This is an amendment (Amendment 0005, Addendum No. 2 R1) to the contract documents for DENA 332037, the Eielson Visitor Center Rehabilitation project at Denali National Park and Preserve, Alaska. The amendment is dated September 20, 2026, and is issued by Design Alaska, Inc. under contract number 140P2026R0087.
The amendment modifies three elements of the contract documents. First, it replaces the existing Submittal List with a new version dated July 20, 2026 R1. Second, it revises Section 26 05 19, Paragraph 3.2.Q of the specifications to clarify that multi-wire branch circuits shall not be provided for new or replacement branch-circuit wiring, though existing multi-wire branch circuits may remain or be reused if brought into compliance with applicable National Electrical Code (NEC) requirements. Third, it modifies General Sheet Note A on drawings E201/E202 to specify that where light fixtures and control switches are replaced on a one-for-one basis, existing branch circuiting may be reused, but if existing multi-wire circuits are encountered, the contractor must ensure NEC compliance through an approved handle tie operating adjacent circuit breakers simultaneously and any necessary rearrangement of circuit breakers. For lighting fixtures and switches not replaced on a one-for-one basis, the contractor must remove and replace branch circuiting to accommodate new locations. All other terms and conditions of the contract remain unchanged.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design Alaska, Inc. Page 1 of 1
140P2026R0087
AMENDMENT 0005
DENA 332037 Rehabilitation of the Eielson Visitor Center
Denali National Park and Preserve
September 20, 2026
DENA 332037
Eielson Visitor Center Rehabilitation Denali National Park and Preserve, Alaska
Re: Addendum No. 2 R1
The Contract Documents for DENA 332037, Eielson Visitor Center Rehabilitation, Denali National Park and Preserve, Alaska, are hereby amended as set forth below. All other terms and conditions remain unchanged.
ADDENDA No. 2
Item No. Reference Change
GENERAL
AD2.1 Submittal List REPLACE the existing Submittal List with the accompanying Submittal List dated July 20, 2026 R1.
SPECIFICATIONS
AD2.2 Section 26 05 19, Paragraph 3.2.Q
CHANGE Sentence 2 to read:
"Multi-wire branch circuits shall not be provided for new or replacement branch-circuit wiring. Existing multi-wire branch circuits permitted to remain or be reused may remain where brought into compliance with applicable NEC requirements."
DRAWINGS
AD.2.3 E201 / E202 CHANGE General Sheet Note A to read:
A. Where light fixtures and control switches are replaced on a one-for-one basis, the existing branch circuiting may be reused. If existing multi-wire circuits are encountered, the contractor shall ensure NEC compliance by provision of an approved handle tie to operate adjacent circuit breakers simultaneously, including any rearrangement of circuit breakers to ensure adjacency. For other lighting fixtures and switches that are not replaced on a one-for-one basis, remove and replace branch circuiting to accommodate new light fixtures and/or switch locations.
END OF ADDENDUM #2