03__Final__Submittal_List_2026-06-12.xlsx

XLSX spreadsheet 58 KB Posted

Attached to
DENA 332037 Eielson Roof Replacement Federal contract opportunity
Solicitation number
140P2026R0087
Issued by
Department of the Interior National Park Service National Office

About this file

This is a Submittal List with Review Estimate template document prepared by the National Park Service (NPS) Denver Service Center for the DENA 332037 Eielson Roof Replacement project (PMIS Number 227793). The template serves as an instruction guide and planning tool for managing construction submittals during both the Design Services (Construction Documents Phase) and Construction Services phases of the project.

The document establishes a comprehensive submittal tracking system organized by specification sections, requiring the Design Architect/Engineer to identify submittal requirements and categorize them as either Action submittals (requiring Government responsive action) or Informational submittals (requiring no Government action). It includes detailed submittal categories spanning numerous construction trades and materials, including structural steel framing, roofing systems (standing seam metal and SBS modified bituminous membrane), mechanical systems (HVAC, fire suppression, plumbing), electrical systems, insulation, sealants, flooring, painting, and landscape work. The template requires the Architect/Engineer to estimate review time in hours by discipline (Architect, Civil Engineer, Structural Engineer, Mechanical Engineer, Electrical Engineer, Project Manager, and Landscape Architect) for each Action submittal, with these estimates then applied against Indefinite Delivery/Indefinite Quantity (IDIQ) contract hourly rates to formulate Government estimates for submittal review costs. The Construction Management Representative is designated to review all Informational submittals, while the Architect/Engineer handles Action submittal reviews. This template is designed for negotiating the submittal review portion of the Architect/Engineer's Construction Services task order.

View the file

Other files for this federal contract opportunity

Other files attached to DENA 332037 Eielson Roof Replacement, newest first.
File Type Posted
Sol_140P2026R0087_Amd_0011.pdf PDF
32_Finalized_Q_and_A_amendment_011_responses_0011.pdf PDF
Sol_140P2026R0087_Amd_0010.pdf PDF
Sol_140P2026R0087_Amd_0009.pdf PDF
31_Finalized_Q___A_for_DENA_Amendment_0009_0009.pdf PDF
30_01_50_00_Temporary_Facilities_and_Controls_0008_0008.pdf PDF
Sol_140P2026R0087_Amd_0008.pdf PDF
29_Amendment_Summary_0008_0008.pdf PDF
28_DENA_332037_EVC_Rehabilitation_Addendum_2R1_0007.pdf PDF
27_Finalized_Q___A_for_DENA_Amendment_0005_0007.pdf PDF
Sol_140P2026R0087_Amd_0007.pdf PDF
25_DENA_332037_-_Pictures_0007.pdf PDF
26_DENA_332037_Submittal_List_2026-07-20_R1_0007.pdf PDF
Sol_140P2026R0087_Amd_0006.pdf PDF
D01_Amendment_0006_DENA_Roof_and_Interior_Repair_0006.pdf PDF
Sol_140P2026R0087_Amd_0005.pdf PDF
21_DENA_332037_-_EVC_Rehabilitation_Amendment_0004_0004.pdf PDF
Sol_140P2026R0087_Amd_0004.pdf PDF
23_Q_A_6_Submittal_List_2026-07-20_Amendment_0004_0004.xlsx XLSX spreadsheet
22_DENA_332037_Q_A_9_18_26_Amend_0004_0004.xlsx XLSX spreadsheet
Sol_140P2026R0087_Amd_0003.pdf PDF
12_07_52_16_SBS_Modified_Bituminous_Membrane_Roofing_-_Amendment_0003_0003.pdf PDF
07_01_26_01_Contract_Modification_Procedures_Pg_7_Amendment_0003_0003.pdf PDF
06_Specification_Index_-_Amendment_0003_0003.pdf PDF
13_12_36_00_Countertops_-_Amendment_0003_0003.pdf PDF
10_02_85_00_Microbial_Remediation_-_Amendment_0003_0003.pdf PDF
14_21_13_00_Fire_Suppression_Sprinkler_System_-_Amendment_0003_0003.pdf PDF
15_26_30_00_Facility_Electrical_Power_Generating__-_Amendment_0003_0003.pdf PDF
17_32_96_13_Groundwater_Transplanting_-_Amendment_0003_0003.pdf PDF
18_Contract_Price_Schedule_(Fields_Blank)_Amendment_0003_0003.xlsx XLSX spreadsheet
08_01_27_00_Definition_of_Contract_Line_Items_Amendment_0003_0003.pdf PDF
09_02_41_19_Selective_Demolition_Pg_1-3_Amednment_0003_0003.pdf PDF
11_05_50_00_Metal_Fabrications_-_Amendment_0003_0003.pdf PDF
16_31_20_00_Earth_Moving_-_Amendment_0003_0003.pdf PDF
19_DENA_332037_-_EVC_Rehabilitation_Addendum_01_-_Amendment_0003_0003.pdf PDF
20_Eielson_Visitor_Center_-_Fire_Sprinkler_As-Builts_-_Amendment_0003_0003.pdf PDF
Sol_140P2026R0087_Amd_0002.pdf PDF
Amendment_0002_0002.pdf PDF
Sol_140P2026R0087_Amd_0001.pdf PDF
DENA_332037_Final_Construction_Documents_Amendment_1_0001.pdf PDF
Amendment_1_DENA_332037_0001.pdf PDF
DENA_332037_As_Built_Drawings_0001.pdf PDF
Drawings_56-99.pdf PDF
1-55.pdf PDF
04_WD_AK20260001_May_17_2026.pdf PDF
05__Subcontracting_Percentage_Worksheet.pdf PDF
Sol_140P2026R0087.pdf PDF
B08_FINAL_Solicitation_updated_7_31_26.pdf PDF
01_DENA_332037_Final_Construction_Documents_07-20-2026.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Submittal List with Review Estimate Instructions
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
DESIGN SERVICES (Construction Documents (CD) Phase)
Responsible Party: Design Architect/Engineer (A/E)
1Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title.
2Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals.
3In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals.
4Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page.
CONSTRUCTION SERVICES (Construction Phase)
Responsible Party: Construction Contracting Officer Representative (COR)
1Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary.
2Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services.
3Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline.
4Add discipline heading column as required.
5Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews.
6Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order.
7Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative.
Responsible Party: Architect/Engineer (A/E)
1Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section.
2All Informational submittals will be reviewed by Construction Management Representative (CMR).
3Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate.
4Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order.

&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

Template

Submittal List with Review Estimate Template
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
SUBMITTAL LISTACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number:227793(Complete this portion for Architect / Engineer (A/E)
Project Title:Replace Roof at the Eielson Visitor Centerconstruction service task order negotiation.)
SUBMITTALREQUIREMENTSARCHITECT / ENGINEER REVIEW TIME
(Indicate with X)(Indicate in whole or partial hours.)
INFORMATIONALACTION
SPECIFICATION SECTIONPARAGRAPH NUMBERDESCRIPTIONCERTIFICATIONS OR LABORATORY TESTSREPORTS OR CALCULATIONS
OR PLANMANUFACTURER DATA
AND INSTRUCTIONSOTHERSAMPLESSHOP DRAWINGSMANUFACTURER DATA
AND INSTRUCTIONSOTHERARCHITECTCIVIL ENGINEERSTRUCTURAL ENGINEERMECHANICAL ENGINEERELECTRICAL ENGINEERPROJECT MANAGER COORDINATIONLANDSCAPE ARCHITECT
01 31 00Project Management and Coordination
11.3.ACoordination DrawingsX
01 32 16Construction Schedule
11.3.BSchedule of ValuesX
21.3.CCritical Path Method (CPM) ReportsX
01 32 33Photo Documentation
11.2.BComplete Set of Digital ImagesX
01 35 13.22Archeological Requirements
11.3.AWork Schedule in Archeologically Sensitive AreasX
01 35 23Safety Requirements
11.3.AAccident Prevention PlanX
01 40 00Quality Requirements
11.4.AQuality Control PlanX
21.4.BQualification DataX
31.4.HPermits, Licenses, and CertificatesX
01 57 23Temporary Storm Water Pollution Prevention
11.3.A.1SWPPX
21.3.A.2UPPPX
31.3.BInspection Schedule: Pollution Prevention MeasuresX
41.3.CInspection Schedule: Storm Water Pollution Prevention MeasuresX
51.3.DErosion Control ProductsX
01 67 00Product Requirements
11.3.ARecord SubmittalsX
01 73 29Cutting and Patching
11.2.ACutting and Patching PlanX
01 73 40Execution
11.2.ALocation and Elevation CertificatesX
21.2.BLandfill ReceiptsX
01 74 19Construction Waste Management and Disposal
11.4.AWaste Management PlanX
21.4.BProject Waste Management Plan WorksheetX
01 78 23Operation and Maintenance Data
11.2.AO&M ManualX
02 41 19Selective Demolition
11.5.AEngineering SurveyX
21.5.BProposed Protection MeasuresX
31.5.CSchedule of Selective Demolition ActivitiesX
41.5.DPredemolition Photographs or VideoX
51.5.EStatement of Refrigerant RecoveryX
61.5.FWarrantiesX
71.6.AInventoryX
03 30 00Cast-In-Place Concrete
11.3.A.1, 2.2Steel ReinforcingX
21.3.A.2, 2.6AdmixturesX
31.3.BDesign MixturesX
41.3.C.1Cold‐Weather Placement PlanX
51.3.C.2Cold‐Weather Protection PlanX
61.3.D.1Material Certificates for Cementitious MaterialsX
71.3.D.2Material Certificates for AdmixturesX
81.3.D.3Material Certificates for Steel Reinforcement And AccessoriesX
91.3.E.1Concrete Testing ReportsX
101.3.E.2Cold Weather Temperature ReportsX
04 81 00Unit Masonry Assemblies
11.3.A, 2.1Concrete Masonry Unit (CMUS)X
21.3.A, 2.2Mortar and GroutX
31.3.A, 2.3.AUncoated Steel Reinforcing BarsX
41.3.A, 2.4.AUnit Type Inserts in ConcreteX
51.3.A, 2.4.BAnchor BoltsX
61.3.A, 2.4.CPostinstalled AnchorsX
71.3.B.1Masonry Units Shop DrawingsX
81.3.B.2Reinforcing Steel Shop DrawingsX
91.3.B.3Fabricated Flashing Shop DrawingsX
101.4.CQualification Data for Testing AgencyX
111.4.DMix Designs for Each Type of Mortar and GroutX
121.4.ECold Weather ProceduresX
05 12 00Structural Steel Framing
11.3.A, 2.3PrimerX
21.3.BShop DrawingsX
31.3.CQualification Data for InstallerX
41.3.CQualification Data for FabricatorX
51.3.CQualification Data for Testing AgencyX
61.3.DWelding CertificatesX
71.3.EMill Test Reports for Structural SteelX
81.3.F.1Product Test Report for Bolts, Nuts, and WashersX
91.3.F.2Product Test Report for Tension-Control, High Strength Bolt-Nut-Washer AssembliesX
05 31 00Steel Decking
11.2.A.1, 2.2.ARoof DeckX
21.2.A.2, 2.3.BMechanical FastenersX
31.2.A.3Sidelap FastenersX
41.2.A.4, 2.3.DGalvanizing Repair PaintX
05 40 00Cold Formed Metal Framing
11.2.A.1, 2.3.AExterior Non-Load-Bearing Wall Framing: Steel StudsX
21.2.A.1, 2.3.BExterior Non-Load-Bearing Wall Framing: Steel TrackX
31.2.A.1, 2.3.CExterior Non-Load-Bearing Wall Framing: Single Deflection TrackX
41.2.A.1, 2.4.AExterior Soffit and Roof FrameX
51.2.A.1, 2.4.BExterior Soffit and Roof Framing: Steel TrackX
61.2.A.1, 2.6.ASteel Shapes and Clips
71.2.A.1, 2.6.BScrew Anchors
81.2.A.1, 2.6.CMechanical Fasteners
91.2.A.1, 2.7.AGalvanizing Repair Paint
101.2.A.2Vertical Deflection ClipsX
111.2.B.1Steel Sheet Test ReportsX
121.2.B.2Power‐Actuated Anchors Test ReportsX
131.2.B.3Mechanical Fasteners Test ReportsX
05 50 00Metal Fabrications
11.3.A.1, 2.3.BSteel Bolts and NutsX
21.3.A.1, 2.3.CHigh‐Strength Bolts, Nuts, and WashersX
31.3.A.1, 2.3.DStainless Steel Bolts and NutsX
41.3.A.1, 2.3.EAnchor BoltsX
51.3.A.1, 2.3.GCast‐in‐Place Anchors in ConcreteX
61.3.A.1, 2.3.HPost‐Installed AnchorsX
71.3.A.2, 2.4.BUniversal Shop PrimerX
81.3.A.2, 2.4.CWater‐Based PrimerX
91.3.A.2, 2.4.DEpoxy Zinc‐Rich PrimerX
101.3.A.2, 2.4.EShop Primer for Galvanized SteelX
111.3.A.2, 2.4.FGalvanizing Repair PaintX
121.3.A.2, 2.4.GBituminous PaintX
131.3.A.3, 2.4.HShrinkage‐Resisting GroutX
141.3.BShop DrawingsX
151.3.CDelegated Design SubmittalsX
161.4.AMill CertificatesX
171.4.BWelding CertificatesX
181.4.CPaint Compatibility CertificatesX
06 10 00Rough Carpentry
11.3.A, 2.2Dimension Lumber For Concealed ApplicationsX
21.3.A, 2.4.AFasteners and AnchorsX
06 16 00Sheathing
11.2.A, 2.1Wall SheathingX
06 20 00Finish Carpentry
11.3.A, 2.2.AHardwood LumberX
21.3.BShop DrawingsX
06 41 00Architectural Wood Casework
11.3.A, 2.7Panel Cores for Wood Veneer and HPDL PanelsX
21.3.A, 2.4Veneer Tape EdgebandingX
31.3.A, 2.8HardwareX
41.3.A, 2.9Accessory ComponentsX
51.3.BShop DrawingsX
07 21 00Thermal Insulation
11.2.A, 2.2.AMolded (Expanded) Polystyrene Board Insulation, Type IX
07 21 19Foamed-In-Place Insulation
11.2.A, 2.1.ABE-3 Foamed-In-Place InsulationX
21.2.BManufacturer's Installation InstructionsX
07 41 13.16Standing Seam Metal Roof Panels
11.2.A, 2.2Standing Seam Metal Roof PanelsX
21.2.A, 2.3Substrate BoardX
31.2.A, 2.4Vapor RetarderX
41.2.A, 2.5Roof InsulationX
51.2.A, 2.6.AAluminum SheetX
07 52 16Styrene-Butadiene-Styrene (SBS) Modified Bituminous Membrane Roofing
11.3.A, 2.3.ASubstrate BoardX
21.3.A, 2.3.BCover BoardX
41.3.A, 2.4.AExtruded-Polystyrene Board InsulationX
51.3.A, 2.4.BMolded (expanded) Polystyrene Board Insulation:X
61.3.A, 2.5.AModified Bituminous Membrane: Base Field PlyX
71.3.A, 2.5.BModified Bituminous Membrane: Cap PlyX
81.3.BShop DrawingsX
101.4.A.1Performance Requirement CertificateX
111.4.A.2Special Warranty CertificateX
121.4.BProduct Test ReportsX
131.4.CResearch ReportsX
141.4.D.1Fastener Pullout Test ReportsX
161.4.EField Quality-Control ReportsX
171.4.FSample WarrantiesX
181.4.GMaintenance DataX
07 62 00Sheet Metal Flashing and Trim
11.3.A, 2.1.APre-Finished Galvanized SteelX
21.3.BShop DrawingsX
31.3.CSamplesX
07 92 00Joint Sealant
11.3.A, 2.3.ANon-Staining Silicone SealantX
21.3.A, 2.3.BPolyurethane SealantX
31.3.A, 2.3.CAcrylic Emulsion LatexX
41.3.A, 2.3.DSilicone, S, NS, 50, NTX
51.3.BColor Cards for SelectionX
09 21 16Gypsum Board Assemblies
11.3.A, 2.1Gypsum Board AssembliesX
21.3.A, 2.2Metal Framing MaterialsX
31.3.A, 2.3.BGypsum WallboardX
41.3.A, 2.4.AAcoustic InsulationX
51.3.A, 2.4.CJoint MaterialsX
61.3.A, 2.4.DScrews for Attachment to Steel Members Less Than 0.03 inch in ThicknessX
71.3.A, 2.4.EScrews for Attachment to Steel Members From 0.033 to 0.112 inch in ThicknessX
81.3.BPartition Head to Structure ConnectionsX
09 51 00Acoustical Ceilings
11.3.A, 2.3Acoustical UnitsX
21.3.A, 2.4Suspension SystemsX
31.3.A, 2.5.ASupport Channels and HangersX
09 65 00Resilient Flooring
11.3.A, 2.1.ALinoleum Sheet FlooringX
21.3.A, 2.2.AResilient BaseX
31.3.BSelection SamplesX
41.3.CVerification SamplesX
51.3.DMaintenance DataX
09 68 13Tile Carpeting
11.3.A, 2.2Joint Layout DrawingsX
21.3.A, 2.3.AManufacturer's InstructionsX
31.3.A, 2.3.BConcrete Subfloor Test ReportX
09 91 23Interior Painting
11.3.A, 2.3.APaint I-OPX
21.3.A, 2.3.BPaint I-OP-MD-DT
31.3.BSamplesX
41.3.CManufacturer's InstructionsX
09 93 00Staining and Transparent Finishing
11.3.A, 2.3.A.1Finish on Wood - Trim: StainX
21.3.A, 2.3.A.2Finish on Wood - Trim: Top CoatX
31.3.BManufacturer's InstructionsX
12 36 00Countertops
11.3.A, 2.1.ASolid Surfacing CountertopsX
21.3.A, 2.2.APlywoodX
31.3.A, 2.2.BAdhesivesX
41.3.A, 2.2.CJoint SealantX
51.3.BShop DrawingsX
20 05 29Hangers and Supports For Mechanical
11.2.A, 2.2.ANon Insulated Pipe HangersX
21.2.A, 2.3Hanger RodsX
31.2.A, 2.4Channel StrutsX
41.2.A, 2.5Steel Structure AttachmentsX
51.2.BApplication ScheduleX
61.2.C.1Test Reports: Third PartyX
71.2.C.2Concrete Anchors Special Inspection FormX
20 07 00Insulation for Mechanical
11.2.A, 2.1.CLagging FabricX
21.2.A, 2.1.DThermal Insulation CoatingsX
31.2.A, 2.1.EInsulating CementX
41.2.A, 2.1.GPlastic Insulation CoversX
51.2.A, 2.1.HMetal JacketsX
61.2.A, 2.2.A.1Outside, Relief, Exhaust, and Combustion Air Duct Insulation: Rectangular DuctworkX
71.2.A, 2.2.A.2Outside, Relief, Exhaust, and Combustion Air Duct Insulation: Round DuctworkX
81.2.BApplication ScheduleX
21 13 00Fire Suppression Sprinkler System
11.2.A, 2.1Piping and Fittings: InteriorX
21.2.A, 2.2Sprinkler HeadsX
31.2.A, 2.3Zone Isolation Valve TagsX
41.2.A, 2.4Fire Protection Backflow Preventer – Double Check Valve AssembliesX
51.2.A, 2.5Check ValveX
61.2.A, 2.6Isolation ValveX
71.2.A, 2.7Tamper SwtichX
81.2.A, 2.8UL Listed Glycol Fire Protection FluidX
91.2.BContractor QualificationsX
101.2.CShop Drawings and CalculationsX
22 13 16Sanitary Waste and Vent Piping
11.2.A, 2.2Vent Through Roof FlashingX
21.2.BApplication ScheduleX
22 13 19Sanitary Waste Piping Specialties
11.2.A, 2.1.AFloor DrainsX
22 42 13Commercial Water Closets and Urinals
11.2.A, 2.2Floor Mounted Water ClosetsX
21.2.A, 2.3AccessoriesX
23 05 00Common Work Results for HVAC
11.2.A, 2.2.AThermometersX
21.2.A, 2.3.APressure GaugesX
31.2.A, 2.4.ADrain ValvesX
41.2.A, 2.7.AAir VentsX
51.2.A, 2.8.ADielectric Pipe ProtectionX
61.2.A, 2.9.AEscutcheonsX
71.2.A, 2.10.AFlow Test KitX
81.2.BBalance Valve ScheduleX
23 05 93Testing, Adjusting and Balancing for HVAC
11.2.ABalancer Qualifications and Balancing PlanX
23 09 23Direct Digital Control Systems for HVAC
11.2.A, 1.2Contractor QualificationsX
21.2.A, 1.4BMS Software Function IndexX
31.2.A, 1.5.E.1System Architecture SchematicX
41.2.A, 1.5.E.2Riser DiagramX
51.2.A, 1.5.E.3Control Valve ScheduleX
61.2.A, 1.5.E.4Damper Actuator ScheduleX
71.2.A, 1.5.E.5HRV Control DiagramsX
81.2.A, 1.5.E.6Terminal Unit Control DiagramsX
91.2.A, 1.5.E.7Miscellaneous Equipment Control DiagramsX
101.2.A, 1.5.E.8I/O Interface DiagramsX
111.2.A, 2.2Direct Digital ControllersX
121.2.A, 2.3Temperature SensorsX
131.2.A, 2.4Thermostats and Temperature SwitchesX
141.2.A, 2.5Other SwitchesX
151.2.A, 2.6Signal ConditionersX
161.2.A, 2.7Control RelaysX
171.2.A, 2.8Control ValvesX
181.2.A, 2.9Damper and Valve ActuatorsX
191.2.A, 2.11PanelsX
23 21 13Hydronic Piping
11.2.BApplication ScheduleX
23 31 13HVAC Ducts and Casings
11.2.A, 2.1.BDuct SealantX
21.2.BShop Drawings: Special FabricationsX
31.2.CShop Drawings: Substantial DeviationsX
23 33 11Air Duct Accessories
11.2.A, 2.2.AFlexible Connections: Non-Insulated DuctworkX
21.2.A, 2.2.BFlexible Connections: Insulated DuctworkX
31.2.A, 2.3Turning VanesX
41.2.A, 2.4Spin-In FittingsX
51.2.BShop Drawings: Contractor Fabricated Items
23 33 13Dampers
11.2.A, 2.2.ABackdraft DampersX
21.2.BShop Drawings: Contractor Fabricated ItemsX
23 33 56HVAC Louvers
11.2.A, 2.1LouversX
23 82 36Finned Tube Radiation
11.2.A, 2.2.ABonderized Steel EnclosuresX
21.2.A, 2.3Nonferrous Heating ElementsX
31.2.A, 2.4.AEnclosure Top SupportsX
41.2.A, 2.5.AEnclosure and Element Saddle Support BracketsX
51.2.A, 2.6.AElements SaddlesX
26 27 26Wiring Devices and Plates
11.2.A,B, 2.2ReceptaclesX
21.2.A,B, 2.3PlatesX
26 50 00Lighting
11.2.A, 2.1Light FixturesX
21.2.A, 2.5Exit Signs and Emergency Lighting UnitsX
26 51 02Lighting Control Devices
11.2.A, 2.3Wired Wallbox Vacancy SensorsX
21.2.A, 2.4Wired Occupancy SensorsX
31.2.BManufacturer's Installation InstructionsX
41.2.COperation and Maintenance DataX
31 20 00Earth Moving
11.3.ATraffic Control PlanX
21.4.AGradation AnalysesX
31.4.BModified Proctor Test ResultsX
41.4.CCompaction Test Resultsx
32 96 13Groundcover Transplanting
11.5.AExisting ConditionsX
Drawings
1C301Geogrid LayoutX
2C700Stone and Rock SamplesX
3C700Mortar SampleX
4C700Resume of Masonry SupervisorX

Total: 0 0 0 0 0 0 0