This document contains a pre-solicitation notice for construction services at Pullman National Monument. The National Park Service seeks to stabilize the Administration Building and construct a new Visitor Center, with an estimated price range of $5-10 million. Work will include masonry repairs, structural reinforcement, and system upgrades to the Administration Building, as well as tenant improvements to convert the first floor into a Visitor Center with exhibits, retail, and meeting spaces. The second and third floors will receive minimal finishes. A single firm will be selected through a negotiated procurement to complete both scopes of work by August 2020. The solicitation will be issued on FedBizOpps on or around July 18th as a total small business set-aside for NAICS 236220 with a size standard of $36.5 million.
Question Answer Log
View the file
Other files for this federal contract opportunity
Show all 50
Pullman National Monument, PULL 223195-253045 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| No. | Date of Question | Question | Response | Response Issued | |
| 1 | 9/23/19 | Transoms of this size cannot be provided without vertical mullion, deadload of glass on horizontal is about 475 lbs., not sure if this is feasible. | |||
| Extrusions detailed appear to be low profile with no clear specification back-up other than CR Laurence or others as listed. Please advise. | Pending | ||||
| 2 | 9/24/19 | While there is irrigation called out on the plans, there is no direction as to acceptable products or manufacturers. I would like to verify that Rain Bird is an acceptable manufacturer for the project. |
| Could you confirm that Rain Bird is an acceptable manufacturer? | There is no irrigation on this project. | 1/10/19 | ||
| 3 | 9/25/19 | Robbins Lightning, Inc. received this project today and we are not listed as an Approved Lightning Protection Manufacturer. I have attached an approval letter about our company. Our websites are listed in the letter where you may view our products and services. We would like to be listed as an Approved Lightning Protection Manufacturer on this project and future projects. | Section 21 41 13 should be deleted from the project manual. It seems to have been inadvertently included from a very early design submission. The current Table of Contents is correct as it does not include that section. |
There is no lightning protection scope of work in this project beyond protection of the existing.
| 1/10/19 | ||
| 4 | 9/23/19 | We would like to request your consideration of our Spray Foam Insulation Product as an alternate for this project: |
QUIK-SHIELD® 118 is the first Ultra-Efficient closed-cell, spray foam on the market today. It is specially formulated to increase jobsite efficiency, decrease labor and overhead costs, reduce jobsite risk, and deliver the lowest cost installed.
Key features of Quik-Shield 118
Core Density: nominal, 1.8-2.0 lb/ft3.
R-value at 1”: 6.6.
9% total renewable/recycle content.
Meets GREENGUARD Gold standard for low VOC’s.
12 hr. commercial project re-entry (vs. 24 hr. for the specified product).
Limited Lifetime Warranty QS118 has been approved with DC315
| Spec Sedtion: 072119: This item is acceptible as an equal. | 1/10/19 |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| 14 | |
| 15 | |
| 16 | |
| 18 | |
| 19 | |
| 20 | |
| 21 | |
| 22 | |
| 23 | |
| 24 | |
| 25 | |
| 26 | |
| 27 | |
| 28 | |
| 29 | |
| 30 | |
| 31 | |
| 32 | |
| 33 | |
| 34 | |
| 35 |
JEFF 181202C North Park Grounds Potential Offeror Questions