This document contains an amendment to a solicitation for construction services at the Pullman National Monument in Chicago, Illinois. The scope of work includes stabilizing the Administration Building and constructing a new Visitor Center. Services required are exterior and interior masonry repairs to the Administration Building, installation of floor slabs, egress structures and an elevator at all three levels, and construction of tenant improvements for the Visitor Center. The period of performance is from September 2019 to August 2020. The estimated price range is $5-10 million. The National Park Service is seeking proposals on a total small business set-aside basis, with the small business size standard being $36.5 million. The solicitation issue date is estimated for July 18, 2019 and proposals will be received electronically. A pre-proposal conference was held on October 9, 2019 and another site visit is scheduled for October 17, 2019.
Amendment 0004 Narrative
View the file
Other files for this federal contract opportunity
Show all 50
Pullman National Monument, PULL 223195-253045 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #: 140P2019R0048
Amendment #00004
The purpose of this amendment #4 is to make changes to the Request for Proposal and provide the sign-in sheets and notes from the Site Visit/Pre-Proposal Conference held on Wednesday, October 9, 2019, at
9:00am at the Pullman National Monument, Pullman Factory site; 11057 South Cottage Grove Avenue, Chicago, IL 60628, provide a copy of the slide presentation, and to answer questions received as of
October 11, 2019.
See following Page(s)
a. RFP, Section L –Instructions, Conditions and Notices to Offerors, Paragraph E. Volume II, Business and
Price Proposal – Format, Organization, Contents. Add the following:
SMALL BUSINESS PATICIPATION PLAN: All offerors, both Small and Large business concerns, are required to submit a Small Business (SB) Participation Plan. The offeror shall propose the level of participation of SB concerns (as a SB prime and/or no lower than first-tier SB subcontractors) that GUARANTEES A MINIMUM OF 20 PERCENT OF THE TOTAL
CONTRACT VALUE WILL GO TO SMALL BUSINESSES in performance of the acquisition. Participation in performance of the contract includes joint ventures, teaming arrangements, and subcontracts. Note: Small business offerors may include the work performed by its own company toward the Small Business Participation Plan.
At a minimum, the Small Business Participation Plan must address the elements listed below
(paragraphs a thru d).
A. Principal Types of Subcontracted Supplies or Services: List the supplies and/or services to be subcontracted and the corresponding socio-economic status of the businesses projected to receive these subcontracts. Complete the spreadsheet included in the Proposal Submission Package. Also, explain and provide supporting documentation regarding the level of SB commitments to use SB concerns (for example, what types of commitments, if any, are in place for this specific acquisition as a SB prime and/or written contract, verbal, enforceable, non-enforceable, joint venturing, mentor-protégé, etc.
B. Subcontracted Value: Provide the anticipated amounts and percentages in terms of total projected subcontracting dollars for each of the following Small Business
(SB) socio-economic categories: Small Business (SB), HubZone (HZ), Small
Disadvantaged Business (SDB), Woman-Owned (WO), Veteran- Owned (VO), and Service-Disabled Veteran-Owned (SDVO). The 20 Percent Requirement is based on the products and services to be subcontracted by the prime contractor
(including affiliates). This Requirement is to be identified at only the first tier subcontract level (i.e. not what your subcontractors may be further subcontracting).
Complete the spreadsheet included in the Proposal Submission Package.
C. Method of Identifying Sources: Describe the methods used to identify subcontracting sources. Explain the verification process used to assess the appropriate SB socio-economic status and how the capabilities of the SB concern were determined.
D. Equitable Opportunity: Describe efforts the offeror will make to assure each of the socio-economic categories have an equitable opportunity to compete for subcontracts. Examples include: Assisting small business concerns, providing counseling, participating in outreach programs, advertising, presenting workshops/seminars, establishing source list, attending small business conferences and trade fairs.
As a result of this change, E.VOLUME II, BUSINESS AND PRICE PROPOSAL – FORMAT, ORGANIZATION, CONTENTS with attached pages.
b. RFP, Section M, C – Evaluation Factors, 2. Non Technical Factor 2, change to read:
FROM:
“….MANDATORY Total Small Business Participation requirement of 10% of the total contract value ….”
TO:
“….MANDATORY Total Small Business Participation requirement of 20% of the total contract value ….”
c. See the attached sign-in sheets and notes from the Site-Visit/Pre-Proposal Conference held on
Wednesday, October 9, 2019, at 9:00am at the Pullman National Monument, Pullman Factory site; 11057
South Cottage Grove Avenue, Chicago, IL 60628.
d. A second Site-Visit has been scheduled for: Thursday, October 17, 2019, at 2:00 PM CT at the Pullman
National Monument, Pullman Factory site; 11057 South Cottage Grove Avenue, Chicago, IL 60628.
e. All other terms and conditions remain unchanged.