3-PULL_223195_FINAL_Drawings_2019-0913.pdf
PDF 31 MB Posted
- Attached to
- Pullman National Monument, PULL 223195-253045 Federal contract opportunity
- Solicitation number
- 140P2019R0048
About this file
This pre-solicitation notice describes a forthcoming solicitation for a construction project at Pullman National Monument in Chicago, Illinois. The project involves stabilizing the Administration Building and constructing a new Visitor Center. Work on the Administration Building includes masonry repairs, structural reinforcement, and minimal build-out of the second and third floors. The Visitor Center project comprises renovating the first floor for interpretive exhibits, offices, and other public functions along with associated mechanical, electrical and plumbing systems. The estimated price range for both projects is $5-10 million. The period of performance is anticipated to be from September 2019 to August 2020. Responses to the solicitation, when issued on or around July 18, 2019, will be considered on a best value basis evaluating both technical capability and price. This procurement is set aside for small businesses with a size standard of $36.5 million for the applicable NAICS code.
Drawings
View the file
Other files for this federal contract opportunity
Show all 50
Pullman National Monument, PULL 223195-253045 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/13/19 rodriguezj2
JOG STAMP
| COVER G0 |
| G0.1 INDEX G0 |
| G0.2 SYM&ABR G0 |
| G1.0 STPLN G1 |
| G2.0 CODE COMP G2 |
| G2.1 CODE PLN G2 |
| G2.2 CODE PLN G2 |
| G3.0 ADAPLN G3 |
| G3.1 ADAPLNBIG G3 |
| A0.0 01DEMO A0 |
| A0.1 02DEMO A0 |
| A0.2 03DEMO A0 |
| A0.3 04DEMO A0 |
| A1.0A 01FLRPLN A1 |
| A1.0B 01FLRPLN A1 |
| A1.1A MZFLRPLN A1 |
| A1.1B MZFLRPLN A1 |
| A1.2A 02FLRPLN A1 |
| A1.2B 02FLRPLN A1 |
| A1.3A 03FLRPLN A1 |
| A1.3B 03FLRPLN A1 |
| A1.4 RFPLN A1 |
| A1.5 01RCPPLN A1 |
| A1.6 01FLRFIN A1 |
| A2.0 EXT ELEV A2 |
| A2.1 EXT ELEV A2 |
| A2.2 EXT ELEV A2 |
| A2.3 EXT ELEV A2 |
| A2.4A INT ELEV A2 |
| A2.4B INT ELEV A2 |
| A2.5 INT ELEV A2 |
| A2.6 INT ELEV A2 |
| A2.7 INT ELEV A2 |
| A2.8 INT ELEV A2 |
| A2.9 INT ELEV A2 |
| A3.0 BLD SECT A3 |
| A3.1 BLD SECT A3 |
| A3.2 BLD SECT A3 |
| A4.0 ENGPLN SE A4 |
| A4.1 ENGPLN SW A4 |
| A4.2 ENGPLN RESTRM A4 |
| A4.3 ENGPLN STAIR N A4 |
| A4.4 ENGPLN STAIR S A4 |
| A4.5 SECTION STAIR N A4 |
| A4.6 SECTION STAIR S A4 |
| A4.7 ENGPLN STAIR DTLS A4 |
| A4.8 ENGPLN STAIR DTLS A4 |
| A5.0 BLD DET A5 |
| A5.1 BLD DET A5 |
| A5.2 BLD DET A5 |
| A5.3 BLD DET A5 |
| A5.4 WALLTYPS A5 |
| A5.5 CLGDTLS A5 |
| A5.6 MILLDTLS A5 |
| A5.7 DESKDTLS A5 |
| A5.8 DESKDTLS A5 |
| A5.9 DESKDTLS A5 |
| A5.10 MVMT JT DET A5 |
| A5.11 SHAFT WALL DET A5 |
| A6.0 FIN SCHD A6 |
| A6.1 DOORSCHD A6 |
| A6.2 DOORDTLS A6 |
| A6.3 WINDSCHD A6 |
| A6.4 WINDDTLS A6 |
| A6.5 DETAILS A6 |
| A6.6 SIGNAGE DETAILS A6 |
| A6.7 WINDDTLS A6 |
| S0.1 STRNOTES S0 |
| S1.0 01STRPLN S1 |
| S1.1 MZSTRPLN S1 |
| S1.2 02STRPLN S1 |
| S1.3 03STRPLN S1 |
| S2.1 STRSECT S2 |
| S3.0 STRDTL S3 |
| S3.1 STRDTL S3 |
| S3.2 STRDTL S3 |
| PULL 223195 FINAL Drawings 2019-0913.pdf |
| F0.0 FIRE COVER F0.0 (1) |
| F1.0 FIRE 1ST F1.0 (1) |
| F1.1 FIRE PROTECTION MEZ F1.1 (1) |
| F1.2 FIRE PROTECTION 2ND AND 3RD FLOOR F1.2 (1) |
| F4.0 FIRE PROTECTION RISER DIAGRAM F4.0 (1) |
| F5.0 FIRE PROTECTION DETAILS F5.0 (1) |
| F6.0 FIRE PROTECTION SCHEDULES F6.0 (1) |
File details come from the government source that posted it. Updated .