B11_PULL_223195-253045_VC_prebid_attendees_191009.pdf

PDF 4 MB Posted

Attached to
Pullman National Monument, PULL 223195-253045
Solicitation number
140P2019R0048
Issued by

About this file

This pre-solicitation notice provides details for an upcoming construction contract opportunity with the National Park Service. The project involves stabilizing the Pullman Administration Building and constructing a new Visitor Center at Pullman National Monument in Chicago, Illinois, with an estimated price range of $5-10 million. The construction period is anticipated to be from September 1, 2019 to August 30, 2020. A firm-fixed price contract will be awarded following the submission and evaluation of both technical and price proposals. Interested small businesses certified in accordance with FAR 52.219-8 are encouraged to respond, as this procurement is set aside for total small business participation. The solicitation is expected to be issued on or around July 18, 2019 through www.fedbizopps.gov.

Pre-proposal site visit sign in sheet

View the file

Other files

File Type Posted
Amendment_Number_0007_Narrative.pdf PDF
191024_RFI_Response_WSP_009-010_MEP_detail.pdf PDF
SF_30-Amendment_0007-140P2019R0048_10.28.19.pdf PDF
2-Amendment_Number_0006_Narrative.pdf PDF
8-A2.4B_INT_ELEV_A2-Addendum_191022.pdf PDF
11-S1.0_01STRPLN_S1-Addendum_191024.pdf PDF
4-10.22.19_-_Pullman_Visitor_Center_Camera_Changes.pdf PDF
5-084413_Glazed_Aluminum_Curtain_Walls.pdf PDF
3-PULL_Visitor_Center,_Bidding_Questions_as_of_10-22-2019.pdf PDF
9-A6.4_WINDDTLS_A6-Addendum_191022.pdf PDF
10-ED1.0_POWER_1ST_FLOOR_DEMOLITION.PDF PDF
1-140P2019R0048,_Amendment_No._0006.pdf PDF
7-282000_FL_-_Video_Surveillance.pdf PDF
PULL_223195_Sustainability_Checklist_2019-0619.pdf PDF
SF_30_-_140P2019R0048-Amendment_0005.pdf PDF
North_Bay_Electrical_Equipment.pdf PDF
PULL_VC_Contractor_Site_Visit_Attendees_191017.pdf PDF
PULL_Visitor_Center,_Bidding_Questions_as_of_10-21-2019-FINAL.pdf PDF
PULL_223195_ARCH_Submittal_List_2019-0820.pdf PDF
1-Amendment__4_Narrative.pdf PDF
SF_30_Amendment___4_140P2019R0048.pdf PDF
2-Amend__4,_Vol_II,_Instructions_.pdf PDF
PULL_Prebid_Notes.pptx PPTX presentation
PULL_Visitor_Center,_Bidding_Questions,_10-1-2019.xlsx XLSX spreadsheet
Amendment_0003_140P2019R0048.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
B02_SF_30,_Amend_No._002.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
_B08_PULL_223195-253045_Amend__1,_page_175_of_180,_preproposal.pdf PDF
B08_PULL_223195-253045_Amend__1,_Narrative.pdf PDF
B01_PULL_223195-253045_140P2019R0048_SF_1442,_Amend__1.pdf PDF
B08_PULL_223195-253045_Amend__1,_SF_30.pdf PDF
PULL_223195_ARCH_ContractPriceSchedule_rfp-6-18-19.xls XLS spreadsheet
E2.1_-_VC_Exhibit_Design_Part1.pdf PDF
E1.1_-_Site_Development_Drawings_DRAFT_2019-0719_Part1.pdf PDF
2-PULL_223195_FINAL_Spec_BOOK_2_2019-0913.pdf PDF
C_-_Limited_Hazardous_Materials_Report_GSG.pdf PDF
B_-_VC_Building_Soil_Sampling_Report_DAI.pdf PDF
4-B03_PULL_223195-253045_General_Decision,_IL20190009_.pdf PDF
D1_-_Pullman_Stabilization_Drawings.pdf PDF
B08_PULL_223195-153045_140P2019R0048_Binder1.pdf PDF
5-PSP_Vol_I,_pkg.pdf PDF
1-PULL_223195_FINAL_Spec_BOOK_1_2019-0913.pdf PDF
B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx XLSX spreadsheet
E1.3_-_Site_Development_Drawings_DRAFT_2019-0719_Part3.pdf PDF
D2_-_Pullman_Stabilization_Project_Manual.pdf PDF
A_-_Soils_Investigation_Report_TSC.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
E2.2_-_VC_Exhibit_Design_Part2.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .