About this file
Written by GovTribe AI
· Dec 27, 2023
This pre-solicitation notice provides details for an upcoming construction project at Pullman National Monument. The National Park Service will solicit proposals for a firm-fixed price contract to stabilize the Administration Building and construct a new Visitor Center. Work will include masonry repairs, structural reinforcement, and interior renovations to convert approximately 10,000 square feet of the first floor into visitor facilities. A new HVAC system, electrical and telecommunications infrastructure, and fire protection will also be installed. The estimated price range for the project is $5-10 million, with a performance period from September 2019 to August 2020. The solicitation will be a total small business set-aside, with a response date and pre-proposal meeting details to be provided in the forthcoming solicitation documents.
From the source
Stabilization Project Manual
Other files for this federal contract opportunity
Other files attached to Pullman National Monument, PULL 223195-253045, newest first.
File
Type
Posted
191024_RFI_Response_WSP_009-010_MEP_detail.pdf
PDF
Oct 28, 2019
1-140P2019R0048,_Amendment_No._0006.pdf
PDF
Oct 25, 2019
9-A6.4_WINDDTLS_A6-Addendum_191022.pdf
PDF
Oct 25, 2019
8-A2.4B_INT_ELEV_A2-Addendum_191022.pdf
PDF
Oct 25, 2019
10-ED1.0_POWER_1ST_FLOOR_DEMOLITION.PDF
PDF
Oct 25, 2019
3-PULL_Visitor_Center,_Bidding_Questions_as_of_10-22-2019.pdf
PDF
Oct 25, 2019
2-Amendment_Number_0006_Narrative.pdf
PDF
Oct 25, 2019
11-S1.0_01STRPLN_S1-Addendum_191024.pdf
PDF
Oct 25, 2019
5-084413_Glazed_Aluminum_Curtain_Walls.pdf
PDF
Oct 25, 2019
4-10.22.19_-_Pullman_Visitor_Center_Camera_Changes.pdf
PDF
Oct 25, 2019
PULL_223195_Sustainability_Checklist_2019-0619.pdf
PDF
Oct 21, 2019
SF_30_-_140P2019R0048-Amendment_0005.pdf
PDF
Oct 21, 2019
North_Bay_Electrical_Equipment.pdf
PDF
Oct 21, 2019
PULL_VC_Contractor_Site_Visit_Attendees_191017.pdf
PDF
Oct 21, 2019
PULL_223195_ARCH_Submittal_List_2019-0820.pdf
PDF
Oct 21, 2019
SF_30_Amendment___4_140P2019R0048.pdf
PDF
Oct 11, 2019
PULL_Prebid_Notes.pptx
PPTX presentation
Oct 11, 2019
1-Amendment__4_Narrative.pdf
PDF
Oct 11, 2019
2-Amend__4,_Vol_II,_Instructions_.pdf
PDF
Oct 11, 2019
B11_PULL_223195-253045_VC_prebid_attendees_191009.pdf
PDF
Oct 11, 2019
PULL_Visitor_Center,_Bidding_Questions,_10-1-2019.xlsx
XLSX spreadsheet
Oct 2, 2019
Amendment_0003_140P2019R0048.pdf
PDF
Oct 2, 2019
E2.3_-_VC_Exhibit_Design_Part3.pdf
PDF
Sep 26, 2019
B02_SF_30,_Amend_No._002.pdf
PDF
Sep 26, 2019
E2.4_-_VC_Exhibit_Design_Part4.pdf
PDF
Sep 26, 2019
B01_PULL_223195-253045_140P2019R0048_SF_1442,_Amend__1.pdf
PDF
Sep 24, 2019
B08_PULL_223195-253045_Amend__1,_Narrative.pdf
PDF
Sep 24, 2019
_B08_PULL_223195-253045_Amend__1,_page_175_of_180,_preproposal.pdf
PDF
Sep 24, 2019
B08_PULL_223195-253045_Amend__1,_SF_30.pdf
PDF
Sep 24, 2019
PULL_223195_ARCH_ContractPriceSchedule_rfp-6-18-19.xls
XLS spreadsheet
Sep 17, 2019
4-B03_PULL_223195-253045_General_Decision,_IL20190009_.pdf
PDF
Sep 17, 2019
B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx
XLSX spreadsheet
Sep 17, 2019
C_-_Limited_Hazardous_Materials_Report_GSG.pdf
PDF
Sep 17, 2019
A_-_Soils_Investigation_Report_TSC.pdf
PDF
Sep 17, 2019
E2.1_-_VC_Exhibit_Design_Part1.pdf
PDF
Sep 17, 2019
E1.3_-_Site_Development_Drawings_DRAFT_2019-0719_Part3.pdf
PDF
Sep 17, 2019
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc
DOC document
Sep 17, 2019
5-PSP_Vol_I,_pkg.pdf
PDF
Sep 17, 2019
B_-_VC_Building_Soil_Sampling_Report_DAI.pdf
PDF
Sep 17, 2019
E1.1_-_Site_Development_Drawings_DRAFT_2019-0719_Part1.pdf
PDF
Sep 17, 2019
D1_-_Pullman_Stabilization_Drawings.pdf
PDF
Sep 17, 2019
1-PULL_223195_FINAL_Spec_BOOK_1_2019-0913.pdf
PDF
Sep 17, 2019
2-PULL_223195_FINAL_Spec_BOOK_2_2019-0913.pdf
PDF
Sep 17, 2019
B08_PULL_223195-153045_140P2019R0048_Binder1.pdf
PDF
Sep 17, 2019
E2.3_-_VC_Exhibit_Design_Part3.pdf
PDF
Sep 17, 2019
E2.4_-_VC_Exhibit_Design_Part4.pdf
PDF
Sep 17, 2019
3-PULL_223195_FINAL_Drawings_2019-0913.pdf
PDF
Sep 17, 2019
E1.2_-_Site_Development_Drawings_DRAFT_2019-0719_Part2.pdf
PDF
Sep 17, 2019
6-PSP_Vol_II,_pkg.pdf
PDF
Sep 17, 2019
E2.2_-_VC_Exhibit_Design_Part2.pdf
PDF
Sep 17, 2019
Show all 50
Pullman National Monument, PULL 223195-253045 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Dec 27, 2023 .