This is a Submittal List with Review Estimate (R1) for a National Park Service construction project to replace the roof at the Eielson Visitor Center (PMIS Number 332037/227793). The document is a template used to outline all required submittals from the contractor to the Architect/Engineer (A/E) for review and approval during the construction phase of the project.
The submittal list comprehensively catalogs over 400 individual submission requirements organized by specification section and work trade. Submissions are classified as either informational or action items requiring A/E review, and include manufacturer data and instructions, certifications and laboratory test reports, calculations and plans, samples, and shop drawings. Key submission categories encompass project management coordination, construction scheduling, quality control, safety requirements, selective demolition procedures, cast-in-place concrete, structural and cold-formed steel, roofing systems (standing seam metal panels and SBS modified bituminous membranes), insulation, carpentry, finishes (gypsum board, acoustical ceilings, resilient flooring, painting), mechanical systems (HVAC, piping, sprinkler systems, controls), plumbing fixtures, electrical systems including lighting and power generation equipment, and site work including grading and groundcover. The document includes designated review time columns for architect, civil engineer, structural engineer, mechanical engineer, electrical engineer, project manager coordination, and landscape architect. The form is designed to be completed with estimated review hours for each submittal to facilitate project scheduling and resource planning.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL LIST R1 ACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number: (Complete this portion for Architect / Engineer (A/E)
Project Title: Replace Roof at the Eielson Visitor Center construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S O
R
LA
B
O R
A T
O R
Y T
E S
T S
R E
P O
R T
S O
R C
A
LC
U
LA
T
IO
N S
O R
P
LA
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
S A
M P
LE
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L
E N
G
IN
E E
R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E
LE
C T
R
IC
A L
E N
G
IN
E E
R
P R
O
JE
C T
M A
N A
G E
C
O R
D
IN
A T
IO
N
LA
N
D S
C A
P E
A R
C H
IT
E
C T
01 31 00 Project Management and Coordination
1 1.3.A Coordination Drawings X
01 32 16 Construction Schedule
1 1.3.B Schedule of Values X
2 1.3.C Critical Path Method (CPM) Reports X
3 1.3.D Construction Schedule X
01 32 33 Photo Documentation
1 1.2.B Complete Set of Digital Images X
01 35 13.22 Archeological Requirements
1 1.3.A Work Schedule in Archeologically Sensitive Areas X
01 35 23 Safety Requirements
1 1.3.A Accident Prevention Plan X
01 40 00 Quality Requirements
1 1.4.A Quality Control Plan X
2 1.4.B Qualification Data X
3 1.4.H Permits, Licenses, and Certificates X
01 57 23 Temporary Storm Water Pollution Prevention
1 1.3.A.1 UPPP X
2 1.3.B Inspection Schedule: Pollution Prevention Measures X
3 1.3.C Inspection Schedule: Storm Water Pollution Prevention Measures
X
4 1.3.D Erosion Control Products X
01 67 00 Product Requirements
1 1.3.A Record Submittals X
01 73 29 Cutting and Patching
1 1.2.A Cutting and Patching Plan X
01 73 40 Execution
1 1.2.A Location and Elevation Certificates X
2 1.2.B Landfill Receipts X
01 74 19 Construction Waste Management and Disposal
1 1.4.A Waste Management Plan X
2 1.4.B Project Waste Management Plan Worksheet X
01 77 00 Closeout Procedures
1 1.3.A.1 Specific Warranties, Guarantees, etc. X
2 1.3.A.2 Project Record Documents X
3 1.3.A.3 Environmental Record Documents X
4 1.3.A.4 Posted Operating Instructions X
5 1.3.A.5 Tools/Spare Parts X
6 1.3.A.6 TAB Report X
01 78 23 Operation and Maintenance Data
1 1.2.A O&M Manual X
02 41 19 Selective Demolition
1 1.5.A Engineering Survey X
2 1.5.B Proposed Protection Measures X
3 1.5.C Schedule of Selective Demolition Activities X
4 1.5.D Predemolition Photographs or Video X
5 1.5.E Statement of Refrigerant Recovery X
6 1.5.F Warranties X
332037 | 227793
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 1 of 6
Park Acronym/Project Management Information System (PMIS) Number: (Complete this portion for Architect / Engineer (A/E)
Project Title: Replace Roof at the Eielson Visitor Center construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S
O R
A T
O R
Y T
E S
T S
R E
P O
R T
S O
R C
A
LC
U
LA
T
IO
N S
O R
P
LA
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
S A
M P
LE
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L
E N
G
IN
E E
R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E
LE
C T
R
IC
A L
E N
G
IN
E E
R
P R
O
JE
C T
M A
N A
G
O R
D
IN
A T
IO
N
LA
N
D S
C A
P E
A R
C H
IT
E
C T
332037 | 227793
7 1.6.A Inventory X
03 30 00 Cast-In-Place Concrete
1 1.3.A.1, 2.2 Steel Reinforcing X
2 1.3.A.2, 2.6 Admixtures X 3 1.3.B Design Mixtures X 4 1.3.C.1 Cold-Weather Placement Plan X 5 1.3.C.2 Cold-Weather Protection Plan X 6 1.3.D.1 Material Certificates for Cementitious Materials X 7 1.3.D.2 Material Certificates for Admixtures X 8 1.3.D.3 Material Certificates for Steel Reinforcement And Accessories X 9 1.3.E.1 Concrete Testing Reports X
10 1.3.E.2 Cold Weather Temperature Reports X
04 81 00 Unit Masonry Assemblies 1 1.3.A, 2.1 Concrete Masonry Unit (CMUS) X 2 1.3.A, 2.2 Mortar and Grout X 3 1.3.A, 2.3.A Uncoated Steel Reinforcing Bars X 4 1.3.A, 2.4.A Unit Type Inserts in Concrete X 5 1.3.A, 2.4.B Anchor Bolts X 6 1.3.A, 2.4.C Postinstalled Anchors X 7 1.3.B.1 Masonry Units Shop Drawings X 8 1.3.B.2 Reinforcing Steel Shop Drawings X 9 1.3.B.3 Fabricated Flashing Shop Drawings X
10 1.4.C Qualification Data for Testing Agency X 11 1.4.D Mix Designs for Each Type of Mortar and Grout X 12 1.4.E Cold Weather Procedures X
05 12 00 Structural Steel Framing 1 1.3.A, 2.3 Primer X 2 1.3.B Shop Drawings X 3 1.3.C Qualification Data for Installer X 4 1.3.C Qualification Data for Fabricator X 5 1.3.C Qualification Data for Testing Agency X 6 1.3.D Welding Certificates X 7 1.3.E Mill Test Reports for Structural Steel X 8 1.3.F.1 Product Test Report for Bolts, Nuts, and Washers X
9 1.3.F.2 Product Test Report for Tension-Control, High Strength Bolt- Nut-Washer Assemblies
X
05 31 00 Steel Decking 1 1.2.A.1, 2.2.A Roof Deck X 2 1.2.A.2, 2.3.B Mechanical Fasteners X 3 1.2.A.3 Sidelap Fasteners X 4 1.2.A.4, 2.3.D Galvanizing Repair Paint X
05 40 00 Cold Formed Metal Framing 1 1.2.A.1, 2.3.A Exterior Non-Load-Bearing Wall Framing: Steel Studs X 2 1.2.A.1, 2.3.B Exterior Non-Load-Bearing Wall Framing: Steel Track X 3 1.2.A.1, 2.3.C
Exterior Non-Load-Bearing Wall Framing: Single Deflection Track
X 4 1.2.A.1, 2.4.A Exterior Soffit and Roof Frame X 5 1.2.A.1, 2.4.B Exterior Soffit and Roof Framing: Steel Track X 6 1.2.A.1, 2.6.A Steel Shapes and Clips 7 1.2.A.1, 2.6.B Screw Anchors 8 1.2.A.1, 2.6.C Mechanical Fasteners 9 1.2.A.1, 2.7.A Galvanizing Repair Paint
10 1.2.A.2 Vertical Deflection Clips X 11 1.2.B.1 Steel Sheet Test Reports X 12 1.2.B.2 Power-Actuated Anchors Test Reports X 13 1.2.B.3 Mechanical Fasteners Test Reports X
05 50 00 Metal Fabrications 1 1.3.A.1, 2.3.B Steel Bolts and Nuts X 2 1.3.A.1, 2.3.C High-Strength Bolts, Nuts, and Washers X 3 1.3.A.1, 2.3.D Stainless Steel Bolts and Nuts X 4 1.3.A.1, 2.3.E Anchor Bolts X 5 1.3.A.1, 2.3.G Cast-in-Place Anchors in Concrete X 6 1.3.A.1, 2.3.H Post-Installed Anchors X 7 1.3.A.2, 2.4.B Universal Shop Primer X 8 1.3.A.2, 2.4.C Water-Based Primer X 9 1.3.A.2, 2.4.D Epoxy Zinc-Rich Primer X
10 1.3.A.2, 2.4.E Shop Primer for Galvanized Steel X 11 1.3.A.2, 2.4.F Galvanizing Repair Paint X 12 1.3.A.2, 2.4.G Bituminous Paint X 13 1.3.A.3, 2.4.H Shrinkage-Resisting Grout X
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 2 of 6
Park Acronym/Project Management Information System (PMIS) Number: (Complete this portion for Architect / Engineer (A/E)
Project Title: Replace Roof at the Eielson Visitor Center construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S
O R
A T
O R
Y T
E S
T S
R E
P O
R T
S O
R C
A
LC
U
LA
T
IO
N S
O R
P
LA
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
S A
M P
LE
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L
E N
G
IN
E E
R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E
LE
C T
R
IC
A L
E N
G
IN
E E
R
P R
O
JE
C T
M A
N A
G
O R
D
IN
A T
IO
N
LA
N
D S
C A
P E
A R
C H
IT
E
C T
332037 | 227793
14 1.3.B Shop Drawings X 15 1.3.C Delegated Design Submittals X 16 1.4.A Mill Certificates X 17 1.4.B Welding Certificates X 18 1.4.C Paint Compatibility Certificates X
06 10 00 Rough Carpentry 1 1.3.A, 2.2 Dimension Lumber for Concealed Applications X 2 1.3.A, 2.4.A Fasteners and Anchors X
06 11 00 Interior Rough Carpentry 1 1.3.A, 2.2 Dimension Lumber for Concealed Applications X 2 1.3.A, 2.3 Construction Panels X 3 1.3.A, 2.4 Fasteners and Adhesives X
06 16 00 Sheathing 1 1.2.A, 2.1 Wall Sheathing X
06 20 00 Finish Carpentry 1 1.3.A, 2.2.A Hardwood Lumber X 2 1.3.B Shop Drawings X
06 41 00 Architectural Wood Casework 1 1.3.A, 2.7 Panel Cores for Wood Veneer and HPDL Panels X 2 1.3.A, 2.4 Veneer Tape Edgebanding X 3 1.3.A, 2.8 Hardware X 4 1.3.A, 2.9 Accessory Components X 5 1.3.B Shop Drawings X
07 21 00 Thermal Insulation 1 1.2.A, 2.2.A Molded (Expanded) Polystyrene Board Insulation, Type I X
07 21 19 Foamed-In-Place Insulation 1 1.2.A, 2.1.A BE-3 Foamed-In-Place Insulation X 2 1.2.B Manufacturer's Installation Instructions X
07 41 13.16 Standing Seam Metal Roof Panels 1 1.2.A, 2.2 Standing Seam Metal Roof Panels X 2 1.2.A, 2.3 Substrate Board X 3 1.2.A, 2.4 Vapor Retarder X 4 1.2.A, 2.5 Roof Insulation X 5 1.2.A, 2.6.A Aluminum Sheet X
07 52 16 Styrene-Butadiene-Styrene (SBS) Modified Bituminous Membrane Roofing
1 1.3.A, 2.3.A Substrate Board X 2 1.3.A, 2.3.B Cover Board X 4 1.3.A, 2.4.A Extruded-Polystyrene Board Insulation X 5 1.3.A, 2.4.B Molded (expanded) Polystyrene Board Insulation: X 6 1.3.A, 2.5.A Modified Bituminous Membrane: Base Field Ply X 7 1.3.A, 2.5.B Modified Bituminous Membrane: Cap Ply X 8 1.3.B Shop Drawings X
10 1.4.A.1 Performance Requirement Certificate X 11 1.4.A.2 Special Warranty Certificate X 12 1.4.B Product Test Reports X 13 1.4.C Research Reports X 14 1.4.D.1 Fastener Pullout Test Reports X 16 1.4.E Field Quality-Control Reports X 17 1.4.F Sample Warranties X 18 1.4.G Maintenance Data X
07 62 00 Sheet Metal Flashing and Trim 1 1.3.A, 2.1.A Pre-Finished Galvanized Steel X 2 1.3.B Shop Drawings X 3 1.3.C Samples X
07 92 00 Joint Sealant 1 1.3.A, 2.3.A Non-Staining Silicone Sealant X 2 1.3.A, 2.3.B Polyurethane Sealant X 3 1.3.A, 2.3.C Acrylic Emulsion Latex X 4 1.3.A, 2.3.D Silicone, S, NS, 50, NT X 5 1.3.B Color Cards for Selection X
09 21 16 Gypsum Board Assemblies 1 1.3.A, 2.1 Gypsum Board Assemblies X 2 1.3.A, 2.2.D Nonstructural Framing System Components X
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 3 of 6
Park Acronym/Project Management Information System (PMIS) Number: (Complete this portion for Architect / Engineer (A/E)
Project Title: Replace Roof at the Eielson Visitor Center construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S
O R
A T
O R
Y T
E S
T S
R E
P O
R T
S O
R C
A
LC
U
LA
T
IO
N S
O R
P
LA
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
S A
M P
LE
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L
E N
G
IN
E E
R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E
LE
C T
R
IC
A L
E N
G
IN
E E
R
P R
O
JE
C T
M A
N A
G
O R
D
IN
A T
IO
N
LA
N
D S
C A
P E
A R
C H
IT
E
C T
332037 | 227793
3 1.3.A, 2.2.E Partition Head to Structure Connections X 4 1.3.A, 2.3.B Gypsum Wallboard X 5 1.3.A, 2.4.A Acoustic Insulation X 6 1.3.A, 2.4.C Finish Accessories X 7 1.3.A, 2.4.D Joint Materials X
8 1.3.A, 2.4.E Screws for Attachment to Steel Members Less Than 0.03 inch in Thickness
X
9 1.3.A, 2.4.F Screws for Attachment to Steel Members From 0.033 to 0.112 inch in Thickness
X
09 51 00 Acoustical Ceilings 1 1.3.A, 2.3 Acoustical Units X 2 1.3.A, 2.4 Suspension Systems X 3 1.3.A, 2.5.A Support Channels and Hangers X
09 65 00 Resilient Sheet Flooring 1 1.3.B, 2.1.A Linoleum Sheet Flooring X 2 1.3.B, 2.2.A Resilient Base X 3 1.3.C Selection Samples X 4 1.3.D Verification Samples X 5 1.3.E Maintenance Data X
09 68 13 Tile Carpeting 1 1.3.A, 2.2 Joint Layout Drawings X 2 1.3.A, 2.3.A Manufacturer's Instructions X 3 1.3.A, 2.3.B Concrete Subfloor Test Report X
09 91 23 Interior Painting 1 1.3.A, 2.3.A Paint I-OP X 2 1.3.A, 2.3.B Paint I-OP-MD-DT 3 1.3.B Samples X 4 1.3.C Manufacturer's Instructions X
09 93 00 Staining and Transparent Finishing 1 1.3.A, 2.3.A.1 Finish on Wood - Trim: Stain X 2 1.3.A, 2.3.A.2 Finish on Wood - Trim: Top Coat X 3 1.3.B Manufacturer's Instructions X
12 36 00 Countertops 1 1.3.A, 2.1.A Solid Surfacing Countertops X 2 1.3.A, 2.2.A Plywood for Supporting Substrate X 3 1.3.A, 2.2.B Adhesives X 4 1.3.A, 2.2.C Joint Sealant X 5 1.3.B Shop Drawings X
20 05 29 Hangers and Supports For Mechanical 1 1.2.A, 2.2.A Non Insulated Pipe Hangers X 2 1.2.A, 2.3 Hanger Rods X 3 1.2.A, 2.4 Channel Struts X 4 1.2.A, 2.5 Steel Structure Attachments X 5 1.2.B Application Schedule X 6 1.2.C.1 Test Reports: Third Party X 7 1.2.C.2 Concrete Anchors Special Inspection Form X
20 07 00 Insulation for Mechanical 1 1.2.A, 2.1.C Lagging Fabric X 2 1.2.A, 2.1.D Thermal Insulation Coatings X 3 1.2.A, 2.1.E Insulating Cement X 4 1.2.A, 2.1.G Plastic Insulation Covers X 5 1.2.A, 2.1.H Metal Jackets X
6 1.2.A, 2.2.A.1 Outside, Relief, Exhaust, and Combustion Air Duct Insulation:
Rectangular Ductwork
X
7 1.2.A, 2.2.A.2 Outside, Relief, Exhaust, and Combustion Air Duct Insulation:
Round Ductwork
X
8 1.2.B Application Schedule X
21 13 00 Fire Suppression Sprinkler System 1 1.2.A, 2.1 Piping and Fittings: Interior X 2 1.2.A, 2.2 Sprinkler Heads X 3 1.2.A, 2.3 Zone Isolation Valve Tags X
4 1.2.A, 2.4 Fire Protection Backflow Preventer – Double Check Valve Assemblies
X
5 1.2.A, 2.5 Check Valve X 6 1.2.A, 2.6 Isolation Valve X 7 1.2.A, 2.7 Tamper Switch X 8 1.2.A, 2.8 UL Listed Glycol Fire Protection Fluid X
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 4 of 6
Park Acronym/Project Management Information System (PMIS) Number: (Complete this portion for Architect / Engineer (A/E)
Project Title: Replace Roof at the Eielson Visitor Center construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S
O R
A T
O R
Y T
E S
T S
R E
P O
R T
S O
R C
A
LC
U
LA
T
IO
N S
O R
P
LA
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
S A
M P
LE
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L
E N
G
IN
E E
R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E
LE
C T
R
IC
A L
E N
G
IN
E E
R
P R
O
JE
C T
M A
N A
G
O R
D
IN
A T
IO
N
LA
N
D S
C A
P E
A R
C H
IT
E
C T
332037 | 227793
9 1.2.B Contractor Qualifications X 10 1.2.C Shop Drawings and Calculations X
22 13 16 Sanitary Waste and Vent Piping 1 1.2.A, 2.2 Vent Through Roof Flashing X 2 1.2.B Application Schedule X
22 13 19 Sanitary Waste Piping Specialties 1 1.2.A, 2.1.A Floor Drains X
22 42 13 Commercial Water Closets and Urinals 1 1.2.A, 2.2 Floor Mounted Water Closets X 2 1.2.A, 2.3 Accessories X
23 05 00 Common Work Results for HVAC 1 1.2.A, 2.2.A Thermometers X 2 1.2.A, 2.3.A Pressure Gauges X 3 1.2.A, 2.4.A Drain Valves X 4 1.2.A, 2.7.A Air Vents X 5 1.2.A, 2.8.A Dielectric Pipe Protection X 6 1.2.A, 2.9.A Escutcheons X 7 1.2.A, 2.10.A Flow Test Kit X 8 1.2.B Balance Valve Schedule X
23 05 93 Testing, Adjusting and Balancing for HVAC 1 1.2.A Balancer Qualifications and Balancing Plan X
23 09 23 Direct Digital Control Systems for HVAC 1 1.2.A, 1.2 Contractor Qualifications X 2 1.2.A, 1.4 BMS Software Function Index X 3 1.2.A, 1.5.E.1 System Architecture Schematic X 4 1.2.A, 1.5.E.2 Riser Diagram X 5 1.2.A, 1.5.E.3 Control Valve Schedule X 6 1.2.A, 1.5.E.4 Damper Actuator Schedule X 7 1.2.A, 1.5.E.5 HRV Control Diagrams X 8 1.2.A, 1.5.E.6 Terminal Unit Control Diagrams X 9 1.2.A, 1.5.E.7 Miscellaneous Equipment Control Diagrams X
10 1.2.A, 1.5.E.8 I/O Interface Diagrams X 11 1.2.A, 2.2 Direct Digital Controllers X 12 1.2.A, 2.3 Temperature Sensors X 13 1.2.A, 2.4 Thermostats and Temperature Switches X 14 1.2.A, 2.5 Other Switches X 15 1.2.A, 2.6 Signal Conditioners X 16 1.2.A, 2.7 Control Relays X 17 1.2.A, 2.8 Control Valves X 18 1.2.A, 2.9 Damper and Valve Actuators X 19 1.2.A, 2.11 Panels X
23 21 13 Hydronic Piping 1 1.2.B Application Schedule X
23 31 13 HVAC Ducts and Casings 1 1.2.A, 2.1.B Duct Sealant X 2 1.2.B Shop Drawings: Special Fabrications X 3 1.2.C Shop Drawings: Substantial Deviations X
23 33 11 Air Duct Accessories 1 1.2.A, 2.2.A Flexible Connections: Non-Insulated Ductwork X 2 1.2.A, 2.2.B Flexible Connections: Insulated Ductwork X 3 1.2.A, 2.3 Turning Vanes X 4 1.2.A, 2.4 Spin-In Fittings X 5 1.2.B Shop Drawings: Contractor Fabricated Items
23 33 13 Dampers 1 1.2.A, 2.2.A Backdraft Dampers X 2 1.2.B Shop Drawings: Contractor Fabricated Items X
23 33 56 HVAC Louvers 1 1.2.A, 2.1 Louvers X
23 82 36 Finned Tube Radiation 1 1.2.A, 2.2.A Bonderized Steel Enclosures X 2 1.2.A, 2.3 Nonferrous Heating Elements X 3 1.2.A, 2.4.A Enclosure Top Supports X 4 1.2.A, 2.5.A Enclosure and Element Saddle Support Brackets X 5 1.2.A, 2.6.A Elements Saddles X
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 5 of 6
Park Acronym/Project Management Information System (PMIS) Number: (Complete this portion for Architect / Engineer (A/E)
Project Title: Replace Roof at the Eielson Visitor Center construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S
O R
A T
O R
Y T
E S
T S
R E
P O
R T
S O
R C
A
LC
U
LA
T
IO
N S
O R
P
LA
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
S A
M P
LE
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L
E N
G
IN
E E
R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E
LE
C T
R
IC
A L
E N
G
IN
E E
R
P R
O
JE
C T
M A
N A
G
O R
D
IN
A T
IO
N
LA
N
D S
C A
P E
A R
C H
IT
E
C T
332037 | 227793
26 27 26 Wiring Devices and Plates 1 1.2.A,B, 2.2 Receptacles X 2 1.2.A,B, 2.3 Plates X
26 30 00 Facility Electrical Power Generating and Storing Equipment
1 1.4.A Qualifications X 2 1.4.B Shop Drawings X 3 1.4.C.1.a Inverters X 4 1.4.C.1.b Charge Controllers X 5 1.4.C.1.c Batteries and Battery Rack System X 6 1.4.C.1.d Resistive Dump Loads and Equipment X 7 1.4.D Warranty Information X 8 1.5.E O&M Manuals X
26 50 00 Lighting 1 1.2.A, 2.1 Light Fixtures X 2 1.2.A, 2.5 Exit Signs and Emergency Lighting Units X
26 51 02 Lighting Control Devices 1 1.2.A, 2.3 Wired Wallbox Vacancy Sensors X 2 1.2.A, 2.4 Wired Occupancy Sensors X 3 1.2.B Manufacturer's Installation Instructions X 4 1.2.C Operation and Maintenance Data X
31 20 00 Earth Moving 1 1.3.A Traffic Control Plan X 2 1.4.A Gradation Analyses X 3 1.4.B Modified Proctor Test Results X 4 1.4.C Compaction Test Results x
32 96 13 Groundcover Transplanting 1 1.5.A Existing Conditions X 2 1.6.a Weed Free Certification X
Drawings 1 C301 Geogrid Layout X 2 C700 Stone and Rock Samples X 3 C700 Mortar Sample X 4 C700 Resume of Masonry Supervisor X
Total: 0 0 0 0 0 0 0