23_Q_A_6_Submittal_List_2026-07-20_Amendment_0004_0004.xlsx
XLSX spreadsheet 59 KB Posted
- Attached to
- DENA 332037 Eielson Roof Replacement
- Solicitation number
- 140P2026R0087
About this file
This is a Submittal List with Review Estimate template developed by the National Park Service Denver Service Center for construction document and construction phase project management. The template is specifically populated for PMIS Project 227793, titled "Replace Roof at the Eielson Visitor Center," and establishes comprehensive submittal requirements and review time estimates for the Architect/Engineer (A/E) during construction services.
The document identifies two primary responsible parties: the Design A/E during the Construction Documents (CD) phase and the Construction Contracting Officer Representative (COR) during the Construction phase. The template categorizes submittals as either Action submittals (requiring Government responsive review) or Informational submittals (reviewed by Construction Management Representative only). It establishes detailed submittal requirements across 45 specification sections encompassing structural systems (concrete, masonry, structural steel, metal fabrications), building envelope components (roof panels, bituminous membrane roofing, sheet metal flashing, sealants), interior finishes (gypsum board, flooring, painting), and MEP systems (HVAC, fire suppression, plumbing, electrical). For each submittal, the template requires identification of specification section, paragraph number, description, and submittal category, with corresponding review time estimates measured in hours by discipline (Architect, Civil Engineer, Structural Engineer, Mechanical Engineer, Electrical Engineer, Project Manager, Landscape Architect). The A/E's estimated review hours are applied against IDIQ contract hourly rates to formulate the Government's cost estimate for submittal review services to be incorporated into the A/E Construction Services task order negotiation.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Submittal List with Review Estimate Instructions | |
| National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21 | |
| DESIGN SERVICES (Construction Documents (CD) Phase) | |
| Responsible Party: Design Architect/Engineer (A/E) | |
| 1 | Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title. |
| 2 | Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals. |
| 3 | In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals. |
| 4 | Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page. |
| CONSTRUCTION SERVICES (Construction Phase) | |
| Responsible Party: Construction Contracting Officer Representative (COR) | |
| 1 | Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary. |
| 2 | Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services. |
| 3 | Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline. |
| 4 | Add discipline heading column as required. |
| 5 | Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews. |
| 6 | Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order. |
| 7 | Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative. |
| Responsible Party: Architect/Engineer (A/E) | |
| 1 | Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section. |
| 2 | All Informational submittals will be reviewed by Construction Management Representative (CMR). |
| 3 | Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate. |
| 4 | Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order. |
&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N
Template
| Submittal List with Review Estimate Template |
| National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21 |
| SUBMITTAL LIST | ACTION SUBMITTAL | |||||||||
| REVIEW ESTIMATE | ||||||||||
| Park Acronym/Project Management Information System (PMIS) Number: | 227793 | (Complete this portion for Architect / Engineer (A/E) | ||||||||
| Project Title: | Replace Roof at the Eielson Visitor Center | construction service task order negotiation.) | ||||||||
| SUBMITTAL | REQUIREMENTS | ARCHITECT / ENGINEER REVIEW TIME | ||||||||
| (Indicate with X) | (Indicate in whole or partial hours.) | |||||||||
| INFORMATIONAL | ACTION | |||||||||
| SPECIFICATION SECTION | PARAGRAPH NUMBER | DESCRIPTION | CERTIFICATIONS OR LABORATORY TESTS | REPORTS OR CALCULATIONS | ||||||
| OR PLAN | MANUFACTURER DATA | |||||||||
| AND INSTRUCTIONS | OTHER | SAMPLES | SHOP DRAWINGS | MANUFACTURER DATA | ||||||
| AND INSTRUCTIONS | OTHER | ARCHITECT | CIVIL ENGINEER | STRUCTURAL ENGINEER | MECHANICAL ENGINEER | ELECTRICAL ENGINEER | PROJECT MANAGER COORDINATION | LANDSCAPE ARCHITECT |
| 01 31 00 | Project Management and Coordination | ||
| 1 | 1.3.A | Coordination Drawings | X |
| 01 32 16 | Construction Schedule | ||
| 1 | 1.3.B | Schedule of Values | X |
| 2 | 1.3.C | Critical Path Method (CPM) Reports | X |
| 3 | 1.3.D | Construction Schedule | X |
| 01 32 33 | Photo Documentation | ||
| 1 | 1.2.B | Complete Set of Digital Images | X |
| 01 35 13.22 | Archeological Requirements | ||
| 1 | 1.3.A | Work Schedule in Archeologically Sensitive Areas | X |
| 01 35 23 | Safety Requirements | ||
| 1 | 1.3.A | Accident Prevention Plan | X |
| 01 40 00 | Quality Requirements | |||
| 1 | 1.4.A | Quality Control Plan | X | |
| 2 | 1.4.B | Qualification Data | X | |
| 3 | 1.4.H | Permits, Licenses, and Certificates | X |
| 01 57 23 | Temporary Storm Water Pollution Prevention | |||
| 1 | 1.3.A.1 | UPPP | X | |
| 2 | 1.3.B | Inspection Schedule: Pollution Prevention Measures | X | |
| 3 | 1.3.C | Inspection Schedule: Storm Water Pollution Prevention Measures | X | |
| 4 | 1.3.D | Erosion Control Products | X |
| 01 67 00 | Product Requirements | ||
| 1 | 1.3.A | Record Submittals | X |
| 01 73 29 | Cutting and Patching | ||
| 1 | 1.2.A | Cutting and Patching Plan | X |
| 01 73 40 | Execution | |||
| 1 | 1.2.A | Location and Elevation Certificates | X | |
| 2 | 1.2.B | Landfill Receipts | X |
| 01 74 19 | Construction Waste Management and Disposal | |||
| 1 | 1.4.A | Waste Management Plan | X | |
| 2 | 1.4.B | Project Waste Management Plan Worksheet | X |
| 01 77 00 | Closeout Procedures | ||||
| 1 | 1.3.A.1 | Specific Warranties, Guarantees, etc. | X | ||
| 2 | 1.3.A.2 | Project Record Documents | X | ||
| 3 | 1.3.A.3 | Environmental Record Documents | X | ||
| 4 | 1.3.A.4 | Posted Operating Instructions | X | ||
| 5 | 1.3.A.5 | Tools/Spare Parts | X | ||
| 6 | 1.3.A.6 | TAB Report | X |
| 01 78 23 | Operation and Maintenance Data | ||
| 1 | 1.2.A | O&M Manual | X |
| 02 41 19 | Selective Demolition | |||
| 1 | 1.5.A | Engineering Survey | X | |
| 2 | 1.5.B | Proposed Protection Measures | X | |
| 3 | 1.5.C | Schedule of Selective Demolition Activities | X | |
| 4 | 1.5.D | Predemolition Photographs or Video | X | |
| 5 | 1.5.E | Statement of Refrigerant Recovery | X | |
| 6 | 1.5.F | Warranties | X | |
| 7 | 1.6.A | Inventory | X |
| 03 30 00 | Cast-In-Place Concrete | ||||
| 1 | 1.3.A.1, 2.2 | Steel Reinforcing | X | ||
| 2 | 1.3.A.2, 2.6 | Admixtures | X | ||
| 3 | 1.3.B | Design Mixtures | X | ||
| 4 | 1.3.C.1 | Cold‐Weather Placement Plan | X | ||
| 5 | 1.3.C.2 | Cold‐Weather Protection Plan | X | ||
| 6 | 1.3.D.1 | Material Certificates for Cementitious Materials | X | ||
| 7 | 1.3.D.2 | Material Certificates for Admixtures | X | ||
| 8 | 1.3.D.3 | Material Certificates for Steel Reinforcement And Accessories | X | ||
| 9 | 1.3.E.1 | Concrete Testing Reports | X | ||
| 10 | 1.3.E.2 | Cold Weather Temperature Reports | X |
| 04 81 00 | Unit Masonry Assemblies | |||||
| 1 | 1.3.A, 2.1 | Concrete Masonry Unit (CMUS) | X | |||
| 2 | 1.3.A, 2.2 | Mortar and Grout | X | |||
| 3 | 1.3.A, 2.3.A | Uncoated Steel Reinforcing Bars | X | |||
| 4 | 1.3.A, 2.4.A | Unit Type Inserts in Concrete | X | |||
| 5 | 1.3.A, 2.4.B | Anchor Bolts | X | |||
| 6 | 1.3.A, 2.4.C | Postinstalled Anchors | X | |||
| 7 | 1.3.B.1 | Masonry Units Shop Drawings | X | |||
| 8 | 1.3.B.2 | Reinforcing Steel Shop Drawings | X | |||
| 9 | 1.3.B.3 | Fabricated Flashing Shop Drawings | X | |||
| 10 | 1.4.C | Qualification Data for Testing Agency | X | |||
| 11 | 1.4.D | Mix Designs for Each Type of Mortar and Grout | X | |||
| 12 | 1.4.E | Cold Weather Procedures | X |
| 05 12 00 | Structural Steel Framing | ||||
| 1 | 1.3.A, 2.3 | Primer | X | ||
| 2 | 1.3.B | Shop Drawings | X | ||
| 3 | 1.3.C | Qualification Data for Installer | X | ||
| 4 | 1.3.C | Qualification Data for Fabricator | X | ||
| 5 | 1.3.C | Qualification Data for Testing Agency | X | ||
| 6 | 1.3.D | Welding Certificates | X | ||
| 7 | 1.3.E | Mill Test Reports for Structural Steel | X | ||
| 8 | 1.3.F.1 | Product Test Report for Bolts, Nuts, and Washers | X | ||
| 9 | 1.3.F.2 | Product Test Report for Tension-Control, High Strength Bolt-Nut-Washer Assemblies | X |
| 05 31 00 | Steel Decking | ||
| 1 | 1.2.A.1, 2.2.A | Roof Deck | X |
| 2 | 1.2.A.2, 2.3.B | Mechanical Fasteners | X |
| 3 | 1.2.A.3 | Sidelap Fasteners | X |
| 4 | 1.2.A.4, 2.3.D | Galvanizing Repair Paint | X |
| 05 40 00 | Cold Formed Metal Framing | |||
| 1 | 1.2.A.1, 2.3.A | Exterior Non-Load-Bearing Wall Framing: Steel Studs | X | |
| 2 | 1.2.A.1, 2.3.B | Exterior Non-Load-Bearing Wall Framing: Steel Track | X | |
| 3 | 1.2.A.1, 2.3.C | Exterior Non-Load-Bearing Wall Framing: Single Deflection Track | X | |
| 4 | 1.2.A.1, 2.4.A | Exterior Soffit and Roof Frame | X | |
| 5 | 1.2.A.1, 2.4.B | Exterior Soffit and Roof Framing: Steel Track | X | |
| 6 | 1.2.A.1, 2.6.A | Steel Shapes and Clips | ||
| 7 | 1.2.A.1, 2.6.B | Screw Anchors | ||
| 8 | 1.2.A.1, 2.6.C | Mechanical Fasteners | ||
| 9 | 1.2.A.1, 2.7.A | Galvanizing Repair Paint | ||
| 10 | 1.2.A.2 | Vertical Deflection Clips | X | |
| 11 | 1.2.B.1 | Steel Sheet Test Reports | X | |
| 12 | 1.2.B.2 | Power‐Actuated Anchors Test Reports | X | |
| 13 | 1.2.B.3 | Mechanical Fasteners Test Reports | X |
| 05 50 00 | Metal Fabrications | |||||
| 1 | 1.3.A.1, 2.3.B | Steel Bolts and Nuts | X | |||
| 2 | 1.3.A.1, 2.3.C | High‐Strength Bolts, Nuts, and Washers | X | |||
| 3 | 1.3.A.1, 2.3.D | Stainless Steel Bolts and Nuts | X | |||
| 4 | 1.3.A.1, 2.3.E | Anchor Bolts | X | |||
| 5 | 1.3.A.1, 2.3.G | Cast‐in‐Place Anchors in Concrete | X | |||
| 6 | 1.3.A.1, 2.3.H | Post‐Installed Anchors | X | |||
| 7 | 1.3.A.2, 2.4.B | Universal Shop Primer | X | |||
| 8 | 1.3.A.2, 2.4.C | Water‐Based Primer | X | |||
| 9 | 1.3.A.2, 2.4.D | Epoxy Zinc‐Rich Primer | X | |||
| 10 | 1.3.A.2, 2.4.E | Shop Primer for Galvanized Steel | X | |||
| 11 | 1.3.A.2, 2.4.F | Galvanizing Repair Paint | X | |||
| 12 | 1.3.A.2, 2.4.G | Bituminous Paint | X | |||
| 13 | 1.3.A.3, 2.4.H | Shrinkage‐Resisting Grout | X | |||
| 14 | 1.3.B | Shop Drawings | X | |||
| 15 | 1.3.C | Delegated Design Submittals | X | |||
| 16 | 1.4.A | Mill Certificates | X | |||
| 17 | 1.4.B | Welding Certificates | X | |||
| 18 | 1.4.C | Paint Compatibility Certificates | X |
| 06 10 00 | Rough Carpentry | ||
| 1 | 1.3.A, 2.2 | Dimension Lumber for Concealed Applications | X |
| 2 | 1.3.A, 2.4.A | Fasteners and Anchors | X |
| 06 11 00 | Interior Rough Carpentry | ||
| 1 | 1.3.A, 2.2 | Dimension Lumber for Concealed Applications | X |
| 2 | 1.3.A, 2.3 | Construction Panels | X |
| 3 | 1.3.A, 2.4 | Fasteners and Adhesives | X |
| 06 16 00 | Sheathing | ||
| 1 | 1.2.A, 2.1 | Wall Sheathing | X |
| 06 20 00 | Finish Carpentry | |||
| 1 | 1.3.A, 2.2.A | Hardwood Lumber | X | |
| 2 | 1.3.B | Shop Drawings | X |
| 06 41 00 | Architectural Wood Casework | |||
| 1 | 1.3.A, 2.7 | Panel Cores for Wood Veneer and HPDL Panels | X | |
| 2 | 1.3.A, 2.4 | Veneer Tape Edgebanding | X | |
| 3 | 1.3.A, 2.8 | Hardware | X | |
| 4 | 1.3.A, 2.9 | Accessory Components | X | |
| 5 | 1.3.B | Shop Drawings | X |
| 07 21 00 | Thermal Insulation | ||
| 1 | 1.2.A, 2.2.A | Molded (Expanded) Polystyrene Board Insulation, Type I | X |
| 07 21 19 | Foamed-In-Place Insulation | |||
| 1 | 1.2.A, 2.1.A | BE-3 Foamed-In-Place Insulation | X | |
| 2 | 1.2.B | Manufacturer's Installation Instructions | X |
| 07 41 13.16 | Standing Seam Metal Roof Panels | ||
| 1 | 1.2.A, 2.2 | Standing Seam Metal Roof Panels | X |
| 2 | 1.2.A, 2.3 | Substrate Board | X |
| 3 | 1.2.A, 2.4 | Vapor Retarder | X |
| 4 | 1.2.A, 2.5 | Roof Insulation | X |
| 5 | 1.2.A, 2.6.A | Aluminum Sheet | X |
| 07 52 16 | Styrene-Butadiene-Styrene (SBS) Modified Bituminous Membrane Roofing | ||||||
| 1 | 1.3.A, 2.3.A | Substrate Board | X | ||||
| 2 | 1.3.A, 2.3.B | Cover Board | X | ||||
| 4 | 1.3.A, 2.4.A | Extruded-Polystyrene Board Insulation | X | ||||
| 5 | 1.3.A, 2.4.B | Molded (expanded) Polystyrene Board Insulation: | X | ||||
| 6 | 1.3.A, 2.5.A | Modified Bituminous Membrane: Base Field Ply | X | ||||
| 7 | 1.3.A, 2.5.B | Modified Bituminous Membrane: Cap Ply | X | ||||
| 8 | 1.3.B | Shop Drawings | X | ||||
| 10 | 1.4.A.1 | Performance Requirement Certificate | X | ||||
| 11 | 1.4.A.2 | Special Warranty Certificate | X | ||||
| 12 | 1.4.B | Product Test Reports | X | ||||
| 13 | 1.4.C | Research Reports | X | ||||
| 14 | 1.4.D.1 | Fastener Pullout Test Reports | X | ||||
| 16 | 1.4.E | Field Quality-Control Reports | X | ||||
| 17 | 1.4.F | Sample Warranties | X | ||||
| 18 | 1.4.G | Maintenance Data | X |
| 07 62 00 | Sheet Metal Flashing and Trim | ||||
| 1 | 1.3.A, 2.1.A | Pre-Finished Galvanized Steel | X | ||
| 2 | 1.3.B | Shop Drawings | X | ||
| 3 | 1.3.C | Samples | X |
| 07 92 00 | Joint Sealant | |||
| 1 | 1.3.A, 2.3.A | Non-Staining Silicone Sealant | X | |
| 2 | 1.3.A, 2.3.B | Polyurethane Sealant | X | |
| 3 | 1.3.A, 2.3.C | Acrylic Emulsion Latex | X | |
| 4 | 1.3.A, 2.3.D | Silicone, S, NS, 50, NT | X | |
| 5 | 1.3.B | Color Cards for Selection | X |
| 09 21 16 | Gypsum Board Assemblies | ||
| 1 | 1.3.A, 2.1 | Gypsum Board Assemblies | X |
| 2 | 1.3.A, 2.2.D | Nonstructural Framing System Components | X |
| 3 | 1.3.A, 2.2.E | Partition Head to Structure Connections | X |
| 4 | 1.3.A, 2.3.B | Gypsum Wallboard | X |
| 5 | 1.3.A, 2.4.A | Acoustic Insulation | X |
| 6 | 1.3.A, 2.4.C | Finish Accessories | X |
| 7 | 1.3.A, 2.4.D | Joint Materials | X |
| 8 | 1.3.A, 2.4.E | Screws for Attachment to Steel Members Less Than 0.03 inch in Thickness | X |
| 9 | 1.3.A, 2.4.F | Screws for Attachment to Steel Members From 0.033 to 0.112 inch in Thickness | X |
| 09 51 00 | Acoustical Ceilings | ||
| 1 | 1.3.A, 2.3 | Acoustical Units | X |
| 2 | 1.3.A, 2.4 | Suspension Systems | X |
| 3 | 1.3.A, 2.5.A | Support Channels and Hangers | X |
| 09 65 00 | Resilient Sheet Flooring | ||||
| 1 | 1.3.B, 2.1.A | Linoleum Sheet Flooring | X | ||
| 2 | 1.3.B, 2.2.A | Resilient Base | X | ||
| 3 | 1.3.C | Selection Samples | X | ||
| 4 | 1.3.D | Verification Samples | X | ||
| 5 | 1.3.E | Maintenance Data | X |
| 09 68 13 | Tile Carpeting | ||||
| 1 | 1.3.A, 2.2 | Joint Layout Drawings | X | ||
| 2 | 1.3.A, 2.3.A | Manufacturer's Instructions | X | ||
| 3 | 1.3.A, 2.3.B | Concrete Subfloor Test Report | X |
| 09 91 23 | Interior Painting | ||||
| 1 | 1.3.A, 2.3.A | Paint I-OP | X | ||
| 2 | 1.3.A, 2.3.B | Paint I-OP-MD-DT | |||
| 3 | 1.3.B | Samples | X | ||
| 4 | 1.3.C | Manufacturer's Instructions | X |
| 09 93 00 | Staining and Transparent Finishing | |||
| 1 | 1.3.A, 2.3.A.1 | Finish on Wood - Trim: Stain | X | |
| 2 | 1.3.A, 2.3.A.2 | Finish on Wood - Trim: Top Coat | X | |
| 3 | 1.3.B | Manufacturer's Instructions | X |
| 12 36 00 | Countertops | |||
| 1 | 1.3.A, 2.1.A | Solid Surfacing Countertops | X | |
| 2 | 1.3.A, 2.2.A | Plywood for Supporting Substrate | X | |
| 3 | 1.3.A, 2.2.B | Adhesives | X | |
| 4 | 1.3.A, 2.2.C | Joint Sealant | X | |
| 5 | 1.3.B | Shop Drawings | X |
| 20 05 29 | Hangers and Supports For Mechanical | |||
| 1 | 1.2.A, 2.2.A | Non Insulated Pipe Hangers | X | |
| 2 | 1.2.A, 2.3 | Hanger Rods | X | |
| 3 | 1.2.A, 2.4 | Channel Struts | X | |
| 4 | 1.2.A, 2.5 | Steel Structure Attachments | X | |
| 5 | 1.2.B | Application Schedule | X | |
| 6 | 1.2.C.1 | Test Reports: Third Party | X | |
| 7 | 1.2.C.2 | Concrete Anchors Special Inspection Form | X |
| 20 07 00 | Insulation for Mechanical | |||
| 1 | 1.2.A, 2.1.C | Lagging Fabric | X | |
| 2 | 1.2.A, 2.1.D | Thermal Insulation Coatings | X | |
| 3 | 1.2.A, 2.1.E | Insulating Cement | X | |
| 4 | 1.2.A, 2.1.G | Plastic Insulation Covers | X | |
| 5 | 1.2.A, 2.1.H | Metal Jackets | X | |
| 6 | 1.2.A, 2.2.A.1 | Outside, Relief, Exhaust, and Combustion Air Duct Insulation: Rectangular Ductwork | X | |
| 7 | 1.2.A, 2.2.A.2 | Outside, Relief, Exhaust, and Combustion Air Duct Insulation: Round Ductwork | X | |
| 8 | 1.2.B | Application Schedule | X |
| 21 13 00 | Fire Suppression Sprinkler System | ||||
| 1 | 1.2.A, 2.1 | Piping and Fittings: Interior | X | ||
| 2 | 1.2.A, 2.2 | Sprinkler Heads | X | ||
| 3 | 1.2.A, 2.3 | Zone Isolation Valve Tags | X | ||
| 4 | 1.2.A, 2.4 | Fire Protection Backflow Preventer – Double Check Valve Assemblies | X | ||
| 5 | 1.2.A, 2.5 | Check Valve | X | ||
| 6 | 1.2.A, 2.6 | Isolation Valve | X | ||
| 7 | 1.2.A, 2.7 | Tamper Switch | X | ||
| 8 | 1.2.A, 2.8 | UL Listed Glycol Fire Protection Fluid | X | ||
| 9 | 1.2.B | Contractor Qualifications | X | ||
| 10 | 1.2.C | Shop Drawings and Calculations | X |
| 22 13 16 | Sanitary Waste and Vent Piping | |||
| 1 | 1.2.A, 2.2 | Vent Through Roof Flashing | X | |
| 2 | 1.2.B | Application Schedule | X |
| 22 13 19 | Sanitary Waste Piping Specialties | ||
| 1 | 1.2.A, 2.1.A | Floor Drains | X |
| 22 42 13 | Commercial Water Closets and Urinals | ||
| 1 | 1.2.A, 2.2 | Floor Mounted Water Closets | X |
| 2 | 1.2.A, 2.3 | Accessories | X |
| 23 05 00 | Common Work Results for HVAC | |||
| 1 | 1.2.A, 2.2.A | Thermometers | X | |
| 2 | 1.2.A, 2.3.A | Pressure Gauges | X | |
| 3 | 1.2.A, 2.4.A | Drain Valves | X | |
| 4 | 1.2.A, 2.7.A | Air Vents | X | |
| 5 | 1.2.A, 2.8.A | Dielectric Pipe Protection | X | |
| 6 | 1.2.A, 2.9.A | Escutcheons | X | |
| 7 | 1.2.A, 2.10.A | Flow Test Kit | X | |
| 8 | 1.2.B | Balance Valve Schedule | X |
| 23 05 93 | Testing, Adjusting and Balancing for HVAC | ||
| 1 | 1.2.A | Balancer Qualifications and Balancing Plan | X |
| 23 09 23 | Direct Digital Control Systems for HVAC | ||||
| 1 | 1.2.A, 1.2 | Contractor Qualifications | X | ||
| 2 | 1.2.A, 1.4 | BMS Software Function Index | X | ||
| 3 | 1.2.A, 1.5.E.1 | System Architecture Schematic | X | ||
| 4 | 1.2.A, 1.5.E.2 | Riser Diagram | X | ||
| 5 | 1.2.A, 1.5.E.3 | Control Valve Schedule | X | ||
| 6 | 1.2.A, 1.5.E.4 | Damper Actuator Schedule | X | ||
| 7 | 1.2.A, 1.5.E.5 | HRV Control Diagrams | X | ||
| 8 | 1.2.A, 1.5.E.6 | Terminal Unit Control Diagrams | X | ||
| 9 | 1.2.A, 1.5.E.7 | Miscellaneous Equipment Control Diagrams | X | ||
| 10 | 1.2.A, 1.5.E.8 | I/O Interface Diagrams | X | ||
| 11 | 1.2.A, 2.2 | Direct Digital Controllers | X | ||
| 12 | 1.2.A, 2.3 | Temperature Sensors | X | ||
| 13 | 1.2.A, 2.4 | Thermostats and Temperature Switches | X | ||
| 14 | 1.2.A, 2.5 | Other Switches | X | ||
| 15 | 1.2.A, 2.6 | Signal Conditioners | X | ||
| 16 | 1.2.A, 2.7 | Control Relays | X | ||
| 17 | 1.2.A, 2.8 | Control Valves | X | ||
| 18 | 1.2.A, 2.9 | Damper and Valve Actuators | X | ||
| 19 | 1.2.A, 2.11 | Panels | X |
| 23 21 13 | Hydronic Piping | ||
| 1 | 1.2.B | Application Schedule | X |
| 23 31 13 | HVAC Ducts and Casings | |||
| 1 | 1.2.A, 2.1.B | Duct Sealant | X | |
| 2 | 1.2.B | Shop Drawings: Special Fabrications | X | |
| 3 | 1.2.C | Shop Drawings: Substantial Deviations | X |
| 23 33 11 | Air Duct Accessories | ||
| 1 | 1.2.A, 2.2.A | Flexible Connections: Non-Insulated Ductwork | X |
| 2 | 1.2.A, 2.2.B | Flexible Connections: Insulated Ductwork | X |
| 3 | 1.2.A, 2.3 | Turning Vanes | X |
| 4 | 1.2.A, 2.4 | Spin-In Fittings | X |
| 5 | 1.2.B | Shop Drawings: Contractor Fabricated Items |
| 23 33 13 | Dampers | |||
| 1 | 1.2.A, 2.2.A | Backdraft Dampers | X | |
| 2 | 1.2.B | Shop Drawings: Contractor Fabricated Items | X |
| 23 33 56 | HVAC Louvers | ||
| 1 | 1.2.A, 2.1 | Louvers | X |
| 23 82 36 | Finned Tube Radiation | ||
| 1 | 1.2.A, 2.2.A | Bonderized Steel Enclosures | X |
| 2 | 1.2.A, 2.3 | Nonferrous Heating Elements | X |
| 3 | 1.2.A, 2.4.A | Enclosure Top Supports | X |
| 4 | 1.2.A, 2.5.A | Enclosure and Element Saddle Support Brackets | X |
| 5 | 1.2.A, 2.6.A | Elements Saddles | X |
| 26 27 26 | Wiring Devices and Plates | ||
| 1 | 1.2.A,B, 2.2 | Receptacles | X |
| 2 | 1.2.A,B, 2.3 | Plates | X |
| 26 30 00 | Facility Electrical Power Generating and Storing Equipment | |||||
| 1 | 1.4.A | Qualifications | X | |||
| 2 | 1.4.B | Shop Drawings | X | |||
| 3 | 1.4.C.1.a | Inverters | X | |||
| 4 | 1.4.C.1.b | Charge Controllers | X | |||
| 5 | 1.4.C.1.c | Batteries and Battery Rack System | X | |||
| 6 | 1.4.C.1.d | Resistive Dump Loads and Equipment | X | |||
| 7 | 1.4.D | Warranty Information | X | |||
| 8 | 1.5.E | O&M Manuals | X |
| 26 50 00 | Lighting | ||
| 1 | 1.2.A, 2.1 | Light Fixtures | X |
| 2 | 1.2.A, 2.5 | Exit Signs and Emergency Lighting Units | X |
| 26 51 02 | Lighting Control Devices | |||
| 1 | 1.2.A, 2.3 | Wired Wallbox Vacancy Sensors | X | |
| 2 | 1.2.A, 2.4 | Wired Occupancy Sensors | X | |
| 3 | 1.2.B | Manufacturer's Installation Instructions | X | |
| 4 | 1.2.C | Operation and Maintenance Data | X |
| 31 20 00 | Earth Moving | |||
| 1 | 1.3.A | Traffic Control Plan | X | |
| 2 | 1.4.A | Gradation Analyses | X | |
| 3 | 1.4.B | Modified Proctor Test Results | X | |
| 4 | 1.4.C | Compaction Test Results | x |
| 32 96 13 | Groundcover Transplanting | |||
| 1 | 1.5.A | Existing Conditions | X | |
| 2 | 1.6.a | Weed Free Certification | X |
| Drawings | |||||
| 1 | C301 | Geogrid Layout | X | ||
| 2 | C700 | Stone and Rock Samples | X | ||
| 3 | C700 | Mortar Sample | X | ||
| 4 | C700 | Resume of Masonry Supervisor | X |
Total: 0 0 0 0 0 0 0
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N
File details come from the government source that posted it. Updated .