2.10 - Drawings 10 of 17 - 04-TD-011 to 08-TD-051.pdf
PDF 13 MB Posted
- Solicitation number
- 36C77623B0038
About this file
This document provides details for a federal contract opportunity for construction services. The solicitation number 36C77623B0038, issued by the Department of Veterans Affairs Technology Acquisition Center Austin, is for infrastructure upgrades at New Orleans EHRM facilities. The opportunity involves construction work at New Orleans locations to modernize and improve existing medical infrastructure assets. Drawings numbered 10 of 17 from 04-TD-011 to 08-TD-051 are provided to convey project specifications and requirements. The response due date and anticipated award date are not stated, but the procurement is for construction services to upgrade Veterans Affairs medical centers in New Orleans, Louisiana.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY ALL CONDITIONS.
UP
UP
UP
DN
LOUNGE
1K116
ST
1K116A
ST
1K116B
DISPATCH & CUBICLES
1K114
TRANS SUPV
1K114A
SECURITY
1K106
TR
1K104
ELEC
1K108
ATTENDANT OFFICE
1K112
WC STOR
1K109
STAIR
STK-1
STAIR
STK-2
EQUIPMENT STORAGE
1K105
EQUIPMENT STORAGE
1K107
MECHANICAL
1K110
SECURITY
1K101 TR
1K103
STAIR
STK-3
STAIR
STK-4
OIL / WATER
INTERCEPTOR
1K128
04-TD-011
04-TD-011
(E)CABLE TRAY
(E)CABLE TRAY
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
(E)1K104-RK3
(E)SBB
(E)1K104-RK2
(E)1K104-RK1
TR
1K104
(E)SBB
TR
1K103
(E)1K103-RK1
(E)1K103-RK2
(E)1K103-RK3
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
04-TD-011
OVERALL FIRST FLOOR TELECOMM
DEMOLITION PLAN - BLDG. 04
DJC AH
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 04 TELECOMM OVERALL DEMOLITION PLAN - LEVEL 1
DEMOLITION GENERAL NOTES
1 VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN THE
CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2 DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE BY OWNER.
3 COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH ARCHITECTURAL.
4 CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
5 IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE.
6 CONTRACTOR SHALL TRACE ALL PORTS LABELED "BLANK", "OPEN", "BAD" OR ANY PORTS
WITHOUT AN ADDRESS IN EXISTING PATCH PANELS AND VERIFY AN OUTLET. FOR PRICING
PURPOSES ASSUME A MINIMUM OF 200FT OF CABLING TO EACH OUTLET.
7 IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE.
PLAN NOTES
1 EXISTING COMMUNICATIONS 2-POST RACK TO REMAIN.
1/4" = 1'-0"2
ENLARGED TELECOMM DEMO PLAN - TR 1K104
1/4" = 1'-0"3
ENLARGED TELECOMM DEMO PLAN - TR 1K103
Revisions: Date:
UP
UP
DN
LOUNGE
1K116
ST
1K116A
ST
1K116B
DISPATCH & CUBICLES
1K114
TRANS SUPV
1K114A
SECURITY
1K106
TR
1K104
ELEC
1K108
ATTENDANT OFFICE
1K112
WC STOR
1K109
STAIR
STK-1
STAIR
STK-2
EQUIPMENT STORAGE
1K105
EQUIPMENT STORAGE
1K107
MECHANICAL
1K110
SECURITY
1K101 TR
1K103
STAIR
STK-3
STAIR
STK-4
OIL / WATER
INTERCEPTOR
1K128
04-TN-011
04-TN-011
(E)CABLE TRAY
(E)CABLE TRAY(2)24-STR MM (OM4)
(2)12-STR SM (OS2)
4"C. FROM 2ND FLR
(2)24-STR MM (OM4)
(2)12-STR SM (OS2)
4"C. FROM 2ND FLR
(1)24-STR MM (OM4)
(1)12-STR SM (OS2)
4"C.
(1)24-STR MM (OM4)
(1)12-STR SM (OS2)
4"C.
PULL BOX
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
(E)1K103-RK1
(E)1K103-RK2
(E)1K103-RK3
TR
1K103
(E)SBB
(E)1K104-RK1
(E)1K104-RK2
(E)1K104-RK3
TR
1K104
2 (E)SBB
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
04-TN-011
OVERALL FIRST FLOOR TELECOMM PLAN -
BLDG. 04
DJC AH
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 04 TELECOMM OVERALL PLAN - LEVEL 1
GENERAL NOTES
1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT SLEEVES TO BE
SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS CABLING THROUGH WALLS
AND NON ACCESSIBLE CEILING AREAS. CONDUIT SLEEVES SHALL BE HILTI SPEED SLEEVES.
CONDUIT SIZE IS TO BE AS NOTED.
2. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING CONCRETE
WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE-DRILLING, SEALING, AND
FIRE STOPPING AS REQUIRED.
3. ALL NEW FIBER SHALL BE REROUTED IN NEW INNERDUCT. INNERDUCT SHALL BE UTILIZED
FOR ROUTING FROM POINT OF ENTRY TO TERMINATION RACK AND SHALL UTILIZE NEW AND
EXISTING PATHWAYS AS REQUIRED.
4. ALL FIBER OPTIC CABLES ARE TO BE FIELD TERMINATED ON BOTH ENDS WITH SPLICE
CASSETTE CONNECTORS. ALL LENGTHS LISTED IN MATRIX ON SHEET 000-TG-001, ARE
APPROXIMATE. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED
LENGTHS PRIOR TO PURCHASE OF FACTOR TERMINATED CABLES. CONTRACTOR SHALL
PROVIDE 10' OF ADDITIONAL LENGTH AT EACH END AND 16' WITHIN EACH VAULT FOR
SERVICE LOOPS.
5. TERMINATE FIBER CABLING IN NEW FIBER PATCH PANELS IN TELECOMMUNICATION RACKS.
6. CONTRACTOR TO PROVIDE NEW J-HOOKS SIZED AS REQUIRED FOR ROUTING OF FIBER
OPTIC CABLE IN ACCESSIBLE SPACES AS SHOWN. PROVIDE ALL APPURTENANCES FOR
INSTALLATION OF J-HOOKS.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ON SITE.
8. PROVIDE 3/4" AC GRADE(OR BETER) PLYWOOD ON ALL WALLS IN TR ROOMS. PLYWOOD WILL
BE FIRE RETARDANT AND COATED WITH TWO COATS OF FIRE RETARDANT PAINT. THE
BOTTOM OF THE PLYWOOD SHOULD BE MOUNTED 6" AFF.
9. CONTRACTOR SHALL TRACE ALL PORTS LABELED "BLANK", "OPEN", "BAD", OR ANY PORTS
WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR PRICING PURPOSES, ASSUME A
MINIMUM OF 200FT OF CABLING TO EACH OUTLET.
10. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED EXACT
LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ON SITE.
11. CONTRACTOR TO PROVIDE ACCESS PANELS IN HARD CEILINGS AS REQUIRED.
12. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
13. FOR ENLARGED PLAN CALLOUTS WE ANNOTATED CURRENT ROOM NUMBER. FLOOR PLAN
ROOM NUMBERS SHOW LEGACY ROOM NUMBERS.
1/4" = 1'-0"2
ENLARGED TELECOMM PLAN - TR 1K103
1/4" = 1'-0"3
ENLARGED TELECOMM PLAN - TR 1K104
PLAN NOTES
1 EXISTING TR RACKS TO REMAIN. PROVIDE FIBER ENCLOSURES, UPS, AND PDU'S. SEE RACK
EQUIPMENT SCHEDULE ON THIS SHEET FOR ADDITONAL INFORMATION.
2 PROVIDE RACK BONDING BUSBAR(RBB) IN EXISTING 2-POST RACK. PROVIDE BONDING AS
REQUIRED. SEE BONDING DETAILS ON SHEET TJ-007 FOR ADDITIONAL INFORMATION.
RACK EQUIPMENT SCHEDULE - EXISTING TR WITH/ (3)EXISTING RACKS
EQUIPMENT QTY TYPE PART#
UPS 3 5 KVA EATON #ZC0517708100000 OR APPROVED
EQUAL, WITH HEAVY DUTY SHELF EATON
#ZC0517708100000
FIBER ENCLOSURE NOTE 1 NOTE 1 NOTE 1
PDU 6 VERTICAL PDU APC #8861, WITH MOUNTING BRACKETS
#KIT-MB-41 OR APPROVED EQUAL
ZONE PDU 1 60 AMP HORIZONTAL
ZONE PDU
#ZPDS-208V60A-HW-6L21-20R OR
APPROVED EQUAL
NOTES: SEE RACK ELEVATIONS FOR EXACT LOCATIONS OF EACH PIECE OF EQUIPMENT.
1. SEE FIBER ONE LINE DIAGRAMS FOR ADDITIONAL INFORMATION.
DN
UP
DN
UP
DN
(2)24-STR MM (OM4)
(2)12-STR SM (OS2)
4"C. DOWN TO 1ST FLR
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
04-TN-021
OVERALL SECOND FLOOR TELECOMM
PLAN - BLDG. 04
DJC AH
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 04 TELECOMM PLAN 2ND FLR
GENERAL NOTES
1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT SLEEVES TO BE
SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS CABLING THROUGH WALLS
AND NON ACCESSIBLE CEILING AREAS. CONDUIT SLEEVES SHALL BE HILTI SPEED SLEEVES.
CONDUIT SIZE IS TO BE AS NOTED.
2. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING CONCRETE
WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE-DRILLING, SEALING, AND
FIRE STOPPING AS REQUIRED.
3. ALL NEW FIBER SHALL BE REROUTED IN NEW INNERDUCT. INNERDUCT SHALL BE UTILIZED
FOR ROUTING FROM POINT OF ENTRY TO TERMINATION RACK AND SHALL UTILIZE NEW AND
EXISTING PATHWAYS AS REQUIRED.
4. ALL FIBER OPTIC CABLES ARE TO BE FIELD TERMINATED ON BOTH ENDS WITH SPLICE
CASSETTE CONNECTORS. ALL LENGTHS LISTED IN MATRIX ON SHEET 000-TG-001, ARE
APPROXIMATE. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED
LENGTHS PRIOR TO PURCHASE OF FACTOR TERMINATED CABLES. CONTRACTOR SHALL
PROVIDE 10' OF ADDITIONAL LENGTH AT EACH END AND 16' WITHIN EACH VAULT FOR
SERVICE LOOPS.
5. TERMINATE FIBER CABLING IN NEW FIBER PATCH PANELS IN TELECOMMUNICATION RACKS.
6. CONTRACTOR TO PROVIDE NEW J-HOOKS SIZED AS REQUIRED FOR ROUTING OF FIBER
OPTIC CABLE IN ACCESSIBLE SPACES AS SHOWN. PROVIDE ALL APPURTENANCES FOR
INSTALLATION OF J-HOOKS.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ON SITE.
8. PROVIDE 3/4" AC GRADE(OR BETER) PLYWOOD ON ALL WALLS IN TR ROOMS. PLYWOOD WILL
BE FIRE RETARDANT AND COATED WITH TWO COATS OF FIRE RETARDANT PAINT. THE
BOTTOM OF THE PLYWOOD SHOULD BE MOUNTED 6" AFF.
9. CONTRACTOR SHALL TRACE ALL PORTS LABELED "BLANK", "OPEN", "BAD", OR ANY PORTS
WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR PRICING PURPOSES, ASSUME A
MINIMUM OF 200FT OF CABLING TO EACH OUTLET.
10. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED EXACT
LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ON SITE.
11. CONTRACTOR TO PROVIDE ACCESS PANELS IN HARD CEILINGS AS REQUIRED.
12. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
13. FOR ENLARGED PLAN CALLOUTS WE ANNOTATED CURRENT ROOM NUMBER. FLOOR PLAN
ROOM NUMBERS SHOW LEGACY ROOM NUMBERS.
PLAN NOTES
DN
UP
DN
UP
(2)24-STR MM (OM4)
(2)12-STR SM (OS2)
4"C. DOWN TO 2ND FLR
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
04-TN-031
OVERALL THIRD FLOOR TELECOMM PLAN -
BLDG. 04
DJC AH
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 04 TELECOMM PLAN 3RD FLR
GENERAL NOTES
1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT SLEEVES TO BE
SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS CABLING THROUGH WALLS
AND NON ACCESSIBLE CEILING AREAS. CONDUIT SLEEVES SHALL BE HILTI SPEED SLEEVES.
CONDUIT SIZE IS TO BE AS NOTED.
2. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING CONCRETE
WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE-DRILLING, SEALING, AND
FIRE STOPPING AS REQUIRED.
3. ALL NEW FIBER SHALL BE REROUTED IN NEW INNERDUCT. INNERDUCT SHALL BE UTILIZED
FOR ROUTING FROM POINT OF ENTRY TO TERMINATION RACK AND SHALL UTILIZE NEW AND
EXISTING PATHWAYS AS REQUIRED.
4. ALL FIBER OPTIC CABLES ARE TO BE FIELD TERMINATED ON BOTH ENDS WITH SPLICE
CASSETTE CONNECTORS. ALL LENGTHS LISTED IN MATRIX ON SHEET 000-TG-001, ARE
APPROXIMATE. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED
LENGTHS PRIOR TO PURCHASE OF FACTOR TERMINATED CABLES. CONTRACTOR SHALL
PROVIDE 10' OF ADDITIONAL LENGTH AT EACH END AND 16' WITHIN EACH VAULT FOR
SERVICE LOOPS.
5. TERMINATE FIBER CABLING IN NEW FIBER PATCH PANELS IN TELECOMMUNICATION RACKS.
6. CONTRACTOR TO PROVIDE NEW J-HOOKS SIZED AS REQUIRED FOR ROUTING OF FIBER
OPTIC CABLE IN ACCESSIBLE SPACES AS SHOWN. PROVIDE ALL APPURTENANCES FOR
INSTALLATION OF J-HOOKS.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ON SITE.
8. PROVIDE 3/4" AC GRADE(OR BETER) PLYWOOD ON ALL WALLS IN TR ROOMS. PLYWOOD WILL
BE FIRE RETARDANT AND COATED WITH TWO COATS OF FIRE RETARDANT PAINT. THE
BOTTOM OF THE PLYWOOD SHOULD BE MOUNTED 6" AFF.
9. CONTRACTOR SHALL TRACE ALL PORTS LABELED "BLANK", "OPEN", "BAD", OR ANY PORTS
WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR PRICING PURPOSES, ASSUME A
MINIMUM OF 200FT OF CABLING TO EACH OUTLET.
10. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED EXACT
LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ON SITE.
11. CONTRACTOR TO PROVIDE ACCESS PANELS IN HARD CEILINGS AS REQUIRED.
12. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
13. FOR ENLARGED PLAN CALLOUTS WE ANNOTATED CURRENT ROOM NUMBER. FLOOR PLAN
ROOM NUMBERS SHOW LEGACY ROOM NUMBERS.
UP DN
DN
UP
DN
SEE SHEET 00-TN-041
FOR CONTINUATION
(2)24-STR MM (OM4)
(2)12-STR SM (OS2)
4"C
(2)24-STR MM (OM4)
(2)12-STR SM (OS2)
4"C. DOWN TO 3RD FLR
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
04-TN-041
OVERALL FOURTH FLOOR TELECOMM
PLAN - BLDG. 04
DJC AH
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 04 TELECOMM PLAN 4TH FLR
GENERAL NOTES
1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT SLEEVES TO BE
SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS CABLING THROUGH WALLS
AND NON ACCESSIBLE CEILING AREAS. CONDUIT SLEEVES SHALL BE HILTI SPEED SLEEVES.
CONDUIT SIZE IS TO BE AS NOTED.
2. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING CONCRETE
WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE-DRILLING, SEALING, AND
FIRE STOPPING AS REQUIRED.
3. ALL NEW FIBER SHALL BE REROUTED IN NEW INNERDUCT. INNERDUCT SHALL BE UTILIZED
FOR ROUTING FROM POINT OF ENTRY TO TERMINATION RACK AND SHALL UTILIZE NEW AND
EXISTING PATHWAYS AS REQUIRED.
4. ALL FIBER OPTIC CABLES ARE TO BE FIELD TERMINATED ON BOTH ENDS WITH SPLICE
CASSETTE CONNECTORS. ALL LENGTHS LISTED IN MATRIX ON SHEET 000-TG-001, ARE
APPROXIMATE. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED
LENGTHS PRIOR TO PURCHASE OF FACTOR TERMINATED CABLES. CONTRACTOR SHALL
PROVIDE 10' OF ADDITIONAL LENGTH AT EACH END AND 16' WITHIN EACH VAULT FOR
SERVICE LOOPS.
5. TERMINATE FIBER CABLING IN NEW FIBER PATCH PANELS IN TELECOMMUNICATION RACKS.
6. CONTRACTOR TO PROVIDE NEW J-HOOKS SIZED AS REQUIRED FOR ROUTING OF FIBER
OPTIC CABLE IN ACCESSIBLE SPACES AS SHOWN. PROVIDE ALL APPURTENANCES FOR
INSTALLATION OF J-HOOKS.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ON SITE.
8. PROVIDE 3/4" AC GRADE(OR BETER) PLYWOOD ON ALL WALLS IN TR ROOMS. PLYWOOD WILL
BE FIRE RETARDANT AND COATED WITH TWO COATS OF FIRE RETARDANT PAINT. THE
BOTTOM OF THE PLYWOOD SHOULD BE MOUNTED 6" AFF.
9. CONTRACTOR SHALL TRACE ALL PORTS LABELED "BLANK", "OPEN", "BAD", OR ANY PORTS
WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR PRICING PURPOSES, ASSUME A
MINIMUM OF 200FT OF CABLING TO EACH OUTLET.
10. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED EXACT
LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ON SITE.
11. CONTRACTOR TO PROVIDE ACCESS PANELS IN HARD CEILINGS AS REQUIRED.
12. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
13. FOR ENLARGED PLAN CALLOUTS WE ANNOTATED CURRENT ROOM NUMBER. FLOOR PLAN
ROOM NUMBERS SHOW LEGACY ROOM NUMBERS.
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY ALL CONDITIONS.
UP
UP
UP
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
OIL WATER
INTERCEPTOR
1L111
TR
1L110
SECURITY
1L108
SECURITY
1L105
TR
1L107 05-TD-011
05-TD-011
(E)CABLE TRAY
(E)CABLE TRAY
TR
1L107
(E)1L107-RK3
(E)SBB
(E)1L107-RK2
(E)1L107-RK11
TR
1L110
(E)1L110-RK3
(E)1L110-RK1
(E)1L110-RK2
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
05-TD-011
OVERALL FIRST FLOOR TELECOMM
DEMOLITION PLAN - BLDG. 05
DJC AH
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 05 TELECOMM OVERALL DEMOLITION PLAN - LEVEL 1
DEMOLITION GENERAL NOTES
1 VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN THE
CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2 DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE BY OWNER.
3 COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH ARCHITECTURAL.
4 CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
5 IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE.
6 CONTRACTOR SHALL TRACE ALL PORTS LABELED "BLANK", "OPEN", "BAD" OR ANY PORTS
WITHOUT AN ADDRESS IN EXISTING PATCH PANELS AND VERIFY AN OUTLET. FOR PRICING
PURPOSES ASSUME A MINIMUM OF 200FT OF CABLING TO EACH OUTLET.
7 IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE.
PLAN NOTES
1 EXISTING COMMUNICATIONS 2-POST RACK TO REMAIN.
1/4" = 1'-0"2
ENLARGED TELECOMM DEMO PLAN - TR 1L107
3/16" = 1'-0"3
ENLARGED TELECOMM DEMO PLAN - TR 1L110
UP
TR
1L110
05-TN-011
05-TN-011
(E)CABLE TRAY
(E)CABLE TRAY
(2)24-STR MM (OM4)
(2)12-STR SM (OS2)
4"C. DOWN TO 3RD FLR
(2)24-STR MM (OM4)
(2)12-STR SM (OS2)
4"C.
(1)24-STR MM (OM4)
(1)12-STR SM (OS2)
4"C.
(1)24-STR MM (OM4)
(1)12-STR SM (OS2)
4"C.
PULL BOX
TR
1L107
SECURITY
1L105
OIL WATER
INTERCEPTOR
1L111
SECURITY
1L108
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
(E)1L107-RK1
(E)1L107-RK2
(E)1L107-RK3
(E)SBB
TR
1L107
2 2
(E)1L110-RK1
(E)1L110-RK2
(E)1L110-RK3
TR
1L110
(N)SBB 3
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
05-TN-011
OVERALL FIRST FLOOR TELECOMM PLAN -
BLDG. 05
DJC AH
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 05 TELECOMM OVERALL PLAN - LEVEL 1
GENERAL NOTES
1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT SLEEVES TO BE
SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS CABLING THROUGH WALLS
AND NON ACCESSIBLE CEILING AREAS. CONDUIT SLEEVES SHALL BE HILTI SPEED SLEEVES.
CONDUIT SIZE IS TO BE AS NOTED.
2. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING CONCRETE
WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE-DRILLING, SEALING, AND
FIRE STOPPING AS REQUIRED.
3. ALL NEW FIBER SHALL BE REROUTED IN NEW INNERDUCT. INNERDUCT SHALL BE UTILIZED
FOR ROUTING FROM POINT OF ENTRY TO TERMINATION RACK AND SHALL UTILIZE NEW AND
EXISTING PATHWAYS AS REQUIRED.
4. ALL FIBER OPTIC CABLES ARE TO BE FIELD TERMINATED ON BOTH ENDS WITH SPLICE
CASSETTE CONNECTORS. ALL LENGTHS LISTED IN MATRIX ON SHEET 000-TG-001, ARE
APPROXIMATE. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED
LENGTHS PRIOR TO PURCHASE OF FACTOR TERMINATED CABLES. CONTRACTOR SHALL
PROVIDE 10' OF ADDITIONAL LENGTH AT EACH END AND 16' WITHIN EACH VAULT FOR
SERVICE LOOPS.
5. TERMINATE FIBER CABLING IN NEW FIBER PATCH PANELS IN TELECOMMUNICATION RACKS.
6. CONTRACTOR TO PROVIDE NEW J-HOOKS SIZED AS REQUIRED FOR ROUTING OF FIBER
OPTIC CABLE IN ACCESSIBLE SPACES AS SHOWN. PROVIDE ALL APPURTENANCES FOR
INSTALLATION OF J-HOOKS.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ON SITE.
8. PROVIDE 3/4" AC GRADE(OR BETER) PLYWOOD ON ALL WALLS IN TR ROOMS. PLYWOOD WILL
BE FIRE RETARDANT AND COATED WITH TWO COATS OF FIRE RETARDANT PAINT. THE
BOTTOM OF THE PLYWOOD SHOULD BE MOUNTED 6" AFF.
9. CONTRACTOR SHALL TRACE ALL PORTS LABELED "BLANK", "OPEN", "BAD", OR ANY PORTS
WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR PRICING PURPOSES, ASSUME A
MINIMUM OF 200FT OF CABLING TO EACH OUTLET.
10. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED EXACT
LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ON SITE.
11. CONTRACTOR TO PROVIDE ACCESS PANELS IN HARD CEILINGS AS REQUIRED.
12. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
13. FOR ENLARGED PLAN CALLOUTS WE ANNOTATED CURRENT ROOM NUMBER. FLOOR PLAN
ROOM NUMBERS SHOW LEGACY ROOM NUMBERS.
1/4" = 1'-0"2
ENLARGED TELECOMM PLAN - TR 1L107
1/4" = 1'-0"3
ENLARGED TELECOMM PLAN - TR 1L110
PLAN NOTES
1 EXISTING TR RACKS TO REMAIN. PROVIDE FIBER ENCLOSURES, UPS, AND PDU'S. SEE RACK
EQUIPMENT SCHEDULE ON THIS SHEET FOR ADDITONAL INFORMATION.
2 PROVIDE RACK BONDING BUSBAR(RBB) IN EXISTING 2-POST RACK. PROVIDE BONDING AS
REQUIRED. SEE BONDING DETAILS ON SHEET TJ-007 FOR ADDITIONAL INFORMATION.
3 PROVIDE BONDING BUSBAR AND BONDING IN TR. SEE BONDING DETAILS ON SHEET TJ-007.
RACK EQUIPMENT SCHEDULE - EXISTING TR WITH/ (3)EXISTING RACKS
EQUIPMENT QTY TYPE PART#
UPS 3 5 KVA EATON #ZC0517708100000 OR APPROVED
EQUAL, WITH HEAVY DUTY SHELF EATON
#ZC0517708100000
FIBER ENCLOSURE NOTE 1 NOTE 1 NOTE 1
PDU 6 VERTICAL PDU APC #8861, WITH MOUNTING BRACKETS
#KIT-MB-41 OR APPROVED EQUAL
ZONE PDU 1 60 AMP HORIZONTAL
ZONE PDU
#ZPDS-208V60A-HW-6L21-20R OR
APPROVED EQUAL
NOTES: SEE RACK ELEVATIONS FOR EXACT LOCATIONS OF EACH PIECE OF EQUIPMENT.
DN
UP
UP
(2)24-STR MM (OM4)
(2)12-STR SM (OS2)
4"C. DOWN TO 1ST FLR
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
05-TN-021
OVERALL SECOND FLOOR TELECOMM
PLAN - BLDG. 05
DJC AH
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 05 TELECOMM OVERALL PLAN - LEVEL 2
GENERAL NOTES
1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT SLEEVES TO BE
SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS CABLING THROUGH WALLS
AND NON ACCESSIBLE CEILING AREAS. CONDUIT SLEEVES SHALL BE HILTI SPEED SLEEVES.
CONDUIT SIZE IS TO BE AS NOTED.
2. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING CONCRETE
WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE-DRILLING, SEALING, AND
FIRE STOPPING AS REQUIRED.
3. ALL NEW FIBER SHALL BE REROUTED IN NEW INNERDUCT. INNERDUCT SHALL BE UTILIZED
FOR ROUTING FROM POINT OF ENTRY TO TERMINATION RACK AND SHALL UTILIZE NEW AND
EXISTING PATHWAYS AS REQUIRED.
4. ALL FIBER OPTIC CABLES ARE TO BE FIELD TERMINATED ON BOTH ENDS WITH SPLICE
CASSETTE CONNECTORS. ALL LENGTHS LISTED IN MATRIX ON SHEET 000-TG-001, ARE
APPROXIMATE. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED
LENGTHS PRIOR TO PURCHASE OF FACTOR TERMINATED CABLES. CONTRACTOR SHALL
PROVIDE 10' OF ADDITIONAL LENGTH AT EACH END AND 16' WITHIN EACH VAULT FOR
SERVICE LOOPS.
5. TERMINATE FIBER CABLING IN NEW FIBER PATCH PANELS IN TELECOMMUNICATION RACKS.
6. CONTRACTOR TO PROVIDE NEW J-HOOKS SIZED AS REQUIRED FOR ROUTING OF FIBER
OPTIC CABLE IN ACCESSIBLE SPACES AS SHOWN. PROVIDE ALL APPURTENANCES FOR
INSTALLATION OF J-HOOKS.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ON SITE.
8. PROVIDE 3/4" AC GRADE(OR BETER) PLYWOOD ON ALL WALLS IN TR ROOMS. PLYWOOD WILL
BE FIRE RETARDANT AND COATED WITH TWO COATS OF FIRE RETARDANT PAINT. THE
BOTTOM OF THE PLYWOOD SHOULD BE MOUNTED 6" AFF.
9. CONTRACTOR SHALL TRACE ALL PORTS LABELED "BLANK", "OPEN", "BAD", OR ANY PORTS
WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR PRICING PURPOSES, ASSUME A
MINIMUM OF 200FT OF CABLING TO EACH OUTLET.
10. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED EXACT
LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ON SITE.
11. CONTRACTOR TO PROVIDE ACCESS PANELS IN HARD CEILINGS AS REQUIRED.
12. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
13. FOR ENLARGED PLAN CALLOUTS WE ANNOTATED CURRENT ROOM NUMBER. FLOOR PLAN
ROOM NUMBERS SHOW LEGACY ROOM NUMBERS.PLAN NOTES
DN
UP
DN
(2)24-STR MM (OM4)
(2)12-STR SM (OS2)
4"C. DOWN TO 2ND FLR
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
05-TN-031
OVERALL THIRD FLOOR TELECOMM PLAN -
BLDG. 05
DJC AH
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 05 TELECOMM OVERALL PLAN - LEVEL 3
GENERAL NOTES
1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT SLEEVES TO BE
SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS CABLING THROUGH WALLS
AND NON ACCESSIBLE CEILING AREAS. CONDUIT SLEEVES SHALL BE HILTI SPEED SLEEVES.
CONDUIT SIZE IS TO BE AS NOTED.
2. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING CONCRETE
WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE-DRILLING, SEALING, AND
FIRE STOPPING AS REQUIRED.
3. ALL NEW FIBER SHALL BE REROUTED IN NEW INNERDUCT. INNERDUCT SHALL BE UTILIZED
FOR ROUTING FROM POINT OF ENTRY TO TERMINATION RACK AND SHALL UTILIZE NEW AND
EXISTING PATHWAYS AS REQUIRED.
4. ALL FIBER OPTIC CABLES ARE TO BE FIELD TERMINATED ON BOTH ENDS WITH SPLICE
CASSETTE CONNECTORS. ALL LENGTHS LISTED IN MATRIX ON SHEET 000-TG-001, ARE
APPROXIMATE. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED
LENGTHS PRIOR TO PURCHASE OF FACTOR TERMINATED CABLES. CONTRACTOR SHALL
PROVIDE 10' OF ADDITIONAL LENGTH AT EACH END AND 16' WITHIN EACH VAULT FOR
SERVICE LOOPS.
5. TERMINATE FIBER CABLING IN NEW FIBER PATCH PANELS IN TELECOMMUNICATION RACKS.
6. CONTRACTOR TO PROVIDE NEW J-HOOKS SIZED AS REQUIRED FOR ROUTING OF FIBER
OPTIC CABLE IN ACCESSIBLE SPACES AS SHOWN. PROVIDE ALL APPURTENANCES FOR
INSTALLATION OF J-HOOKS.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ON SITE.
8. PROVIDE 3/4" AC GRADE(OR BETER) PLYWOOD ON ALL WALLS IN TR ROOMS. PLYWOOD WILL
BE FIRE RETARDANT AND COATED WITH TWO COATS OF FIRE RETARDANT PAINT. THE
BOTTOM OF THE PLYWOOD SHOULD BE MOUNTED 6" AFF.
9. CONTRACTOR SHALL TRACE ALL PORTS LABELED "BLANK", "OPEN", "BAD", OR ANY PORTS
WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR PRICING PURPOSES, ASSUME A
MINIMUM OF 200FT OF CABLING TO EACH OUTLET.
10. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED EXACT
LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ON SITE.
11. CONTRACTOR TO PROVIDE ACCESS PANELS IN HARD CEILINGS AS REQUIRED.
12. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
13. FOR ENLARGED PLAN CALLOUTS WE ANNOTATED CURRENT ROOM NUMBER. FLOOR PLAN
ROOM NUMBERS SHOW LEGACY ROOM NUMBERS.
DN
UP
DN
B B B B B B
B B B B B B B B B B B B B B B B B B
B B
B B B B B B B
B B B B B B B B B B B B B B B B B B
B B
B B B B B B B
B B B B B B B B B B B B B B B B B B
B B
B B B B B B B
B B B B B B B B B B B B B B B B B B
B B
B
(2)24-STR MM (OM4)
(2)12-STR SM (OS2)
SEE SHEET 00-TN-042
FOR CONTINUATION
(2)24-STR MM (OM4)
(2)12-STR SM (OS2)
4"C.
(2)24-STR MM (OM4)
(2)12-STR SM (OS2)
4"C. DOWN TO 3RD FLR
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
05-TN-041
OVERALL FOURTH FLOOR TELECOMM
PLAN - BLDG. 05
DJC AH
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 05 TELECOMM PLAN 4TH FLR
GENERAL NOTES
1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT SLEEVES TO BE
SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS CABLING THROUGH WALLS
AND NON ACCESSIBLE CEILING AREAS. CONDUIT SLEEVES SHALL BE HILTI SPEED SLEEVES.
CONDUIT SIZE IS TO BE AS NOTED.
2. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING CONCRETE
WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE-DRILLING, SEALING, AND
FIRE STOPPING AS REQUIRED.
3. ALL NEW FIBER SHALL BE REROUTED IN NEW INNERDUCT. INNERDUCT SHALL BE UTILIZED
FOR ROUTING FROM POINT OF ENTRY TO TERMINATION RACK AND SHALL UTILIZE NEW AND
EXISTING PATHWAYS AS REQUIRED.
4. ALL FIBER OPTIC CABLES ARE TO BE FIELD TERMINATED ON BOTH ENDS WITH SPLICE
CASSETTE CONNECTORS. ALL LENGTHS LISTED IN MATRIX ON SHEET 000-TG-001, ARE
APPROXIMATE. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED
LENGTHS PRIOR TO PURCHASE OF FACTOR TERMINATED CABLES. CONTRACTOR SHALL
PROVIDE 10' OF ADDITIONAL LENGTH AT EACH END AND 16' WITHIN EACH VAULT FOR
SERVICE LOOPS.
5. TERMINATE FIBER CABLING IN NEW FIBER PATCH PANELS IN TELECOMMUNICATION RACKS.
6. CONTRACTOR TO PROVIDE NEW J-HOOKS SIZED AS REQUIRED FOR ROUTING OF FIBER
OPTIC CABLE IN ACCESSIBLE SPACES AS SHOWN. PROVIDE ALL APPURTENANCES FOR
INSTALLATION OF J-HOOKS.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ON SITE.
8. PROVIDE 3/4" AC GRADE(OR BETER) PLYWOOD ON ALL WALLS IN TR ROOMS. PLYWOOD WILL
BE FIRE RETARDANT AND COATED WITH TWO COATS OF FIRE RETARDANT PAINT. THE
BOTTOM OF THE PLYWOOD SHOULD BE MOUNTED 6" AFF.
9. CONTRACTOR SHALL TRACE ALL PORTS LABELED "BLANK", "OPEN", "BAD", OR ANY PORTS
WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR PRICING PURPOSES, ASSUME A
MINIMUM OF 200FT OF CABLING TO EACH OUTLET.
10. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED EXACT
LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ON SITE.
11. CONTRACTOR TO PROVIDE ACCESS PANELS IN HARD CEILINGS AS REQUIRED.
12. CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
13. FOR ENLARGED PLAN CALLOUTS WE ANNOTATED CURRENT ROOM NUMBER. FLOOR PLAN
ROOM NUMBERS SHOW LEGACY ROOM NUMBERS.
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY ALL CONDITIONS.
DN
UP
UP
DN
PMRS SCI EXAM
1M028
PMRS SCI EXAM
1M030
PMRS EXAM
1M036
PMRS EXAM
1M038
PMRS EXAM
1M040
PMRS EXAM
1M037
PMRS EXAM
1M039
PMRS EXAM
1M035
PMRS SCI EXAM
1M031
PMRS SCI EXAM
1M029 CONSULT
1M042
PROS EXAM
1M045
T
1M034
DRESS
1M044
CAST ROOM
1M076
PROS EXAM
1M043
PROS EXAM
1M047
PROS EXAM
1M049
ELEV EQUIP
1M015
MOLD ROOM
1M055
CLEAN LINEN
1M077
RESTR LAB
1M054
DUST ROOM
1M062
FUME ROOM
1M066
MAINT
1M064
LAB
1M056
LAB
1M058 LAB
1M060
WC PARTS
1M069
SEWING RM
1M052
CAD/CAM
1M075
P/O PARTS
1M057
WC REPAIR
1M068
SOIL HOLD
1M071
HK
1M073
SHOE
1M053
WC HOLDING
1M063
TRASH
1M072
TRTMT
1M112
BAR TRTMT
1M111
TRTMT
1M110
MAT AREA
1M114
NURSE STATION
1M033
PT OFFICE
1M137
PT OFFICE
1M142
CONF/ CLASSRM
1M143
RESID
1M135
RESID
1M131
RESID
1M132
RESID
1M129
RESID
1M128
RESID
1M134
RESID
1M130
RESID
1M133
SEC
1M125
COPY/ FAX
1M126
WAITING
1M124
TR
1M115A
STAFF LCKR
1M146 STAFF LOUNGE
1M147
WOMEN LCKR
1M161
MEN LCKR
1M156
REC OFFICE
1M154
REC OFFICE
1M153
CLEAN
1M160
POOL ROOM
1M162
OT GYM
1M113PT GYM
1M095
LINEN
1M108
WC ALC A
1M067
EQUIP STOR
1M061
MAIL AREA
1M074
TRTMT
1M107
BAR TRTMT
1M106
CERVICAL TRTMT
1M105
REC THER STOR
1M163
SOIL HOLD
1M158
DR
1M032B
DR
1M032A
DR
1M139
DR
1M140
DR
1M141
HK
1M109
MAIN STREET
1M019
HK
1M159
PROS CONF
1M093
AISLE C
1M144
ST
1M050
ELECTRO
1M046
WC ACTIVE
1M065
PROS OFFICE
1M080
CHIEF OFFICE
1M083
PURCH AGNT
1M085GAIT LANE
1M078
PROS OFFICE
1M081
SEC/ WAIT
1M079A
ST
1M121
STOR
1M082
MULTI-PUR RM
1M092
PURCH AGNT
1M087
PURCH AGNT
1M089
PURCH AGNT
1M091
PURCH AGNT
1M084
PURCH AGNT
1M086
COPY/ FAX
1M088
PURCH AGNT
1M090
CORR A
1M026
ST
1M148
NORM ELEC
1M014
EMER ELEC
1M013
NORM ELEC
1M116
POOL EQUIP
1M165
DEHUMIDIFICATION
EQUIP
1M164
FILE ROOM
1M127
SALON
1M024
FEMALE
1M016
MALE
1M017
PT/ OT ADMIN
1M103
UTILITY AREA
1M104
SOIL HOLD
1M097
DRESS
1M098
DRESS
1M099
CARDIO AREA
1M118
BAL QUEST
1M102
WC STOR
1M119A
OT STOR/ PAT PROJ
1M117
T
1M101
SUB WAIT
1M100
PT STOR
1M119
VESTIBULE
1M151
DR
1M138
WAITING
1M007
SERV ELEV LOBBY
1M122
MP-01
1M021A
STAIR M1
1M022
MS-03
1M123
STAIR M2
1M150
PROS REP
1M006
MEDS
1M048
BRAIN TRAIN
1M096
CHUTE ROOM
1M149
LOBBY
1M152
CORR C
1M041
CORR D
1M059
AISLE
1M079
AISLE B
1M051
AISLE A
1M094
AISLE
1M136
CORR
1M010
CORR
1M018
CORR C
1M027
CORR D
1M070
STOR
1M157
RECEP
1M155
CORR A
1M120
T
1M025A
STOR
1M025B
SANCTUARY
1M023
ADMIN WKRM
1M005A
SUNDRY SHOP
1M025
CHECK OUT
1M005B
CHECK OUT
1M005D
STOR
1M023A
RECEPT
1M004
FAMILY T
1M011
ST
1M145
SECUR DESK
1M003
ENTRY
1M002
VESTIBULE
1M001
WC ALC
1M012
MP-02
1M021B
PUB ELEV LOBBY
1M020
LVSR
1M115
STAFF COURT
1M147A
PASS
1M005C
CORR A
1M151A
06-TD-011
(E)CABLE TRAY
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
TR
1M115A
(E)SBB
(E)1M240-RK4
(E)1M240-RK3
(E)1M240-RK2
(E)1M240-RK1
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
06-TD-011
OVERALL FIRST FLOOR TELECOMM
DEMOLITION PLAN - BLDG. 06
DJC AH
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 06 TELECOMM OVERALL DEMOLITION PLAN - LEVEL 1
DEMOLITION GENERAL NOTES
1 VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN THE
CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2 DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE BY OWNER.
3 COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH ARCHITECTURAL.
4 CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
5 IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE.
6 CONTRACTOR SHALL TRACE ALL PORTS LABELED "BLANK", "OPEN", "BAD" OR ANY PORTS
WITHOUT AN ADDRESS IN EXISTING PATCH PANELS AND VERIFY AN OUTLET. FOR PRICING
PURPOSES ASSUME A MINIMUM OF 200FT OF CABLING TO EACH OUTLET.
7 IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE.
PLAN NOTES
1 EXISTING COMMUNICATIONS 2-POST RACK TO REMAIN.
1/4" = 1'-0"2
ENLARGED TELECOMM DEMO PLAN - TR 1M240
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY ALL CONDITIONS.
DN
UP
UP
DN
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
TR
2M066A
PAT
2M021
BAR PAT
2M019
PAT
2M108
MEDS
2M016
PANTRY
2M004
MULTI-PUR
2M003
EQUIP
2M034
QUIET/ DEN
2M032
CARE TEAM
2M061
BAR PAT
2M099
ISO PAT
2M020
T
2M021A T
2M022A
PAT
2M022
PAT
2M023
PAT
2M024
PAT
2M025
PAT
2M026
PAT
2M115
PAT
2M114
PAT
2M112
PAT
2M111 PAT
2M110
T
2M108A
CARE TEAM
2M065
BAR T
2M099A
ISO PAT
2M101
QUIET/ DEN
2M121
LAUN
2M012
VT
2M015
NOUR
2M030
VEST
2M031
CORR E
2M018
VEST
2M120
LIVING/DINING
2M116
CORR E
2M107
ACAD WKRM
2M062
LAUN
2M037
QUIET/ DEN
2M057
QUIET/ DEN
2M094
ACAD WKRM
2M064
PHY THER
2M128
CONF/ CLASSRM
2M142
SOC WORK
2M137
DIETITIAN
2M136
MDS COORD
2M139
PANTRY
2M127A
NURSE MAN
2M138
MED DIR
2M132
THERAPIST
2M128A
VEST
2M093
LIVING/DINING
2M052
VEST
2M056
HK
2M055
PAT
2M046
CORR E
2M043
CLEAN LINEN
2M010A
LIVING/DINING
2M090
SOIL
2M008
MEDS
2M041
NOUR
2M053
VT
2M054
CLEAN LINEN
2M035A
LIVING/DINING
2M029
CORR B
2M001
CORR E
2M079
WC ALC B
2M059
WC ALC B
2M125
CORR B
2M063
T
2M024A
T
2M023A
T
2M026A
T
2M025A
T
2M028A
T
2M027A
PAT
2M027
PAT
2M028
PAT
2M113
T
2M114A
T
2M115A
T
2M112A
T
2M113A
T
2M110A
T
2M111A
T
2M020A
BAR PAT
2M080
BAR PAT
2M044
PAT
2M040
ISO PAT
2M045
T
2M081A
ISO PAT
2M081
PAT
2M082
PAT
2M083
PAT
2M084
PAT
2M085
PAT
2M051
T
2M088A
PAT
2M050
PAT
2M049
PAT
2M048
PAT
2M047
BAR T
2M044A
BAR T
2M080A
T
2M040A
PAT
2M038
T
2M083A
T
2M082A
T
2M085A
T
2M084A
T
2M087A
T
2M086A
PAT
2M086
PAT
2M087
PAT
2M088
T
2M050A T
2M051A
T
2M048A
T
2M049AT
2M046A
T
2M047A
VT
2M118
HK
2M103
SOIL
2M070
MEDS
2M106
NOUR
2M117
EMER ELEC
2M119
CLEAN LINEN
2M097A
VT
2M092
MEDS
2M078
LAUN
2M074A
NOUR
2M091 CLEAN LINEN
2M074
HK
2M073
PAT
2M109
T
2M126
HK
2M011
T
2M109A
LAUN
2M102
NORM ELEC
2M007
EMER ELEC
2M009
CARE GIVER
2M014
CG
2M039
T
2M045A
PAT
2M089
T
2M089A
CG
2M076
ASST MAN
2M140
STOR
2M134A
CG
2M104
BAR T
2M019A
EXTERIOR COURTYARD
2M033
EXTERIOR COURTYARD
2M122
EXTERIOR COURTYARD
2M058
EXTERIOR COURTYARD
2M095
RECEP
2M002
ST
2M098
ST
2M017
MP-01
2M005A
STAIR M1
2M006
STAIR M2
2M124
SERV ELEV LOBBY
2M067
MS-03
2M068
CLEAN
2M013
EQUIP
2M096
ST
2M075
CHUTE ROOM
2M069
CLEAN
2M100
CLEAN
2M072
CORR B
2M123
VT
2M002A
COPY/ FAX
2M133
FOOD PREP
2M060
FOOD PREP
2M030A
LOUNGE
2M143
MULTI-PUR
2M127
ST
2M130
CORR G
2M129
DR OFFICE 1
2M141
DR OFFICE 2
2M135
T
2M101A
T
2M038A
CLEAN
2M036
ST
2M042
CORR F
2M010
CORR F
2M097
CORR F
2M071
CORR F
2M035
MP-02
2M005B
LVSR
2M066
OUT TER
2M143A
STOR
2M131
SEC
2M134
06-TD-021
(E)CABLE TRAY
(E)SBB
(E)2M252-RK3
TR
2M066A
(E)2M252-RK2
(E)2M252-RK1 1
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
06-TD-021
OVERALL SECOND FLOOR TELECOMM
DEMOLITION PLAN - BLDG. 06
DJC AH
VA NEW ORLEANS (EHRM) ELECTRONIC
HEALTH RECORD MODERNIZATION
INFRASTRUCTURE UPGRADES
2400 CANAL STREET, NEW ORLEANS, LA 70119
FINAL BID DOCUMENTS 629-22-700
3/32" = 1'-0"1
BLDG. 06 TELECOMM OVERALL DEMOLITION PLAN - LEVEL 2
DEMOLITION GENERAL NOTES
1 VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN THE
CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2 DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE BY OWNER.
3 COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH ARCHITECTURAL.
4 CONTRACTOR SHALL BE RESPONSIBLE TO TEMPORARILY MOVE AND RETURN FURNITURE,
FIXTURES, AND EQUIPMENT WITHIN SPACES AS REQUIRED TO COMPLETE EACH DAY'S
WORK. THE VA WILL REMOVE, OR SECURE, PHI, PPI, AND PERSONAL PROPERTY.
COORDINATE THIS WORK WITH THE COR.
5 IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE.
6 CONTRACTOR SHALL TRACE ALL PORTS LABELED "BLANK", "OPEN", "BAD" OR ANY PORTS
WITHOUT AN ADDRESS IN EXISTING PATCH PANELS AND VERIFY AN OUTLET. FOR PRICING
PURPOSES ASSUME A MINIMUM OF 200FT OF CABLING TO EACH OUTLET.
7 IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY. CONTRACTOR IS
RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE.
PLAN NOTES
1 EXISTING COMMUNICATIONS 2-POST RACK TO REMAIN.
1/4" = 1'-0"2
ENLARGED TELECOMM DEMO PLAN - TR 2M252
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY ALL CONDITIONS.
DN
UP
UP
DN
NORTH
KEY PLAN
KEY PLAN
Q B
C
D
E
F
G
J
H
K
L M
P
N
S H
O T
G U
N
F
IS
H E
R
ON CALL ROOM
3M079
MULTI-PUR
3M074
PANTRY
3M074A
MECH ROOM
3M081
CORR B
3M001
LOUNGE/ LOCKERS
3M078
CORR
3M071
OUTDOOR TERRACE
3M037
ASST. MANG.
3M073
PANTRY
3M004
MULTI-PUR
3M003
QUIET/ DEN
3M034
CARE TEAM
3M036
BAR T
3M021A
QUIET/ DEN
3M069
VEST
3M033
CORR
3M020
VEST
3M068
LIVING/DINING
3M064
CORR
3M055
LIVING/DINING
3M031
HK
3M051
SOIL
3M010
NORM ELEC
3M009
EMER ELEC
3M011
TR
3M040A
T
3M076
MEDS
3M018
EQUIP
3M044
LAUN
3M014
VT
3M017
NOUR
3M032
CLEAN LINEN
3M012A
HK
3M013
CG
3M016
PAT
3M023
BAR PAT
3M021
PAT
3M056ISO PAT
3M022
T
3M023A
T
3M024A
PAT
3M024
PAT
3M025
PAT
3M026
PAT
3M027
PAT
3M028
PAT
3M063
PAT
3M062
PAT
3M060
PAT
3M059
PAT
3M058
T
3M056A
T
3M026A
T
3M025A
T
3M028A
T
3M027A
T
3M030A
T
3M029A
PAT
3M029
PAT
3M030
PAT
3M061
T
3M062A
T
3M063A
T
3M060A
T
3M061A
T
3M058A
T
3M059A
T
3M022A
PAT
3M057
T
3M057A
ACAD WKRM
3M039
VT
3M066
MEDS
3M054
NOUR
3M065
NORM ELEC
3M067
CLEAN LINEN
3M045A
LAUN
3M050
CG
3M052 T
3M049A
BAR PAT
3M047
BAR T
3M047A
ISO PAT
3M049
SERV ELEV LOBBY
3M041
ST
3M046
ST
3M019
STAIR M1
3M006
MP-01
3M005A STAIR M2
3M072
MS-03
3M042
CLEAN
3M015
T/SHWR
3M079A
CLEAN
3M048
WC ALC B
3M007
EQUIP
3M008
CHUTE ROOM
3M043
FOOD PREP
3M032A
VT
3M002A
CORR F
3M012
CORR F
3M045
OUTDOOR TERRACE
3M035
OUTDOOR TERRACE
3M070
MP-02
3M005B
LVSR
3M040
ST
3M080
WC ALC B
3M075
PASS
3M077
TR
3M104
06-TD-031
06-TD-031
(E)CABLE TRAY
(E)CABLE TRAY
(E)SBB
(E)3M104-RK3
TR
3M104
(E)3M104-RK2
(E)3M104-RK11
(E)SBB
(E)3M252-RK3
(E)3M252-RK2
(E)3M252-RK1
TR
3M040A
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
CONSULTANTS
FOR OFFICIAL USE ONLY (FOUO)
04-25-2023
FULLY
SPRINKLED
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Kramer Gehlen & Associates Structural Engineers 400 Columbia St., Suite 240, Vancouver, WA 98660 Vancouver
10% BASIS OF DESIGN 07.08.2022
35% SCHEMATIC DESIGN 11.10.2022
65% DESIGN DEVELOPMENT 01.13.2023
95% CONSTRUCTION DOCUMENTS 03.17.2023 GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
TERP consulting Fire + Life Safety
14241 E. 4th Avenue, Suite 5-230 Aurora CO, 80011
FINAL BID DOCUMENTS 04.25.2023
A u to d e s k D o c s /2
-0
N e w O rl e a n s
E H
R M
/2 -0
N
O L
A E
H R
M
C O
N C
O U
R S
E
E le c I n t-
R
.r v t
06-TD-031
OVERALL THIRD FLOOR TELECOMM
DEMOLITION PLAN - BLDG. 06
DJC AH
VA NEW ORLEANS…