This document contains a pre-solicitation notice for construction services at Pullman National Monument. The National Park Service seeks to stabilize the Administration Building and construct a new Visitor Center, with an estimated price range of $5-10 million. Work will include masonry repairs, structural reinforcement, and system upgrades to the Administration Building, as well as tenant improvements to convert the first floor into a Visitor Center with exhibits, retail, and meeting spaces. The second and third floors will receive minimal finishes. A single firm will be selected through a negotiated procurement to complete both scopes of work by August 2020. The solicitation will be issued on FedBizOpps on or around July 18th as a total small business set-aside for NAICS 236220 with a size standard of $36.5 million.

Question Answer Log

View the file

Other files for this federal contract opportunity

Other files attached to Pullman National Monument, PULL 223195-253045, newest first.
File Type Posted
191024_RFI_Response_WSP_009-010_MEP_detail.pdf PDF
11-S1.0_01STRPLN_S1-Addendum_191024.pdf PDF
5-084413_Glazed_Aluminum_Curtain_Walls.pdf PDF
4-10.22.19_-_Pullman_Visitor_Center_Camera_Changes.pdf PDF
1-140P2019R0048,_Amendment_No._0006.pdf PDF
9-A6.4_WINDDTLS_A6-Addendum_191022.pdf PDF
8-A2.4B_INT_ELEV_A2-Addendum_191022.pdf PDF
10-ED1.0_POWER_1ST_FLOOR_DEMOLITION.PDF PDF
3-PULL_Visitor_Center,_Bidding_Questions_as_of_10-22-2019.pdf PDF
2-Amendment_Number_0006_Narrative.pdf PDF
PULL_VC_Contractor_Site_Visit_Attendees_191017.pdf PDF
PULL_223195_Sustainability_Checklist_2019-0619.pdf PDF
SF_30_-_140P2019R0048-Amendment_0005.pdf PDF
North_Bay_Electrical_Equipment.pdf PDF
PULL_223195_ARCH_Submittal_List_2019-0820.pdf PDF
2-Amend__4,_Vol_II,_Instructions_.pdf PDF
B11_PULL_223195-253045_VC_prebid_attendees_191009.pdf PDF
SF_30_Amendment___4_140P2019R0048.pdf PDF
PULL_Prebid_Notes.pptx PPTX presentation
1-Amendment__4_Narrative.pdf PDF
Amendment_0003_140P2019R0048.pdf PDF
B02_SF_30,_Amend_No._002.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
B01_PULL_223195-253045_140P2019R0048_SF_1442,_Amend__1.pdf PDF
B08_PULL_223195-253045_Amend__1,_Narrative.pdf PDF
_B08_PULL_223195-253045_Amend__1,_page_175_of_180,_preproposal.pdf PDF
B08_PULL_223195-253045_Amend__1,_SF_30.pdf PDF
PULL_223195_ARCH_ContractPriceSchedule_rfp-6-18-19.xls XLS spreadsheet
D1_-_Pullman_Stabilization_Drawings.pdf PDF
1-PULL_223195_FINAL_Spec_BOOK_1_2019-0913.pdf PDF
2-PULL_223195_FINAL_Spec_BOOK_2_2019-0913.pdf PDF
B08_PULL_223195-153045_140P2019R0048_Binder1.pdf PDF
4-B03_PULL_223195-253045_General_Decision,_IL20190009_.pdf PDF
B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx XLSX spreadsheet
C_-_Limited_Hazardous_Materials_Report_GSG.pdf PDF
A_-_Soils_Investigation_Report_TSC.pdf PDF
E2.1_-_VC_Exhibit_Design_Part1.pdf PDF
E1.3_-_Site_Development_Drawings_DRAFT_2019-0719_Part3.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
5-PSP_Vol_I,_pkg.pdf PDF
B_-_VC_Building_Soil_Sampling_Report_DAI.pdf PDF
D2_-_Pullman_Stabilization_Project_Manual.pdf PDF
E1.1_-_Site_Development_Drawings_DRAFT_2019-0719_Part1.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
3-PULL_223195_FINAL_Drawings_2019-0913.pdf PDF
E1.2_-_Site_Development_Drawings_DRAFT_2019-0719_Part2.pdf PDF
6-PSP_Vol_II,_pkg.pdf PDF
E2.2_-_VC_Exhibit_Design_Part2.pdf PDF
Show all 50

Pullman National Monument, PULL 223195-253045 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

No.Date of QuestionQuestionResponseResponse Issued
19/23/19Transoms of this size cannot be provided without vertical mullion, deadload of glass on horizontal is about 475 lbs., not sure if this is feasible.
Extrusions detailed appear to be low profile with no clear specification back-up other than CR Laurence or others as listed. Please advise.Pending
29/24/19While there is irrigation called out on the plans, there is no direction as to acceptable products or manufacturers. I would like to verify that Rain Bird is an acceptable manufacturer for the project.
Could you confirm that Rain Bird is an acceptable manufacturer?There is no irrigation on this project.1/10/19
39/25/19Robbins Lightning, Inc. received this project today and we are not listed as an Approved Lightning Protection Manufacturer. I have attached an approval letter about our company. Our websites are listed in the letter where you may view our products and services. We would like to be listed as an Approved Lightning Protection Manufacturer on this project and future projects.Section 21 41 13 should be deleted from the project manual. It seems to have been inadvertently included from a very early design submission. The current Table of Contents is correct as it does not include that section.

There is no lightning protection scope of work in this project beyond protection of the existing.

1/10/19
49/23/19We would like to request your consideration of our Spray Foam Insulation Product as an alternate for this project:

QUIK-SHIELD® 118 is the first Ultra-Efficient closed-cell, spray foam on the market today. It is specially formulated to increase jobsite efficiency, decrease labor and overhead costs, reduce jobsite risk, and deliver the lowest cost installed.

Key features of Quik-Shield 118

Core Density: nominal, 1.8-2.0 lb/ft3.

R-value at 1”: 6.6.

9% total renewable/recycle content.

Meets GREENGUARD Gold standard for low VOC’s.

12 hr. commercial project re-entry (vs. 24 hr. for the specified product).

Limited Lifetime Warranty QS118 has been approved with DC315

Spec Sedtion: 072119: This item is acceptible as an equal.1/10/19
5
6
7
8
9
10
11
12
13
14
15
16
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

JEFF 181202C North Park Grounds Potential Offeror Questions

Sheet2

Sheet3

File details come from the government source that posted it. Updated .