D1_-_Pullman_Stabilization_Drawings.pdf

PDF 36 MB Posted

Attached to
Pullman National Monument, PULL 223195-253045 Federal contract opportunity
Solicitation number
140P2019R0048
Issued by
Department of the Interior National Park Service National Office

About this file

This document outlines a pre-solicitation notice for a construction project at Pullman National Monument. The National Park Service seeks to stabilize the Administration Building and construct a new Visitor Center, with an estimated price range of $5-10 million. The project includes masonry repairs, floor installation, egress enclosures and stairs in the Administration Building across three floors. For the Visitor Center, tenant improvements are required on the first floor for exhibits, retail, and offices, along with full mechanical, electrical and plumbing systems. The solicitation is anticipated in July 2019 as a small business set-aside for a firm-fixed price contract, with a period of performance from September 2019 to August 2020. Coordination is necessary with concurrent infrastructure and building projects at the site by other entities.

Stabilization Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Pullman National Monument, PULL 223195-253045, newest first.
File Type Posted
SF_30-Amendment_0007-140P2019R0048_10.28.19.pdf PDF
Amendment_Number_0007_Narrative.pdf PDF
1-140P2019R0048,_Amendment_No._0006.pdf PDF
9-A6.4_WINDDTLS_A6-Addendum_191022.pdf PDF
8-A2.4B_INT_ELEV_A2-Addendum_191022.pdf PDF
10-ED1.0_POWER_1ST_FLOOR_DEMOLITION.PDF PDF
3-PULL_Visitor_Center,_Bidding_Questions_as_of_10-22-2019.pdf PDF
2-Amendment_Number_0006_Narrative.pdf PDF
7-282000_FL_-_Video_Surveillance.pdf PDF
PULL_223195_Sustainability_Checklist_2019-0619.pdf PDF
SF_30_-_140P2019R0048-Amendment_0005.pdf PDF
North_Bay_Electrical_Equipment.pdf PDF
PULL_223195_ARCH_Submittal_List_2019-0820.pdf PDF
PULL_Visitor_Center,_Bidding_Questions_as_of_10-21-2019-FINAL.pdf PDF
PULL_VC_Contractor_Site_Visit_Attendees_191017.pdf PDF
SF_30_Amendment___4_140P2019R0048.pdf PDF
PULL_Prebid_Notes.pptx PPTX presentation
1-Amendment__4_Narrative.pdf PDF
2-Amend__4,_Vol_II,_Instructions_.pdf PDF
B11_PULL_223195-253045_VC_prebid_attendees_191009.pdf PDF
PULL_Visitor_Center,_Bidding_Questions,_10-1-2019.xlsx XLSX spreadsheet
Amendment_0003_140P2019R0048.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
B02_SF_30,_Amend_No._002.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
B01_PULL_223195-253045_140P2019R0048_SF_1442,_Amend__1.pdf PDF
B08_PULL_223195-253045_Amend__1,_Narrative.pdf PDF
_B08_PULL_223195-253045_Amend__1,_page_175_of_180,_preproposal.pdf PDF
B08_PULL_223195-253045_Amend__1,_SF_30.pdf PDF
PULL_223195_ARCH_ContractPriceSchedule_rfp-6-18-19.xls XLS spreadsheet
4-B03_PULL_223195-253045_General_Decision,_IL20190009_.pdf PDF
B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx XLSX spreadsheet
C_-_Limited_Hazardous_Materials_Report_GSG.pdf PDF
A_-_Soils_Investigation_Report_TSC.pdf PDF
E2.1_-_VC_Exhibit_Design_Part1.pdf PDF
E1.3_-_Site_Development_Drawings_DRAFT_2019-0719_Part3.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
5-PSP_Vol_I,_pkg.pdf PDF
B_-_VC_Building_Soil_Sampling_Report_DAI.pdf PDF
D2_-_Pullman_Stabilization_Project_Manual.pdf PDF
E1.1_-_Site_Development_Drawings_DRAFT_2019-0719_Part1.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
3-PULL_223195_FINAL_Drawings_2019-0913.pdf PDF
E1.2_-_Site_Development_Drawings_DRAFT_2019-0719_Part2.pdf PDF
6-PSP_Vol_II,_pkg.pdf PDF
E2.2_-_VC_Exhibit_Design_Part2.pdf PDF
1-PULL_223195_FINAL_Spec_BOOK_1_2019-0913.pdf PDF
2-PULL_223195_FINAL_Spec_BOOK_2_2019-0913.pdf PDF
B08_PULL_223195-153045_140P2019R0048_Binder1.pdf PDF
Show all 50

Pullman National Monument, PULL 223195-253045 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

001_GN_1_AB_NF Layout

002_GN_2_AB_NF Layout
003_GN_3_AB_NF Layout
004_A1_1_AB Layout1 (
005_A1_2_AB Layout1 (
006_A1_3_AB Layout1 (
007_A1_4_AB Layout1 (
008_A1_5_NF Layout1 (
009_A1_6_NF Layout1 (
010_A1_7_NF Layout1 (
011_A1_8_RS Layout1 (
012_A1_9_RS Layout1 (
013_A2_1_AB Layout1 (
014_A2_2_AB Layout1 (
015_A2_3_AB Layout1 (
016_A2_4_AB Layout1 (
017_A2_5_AB Layout1 (
018_A2_6_AB Layout1 (
019_A2_7_NF Layout1 (
020_A2_8_NF Layout1 (
021_A2_9_NF Layout1 (
022_A2_10_NF Layout1
023_A2_11_NF Layout1
024_A2_12_NF Layout1
025_A2_13_NF Layout1
026_A2_14_NF Layout1
027_A2_15_AB Layout1
028_A2_16 Layout1 (1)
029_A2_17 Layout1 (1)
030_A2_18 Layout1 (1)
031_A2_19 Layout1 (1)
032_A2_20 Layout1 (1)
033_A3_1_AB Layout1 (
034_A3_2_AB_NF Layout
035_A3_3_AB Layout1 (
036_A3_4_AB Layout1 (
037_A4_1_AB_NF Layout
038_A4_2_AB_NF Layout
039_A5_1_AB Layout1 (
040_A5_2_AB Layout1 (
041_A5_3_AB Layout1 (
042_A5_4_AB Layout1 (
043_A6_1_AB Layout1 (
044_A6_2_AB Layout1 (
045_A6_3_AB Layout1 (
046_A6_4_AB Layout1 (
047_A6_5_NF Layout1 (
048_A6_6_NF Layout1 (
049_S1_1 Layout1 (1)
050_S1_2 Layout1 (1)
051_S1_3 Layout1 (1)
052_S1_4 Layout1 (1)
053_S1_5 Layout1 (1)
054_S1_6 Layout1 (1)
055_S1_7 Layout1 (1)
056_S2_1 Layout1 (1)
057_S2_2 Layout1 (1)
058_S2_3 Layout1 (1)
059_S2_4 Layout1 (1)
060_S3_1 Layout1 (1)
061_S3_2 Layout1 (1)
062_S3_3 Layout1 (1)
063_S3_4 Layout1 (1)
064_S3_6 Layout1 (1)
065_S3_7 Layout1 (1)
066_S3_8 Layout1 (1)
067_S3_9 Layout1 (1)
068_M1_1_NF Layout1 (
069_V-2 Layout1 (1)
070_V-3 Layout1 (1)
071_E-1 Layout1 (1)
072_E-2 Layout1 (1)
073_E-3 Layout1 (1)
074_E-4 Layout1 (1)
075_E-5 Layout1 (1)
076_E-6 Layout1 (1)
077_E-7 Layout1 (1)
078_E-8 Layout1 (1)
079_E-9 Layout1 (1)
080_E-10 Layout1 (1)
081_E-11 Layout1 (1)
082_E-12 Layout1 (1)
083_E-13 Layout1 (1)
084_E-14 Layout1 (1)
085_E-15 Layout1 (1)
086_E-16 Layout1 (1)
087_E-17 Layout1 (1)
088_E-18 Layout1 (1)
089_E-19 Layout1 (1)
090_E-20 Layout1 (1)
091_E-21 E-21 (1)
092_E-22 E-22 (1)

File details come from the government source that posted it. Updated .