18_Contract_Price_Schedule_(Fields_Blank)_Amendment_0003_0003.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
DENA 332037 Eielson Roof Replacement Federal contract opportunity
Solicitation number
140P2026R0087
Issued by
Department of the Interior National Park Service National Office

About this file

This is a Contract Price Schedule template developed by the National Park Service (NPS) Denver Service Center for the Rehabilitation of the Eielson Visitor Center at Denali National Park, Mile Post 66. The document (Solicitation Number PARK-PMIS 227793/332037) is a blank pricing template that requires offerors to submit pricing for both base line items and all option line items as a condition of proposal acceptability.

The template establishes six base contract line items for lump-sum pricing: (1) Replace Roof on the EVC Main Building, (2) New Lighting & Mitigate Entry of Wind-Driven Snow into Roof/Wall Assembly, (3) Exterior Doors Adjustments, Heating Modifications & Exterior Patio, (4) Hydro Interconnection/Plaza Reconfiguration, (5) Repair Interior Water Damage, and (6) Replace Roof on the EVC Utility Building. Additionally, the template includes unit-priced line items for mold/microbial growth remediation services: (7.a) Mold-Impacted Wall/Floor/Ceiling Assembly Remediation at 3,800 square feet and (7.b) Mold Containment/Mobilization/Clearance Event at 4 each. The document specifies that offerors must provide total prices for lump-sum items and both unit prices and extended total prices for unit-priced items, with all amounts rounded to whole dollars. The file also contains sample price schedule templates for Design-Bid-Build and Design-Build delivery methods, serving as reference formats for proposal submission. All measurement and payment information is referenced in Division 01 Specifications Section 01 27 00.

View the file

Other files for this federal contract opportunity

Other files attached to DENA 332037 Eielson Roof Replacement, newest first.
File Type Posted
Sol_140P2026R0087_Amd_0011.pdf PDF
32_Finalized_Q_and_A_amendment_011_responses_0011.pdf PDF
Sol_140P2026R0087_Amd_0010.pdf PDF
31_Finalized_Q___A_for_DENA_Amendment_0009_0009.pdf PDF
Sol_140P2026R0087_Amd_0009.pdf PDF
29_Amendment_Summary_0008_0008.pdf PDF
30_01_50_00_Temporary_Facilities_and_Controls_0008_0008.pdf PDF
Sol_140P2026R0087_Amd_0008.pdf PDF
28_DENA_332037_EVC_Rehabilitation_Addendum_2R1_0007.pdf PDF
27_Finalized_Q___A_for_DENA_Amendment_0005_0007.pdf PDF
Sol_140P2026R0087_Amd_0007.pdf PDF
25_DENA_332037_-_Pictures_0007.pdf PDF
26_DENA_332037_Submittal_List_2026-07-20_R1_0007.pdf PDF
Sol_140P2026R0087_Amd_0006.pdf PDF
D01_Amendment_0006_DENA_Roof_and_Interior_Repair_0006.pdf PDF
Sol_140P2026R0087_Amd_0005.pdf PDF
21_DENA_332037_-_EVC_Rehabilitation_Amendment_0004_0004.pdf PDF
Sol_140P2026R0087_Amd_0004.pdf PDF
23_Q_A_6_Submittal_List_2026-07-20_Amendment_0004_0004.xlsx XLSX spreadsheet
22_DENA_332037_Q_A_9_18_26_Amend_0004_0004.xlsx XLSX spreadsheet
08_01_27_00_Definition_of_Contract_Line_Items_Amendment_0003_0003.pdf PDF
09_02_41_19_Selective_Demolition_Pg_1-3_Amednment_0003_0003.pdf PDF
11_05_50_00_Metal_Fabrications_-_Amendment_0003_0003.pdf PDF
16_31_20_00_Earth_Moving_-_Amendment_0003_0003.pdf PDF
19_DENA_332037_-_EVC_Rehabilitation_Addendum_01_-_Amendment_0003_0003.pdf PDF
20_Eielson_Visitor_Center_-_Fire_Sprinkler_As-Builts_-_Amendment_0003_0003.pdf PDF
Sol_140P2026R0087_Amd_0003.pdf PDF
12_07_52_16_SBS_Modified_Bituminous_Membrane_Roofing_-_Amendment_0003_0003.pdf PDF
07_01_26_01_Contract_Modification_Procedures_Pg_7_Amendment_0003_0003.pdf PDF
06_Specification_Index_-_Amendment_0003_0003.pdf PDF
13_12_36_00_Countertops_-_Amendment_0003_0003.pdf PDF
10_02_85_00_Microbial_Remediation_-_Amendment_0003_0003.pdf PDF
14_21_13_00_Fire_Suppression_Sprinkler_System_-_Amendment_0003_0003.pdf PDF
15_26_30_00_Facility_Electrical_Power_Generating__-_Amendment_0003_0003.pdf PDF
17_32_96_13_Groundwater_Transplanting_-_Amendment_0003_0003.pdf PDF
Sol_140P2026R0087_Amd_0002.pdf PDF
Amendment_0002_0002.pdf PDF
Sol_140P2026R0087_Amd_0001.pdf PDF
DENA_332037_Final_Construction_Documents_Amendment_1_0001.pdf PDF
Amendment_1_DENA_332037_0001.pdf PDF
DENA_332037_As_Built_Drawings_0001.pdf PDF
01_DENA_332037_Final_Construction_Documents_07-20-2026.pdf PDF
Drawings_56-99.pdf PDF
1-55.pdf PDF
04_WD_AK20260001_May_17_2026.pdf PDF
05__Subcontracting_Percentage_Worksheet.pdf PDF
Sol_140P2026R0087.pdf PDF
B08_FINAL_Solicitation_updated_7_31_26.pdf PDF
03__Final__Submittal_List_2026-06-12.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Template

Contract Price Schedule Template
National Park Service (NPS) - Denver Service Center (DSC) | 7/31/2026
Solicitation Number:
PARK - PMIS:227793 | 332037
(Project Management Information System)
Developed Area:Denali National Park, Mile Post 66
Project Title:Rehabilitation of the Eielson Visitor Center
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Replace Roof On The EVC Main Building1Lump Sum
2New Lighting & Mitigate Entry of Wind-Drive Snow into Roof/Wall Assembly1Lump Sum
3Exterior Doors Adjustments, Heating Modifications & Exterior Patio1Lump Sum
4Hydro Interconnection/Plaza Reconfiguration1Lump Sum
5Repair Interior Water Damage1Lump Sum
6Replace Roof on the EVC Utility Building1Lump Sum
TOTAL BASE PRICE (Contract Line Item Number 1 through 7) ---------------------------------------------------------------------------------$0
7Government-stated units of measure for authorized mold/microbial growth remediation
7.a.Mold-Impacted Wall/Floor/Ceiling Assembly Remediation (Subject to Variation in Estimated Quantities)3800SF$0
7.b.Mold Containment / Mobilization / Clearance Event4EA$0
TOTAL PRICE FOR UNIT-PRICED QUANTITIES (Contract Line Item Number 7) -----------------------------------------------------------$0
TOTAL PROPOSED PRICE - BASE PLUS ALL UNIT PRICING (Contract Line Item Number 1 through 7) ------------------------------$0
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

Design-Bid-Build (DBB) Sample

Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Old Faithful
Project Title:Johnstonian Visitors Center
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Visitors Center1Lump Sum$0.00
2Water Line400Lineal Feet- 0
3Sanitary Sewer Line200Lineal Feet- 0
4Rock Excavation150Cubic Yards- 0
TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ---------------------------------------------------------------------------------$0.00
5OPTION A, Geothermal Wells1Lump Sum- 0
6OPTION B, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) -------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

Design-Build (DB) Sample

Contract Price Schedule - Design-Build (DB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Yosemite Valley
Project Title:Design and Build a New Structure
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Design1Lump Sum$0.00
2Construction1Lump Sum- 0
TOTAL BASE PRICE (Contract Line Item Number 1 and 2) ---------------------------------------------------------------------------------------$0.00
3OPTION A, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ----------------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.