
TEL CLST
3C152D
CONF/ REPORT
1C190C
01-AJ-035
F1
01-AJ-035
F4
01-AJ-037
F1
01-AJ-037
F4
01-AJ-038
F1
01-AJ-036
F1
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
01-AC-031
B & C
LEVEL 3 REFLECTED CEILING PLAN
BUILDINGS B & C
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
3/32" = 1'-0"F1
THIRD FLOOR REFLECTIVE CEILING PLAN BUILDINGS B & C
AP
APAPAP
AP
NNNNNNN
NN NN N
NN NN NNN
NNNNNN
KEY PLAN
NORTH
GENERAL NOTES ARCHITECTURAL
A. THE C.O.R. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR, TO ALLOW CABLES TO PENETRATE WALLS WITHOUT LIMITING ABILITY
TO ADD OR REMOVE CABLES WITHOUT RESEALING.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. REFER TO INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. REFER TO SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. PORTION OF WALL TO REMAIN UNTIL LOW VOLTAGE/TELECOM PROVIDER CAN RELOCATE
EXISTING EQUIPMENT. CONTRACTOR TO CORDINATE WITH VA COR AND PROVIDER.
GENERAL NOTES REFLECTED CEILING
A. RESTORE EFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL SHEET NOTES
GYP. BD. CEILING SYSTEM
2 X 4 ACOUSTICAL LAY-IN CEILING SYSTEM.
DOWN LIGHT FIXTURE
LEGEND
KEYED NOTES
1'X4' LIGHT FIXTURE
8' X 7" LIGHT FIXTURE
2'X4' LIGHT FIXTURE
2'X2' SUPPLY
2'X2' RETURN
SERVICE BAY
4B123
SERVICE BAY
4C114
CONSULT
4B105
NOUR
4B122
TR
4B123D
RETHERM
4B121
CHUTE
4B104
COMM CENTER
4B118
STAFF LOUNGE
4B109
CONF/ REPORT
4B106
HOUSE STAFF
4B107
RESIDENT CONF
4B108
PCI
4B102
SOC WRK
4B110
CLEAN
4B155D
DIET
4B125
HEAD NURSE
4B114
CARE PROVIDER
4B116
WAITING
4A100A
STOR/EQUIP
4B103
HC ST
4B126A
STAFF LOCKER
4B126
EC
4B153
TR
4C114C
NORM ELEC
4B123B
EMER ELEC
4B123A
EMER ELEC
4C114B
NORM ELEC
4C114A
PATIENT NEG
4B143 MED ROOM
4B155B
SOILED
4B155E
CLEAN
4B120
ISO T
4B141A
ISO T
4B143A
PATIENT
4B163
T 4B145A
PATIENT
4B161
T 4B147A
PATIENT
4B159
T 4B149A
PATIENT
4B157
T 4B151A
PATIENT
4B152
T 4B140A
PATIENT
4B164
T 4B142A
PATIENT
4B162
T 4B144A
PATIENT
4B160
T 4B146A
T 4B148A
PATIENT
4B158
T 4B150A
PATIENT
4B156
T 4B154A
PATIENT
4B154
T 4B156A
PATIENT
4B151
T 4B158A
PATIENT
4B149
T 4B160A
PATIENT
4B147
T 4B162A
PATIENT
4B145
T 4B164A
PATIENT
4B142
PATIENT
4B140
T 4B163A
PATIENT
4B150
T 4B161A
PATIENT
4B148
T 4B159A
PATIENT
4B146
T 4B157A
PATIENT
4B144
T 4B152A
SUB-STATION
4B130A
SUB-STATION
4B130C
SUB-STATION
4B130E
SUB-STATION
4B132H
SUB-STATION
4B132D
SUB-STATION
4B132F
RESPITE
4B166
ANTE POS
4B165B
PATIENT NEG
4B141
PATIENT POS
4B165
PUB ELEV LOBBY
4B100
SERV ELEV LOBBY
4B111
X-RAY ALC
4B115
SUPPLY
4B130D
SUPPLY
4B130B
SUPPLY
4B132E
ISO T
4C134A
BED STATION ISO
4C134
BED STATION
4C128
BED STATION
4C130
BED STATION
4C132
T 4C135
CLEAN
4C137
SOILED
4C141
EQ CLEAN STOR
4C136
MED
4C127
DIALYSATE STOR
4C120
CH NURSE
4C126
STOR STERILE
4C123
WATER TREAT
4C110
EQUIP SERVICE
4C111
WC
4C113
CUB
4C122B
CC
4C118
LOCKER
4C112 ST
4C121
T 4B167
T/S 4C106A
T/S 4C105A
T/S 4C104A
ON CALL
4C107
ON CALL
4C103
ON CALL
4C106
ON CALL
4C105
ST
4B127A
ISO T
4B165A
NOUR
4C139
OFF PHYSICIAN
4C124
CUB
4C122A
T/S 4C107A
HC T/S
4C103A
T/S 4C102A
ON CALL
4C102
ON CALL
4C104
EQUIP SOIL/PREP
4C138
NURSE STA
4C125
AISLE
4B-C01A
CORR
4B-C01
CORR
4B-C02
CORR
4B-C03
CORR
4B-C04
CORR
4B-C04A
CORR
4C-C01
CORR
4C-C02 CORR
4C-C03
CORR
4C-C04
CORR
4C-C05
CORR
4C-C06
AISLE
4C-C06A
ELEV
BS-1
FUTURE ELEV
BS-2
ELEV
BS-4
ELEV
BS-3
STAIR
STB-1
SHAFT
SHB01
SHAFT
SHB03
SHAFT
SHC06
SHAFT
SHC05B
SHAFT
SHC05A
SUPPLY
4B132A
SUPPLY
4B132G
SCALE
4C119
HK
4B112
CC
4B165C
P/C/N OFFICE
4B113
AISLE
4B-C03A
TR
4B161A
STAIR
STC-4
SECURITY
4B123C
SECURITY
4C114D
SUB-STATION
4B132B
CORR
4B-C01B
CORR
4B-C04B
CLST
4C107B
CLST
4C105B
CLST
4C103B
CLST
4C102B
CLST
4C104B
CLST
4C106B
CORR
4B-C05
ALCOVE
4B-C02A
ALCOVE
4C136A
ALCOVE
4C128A
MALE
4C101B
FEMALE
4C101A
SHAFT
SHC05C
TR
4B155C
01-AJ-044
F1
01-AJ-044
F4
01-AJ-045
F1
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
01-AC-041
B & C
LEVEL 4 REFLECTED CEILING PLAN
BUILDINGS B & C
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R H
O U
S E
3/32" = 1'-0"F1
FOURTH FLOOR REFLECTIVE CEILING PLAN BUILDINGS B & C
TH
F
F
FD
TR
1C114C
1A104B
128R
128R
128R
T 1C143
SECURITY
1C114D
STOR
1C133
TR
1C114C
1A104B
T 1C143
SECURITY
1C114D
STOR
1C133
TR
1C114C
1A104B
94D
101D
STOR
1C133
SECURITY
1C114D
T 1C143
TR
1C114C
1A104B
130R
SECURITY
1C114D
STOR
1C133
T 1C143
130R
GENERAL NOTE DEMOLITION
A. FIELD VERIFY ALL EXISTING CONDITIONS, PRIOR TO START OF DEMOLITION. BRING SIGNIFICANT
DISCREPANCIES TO THE ATTENTION OF THE COR. FOR REVIEW.
B. COORDINATE DEMOLITION TIMING WITH THE COR. PRIOR TO START.
C. PROTECT EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING DEMOLITION, INCLUDING
MECHANICAL & FIRE SUPPRESSION SYSTEMS.
D. UPON COMPLETION OF DEMOLITION, PREPARE SUBSTRATE AS REQUIRED TO RECEIVE NEW FINISH
PER ARCHITECTURAL DRAWINGS. REPAIR ANY DAMAGE INCURRED DURING OR PRIOR TO THE
START OF WORK TO MATCH EXISTING CONDITION INCLUDING FIREPROOF MATERIALS.
E. SALVAGE AND RETURN TO C.O.R. EXISTING LIGHT FIXTURES TO BE REMOVED PER DRAWINGS.
F. EXISTING WALL MOUNTED DEVICES TO REMAIN UNLESS NOTED OTHERWISE, INCLUDED BUT NOT
LIMITED TO THERMOSTATS, LIGHT SWITCHES, OUTLETS, DATA PORTS, INTERIOR DEVICES, ETC.
FOLLOW ELECTRICAL, MECHANICAL, AND TELECOMMUNICATION DRAWINGS.
G. REMOVE EXISTING SIGNAGE, COORDINATE WITH C.O.R. ANY REQUIRED NEW SIGNAGE.
H. FOLLOW MECHANICAL DRAWINGS FOR GRILL, DIFFUSER, AND REGISTER DEMOLITION, CAP AND
REPAIR AS REQUIRED.
I. RELOCATE EXISTING WATER, DRAIN, CONDENSATE, & STEAM LINES OUTSIDE NEW T.R., REFER TO
PLUMBING DRAWINGS FOR COORDINATION.
GENERAL NOTES ARCHITECTURAL
A. THE COR. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO PENETRATE WALLS. INSTALLED PER
MANUFACTURERS REQUIREMENTS TO MATCH RATING OF WALL.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. FOLLOW INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. FOLLOW SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. FOLLOW SHEET 000-AJ-605 FOR ALL FINISHES
GENERAL NOTES REFLECTED CEILING
A. RESTORE AFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL NOTES INFECTION CONTROL
A. ALL AREAS ON THIS PLAN SHALL BE CONSIDERED CONSTRUCTION TYPE D, LOW RISK GROUP AND
INFECTION CONTROL, PRECAUTION CLASS III. WHERE CORRIDOR IS SHOWN WITH IN AREA OF
HIGHER PRECAUTION CLASS, CORRIDOR SHALL MEET THE MORE STRINGENT REQUIREMENT.
B. ALL OTHER AREAS ON THIS SHEET PLAN SHALL BE CONSIDERED CONSTRUCTION TYPE C, LOW
RISK GROUP AND INFECTION CONTROL PRECAUTION CLASS II UNLESS OTHERWISE NOTED.
C. REFER TO SHEET GI003 FOR SYMBOLS AND ABBREVIATIONS.
GENERAL SHEET NOTES
KEYED NOTES - DEMOLITION
KEYED NOTES
KEYED NOTES - RENOVATION
Room Name
LEGEND
LEGACY ROOM NUMBER
SIGNAGE ROOM NUMBER
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
01-AJ-011
C
ENLARGED PLANS BUILDING C
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
3/8" = 1'-0"D3
ENLARGED FIRST FLOOR PLAN - RENOVATION
RM 1C114C / 1A104B3/8" = 1'-0"D1
ENLARGED FIRST FLOOR PLAN - DEMOLITION
RM 1C114C / 1A104B 3/8" = 1'-0"D5
ENLARGED FIRST FLOOR RCP - DEMOLITION
RM 1C114C / 1A104B 3/8" = 1'-0"D7
ENLARGED FIRST FLOOR RCP - RENOVATION
RM 1C114C / 1A104B
128R PATCH EXISTING WALL WHERE DUCTWORK WAS REMOVED. MATCH EXISTING
CONSTRUCTION TYPE REFER TO MECHANICAL.
130R REPLACE CEILING GRIDS & TILE TO PREVIOUS CONDITION.
Revisions: Date:
94D EXISTING CEILING GRID AND TILE TO BE REMOVED AND REINSTALLED AS
NEEDED TO GIVE ACCESS TO NEW MECHANICAL UNITS. REFER TO
MECHANICAL DRAWINGS.
101D REMOVE EXISTING CEILING GRID & TILE FOR ACCESS TO DUCT REMOVAL.
SEE MECHANICAL.
S
C 4
C 4
C 4
TH
RE RE
O C
C R
C 4
C
TR
1B179
1B145
5D
79D
2D
93D
TR
1B179
1B145
107R
27R
47R
120R 4R
TR
1B179
1B145
1D
8D
20D
84D
82D
100D
7D
7D
102D
C7
01-AJ-014
F7
01-AJ-014
TR
1B179
1B145
2A
2A
2A
2A
2R 11R
12R
10R
10R
108R
10R
10R
7' - 3 1/2"
2A
18R
B
1R
19R
115R
47R
128R
127R
127R
127R
10R
119R
2R
47R
27R
SLOPE
F
IE
L D
V E
R
IF
Y W
I T H
E X
I S T
IN
G
D U
C T
S
10R
28R
47R
119R
27R
2R
GENERAL NOTE DEMOLITION
A. FIELD VERIFY ALL EXISTING CONDITIONS, PRIOR TO START OF DEMOLITION. BRING SIGNIFICANT
DISCREPANCIES TO THE ATTENTION OF THE COR. FOR REVIEW.
B. COORDINATE DEMOLITION TIMING WITH THE COR. PRIOR TO START.
C. PROTECT EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING DEMOLITION, INCLUDING
MECHANICAL & FIRE SUPPRESSION SYSTEMS.
D. UPON COMPLETION OF DEMOLITION, PREPARE SUBSTRATE AS REQUIRED TO RECEIVE NEW FINISH
PER ARCHITECTURAL DRAWINGS. REPAIR ANY DAMAGE INCURRED DURING OR PRIOR TO THE
START OF WORK TO MATCH EXISTING CONDITION INCLUDING FIREPROOF MATERIALS.
E. SALVAGE AND RETURN TO C.O.R. EXISTING LIGHT FIXTURES TO BE REMOVED PER DRAWINGS.
F. EXISTING WALL MOUNTED DEVICES TO REMAIN UNLESS NOTED OTHERWISE, INCLUDED BUT NOT
LIMITED TO THERMOSTATS, LIGHT SWITCHES, OUTLETS, DATA PORTS, INTERIOR DEVICES, ETC.
FOLLOW ELECTRICAL, MECHANICAL, AND TELECOMMUNICATION DRAWINGS.
G. REMOVE EXISTING SIGNAGE, COORDINATE WITH C.O.R. ANY REQUIRED NEW SIGNAGE.
H. FOLLOW MECHANICAL DRAWINGS FOR GRILL, DIFFUSER, AND REGISTER DEMOLITION, CAP AND
REPAIR AS REQUIRED.
I. RELOCATE EXISTING WATER, DRAIN, CONDENSATE, & STEAM LINES OUTSIDE NEW T.R., REFER TO
PLUMBING DRAWINGS FOR COORDINATION.
GENERAL NOTES ARCHITECTURAL
A. THE COR. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO PENETRATE WALLS. INSTALLED PER
MANUFACTURERS REQUIREMENTS TO MATCH RATING OF WALL.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. FOLLOW INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. FOLLOW SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. FOLLOW SHEET 000-AJ-605 FOR ALL FINISHES
GENERAL NOTES REFLECTED CEILING
A. RESTORE AFFECTED CEILINGS TO ORIGINAL CONDITION UNLESS NOTED OTHERWISE.
B. NOT ALL CEILING DEVICES SHOWN, SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
C. EXTEND EXISTING WALL ASSEMBLY WITHIN SCOPE TO THE DECK AS REQUIRED.
GENERAL NOTES INFECTION CONTROL
A. ALL AREAS ON THIS PLAN SHALL BE CONSIDERED CONSTRUCTION TYPE D, LOW RISK GROUP AND
INFECTION CONTROL, PRECAUTION CLASS III. WHERE CORRIDOR IS SHOWN WITH IN AREA OF
HIGHER PRECAUTION CLASS, CORRIDOR SHALL MEET THE MORE STRINGENT REQUIREMENT.
B. ALL OTHER AREAS ON THIS SHEET PLAN SHALL BE CONSIDERED CONSTRUCTION TYPE C, LOW
RISK GROUP AND INFECTION CONTROL PRECAUTION CLASS II UNLESS OTHERWISE NOTED.
C. REFER TO SHEET GI003 FOR SYMBOLS AND ABBREVIATIONS.
GENERAL SHEET NOTES
KEYED NOTES - DEMOLITION
KEYED NOTES
KEYED NOTES - RENOVATION
Room Name
LEGEND
LEGACY ROOM NUMBER
SIGNAGE ROOM NUMBER
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023
100% FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s
/2 -0
N e w O rl e a n s
E H
R M
/2 -0
N
O L A
E H
R M
C o n c o u rs e
A rc h
P ro d u c ti o n -R
.r v t
01-AJ-014
C
ENLARGED PLANS BUILDING B
ES BS
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
100% FINAL BID
DOCUMENTS
629-22-700
3/8" = 1'-0"F1
ENLARGED FIRST FLOOR RCP - DEMOLITION
ROOM 1B179 3/8" = 1'-0"F4
ENLARGED FIRST FLOOR RCP - RENOVATION
ROOM 1B179
3/8" = 1'-0"C1
ENLARGED FIRST FLOOR PLAN - DEMOLITION
ROOM 1B179 3/8" = 1'-0"C4
ENLARGED FIRST FLOOR PLAN - RENOVATION
ROOM 1B179 3/8" = 1'-0"C7
TR SECTION 1
ROOM 1B179
3/8" = 1'-0"F7
TR SECTION 2
ROOM 1B179
1R NEW DOOR, RE: SHEET 000-AJ-605 DOOR SCHEDULE.
2R INSTALL 4' X 8' 3/4" FIRE RATED PLYWOOD, VERTICAL, AC GRADE, 6" A.F.F. PER
WALL TYPE REFER TO SHEET 000-AJ-601. PAINT PLYWOOD W/ HIGH GLOSS, TWO
COATS, FIRE RESISTANT PAINT - COLOR WHITE. DO NOT PAINT OVER ONE FIRE
RATED STAMP ON EACH SHEET OF PLYWOOD.
4R CONTRACTOR TO PROVIDE APPROVAL SUBMITTAL FOR THE FIRE SPRINKLER
SYSTEM MODIFICATIONS IN EXISTING AND NEW TELECOMMUNICATION ROOMS
AND TELECOMMUNICATION SPACES. RELOCATE OR ADD NEW HEADS WHERE
REQUIRED, SPRINKLER HEADS TO BE WITHIN 12" OF THE CONCRETE
FLOOR/ROOF DECK ABOVE IN COMPLIANCE WITH NFPA13. COORDINATE
SPRINKLER SYSTEM SHUTDOWN/SCHEDULE WITH VA C.O.R. AND LOCAL FIRE
DEPARTMENT/AUTHORITY HAVING JURISDICTION.
10R 4" NEW VINYL BASE, COLOR TO MATCH EXISTING.
11R NEW STATIC DISSIPATIVE FLOORING TILE.
12R PAINT WALL FULL HEIGHT. FINISH TO MATCH EXISTING. PATCH AND REPAIR ANY
WALL DAMAGE TO MATCH EXISTING ADJACENT FINISHES AND TEXTURES.
18R NEW SEMI-RECESSED CLEAN AGENT FIRE EXTINGUISHER CABINET (DEPENDING
ON WALL CONDITION). MOUNT @ 48" TOP OF CABINET. FIELD VERIFICATION
REQUIRED.
19R NEW CARD READER AND KEYPAD.
27R NEW CABLE TRAY. RE: TELECOM.
28R NEW TELECOMMUNICATION EQUIPMENT, RE: TELECOM.
47R MECHANICAL UNIT, RE: MECHANICAL.
107R PATCH REPAIR CEILING AND TILE GRID AT NEW WALL LOCATION.
108R PAINT NEW WALLS TO MATCH EXISTING COLOR AND SCHEEN.
115R PAINT ENTIRE ROOM W/ HIGH GLOSS WHITE PAINT EXCEPT FOR PLYWOOD
WALLS.
119R NEW ROOF STRUCTURE REFER TO F5 SHEET 000-AJ-601.
120R 16" X 30" ACCESS HATCH IN PLYWOOD DECKING.
127R CUT PATCH AND REWORK EXISTING CARPET TILES AROUND NEW ROOM.
128R PATCH EXISTING WALL WHERE DUCTWORK WAS REMOVED. MATCH EXISTING
CONSTRUCTION TYPE REFER TO MECHANICAL.
1D REMOVE EXISTING DOOR AND FRAME
2D DEMOLISH EXISTING LAY-IN CEILING ASSEMBLY.
5D REMOVE EXISTING LIGHT FIXTURE, RETURN TO OWNER?. RE: ELECTRICAL
7D INFECTIONS CONTROL PLAN DETAIL, RE: F5/000-AJ-604
8D DEMOLISH EXISTING WALL.
20D REMOVE EXISTING FLOORING, VINYL AND BASE. PREP SLAB TO RECEIVE NEW
MATERIAL.
79D RELOCATE EXISTING DIFFUSER AND DUCTWORK. REFER TO MECHANICAL.
82D REMOVE FLOORING TO NEW WALL LOCATION PROTECT FLOOR TO REMAIN.
84D PROTECT EXISTING FLOORING MATERIAL.
93D PROTECT EXISTING SPRINKLER HEAD.
100D PROTECT EXISTING TELECOM EQUIPMENT FROM ALL CONSTRUCTION DEBRIS
UNTIL IT IS DEMOED.
102D PROTECT EXISTING ELECTRICAL PANEL FROM ALL CONSTRUCTION DEBRIS UNTIL
IT IS RELOCATED.
NORTH NORTH
NORTHNORTH
RE
RE
CR
F
OC
C 1
S
T ectonic Copyrig ht 2007
TR
1C228
1C1491D
20D
17D
7D
7D
E1
01-AJ-015
E3
01-AJ-015
TR
1C228
1C149
2R 11R 12R10R
18R
C
1R
19R
115R8R
47R
126R
128R
TR
1C228
1C149
5D 5D
79D 2D
93D 93D
TR
1C228
1C149 8R
27R
4R 4R
10R
2R
28R
27R
47R
GENERAL NOTE DEMOLITION
A. FIELD VERIFY ALL EXISTING CONDITIONS, PRIOR TO START OF DEMOLITION. BRING SIGNIFICANT
DISCREPANCIES TO THE ATTENTION OF THE COR. FOR REVIEW.
B. COORDINATE DEMOLITION TIMING WITH THE COR. PRIOR TO START.
C. PROTECT EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING DEMOLITION, INCLUDING
MECHANICAL & FIRE SUPPRESSION SYSTEMS.
D. UPON COMPLETION OF DEMOLITION, PREPARE SUBSTRATE AS REQUIRED TO RECEIVE NEW FINISH
PER ARCHITECTURAL DRAWINGS. REPAIR ANY DAMAGE INCURRED DURING OR PRIOR TO THE
START OF WORK TO MATCH EXISTING CONDITION INCLUDING FIREPROOF MATERIALS.
E. SALVAGE AND RETURN TO C.O.R. EXISTING LIGHT FIXTURES TO BE REMOVED PER DRAWINGS.
F. EXISTING WALL MOUNTED DEVICES TO REMAIN UNLESS NOTED OTHERWISE, INCLUDED BUT NOT
LIMITED TO THERMOSTATS, LIGHT SWITCHES, OUTLETS, DATA PORTS, INTERIOR DEVICES, ETC.
FOLLOW ELECTRICAL, MECHANICAL, AND TELECOMMUNICATION DRAWINGS.
G. REMOVE EXISTING SIGNAGE, COORDINATE WITH C.O.R. ANY REQUIRED NEW SIGNAGE.
H. FOLLOW MECHANICAL DRAWINGS FOR GRILL, DIFFUSER, AND REGISTER DEMOLITION, CAP AND
REPAIR AS REQUIRED.
I. RELOCATE EXISTING WATER, DRAIN, CONDENSATE, & STEAM LINES OUTSIDE NEW T.R., REFER TO
PLUMBING DRAWINGS FOR COORDINATION.
GENERAL NOTES ARCHITECTURAL
A. THE COR. RESERVES THE RIGHT TO HALT CONSTRUCTION ACTIVITY AT ANY TIME DUE TO NOISE
AND VIBRATION WHICH MIGHT AFFECT THE ONGOING USE OF THE FACILITY.
B. PROVIDE UL LISTED FIRESTOPPING AT ALL PENETRATION OF FIRE AND/OR SMOKE RATED WALLS.
C. USE EZ PATH OR SIMILAR TO ALLOW CABLES TO PENETRATE WALLS. INSTALLED PER
MANUFACTURERS REQUIREMENTS TO MATCH RATING OF WALL.
D. ALL HVAC DUCT OPENINGS SHALL BE COMPLETELY SEALED TO PREVENT AIR MOVEMENT
BETWEEN CONSTRUCTION AREA VIA THE BUILDING HVAC SYSTEM.
E. FOLLOW INFECTION CONTROL INFORMATION IN SPECIFICATIONS.
F. FOLLOW SHEET 000-AJ-601 FOR ALL DETAILS & PARTITION TYPES.
G. FOLLOW SHEET 000-AJ-605 FOR ALL FINISHES
GENERAL NOTES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .