This is an attachment to a bid question providing photographic documentation of existing hydro and renewable energy control equipment at the Eielson Visitor Center in Denali National Park and Preserve, Alaska. The document is part of Amendment 0005 to the solicitation for rehabilitation of the facility and references Drawing U101.

The attachment contains four photographs documenting equipment within the Utility Building. Photo 1 provides an overview of the utility building equipment layout, identifying a left-side equipment group and an upper-right enclosure, along with a red wall phone between the groups reportedly intended for communication with the turbine house. Photo 2 shows the interior of the upper-left equipment enclosure containing various electrical components including contactors, relays, wiring, and control equipment. Photo 3 documents the interior of the lower-left equipment enclosure labeled as field-voltage-control equipment, displaying voltage regulators and associated wiring. Photo 4 shows the upper-right enclosure clearly labeled "HYDRO METER," though the interior was not photographed. The document explicitly notes that these photographs are informational and do not identify every component or connection shown on Drawing U101. All existing equipment configurations and connections, including the FAA DC connection, must be field verified by the contractor.

View the file

Other files

File Type Posted
Sol_140P2026R0087_Amd_0011.pdf PDF
32_Finalized_Q_and_A_amendment_011_responses_0011.pdf PDF
Sol_140P2026R0087_Amd_0010.pdf PDF
Sol_140P2026R0087_Amd_0009.pdf PDF
31_Finalized_Q___A_for_DENA_Amendment_0009_0009.pdf PDF
30_01_50_00_Temporary_Facilities_and_Controls_0008_0008.pdf PDF
29_Amendment_Summary_0008_0008.pdf PDF
Sol_140P2026R0087_Amd_0008.pdf PDF
27_Finalized_Q___A_for_DENA_Amendment_0005_0007.pdf PDF
26_DENA_332037_Submittal_List_2026-07-20_R1_0007.pdf PDF
Sol_140P2026R0087_Amd_0007.pdf PDF
28_DENA_332037_EVC_Rehabilitation_Addendum_2R1_0007.pdf PDF
Sol_140P2026R0087_Amd_0006.pdf PDF
D01_Amendment_0006_DENA_Roof_and_Interior_Repair_0006.pdf PDF
Sol_140P2026R0087_Amd_0005.pdf PDF
Sol_140P2026R0087_Amd_0004.pdf PDF
22_DENA_332037_Q_A_9_18_26_Amend_0004_0004.xlsx XLSX spreadsheet
21_DENA_332037_-_EVC_Rehabilitation_Amendment_0004_0004.pdf PDF
23_Q_A_6_Submittal_List_2026-07-20_Amendment_0004_0004.xlsx XLSX spreadsheet
15_26_30_00_Facility_Electrical_Power_Generating__-_Amendment_0003_0003.pdf PDF
10_02_85_00_Microbial_Remediation_-_Amendment_0003_0003.pdf PDF
14_21_13_00_Fire_Suppression_Sprinkler_System_-_Amendment_0003_0003.pdf PDF
09_02_41_19_Selective_Demolition_Pg_1-3_Amednment_0003_0003.pdf PDF
20_Eielson_Visitor_Center_-_Fire_Sprinkler_As-Builts_-_Amendment_0003_0003.pdf PDF
Sol_140P2026R0087_Amd_0003.pdf PDF
12_07_52_16_SBS_Modified_Bituminous_Membrane_Roofing_-_Amendment_0003_0003.pdf PDF
16_31_20_00_Earth_Moving_-_Amendment_0003_0003.pdf PDF
11_05_50_00_Metal_Fabrications_-_Amendment_0003_0003.pdf PDF
08_01_27_00_Definition_of_Contract_Line_Items_Amendment_0003_0003.pdf PDF
19_DENA_332037_-_EVC_Rehabilitation_Addendum_01_-_Amendment_0003_0003.pdf PDF
18_Contract_Price_Schedule_(Fields_Blank)_Amendment_0003_0003.xlsx XLSX spreadsheet
17_32_96_13_Groundwater_Transplanting_-_Amendment_0003_0003.pdf PDF
13_12_36_00_Countertops_-_Amendment_0003_0003.pdf PDF
06_Specification_Index_-_Amendment_0003_0003.pdf PDF
07_01_26_01_Contract_Modification_Procedures_Pg_7_Amendment_0003_0003.pdf PDF
Amendment_0002_0002.pdf PDF
Sol_140P2026R0087_Amd_0002.pdf PDF
Sol_140P2026R0087_Amd_0001.pdf PDF
Amendment_1_DENA_332037_0001.pdf PDF
DENA_332037_As_Built_Drawings_0001.pdf PDF
DENA_332037_Final_Construction_Documents_Amendment_1_0001.pdf PDF
05__Subcontracting_Percentage_Worksheet.pdf PDF
1-55.pdf PDF
Drawings_56-99.pdf PDF
03__Final__Submittal_List_2026-06-12.xlsx XLSX spreadsheet
Sol_140P2026R0087.pdf PDF
01_DENA_332037_Final_Construction_Documents_07-20-2026.pdf PDF
04_WD_AK20260001_May_17_2026.pdf PDF
B08_FINAL_Solicitation_updated_7_31_26.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DENA Eielson Visitor Center - Attachment to Bid Question 20

ATTACHMENT TO QUESTION 20 -AMENDMENT 0005

Existing Hydro / Renewable Energy Control Equipment Photographs

Rehabilitation of the Eielson Visitor Center Denali National Park and Preserve, Alaska

Reference: Drawing U101

Reference Note: These photographs are provided to show observed existing equipment within the Utility Building. They are informational and do not identify every component or connection shown on Drawing U101. Existing equipment configuration and connections, including the FAA DC connection, shall be field verified.

Photo 1 - Utility Building equipment overview. The red circles identify the left-side equipment group and the upper-right enclosure referenced in the following photographs. The red wall phone visible between the equipment groups was reportedly intended for communication with the turbine house; operational status has not been verified.

Photo 2 - Interior of the upper-left equipment enclosure, as identified in the A/E field notes. Specific equipment function and existing connections shall be field verified.

Photo 3 - Interior of the lower-left equipment enclosure / field-voltage-control equipment, as identified in the A/E field notes.

Specific equipment function and existing connections shall be field verified.

Photo 4 - Upper-right enclosure labeled "HYDRO METER." The interior of this enclosure was not photographed.

CAI MEMORY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .