This is a Performance Work Statement (PWS) Section 21 13 00 for the rehabilitation of the Eielson Visitor Center fire suppression sprinkler system at Denali National Park and Preserve, Alaska.

The contractor must design, select, install, and test a hydraulic calculated wet pipe fire suppression sprinkler system protecting all spaces unless specifically exempted under NFPA 13 (2022). The building is classified as educational/museum occupancy for light hazard purposes. The system will be fed from an existing nominal 2,500-gallon pressure tank in accordance with NFPA 22 chapter 7. Materials must include UL or FM listed schedule 40 black steel piping with threaded, welded, grooved, or rolled joint fittings (thin-walled piping prohibited); sprinklers matching existing type, orientation, response, K-factor, and color; swing-type check valves with elastomer seals; OS&Y isolation valves; tamper switches on isolation valves; and UL 2901 listed pre-mixed antifreeze solution with a freezing point less than -28°F. Seismic protection calculations require a CP value of 0.8369 based on an SDS of 1.11. Installation requirements include concealing piping above ceilings, centering pendant heads in ceiling tiles, providing wire guards in vulnerable areas, and protecting ceiling penetrations from seismic damage with oversize escutcheons or arm-over length allowing one-inch movement. The contractor must employ either a licensed fire protection engineer or NICET Level III Technician for system design and maintain NICET Level II certification for supervisory personnel. Testing must occur per NFPA 13 in the presence of Owner's designated personnel, followed by completion of the NFPA "Contractor's Material and Test Certificate." Training must be provided to Owner's personnel on system operation, maintenance, control valve location, and fire alarm interface, with delivery of as-builts, care and maintenance instructions, and NFPA 25 standards.

View the file

Other files for this federal contract opportunity

Other files attached to DENA 332037 Eielson Roof Replacement, newest first.
File Type Posted
Sol_140P2026R0087_Amd_0011.pdf PDF
32_Finalized_Q_and_A_amendment_011_responses_0011.pdf PDF
Sol_140P2026R0087_Amd_0010.pdf PDF
Sol_140P2026R0087_Amd_0009.pdf PDF
31_Finalized_Q___A_for_DENA_Amendment_0009_0009.pdf PDF
Sol_140P2026R0087_Amd_0008.pdf PDF
29_Amendment_Summary_0008_0008.pdf PDF
30_01_50_00_Temporary_Facilities_and_Controls_0008_0008.pdf PDF
28_DENA_332037_EVC_Rehabilitation_Addendum_2R1_0007.pdf PDF
27_Finalized_Q___A_for_DENA_Amendment_0005_0007.pdf PDF
Sol_140P2026R0087_Amd_0007.pdf PDF
25_DENA_332037_-_Pictures_0007.pdf PDF
26_DENA_332037_Submittal_List_2026-07-20_R1_0007.pdf PDF
Sol_140P2026R0087_Amd_0006.pdf PDF
D01_Amendment_0006_DENA_Roof_and_Interior_Repair_0006.pdf PDF
Sol_140P2026R0087_Amd_0005.pdf PDF
Sol_140P2026R0087_Amd_0004.pdf PDF
23_Q_A_6_Submittal_List_2026-07-20_Amendment_0004_0004.xlsx XLSX spreadsheet
22_DENA_332037_Q_A_9_18_26_Amend_0004_0004.xlsx XLSX spreadsheet
21_DENA_332037_-_EVC_Rehabilitation_Amendment_0004_0004.pdf PDF
07_01_26_01_Contract_Modification_Procedures_Pg_7_Amendment_0003_0003.pdf PDF
06_Specification_Index_-_Amendment_0003_0003.pdf PDF
13_12_36_00_Countertops_-_Amendment_0003_0003.pdf PDF
10_02_85_00_Microbial_Remediation_-_Amendment_0003_0003.pdf PDF
15_26_30_00_Facility_Electrical_Power_Generating__-_Amendment_0003_0003.pdf PDF
17_32_96_13_Groundwater_Transplanting_-_Amendment_0003_0003.pdf PDF
18_Contract_Price_Schedule_(Fields_Blank)_Amendment_0003_0003.xlsx XLSX spreadsheet
08_01_27_00_Definition_of_Contract_Line_Items_Amendment_0003_0003.pdf PDF
09_02_41_19_Selective_Demolition_Pg_1-3_Amednment_0003_0003.pdf PDF
11_05_50_00_Metal_Fabrications_-_Amendment_0003_0003.pdf PDF
16_31_20_00_Earth_Moving_-_Amendment_0003_0003.pdf PDF
19_DENA_332037_-_EVC_Rehabilitation_Addendum_01_-_Amendment_0003_0003.pdf PDF
20_Eielson_Visitor_Center_-_Fire_Sprinkler_As-Builts_-_Amendment_0003_0003.pdf PDF
Sol_140P2026R0087_Amd_0003.pdf PDF
12_07_52_16_SBS_Modified_Bituminous_Membrane_Roofing_-_Amendment_0003_0003.pdf PDF
Sol_140P2026R0087_Amd_0002.pdf PDF
Amendment_0002_0002.pdf PDF
DENA_332037_As_Built_Drawings_0001.pdf PDF
Sol_140P2026R0087_Amd_0001.pdf PDF
DENA_332037_Final_Construction_Documents_Amendment_1_0001.pdf PDF
Amendment_1_DENA_332037_0001.pdf PDF
Sol_140P2026R0087.pdf PDF
B08_FINAL_Solicitation_updated_7_31_26.pdf PDF
03__Final__Submittal_List_2026-06-12.xlsx XLSX spreadsheet
01_DENA_332037_Final_Construction_Documents_07-20-2026.pdf PDF
Drawings_56-99.pdf PDF
1-55.pdf PDF
04_WD_AK20260001_May_17_2026.pdf PDF
05__Subcontracting_Percentage_Worksheet.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL PARK SERVICE SECTION 21 13 00

REHABILITATION OF THE EIELSON VISITOR CENTER FIRE SUPPRESSION SPRINKLER SYSTEM

DENALI NATIONAL PARK AND PRESERVE, ALASKA

Design Alaska, Inc. 21 13 00- 1

PART 1 GENERAL

1.1 SCOPE: SECTION 21 13 00 - FIRE SUPPRESSION SPRINKLER SYSTEM

A. This Section covers design, selection, installation, and testing of materials and equipment making up the fire suppression system.

1.2 SUBMITTALS

A. Manufacturer's Data:

1. Catalog cuts and selections of system component parts and accessories.

2. Anchors: Submit anchor data with proposed applications. Whenever anchors are to be installed in concrete, submit third party listing criteria. Concrete anchors are to be UL and/or FM approved, approved by ICC-ES, and be prequalified for seismic applications in accordance with ACI 355.2 per NFPA 13 requirements.

3. Provide a single electronic copy (PDF format) of all catalog cuts and selections with a populated table of contents and applicable equipment highlighted/selected. Electronically index (Bookmark) each item within the electronic submittal.

4. Provide submittal concurrently with Shop Drawings and Calculations.

B. Contractor Qualifications:

1. Submit material indicating that the Contractor is regularly engaged in the fire suppression business and has employees trained in the installation and repair, testing, and certification of fire suppression systems, including copies of required certifications, as required in quality assurance.

2. Submit who will be responsible for the fire suppression system design. Provide name, qualifications, and a copy of any required certifications, as required in quality assurance.

C. Shop Drawing and Calculations:

1. Each Shop Drawing sheet shall identify the individual responsible for the fire suppression design and include their license or certificate information for their qualifications required in quality assurance. The cover sheet of each set of calculations shall list the individual responsible for the fire suppression system design.

Design Alaska, Inc. 21 13 00- 2

2. Submit fire suppression system Shop Drawings and calculations to:

a. Contracting Officer for review and acceptance by the National Park Service Regional Structural Fire Manager (RSFM).

3. Submit Shop Drawings and calculations to the Contracting Officer for final review and acceptance after they have been reviewed and approved or commented on by the other reviewing authorities. Submit copies of reviewing agency comments with Shop Drawings.

4. Shop Drawing scales used shall be no less than the scales used in the Contract Documents.

5. Shop Drawings are to include reflected ceiling plan indicating proposed sprinkler head layout.

6. Indicate seismic force factor used for seismic bracing selection.

D. As-Builts Fire Sprinkler Drawings:

1. Provide updated shop drawings that reflect installed conditions. Submit As-Builts after acceptance testing.

1.3 QUALITY ASSURANCE

A. All components UL listed or FM approved for application.

B. Design and installation in accordance with National Park Service Reference Manual 58 (RM-58): Structural Fire Management, and the International Fire Code (IFC) as amended by RM-58, Appendix A, including applicable NFPA standards by reference from IFC.

C. For system design employ an individual either a licensed fire protection engineer or a NICET Level III Technician Certified for water-based systems layout, or higher.

D. Fire suppression system Contractor shall be regularly engaged in the fire suppression business and have employees trained in the installation and repair, testing, and certification of fire suppression systems. Employees responsible for direct oversight and supervision of the work performed, shall maintain a NICET Level II Technician certificate for water-based system layout, or higher.

E. All wiring shall comply with Division 26 and 28.

1.4 SYSTEM DESIGN

A. Design, provide, and install a sprinkler system protecting all spaces unless those spaces are specifically exempted from protection by NFPA 13 (2022).

Design Alaska, Inc. 21 13 00- 3

B. Building occupancy is educational/museum as defined by NFPA 13 (2022) section A.4.3.

C. Unless otherwise indicated, provide a hydraulic calculated wet pipe system for light hazard occupancy. Hydraulic remote areas are permitted to be reduced within the parameters indicated in NFPA 13 (2022) section 19.3.3.2.3 if quick-response sprinklers are utilized.

D. Fire suppression system as-built drawings from March 2008 are available for use in hydraulic design calculations.

E. Existing fire suppression system is fed from a nominal 2,500 gallon pressure tank in accordance with NFPA 22 chapter 7. See notes indicated on Drawings and fire suppression system as-built drawings for capacity and demand utilized for original system design.

F. System residual pressure requirements at design flow rate shall not exceed 90 percent of residual pressure available at design flow rate.

G. Locate sprinkler accessories where indicated on drawings.

H. Seismic protection shall be in accordance with NFPA 13 Chapter 18. Horizontal seismic force shall be calculated as FPW = CP x WP, where CP = 0.754 x SDS per NFPA 13 section

18.5.9.3. The SDS for this structure is 1.11, resulting in a CP of 0.8369 for use in seismic protection design.

I. Fire suppression Drawings are conceptual, representing system design intentions. When Drawings conflict with referenced standards provide protection and an installation complying with referenced standards. Coordinate the installation of the fire suppression system with the work of other building trades and site conditions.

J. Floor plans and building sections are shown to relay relative space layout, floor to floor heights, and ceiling heights and type only. Field verify existing conditions and provide a sprinkler system design and installation to match.

K. Field locate existing mechanical and electrical equipment and coordinate new fire suppression piping installation with existing ducts, pipes, conduits, equipment, structural elements, etc. When portions of existing mechanical, electrical, and structural systems are shown it is not meant to indicate that all of such systems are shown. Field verify portions shown.

PART 2 PRODUCTS

2.1 PIPE AND FITTINGS, INTERIOR

A. UL or FM listed schedule 40 black steel piping with threaded, welded, grooved or rolled joint fittings.

Design Alaska, Inc. 21 13 00- 4

B. Use of grooved or threadable thin-walled piping is not permitted.

2.2 SPRINKLERS

A. Sprinklers shall match existing sprinkler type, orientation, response, K-factor, and color.

Sprinklers to be UL listed or FM approved for their specific use. Tyco, Reliable, Victaulic, or equal.

2.3 ZONE ISOLATION VALVE TAGS

A. Laminated plastic with subsurface printing, heavy duty, nickel-plated grommet, brass bead chain, and appropriately colored border. Craftmark, Seton, Brimar, or equal.

B. Tags installed within 8 feet of the floor or maintenance platform: Minimum 3-1/2 inches by 2 inches with four lines, 0.2 inch high characters, 8 characters per line.

C. Tags installed higher than 8 feet off the floor or maintenance platform: Minimum 5 inches by 3-1/2 inches with four lines, 0.4 inch high characters, 8 characters per line.

D. On each valve tag, print message describing area served and zone designation used on As-built Fire Suppression Drawings.

2.4 CHECK VALVE

A. Swing-type unit, elastomer seal, ductile iron body with stainless steel clapper. Tyco CV- 1F, Viking, Reliable, or equal.

2.5 ISOLATION VALVE – OUTSIDE SCREW AND YOKE (OS&Y)

A. OS&Y valve, ductile iron body and yoke, EPDM body gasket, brass stem, cast iron gate.

Similar to Victaulic Series 771.

2.6 TAMPER SWITCH

A. Outside Screw and Yoke supervisory switch, corrosion resistant finishes. Similar to Potter

OSYSU-1.

2.7 UL LISTED PRE-MIXED GLYCOL FIRE SUPPRESSION SOLUTION

A. UL 2901 listed pre-mixed antifreeze solution for use in fire suppression systems, with a freezing point less than -28°F, buffered for use with commodity fire suppression system materials to include steel, stainless steel, brass, bronze, copper, cast iron, EPDM, and nitrile and butyl rubbers. Tyco Fire LFP Antifreeze+.

Design Alaska, Inc. 21 13 00- 5

PART 3 EXECUTION

3.1 INSTALLATION

A. Do not install wet pipe sprinkler system piping in unheated spaces or in spaces subject to freezing conditions while in operation.

B. Temporary impairment of an "in-service" fire protection system must be minimized and coordinated with the Contracting Officer.

C. Conceal piping above ceilings where ceilings are installed.

D. Center pendent sprinkler heads in ceiling tiles where tiles are installed. In two-foot by four-foot ceiling tiles which are constructed to look like two-foot by two-foot ceiling tiles, center heads in one of the two-foot by two-foot sections.

E. Protect penetrations at ceilings from damage during a seismic event by either providing an oversize escutcheon with one-inch clearance all around the sprinkler head or by providing a sufficient arm-over length to allow one-inch movement in all directions.

F. Install semi-recessed sprinkler heads with minimum listed head protrusion below finished ceilings.

G. Provide wire guards in all areas where damage to the sprinkler head is possible, including but not limited to storage rooms, communications rooms, mechanical rooms, and under stairs.

H. Drain and purge existing glycol suppression piping completely to prepare for filling with UL Listed glycol solution.

3.2 FIRE ALARM INTERFACE

A. Provide tamper switches on all building domestic/fire water isolation valves that interrupt fire system water supply.

B. Coordinate electrical requirements with Division 26 and 28.

3.3 TESTING

A. Test in accordance with NFPA 13 and in the presence of the Owner’s personnel specifically designated by the Contracting Officer.

B. Following testing, complete the NFPA prescribed "Contractor's Material and Test Certificate" and forward to the Contracting Officer.

Design Alaska, Inc. 21 13 00- 6

3.4 TRAINING

A. Provide system training to Owner’s personnel specifically designated by the Contracting Officer in accordance with NFPA 13. At a minimum, provide training in the following areas:

1. Operation, adjustment and maintenance of equipment and system.

2. Location of control valves and low point drains.

3. Fire Alarm Interface.

B. Provide copies of the follow items to the Owner’s personnel specifically designated by the Contracting Officer:

1. As-builts of the fire sprinkler system.

2. Care and maintenance instructions.

3. Latest edition of NFPA 25 – Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems.

END OF SECTION