05__Subcontracting_Percentage_Worksheet.pdf

PDF 173 KB Posted

Attached to
DENA 332037 Eielson Roof Replacement Federal contract opportunity
Solicitation number
140P2026R0087
Issued by
Department of the Interior National Park Service National Office

About this file

This document is a Subcontracting Percentage Worksheet template used by the National Park Service Denver Service Center to calculate compliance with FAR Clause 52.219-14 Limitations of Subcontracting.

The worksheet is designed to determine the subcontracting labor cost percentage for a prime contractor and its subcontractor(s). Users must input direct labor and fringe benefits for both the prime contractor and subcontractor, then calculate labor General and Administrative (G&A) costs by applying the G&A rate to the subtotal of direct labor and fringe benefits. The total labor costs are derived by adding labor G&A to the subtotal. The subcontracting labor cost percentage is then calculated using the formula: (D) / (C) + (D), where (D) represents the subcontractor's total labor costs and (C) represents the prime contractor's total labor costs. The worksheet includes footnotes specifying that fringe benefits and labor overhead must be allowable under FAR 31.205-6(m), that G&A denotes General and Administrative Costs, and that users should compare like figures when available. If subcontractor cost breakdowns are unavailable, the total subcontracting amount should be used for the calculation while the prime contractor's costs must still be broken down by category.

View the file

Other files for this federal contract opportunity

Other files attached to DENA 332037 Eielson Roof Replacement, newest first.
File Type Posted
Sol_140P2026R0087_Amd_0011.pdf PDF
32_Finalized_Q_and_A_amendment_011_responses_0011.pdf PDF
Sol_140P2026R0087_Amd_0010.pdf PDF
31_Finalized_Q___A_for_DENA_Amendment_0009_0009.pdf PDF
Sol_140P2026R0087_Amd_0009.pdf PDF
30_01_50_00_Temporary_Facilities_and_Controls_0008_0008.pdf PDF
Sol_140P2026R0087_Amd_0008.pdf PDF
29_Amendment_Summary_0008_0008.pdf PDF
28_DENA_332037_EVC_Rehabilitation_Addendum_2R1_0007.pdf PDF
27_Finalized_Q___A_for_DENA_Amendment_0005_0007.pdf PDF
Sol_140P2026R0087_Amd_0007.pdf PDF
25_DENA_332037_-_Pictures_0007.pdf PDF
26_DENA_332037_Submittal_List_2026-07-20_R1_0007.pdf PDF
Sol_140P2026R0087_Amd_0006.pdf PDF
D01_Amendment_0006_DENA_Roof_and_Interior_Repair_0006.pdf PDF
Sol_140P2026R0087_Amd_0005.pdf PDF
21_DENA_332037_-_EVC_Rehabilitation_Amendment_0004_0004.pdf PDF
Sol_140P2026R0087_Amd_0004.pdf PDF
23_Q_A_6_Submittal_List_2026-07-20_Amendment_0004_0004.xlsx XLSX spreadsheet
22_DENA_332037_Q_A_9_18_26_Amend_0004_0004.xlsx XLSX spreadsheet
Sol_140P2026R0087_Amd_0003.pdf PDF
12_07_52_16_SBS_Modified_Bituminous_Membrane_Roofing_-_Amendment_0003_0003.pdf PDF
07_01_26_01_Contract_Modification_Procedures_Pg_7_Amendment_0003_0003.pdf PDF
06_Specification_Index_-_Amendment_0003_0003.pdf PDF
13_12_36_00_Countertops_-_Amendment_0003_0003.pdf PDF
08_01_27_00_Definition_of_Contract_Line_Items_Amendment_0003_0003.pdf PDF
09_02_41_19_Selective_Demolition_Pg_1-3_Amednment_0003_0003.pdf PDF
11_05_50_00_Metal_Fabrications_-_Amendment_0003_0003.pdf PDF
16_31_20_00_Earth_Moving_-_Amendment_0003_0003.pdf PDF
19_DENA_332037_-_EVC_Rehabilitation_Addendum_01_-_Amendment_0003_0003.pdf PDF
20_Eielson_Visitor_Center_-_Fire_Sprinkler_As-Builts_-_Amendment_0003_0003.pdf PDF
10_02_85_00_Microbial_Remediation_-_Amendment_0003_0003.pdf PDF
14_21_13_00_Fire_Suppression_Sprinkler_System_-_Amendment_0003_0003.pdf PDF
15_26_30_00_Facility_Electrical_Power_Generating__-_Amendment_0003_0003.pdf PDF
17_32_96_13_Groundwater_Transplanting_-_Amendment_0003_0003.pdf PDF
18_Contract_Price_Schedule_(Fields_Blank)_Amendment_0003_0003.xlsx XLSX spreadsheet
Sol_140P2026R0087_Amd_0002.pdf PDF
Amendment_0002_0002.pdf PDF
Sol_140P2026R0087_Amd_0001.pdf PDF
DENA_332037_Final_Construction_Documents_Amendment_1_0001.pdf PDF
Amendment_1_DENA_332037_0001.pdf PDF
DENA_332037_As_Built_Drawings_0001.pdf PDF
Drawings_56-99.pdf PDF
1-55.pdf PDF
04_WD_AK20260001_May_17_2026.pdf PDF
01_DENA_332037_Final_Construction_Documents_07-20-2026.pdf PDF
Sol_140P2026R0087.pdf PDF
B08_FINAL_Solicitation_updated_7_31_26.pdf PDF
03__Final__Submittal_List_2026-06-12.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

Subcontracting Percentage Worksheet FAR Clause 52.219-14 Limitations of Subcontracting

Prime Contractor:__________________________ Source:________________________

Subcontractor:____________________________ Source:________________________

PRIME CONTRCTOR SUBCONTRACTOR

DIRECT LABOR $

FRINGE BEBFITS* $

SUBTOTAL (A)$ (B)$

LABOR G&A** @ % $ $

TOTAL LABOR COSTS (C)$ (D)$

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENFITS and enter these figures for the prime contractor is space (A) and for the subcontractor (if available?)*** in space (B)

Next, calculate the LABOR G&A frate by the subtotal figure in space (A).

Calculate the subcontractor’s LABOR G&A by multiplying the subcontractor’s G&A rate by the subcontractor’s SUBTOTAL figure in (B).

Add the LABOR G&A to the SUBTOTAL and record that figure in the space for TOTAL LABOR COSTS at (C) and (D) respectively.

Next, using the formula below, calculate the subcontracting labor percentage.

(D)

(C) + (D)

SUBCONTRACTING LABOR COST PERCENTAGE = ___________%

* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205-

6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

** G&A denotes General and Administrative Costs.

*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor’s costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor’s costs.

File details come from the government source that posted it. Updated .