This is an Amendment 0003 (Design Addendum 01) to the contract documents for the Eielson Visitor Center Rehabilitation project at Denali National Park, Alaska (Contract No. DENA 332037 | 227793), issued by Design Alaska, Inc. on September 14, 2026.

The addendum modifies contract documents through 18 line items organized into three categories: General, Specifications, and Drawings. General changes include adding 2008 sprinkler as-builts for reference and replacing the Pricing Schedule. Specification modifications involve replacing or adding sections covering Contract Modification Procedures (01 26 01), Definition of Contract Line Items (01 27 00), Selective Demolition (02 41 19), Facility Electrical Power Generating and Storing Equipment (26 30 00), Membrane Roof Systems (07 52 16), and Metal Fabrications (05 50 00); adding new specifications for Countertops (12 36 00), Microbial Remediation (02 85 00), and Earth Moving (31 20 00); and replacing specifications for Landscape Equipment (32 96 13) and Smoke Control Systems (21 13 00). Drawing changes include deleting a condensate pump motor symbol from sheet 3/E202, replacing a receptacle with a hardwired trap-primer connection on the same sheet, adding a motor connection for a new 38W pump in Mechanical room 110 on sheet 1/E202, and modifying the lighting fixture specification for fixture type T3 on the E001 Lighting Fixture Schedule to reference a Coronet Lighting model or approved equal. All other terms and conditions of the contract remain unchanged.

View the file

Other files

File Type Posted
Sol_140P2026R0087_Amd_0011.pdf PDF
32_Finalized_Q_and_A_amendment_011_responses_0011.pdf PDF
Sol_140P2026R0087_Amd_0010.pdf PDF
Sol_140P2026R0087_Amd_0009.pdf PDF
31_Finalized_Q___A_for_DENA_Amendment_0009_0009.pdf PDF
30_01_50_00_Temporary_Facilities_and_Controls_0008_0008.pdf PDF
29_Amendment_Summary_0008_0008.pdf PDF
Sol_140P2026R0087_Amd_0008.pdf PDF
27_Finalized_Q___A_for_DENA_Amendment_0005_0007.pdf PDF
25_DENA_332037_-_Pictures_0007.pdf PDF
26_DENA_332037_Submittal_List_2026-07-20_R1_0007.pdf PDF
Sol_140P2026R0087_Amd_0007.pdf PDF
28_DENA_332037_EVC_Rehabilitation_Addendum_2R1_0007.pdf PDF
Sol_140P2026R0087_Amd_0006.pdf PDF
D01_Amendment_0006_DENA_Roof_and_Interior_Repair_0006.pdf PDF
Sol_140P2026R0087_Amd_0005.pdf PDF
Sol_140P2026R0087_Amd_0004.pdf PDF
22_DENA_332037_Q_A_9_18_26_Amend_0004_0004.xlsx XLSX spreadsheet
21_DENA_332037_-_EVC_Rehabilitation_Amendment_0004_0004.pdf PDF
23_Q_A_6_Submittal_List_2026-07-20_Amendment_0004_0004.xlsx XLSX spreadsheet
15_26_30_00_Facility_Electrical_Power_Generating__-_Amendment_0003_0003.pdf PDF
10_02_85_00_Microbial_Remediation_-_Amendment_0003_0003.pdf PDF
14_21_13_00_Fire_Suppression_Sprinkler_System_-_Amendment_0003_0003.pdf PDF
09_02_41_19_Selective_Demolition_Pg_1-3_Amednment_0003_0003.pdf PDF
20_Eielson_Visitor_Center_-_Fire_Sprinkler_As-Builts_-_Amendment_0003_0003.pdf PDF
Sol_140P2026R0087_Amd_0003.pdf PDF
12_07_52_16_SBS_Modified_Bituminous_Membrane_Roofing_-_Amendment_0003_0003.pdf PDF
16_31_20_00_Earth_Moving_-_Amendment_0003_0003.pdf PDF
11_05_50_00_Metal_Fabrications_-_Amendment_0003_0003.pdf PDF
08_01_27_00_Definition_of_Contract_Line_Items_Amendment_0003_0003.pdf PDF
18_Contract_Price_Schedule_(Fields_Blank)_Amendment_0003_0003.xlsx XLSX spreadsheet
17_32_96_13_Groundwater_Transplanting_-_Amendment_0003_0003.pdf PDF
13_12_36_00_Countertops_-_Amendment_0003_0003.pdf PDF
06_Specification_Index_-_Amendment_0003_0003.pdf PDF
07_01_26_01_Contract_Modification_Procedures_Pg_7_Amendment_0003_0003.pdf PDF
Amendment_0002_0002.pdf PDF
Sol_140P2026R0087_Amd_0002.pdf PDF
Sol_140P2026R0087_Amd_0001.pdf PDF
Amendment_1_DENA_332037_0001.pdf PDF
DENA_332037_As_Built_Drawings_0001.pdf PDF
DENA_332037_Final_Construction_Documents_Amendment_1_0001.pdf PDF
05__Subcontracting_Percentage_Worksheet.pdf PDF
1-55.pdf PDF
Drawings_56-99.pdf PDF
03__Final__Submittal_List_2026-06-12.xlsx XLSX spreadsheet
Sol_140P2026R0087.pdf PDF
01_DENA_332037_Final_Construction_Documents_07-20-2026.pdf PDF
04_WD_AK20260001_May_17_2026.pdf PDF
B08_FINAL_Solicitation_updated_7_31_26.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design Alaska, Inc. Page 1 of 2

September 14, 2026

DENA 332037 | 227793

Eielson Visitor Center Rehabilitation

Denali National Park, Alaska

Re: Amendment 0003: Design Addendum 01

The Contract Documents for DENA 332037 Eielson Visitor Center Rehabilitation, Denali National

Park, Alaska are amended as follows; all other terms and conditions remain unchanged.

ADDENDA No. 1

Item No. Reference Change

GENERAL

AD1.1 ADD accompanying 2008 sprinkler as-builts for reference

AD1.2 REPLACE Pricing Schedule

SPECIFICATIONS

AD1.3 Index ADD accompanying specs

AD1.4 01 26 01 REPLACE PAGE 7 accompanying Spec 01 26 01 Contract

Modification Procedures

AD1.5 01 27 00 REPLACE accompanying spec 01 27 00 Definition of Contract

Line Items

AD1.6 02 41 19 REPLACE PAGE 1-3 accompanying spec 02 41 19 Selective

Demolition

AD1.7 12 36 00 ADD accompanying spec 12 36 00 Countertops

AD1.8 02 85 00 ADD accompanying spec 02 85 00 Microbial Remediation

AD1.9 26 30 00 REPLACE accompanying spec 26 30 00 Facility Electrical

Power Generating and Storing Equipment

AD1.10 07 52 16 REPLACE with the accompanying spec 07 52 16

AD1.11 05 50 00 REPLACE with the accompanying spec 05 50 00

DENA 332037

Eielson Visitor Center Rehabilitation Denali National Park, Alaska Addendum #1

Design Alaska, Inc. Page 2 of 2

AD1.12 31 20 00 ADD accompanying spec 31 20 00 Earth Moving

AD1.13 32 96 13 REPLACE with the accompanying spec 32 96 13

AD1.14 21 13 00 REPLACE with the accompanying spec 21 13 00

DRAWINGS

AD1.15 3/E202 DELETE the motor symbol with Specific Sheet Note #2 for condensate pump, which has been removed from mechanical scope.

AD1.16 3/E202 DELETE the receptacle tagged with Specific Sheet Note #3.

Replace this receptacle with a hardwired power connection connected to circuit “B-11” and a new Specific Sheet Note

#3, “PROVIDE HARDWIRED CONNECTION FOR TRAP-PRIMER

(TP-1).”

AD1.17 1/E202 ADD motor connection with motor rated switch in Mech room 110, with a new Specific Sheet Note #17, “PROVIDE

MOTOR CONNECTION FOR NEW 38W PUMP (THWP-1).

PUMP IS AN “ECM” UNIT WITH INTEGRAL OVERLOADS.

EXTEND THE EXISTING ROOM CIRCUIT “B-23” TO POWER

THE NEW MOTOR.”

AD1.18 E001 Lighting

Fixture

Schedule

CHANGE Fixture type ‘T3’: the complete basis of design light fixture model should read “CORONET LIGHTING / CRD1S-

DS\2-ED\1-ST\4-30-MED-UNV-DR96-W-ACP-MB-SD, OR

APPROVED EQUAL”.

END OF ADDENDUM 01