About this file
This pre-solicitation notice announces an upcoming small business set-aside solicitation for a construction project at the Pullman National Monument in Chicago, Illinois. The project includes stabilizing the three-story Administration Building and converting the first floor into a new visitor center, with tenant improvements such as interpretive exhibits, a bookstore, meeting rooms, and offices. Work on the Administration Building involves masonry repairs, structural reinforcement, and installing stairs, elevators, and minimal finishes on the upper floors. An integrated security and fire alarm system will be provided for the entire building. The solicitation is expected to issue on or around July 18, 2019 seeking a firm-fixed price contract with award by September 1, 2019 and a period of performance through August 30, 2020. The project is estimated to cost between $5-10 million. The NAICS code is 236220 for construction of buildings, and it is reserved as a total small business set-aside.
Site Development Drawings, Part 1 of 3
View the file
Other files for this federal contract opportunity
Show all 50
Pullman National Monument, PULL 223195-253045 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HARDSCAPE PROTECTION AND REMOVAL NOTES:
1. PRIOR TO THE COMMENCEMENT OF HARDSCAPE PROTECTION AND
REMOVAL SCOPE OF WORK, CONVENE A PRE-CONSTRUCTION
CONFERENCE WITH AOR, LA, CONTRACTOR AND ANY ASSOCIATED AND
RELEVANT DESIGN TEAM MEMBERS, SUBCONTRACTORS AND AHJ TO
REVIEW WORK SCOPE, SCHEDULE AND TO REVIEW Q&A BY DESIGN TEAM,
AHJ AND CONTRACTORS. CONTRACTOR TO PROVIDE MINIMUM 5
BUSINESS DAY NOTICE FOR ALL MEETINGS.
2. CONFIRM ALL HARDSCAPE REMOVAL AND PROTECTION QUANTITIES AND
DIMENSIONS.
3. CAREFULLY REMOVE ALL HARDSCAPE ELEMENTS WITHIN THE DRIP LINES
OF EXISTING TREES SCHEDULED TO REMAIN.
4. VERIFY REMOVALS FOR COMPLETION OF THE WORK PRIOR TO
SUBMITTING BID FOR THE WORK ON THIS PROJECT. REMOVE
EVERYTHING NECESSARY TO COMPLETE SITE WORK.
5. ALL STRUCTURES AND UTILITIES ARE TO REMAIN IN EXISTING LOCATIONS
UNO.
6. MAINTAIN EXISTING GRADE AT BASE OF ALL EXISTING TREES TO REMAIN.
PROTECT EXISTING TREES TO REMAIN AGAINST ANY DISTURBANCE
INCLUDING UNNECESSARY CUTTING, BREAKING OR EXCAVATION.
7. "REMOVE' MEANS REMOVAL OF ITEM ABOVE GRADE AND REMOVAL OF
ALL ELEMENTS BELOW GRADE INCLUDING, BUT NOT LIMITED TO,
FOOTINGS, WIRING, GRANULAR BASE, AND PIPING THAT ARE
IMMEDIATELY ADJACENT TO THE ITEMS BEING REMOVED AND NOT
NEEDED FOR PROPOSED USE.
8. REMOVE EVERYTHING NECESSARY TO COMPLETE NEW SITE WORK.
LABELS ARE FOR CONVENIENCE ONLY AND THE CONTRACTOR MUST
VERIFY REMOVALS PRIOR TO SUBMITTING THE BID FOR THE WORK.
9. EXCAVATE ALL AREAS TO RECEIVE PAVEMENT/FOUNDATIONS. CUT OR
FILL AND COMPACT THE EXCAVATED AREA TO THE PROPOSED GRADE
AND CROSS SECTION PRIOR TO THE INSTALLATION OF UNDERGROUND
IMPROVEMENTS. FINISH GRADE (+/-1" UNO) AND COMPACT THE
SUBGRADE PRIOR TO THE PLACEMENT OF THE SUBBASE OR BASE
MATERIAL. STRIP UNSUITABLE MATERIALS PRIOR TO PLACEMENT OF
APPROVED CLEAN FILL.
10. SAWCUT ALL EXISTING PAVEMENT TO BE REMOVED AT EDGE OF
EXISTING PAVEMENT TO REMAIN. SAWCUT CONCRETE AT NEAREST
CONTROL JOINT. PROVIDE A STRAIGHT SAWCUT AT EXTENT OF ASPHALT
REMOVAL LIMITS.
11. ALL MATERIALS REMOVED FROM SITE SHALL BE DISPOSED OF PER
FEDERAL, STATE AND LOCAL STANDARDS.
MOCKUP NOTES:
1. PRIOR TO THE COMMENCEMENT OF MOCKUPS, CONVENE A
PRE-CONSTRUCTION CONFERENCE WITH AOR, LA, CONTRACTOR AND
ANY ASSOCIATED AND RELEVANT DESIGN TEAM MEMBERS,
SUBCONTRACTORS AND AHJ TO REVIEW WORK SCOPE, SCHEDULE AND
TO REVIEW Q&A BY DESIGN TEAM, AHJ AND CONTRACTORS.
CONTRACTOR TO PROVIDE MINIMUM 5 BUSINESS DAY NOTICE FOR ALL
MEETINGS.
GRADING AND EROSION CONTROL NOTES:
1. PRIOR TO THE COMMENCEMENT OF PLANTING GRADING AND EROSION
CONTROL SCOPE OF WORK, CONVENE A PRE-CONSTRUCTION
CONFERENCE WITH AOR, LA, CONTRACTOR AND ANY ASSOCIATED AND
RELEVANT DESIGN TEAM MEMBERS, SUBCONTRACTORS AND AHJ TO
REVIEW WORK SCOPE, SCHEDULE AND TO REVIEW Q&A BY DESIGN TEAM,
AHJ AND CONTRACTORS. CONTRACTOR TO PROVIDE MINIMUM 5
BUSINESS DAY NOTICE FOR ALL MEETINGS.
2. CONFIRM ALL GRADING AND EROSION CONTROL QUANTITIES AND
DIMENSIONS.
3. PROVIDE ALL GRADES FOR NATURAL RUNOFF OF WATER WITHOUT LOW
POINTS OR POCKETS.
4. SLOPE ALL AREAS AWAY FROM BUILDINGS AND STRUCTURES AT MIN 2%
UNO.
5. FINISH GRADES SHALL BE SMOOTH, EVEN AND ON A UNIFORM PLANE
WITH NO ABRUPT CHANGES OF SURFACE.
6. GRADES NOT OTHERWISE INDICATED SHALL BE UNIFORM AND LEVEL OR
SLOPED BETWEEN POINTS WHERE ELEVATIONS ARE GIVEN AS
NECESSARY AND AS ESTABLISHED BY WALLS, CURBS, PAVING OR CATCH
BASINS, ETC.
7. TOPS AND TOES OF ALL SLOPES SHAL BE ROUNDED TO PRODUCE A
GRADUAL AND NATURAL APPEARING TRANSITION BETWEEN RELATIVELY
LEVEL AREAS AND SLOPES UNO OR DIRECTED BY LA.
8. CONTRACTOR TO PROVIDE POSITIVE DRAINAGE AWAY FROM ALL
BUILDINGS, STRUCTURES AND ALL IN-PROGRESS CONSTRUCTIONS THAT
CAN BE ADVERSELY IMPACTED BY WATER DURING THE CONSTRUCTION
PROCESS.
LANDSCAPE DRAINAGE NOTES:
1. PRIOR TO THE COMMENCEMENT OF DRAINAGE SCOPE OF WORK,
CONVENE A PRE-CONSTRUCTION CONFERENCE WITH AOR, LA,
CONTRACTOR AND ANY ASSOCIATED AND RELEVANT DESIGN TEAM
MEMBERS, SUBCONTRACTORS AND AHJ TO REVIEW WORK SCOPE,
SCHEDULE AND TO REVIEW Q&A BY DESIGN TEAM, AHJ AND
CONTRACTORS. CONTRACTOR TO PROVIDE MINIMUM 5 BUSINESS DAY
NOTICE FOR ALL MEETINGS.
2. CONFIRM ALL DRAINAGE QUANTITIES AND DIMENSIONS.
3. LANDSCAPE DRAINAGE SHOWN IS IN ADDITION TO CIVIL DRAINGE, REFER
TO CIVIL.
4. ALL DRAINAGE PIPING AND ACCESORIED TO BE INSTALLED IN SEGEMNTS
WITH APPLICABLE CONNECTIONS. CONNECTION BETWEEN DRAINAGE
PIPING IS NOT SHOWN BUT IS TO BE ASSUMED AND TO BE INCLUDED IN
COSTS.
5. COORDINATE TAP LOCATIONS AND ELEVATIONS WITH CIVIL, REFER TO
CIVIL.
GENERAL NOTES:
1. SURVEY AND BASE PLAN INFORMATION PROVIDED BY SPACECO INC.,
DATED 08/10/2017.
2. PROJECT ELEVATIONS CORRELATE TO THE CHICAGO CITY DATUM,
INDICATED AS CCD UNO.
3. COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES
AND ORDINANCES FOR ALL SCOPE AND OPERATIONS.
4. BEFORE SUBMITTING A PROPOSAL FOR THIS WORK, THE CONTRACTOR
SHALL VISIT THE PREMISES AND ACQUAINT HIMSELF FULLY WITH THE
EXISTING CONDITIONS, TEMPORARY CONSTRUCTION REQUIRED,
QUANTITIES AND TYPES OF EQUIPMENT REQUIRED, ETC. ANY BID SHALL
INCLUDE ALL SUMS REQUIRED TO DO THE WORK WITHIN THE EXISTING
CONDITIONS. DISRUPTION OF NORMAL ACTIVITIES IN THE WORK AREA
MUST BE KEPT TO A MINIMUM.
5. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION,
DIMENSIONS, AND ELEVATIONS FOR CONFORMANCE WITH THE
DRAWINGS. ALL DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO
THE ATTENTION OF THE AOR AND LA.
6. COORDINATE WITH THE ARCHITECTURAL DRAWINGS FOR ALL BUILDING
ELEMENTS NOT SHOWN IN THESE DRAWINGS, ETC.
7. THE LANDSCAPE ARCHITECTURAL DRAWINGS ARE TO BE USED IN
CONJUNCTION WITH THE ARCHITECTURAL AND OTHER DISCIPLINES'
DRAWINGS. ALL DIMENSIONS, ELEVATIONS, DETAILS, BUILDING
COMPONENTS, ETC. ARE TO BE CHECKED AGAINST ALL DOCUMENTS AS
WELL AS THE PROJECT SPECIFICATIONS. ANY DISCREPANCIES SHALL
BE BROUGHT TO THE ATTENTION OF THE AOR AND LA IMMEDIATELY,
AND RESOLVED PRIOR TO PROCEEDING WITH CONSTRUCTION.
CONTRACTOR TO COORDINATE THE WORK OF ALL TRADES AND MAKE
NECESSARY INVESTIGATIONS AND FIELD MEASUREMENTS.
8. SHOP DRAWINGS PREPARED BY THE CONTRACTOR AND/OR HIS
SUPPLIERS SHALL BE REVIEWED BY THE AOR AND LA ONLY FOR
CONFORMANCE WITH THE DESIGN CONCEPT. NO WORK SHALL BE
STARTED WITHOUT SUCH REVIEW.
9. CONTRACTOR SHOP DRAWINGS PREPARED BY SUPPLIERS AND/OR
SUBCONTRACTORS SHALL BE REVIEWED BY THE CONTRACTOR PRIOR
TO SUBMISSION TO THE AOR AND LA.
10. CONTRACTOR SHOP DRAWINGS SUBMITTED PRIOR TO PERMIT RECEIPT
ARE SUBJECT TO CHANGE. ADDITIONAL SERVICES FOR SUBSEQUENT
REVIEW BY THE AOR AND LA, WILL BE PAID BY THE CONTRACTOR, AT NO
COST TO THE OWNER.
11. CONTRACTOR SHOP DRAWINGS AND CALCULATIONS SHALL BE
PROVIDED FOR ALL STRUCTURAL PREFABRICATED ITEMS TO AOR, SOR
AND LA FOR REVIEW. ALL STRUCTURAL PREFABRICATED ITEMS TO BE
SEALED BY A STRUCTURAL ENGINEER LICENSED IN THE STATE OF
CONSTRUCTION.
12. DETAILS AND SECTIONS DESIGNATED AS "TYPICAL" APPLY TO AREAS
WHERE CONDITIONS ARE SIMILAR TO THOSE INDICATED BY DETAIL OR
DETAIL TITLE UNO.
a. WATERSTOPS, VAPOR BARRIERS, ETC. SHOWN ON LANDSCAPE
ARCHITECTURAL DRAWINGS ARE SCHEMATIC. SEE ARCHITECTURAL
DRAWINGS FOR MORE INFORMATION ON WATER, MOISTURE AND
CONDENSATION RESISTANCE DETAILING.
13. PRIOR TO THE COMMENCEMENT OF ANY INDIVIDUAL SCOPE OF WORK,
CONVENE A PRE-CONSTRUCTION CONFERENCE WITH AOR, LA,
CONTRACTOR AND ANY ASSOCIATED AND RELEVANT DESIGN TEAM
MEMBERS, SUBCONTRACTORS AND AHJ TO REVIEW WORK SCOPE,
SCHEDULE AND TO REVIEW Q&A BY DESIGN TEAM, AHJ AND
CONTRACTORS. CONTRACTOR TO PROVIDE MINIMUM 5 BUSINESS DAY
NOTICE FOR ALL MEETINGS.
14. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO COMPLETE
WORK SCOPE AT NO COST TO OWNER UNO.
15. FOLLOW ALL LOCAL AND STATE STANDARDS, INCLUDING APPLICABLE
DOT STANDARDS FOR WORK WITHIN THE RIGHT-OF-WAY. SUBMIT PLAN
OF CONSTRUCTION STAGING FOR APPROVAL PRIOR TO START OF
WORK.
16. IF WORK REQUIRES SIDEWALK OR STREET CLOSURE, CONTRACTOR IS
RESPONSIBLE FOR PROVIDING ALL NECESSARY WORK AND MATERIALS
TO DO SO.
17. INSTALL AND MAINTAIN MIN 6'HT CHAINLINK CONSTRUCTION FENCING
AS INDICATED WITHIN SPECIFICATIONS TO PROTECT THE WORK FOR
PUBLIC SAFETY AND TO PROVIDE SECURITY. ADJUST FENCING TO
ACCOMMODATE PROGRESS OF CONSTRUCTION. MAINTAIN FENCING IN
PLACE UNTIL SUBSTANTIAL PROJECT COMPLETION OR AS DIRECTED BY
THE OWNER. INSTALL GATES FOR CONSTRUCTION ACCESS AS
REQUIRED.
18. MODIFY AND RESTORE SITE CONDITIONS TO GAIN ACCESS INTO THE
SITE. OWNER NOT RESPONSIBLE FOR RESTORATION COSTS DUE TO
CONTRACTOR NEGLIGENCE DURING CONSTRUCTION. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO ACCURATELY DOCUMENT
THE EXISTING CONDITIONS OF THE SITE.
19. VERIFY THE EXACT LOCATIONS OF ALL PUBLIC AND PRIVATE UTILITIES
PRIOR TO THE START OF LANDSCAPE OPERATIONS. CONTRACTOR TO
MAKE EVERY EFFORT POSSIBLE TO LOCATE ALL PRIVATE UTILITIES.
CONTRACTOR TO ALSO BE RESPONSIBLE FOR MAINTIANING ALL UTILITY
LOCATIONS AS MARKED BY THE UTILITY COMPANIES AND OWNER'S
REPRESENTATIVE THROUGHOUT THE DURATION OF LANDSCAPE
CONSTRUCTION.
20. BEFORE ANY EXCAVATION ON THE SITE, CALL TO LOCATE ANY EXISTING
UTILITIES ON THE SITE. BECOME FAMILIAR WITH THE LOCATIONS OF ALL
BURIED UTILITIES IN THE AREAS OF WORK BEFORE START OF
OPERATIONS. REPAIR OR REPLACE ANY BURIED CONDUITS, CABLES OR
PIPING DAMAGED DURING THE INSTALLATION OF THE WORK, AT NO
COST TO OWNER.
21. REMOVE FROM THE SITE IN A LEGAL MANNER ANY AND ALL DEBRIS
GENERATED DURING CONSTRUCTION OPERATIONS.
22. DO NOT INTERFERE WITH THE USE OF ADJACENT PROPERTIES
INCLUDING BUT NOT LIMITED TO BUILDINGS, PARKING LOTS, STREETS
OR ALLEYS.
23. PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, FENCING,
FURNISHINGS, AND PLANTINGS, TREES, AND LAWNS FROM DAMAGE
CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING,
WASHOUTS, AND OTHER HAZARDS CREATED BY SITE IMPROVEMENTS.
IF ANY DAMAGE OCCURS, REPAIR TO ORIGINAL CONDITION AT NO
ADDITIONAL COST TO OWNER.
24. PROTECT AND/OR RESTORE EXISTING LAWN TO EXCELLENT CONDITION
WITH TOPSOIL AND SOD. CONTRACTOR IS RESPONSIBLE FOR
REPLACING ALL LANDSCAPE MATERIAL REMOVED OR DAMAGED DUE TO
CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST TO OWNER.
25. VERIFY SITE CONDITIONS BEFORE PROCEEDING WITH WORK AND
REPORT ANY CONFLICT WITH AOR AND LA.
26. QUANTITIES ARE SHOWN FOR REFERENCE ONLY. ALL QUANTITIES TO BE
CONFIRMED BY CONTRACTOR. FOR ALL FINISH MATERIALS AND SITE
FURNISHINGS CONTRACTOR TO PROVIDE 5% OR 1 ITEM MIN FOR ALL
LOOSE ITEMS TO OWNER UNO.
27. IDENTIFY AND REPORT ANY SUBSOIL, SOIL AND/OR DRAIANGE ISSUES
IMMEDIATELY TO THE ATTENTION OF THE AOR AND LA.
28. VERIFY ALL DIMENSIONS IN FIELD AND BRING ANY DISCREPENCIES
IMMEDIATELY TO THE ATTENTION OF THE AOR AND LA.
29. COORDINATE WORK WITH ALL OTHER TRADES.
30. RESTORE ANY AREAS IMPACTED BY CONSTRUCTION OPERATIONS
WHETHER WITHIN OR OUTSIDE OF PROJECT LIMITS.
31. PERFORM ALL MAINTENANCE ACTIVITIES WITHIN THE PROJECT LIMITS
THROUGH FINAL ACCEPTANCE.
EXCAVATION AND BACKFILL NOTES:
1. BEFORE ANY CONSTRUCTION OPERATIONS ARE STARTED, REMOVE ALL
BITUMINOUS PAVEMENT, LOOSE GRAVEL, FOUNDATIONS, BLACK LOAM
AND FILL ENCOUNTERED WITHIN THE AREA TO BE OCCUPIED BY NEW
CONSTRUCTION. NONE OF THIS MATERIAL OR OTHER EXCAVATED
ON-SITE SOILS, WHICH ARE FOUND TO BE UNSUITABLE, SHALL BE USED
FOR FILL WITHIN OR ADJACENT TO PROPOSED STRUCTURES. STORE
GRAVEL AND SOIL ON SITE FOR POTENTIAL RE-USE UNO.
2. GENERAL MACHINE EXCAVATION FOR FOOTINGS SHALL STOP NOT LESS
THAN ONE-HALF THE THICKNESS OF THE FOOTING ABOVE SCHEDULED
ELEVATIONS OF BOTTOMS OF FOOTINGS. FINAL 6" EXCAVATION TO
UNDISTURBED SOIL AT REQUIRED FOOTING ELEVATION SHALL BE DONE
BY HAND NOT MORE THAN 48 HOURS BEFORE THE FOOTING IS POURED
UNO.
3. ALL NECESSARY CHANGES IN ELEVATION OF CONTINUOUS FOOTINGS
SHALL BE MADE IN STEPS OF NOT MORE THAN 2'-0" HIGH AND A
MINIMUM OF 4'-0" APART, UNO.
4. AFTER EXCAVATING FOR ALL EARTH-SUPPORTED FOOTINGS AND
FOUNDATIONS, THE EXPOSED NATURAL SOIL SHALL BE THOROUGHLY
COMPACTED TO 95% OF ASTM D1557 (MODIFIED PROCTOR) MAXIMUM
DENSITY AT OPTIMUM MOISTURE CONTENT PRIOR TO PLACING FILL.
5. ALL FOUNDATION BACKFILL AND FILL REQUIRED TO ESTABLISH FINAL
SUBGRADES SHALL CONSIST OF CA-7 (OR APPROVED EQUIVALENT)
CLEAN GRANULAR MATERIAL THOROUGHLY COMPACTED IN LAYERS OF
6" TO 8" THICK. ALL EARTH-SUPPORTED SLABS SHALL HAVE AT LEAST 6"
OF CA-6 (OR APPROVED EQUIVALENT) CRUSHED STONE OR WASHED
GRAVEL COMPACTED TO 95% OF ASTM D-1557 (MODIFIED PROCTOR)
MAXIMUM DENSITY, DIRECTLY BELOW THE SLAB AND AS
RECOMMENDED BY SOIL REPORT.
6. BACKFILL PLACED DIRECTLY ADJACENT TO STRUCTURES AND/OR
RETAINING WALLS SHALL BE COMPACTED CA-7 (OR APPROVED
EQUIVALENT) CLEAN GRANULAR MATERIAL COMPACTED TO 95% OF
ASTM D-1557 (MODIFIED PROCTOR) MAXIMUM DENSITY AT OPTIMUM
MOISTURE CONTENT. AT TOP OF BACKFILL, PROVIDE A 2'-0" CAP OF
COHESIVE FILL.
7. EXCAVATE AS REQUIRED FOR PLACING FOOTINGS ON SOIL CAPABLE OF
SUPPORTING A MINIMUM NET ALLOWABLE SOIL BEARING PRESSURE OF
1,500 PSF, AS INDICATED IN THE GEOTECHNICAL REPORT AND AS FIELD
VERIFIED AND APPROVED BY THE OWNER'S SOIL TESTING
LABORATORY.
8. THE FOOTING AND FOUNDATION ELEVATIONS AND SOIL BEARING
CAPACITIES AS SHOWN ON THE DRAWINGS ARE ESTIMATED FROM THE
SOIL BORING DATA. FINAL, EXACT ELEVATIONS AND SOIL BEARING
CAPACITIES SHALL BE FIELD DETERMINED AND VERIFIED BY THE
OWNER'S SOIL TESTING LABORATORY PRIOR TO PLACEMENT OF
CONCRETE. THE CONTRACTOR SHALL NOTIFY THE AOR, SOR AND LA
IMMEDIATELY IN THE EVENT THAT THE SOILS CONDITIONS
ENCOUNTERED VARY FROM THOSE USED FOR DESIGN. ALL SOILS
VERIFICATION AND TESTING TO BE COMPLETED UNDER THE DIRECTION
OF A SOILS ENGINEER WHO IS A LICENSED PROFESSIONAL ENGINEER IN
THE PROJECT'S JURISDICTION.
9. BACKFILL AGAINST SIDES OF FOUNDATION WALLS SHALL BE PLACED
SIMULTANEOUSLY ON BOTH SIDES TO THE TOP OF THE WALL.
10. NO MUD SLABS, FOOTINGS, OR SLABS SHALL BE PLACED ONTO OR
AGAINST SUBGRADE CONTAINING FREE WATER, FROST, OR ICE.
11. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY MEASURES TO
PREVENT ANY FROST OR ICE FROM PENETRATING ANY FOOTING OR
SLAB SUBGRADE BEFORE AND AFTER PLACEMENT OF CONCRETE UNTIL
SUCH SUBGRADES ARE FULLY PROTECTED BY THE PERMANENT
STRUCTURE.
12. THE CONCRETE FOR EACH ISOLATED FOOTING SHALL BE PLACED IN
ONE (1) CONTINUOUS PLACEMENT.
13. ALL PERIMETER WALL AND COLUMN FOOTINGS SHALL BEAR A MINIMUM
OF 4'-0" BELOW FINISHED GRADE.
14. ALL UNSUITABLE SOIL SHALL BE EXCAVATED AND REMOVED TO A MIN.
OF 2'-0" BELOW SLAB ELEVATION, SEE REPORT FOR NEW FILL MATERIAL
REQUIREMENTS TO REACH THE DESIGN SLAB SUBGRADE ELEVATION.
15. ALL FOUNDATIONS SHALL BE CARRIED DOWN TO THE MINIMUM DEPTHS
SHOWN.
16. THE CONTRACTOR SHALL PREPARE ALL CONSTRUCTION PROCEDURES
AND SEQUENCES AND SUBMIT FOR THE AOR, EOR, LA, AND
GEOTECHNICAL REVIEW PRIOR TO THE START OF CONSTRUCTION.
17. FOR ADDITIONAL SITE CONDITIONS, FOUNDATION CONSTRUCTION
CONSIDERATIONS AND RECOMMENDATION, REFER TO THE
GEOTECHNICAL ENGINEERING REPORT DATED JUNE 22, 2001,
PREPARED BY STS CONSULTANTS, LTD.
SHORING AND BRACING NOTES:
1. INDIVIDUAL STRUCTURAL COMPONENTS ARE DESIGNED TO SUPPORT
LOADS IN THEIR FINALLY ERECTED POSITION AS PART OF THE TOTAL
COMPLETED STRUCTURE. PROVIDE TEMPORARY SHORING, GUYING
AND BRACING AS REQUIRED UNTIL ALL CONSTRUCTION AFFECTING
LOAD CARRYING MEMBERS AND LATERAL STABILITY IS COMPLETED.
2. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR STABILITY OF
STRUCTURE, ITS PARTS AND JOB SITE SAFETY BY USE OF GUYING,
BRACING, SHORING, BARRICADES, SAFETY RAILINGS AND DEVICES
DURING THE ENTIRE PERIOD OF CONSTRUCTION.
3. CONTRACTOR IS FULLY RESPONSIBLE FOR PROVIDING ALL TEMPORARY
SHORING AND BRACING OF EXISTING STRUCTURAL ELEMENTS DURING
CONSTRUCTION. ALL SHORING SHALL BE ADEQUATE TO SUPPORT ALL
STRUCTURAL LOADINGS DURING MODIFICATION OF THE EXISTING
STRUCTURES AND ERECTION OF THE NEW STRUCTURAL SUPPORT
SYSTEM. TEMPORARY SHORING MUST REMAIN IN PLACE UNTIL ALL NEW
STRUCTURAL MEMBERS SUPPORTING SHORED ELEMENTS ARE IN
PLACE AND ALL NEW CONNECTIONS COMPLETED.
UNDERPINNING NOTES:
1. BEFORE EXCAVATION, REDUCE LOAD ON EXISTING WALL AND
FOUNDATIONS AS MUCH AS POSSIBLE.
2. LIMIT EXCAVATION TO THE MINIMUM SIZE NECESSARY FOR
UNDERPINNING IN STAGES. PROVIDE FOR DEWATERING AS NECESSARY
FOR THE WORK TO AVOID DISTURBANCE OF BEARING MATERIAL.
3. PROVIDE SUPPORT OF THE STRUCTURE OVER SECTIONS OF THE
EXCAVATION BY MEANS OF NEEDLE BEAMS, POSTS AND GRILLAGE.
4. SOILS ENGINEER TO INSPECT BEARING SURFACE PRIOR TO
INSTALLATION OF UNDERPINNING. COMMENCE UNDERPINNING
CONSTRUCTION AS SOON AS POSSIBLE AFTER EXCAVATION SUBGRADE
HAS BEEN EXPOSED AND INSPECTED.
5. BEFORE FINAL UNDERPINNING IN CONCRETE, THE LOWER SECTIONS OF
THE UNDERPINNING SHOULD BE ALLOWED TO COMPLETE THEIR SET.
FINAL CONTACT WITH STRUCTURE SHOULD BE MADE BY DRY-PACKING
NON-SHRINK GROUT.
CONCRETE AND FORMWORK NOTES:
1. ALL CONCRETE WORK SHALL CONFORM TO THE LATEST EDITION OF
THE FOLLOWING (INCLUDING BUT NOT LIMITED TO) AMERICAN
CONCRETE INSTITUTE PUBLICATIONS:
a. ACI 301 - SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR
BUILDINGS
b. ACI 304 - GUIDE FOR MEASURING, MIXING, TRANSPORTING AND
PLACING CONCRETE
c. ACI 311 - GUIDE FOR CONCRETE INSPECTION
d. ACI 315 - DETAILS AND DETAILING OF CONCRETE REINFORCEMENT
e. ACI 318 - BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE AND COMMENTARY
f. ACI 347 - GUIDE TO FORMWORK FOR CONCRETE
2. CONCRETE SHALL BE AS FOLLOWS:
a. CONCRETE F'C PSI @ 28 DAYS
i. FOUNDATIONS AND FOOTINGS NORMAL WEIGHT (145 PCF) F'C = 4000
PSI
ii. GRADE BEAMS NORMAL WEIGHT (145 PCF) F'C = 4000 PSI iii.EXTERIOR SLAB ON GRADE NORMAL WEIGHT (145 PCF) F'C = 4000 PSI iv.PADS FOR MEP EQUIP. NORMAL WEIGHT (145 PCF) F'C = 4000 PSI
v. ELEVATED SLABS, BEAMS NORMAL WEIGHT (145 PCF) F'C = 8000 PSI
3. ALL EXTERIOR EXPOSED CONCRETE SHALL BE AIR- ENTRAINED TO GIVE
THE CONCRETE AN AIR CONTENT OF 6 +/- 1 1/2% BY VOLUME. WATER
REDUCING PLASTICIZING ADMIXTURES MAY BE USED, PENDING
APPROVAL OF THE AOR, SOR AND LA.
4. NO CALCIUM CHLORIDE OR CHLORIDE ION PRODUCING ADD MIXTURE
SHALL BE USED IN ANY CONCRETE.
5. FORMWORK FOR ALL CONCRETE WHICH WILL BE EXPOSED IN
COMPLETED STRUCTURES SHALL BE CONSTRUCTED FROM A SUITABLE
PLASTIC SURFACED PLYWOOD WHICH WILL PRODUCE AN ACCEPTABLY
SMOOTH SURFACE. ALSO SEE THE SPECIFICATIONS.
6. THE CONTRACTOR SHALL SUBMIT DETAILED DRAWINGS SHOWING THE
LOCATIONS OF ALL FORM TIES, CONSTRUCTION JOINTS, CURBS AND
SLAB DEPRESSIONS, IF ANY, AND DESCRIBE THE CONCRETE
PLACEMENT SEQUENCING. ALL CURBS SHALL BE REINFORCED WITH AT
LEAST (1) - #4 CONTINUOUS AND #3 AT 16" C/C DOWELS TO THE
STRUCTURE BELOW, UNO.
7. ALL CONSTRUCTION JOINTS SHALL BE WIRE BRUSHED AND CLEANED
IMMEDIATELY PRIOR TO PLACING NEW CONCRETE. ALLOW 24 HOURS
MINIMUM TO ELAPSE BETWEEN POURS.
8. SEE ARCHITECTURAL DRAWINGS FOR TYPE AND LOCATION OF ALL
INTERIOR FLOOR FINISHES, FLOOR DEPRESSIONS AND CURBS AND FOR
ALL WATERPROOFING/DAMPPROOFING DETAILS. SEE MEP DRAWINGS
FOR ADDITIONAL WALL AND/OR SLAB OPENINGS, AND EQUIPMENT PADS
NOT SHOWN ON THE STRUCTURAL DRAWINGS.
9. SLOPE CONCRETE SLABS, WHERE REQUIRED, DRAINS SHOWN ON THE
ARCHITECTURAL CIVIL AND/OR MEP.
10. CONCRETE PROTECTION FOR REINFORCING BARS SHALL BE AS
FOLLOWS:
a. FOOTINGS 3" CLEAR, SIDES AND BOTTOM
b. WALLS 2" CLEAR, OUTSIDE FACE, 1 1/2" CLEAR, INSIDE FACE
c. SLABS 1" CLEAR
d. PIERS 2" CLEAR TO TIES
REINFORCING STEEL NOTES:
1. ALL REINFORCING STEEL SHALL BE HIGH STRENGTH NEW BILLET STEEL
CONFORMING TO THE LATEST EDITION OF ASTM A 615, GRADE 60.
2. REINFORCING STEEL AT EXPOSED EXTERIOR CONCRETE SHALL BE
EPOXY COATED AND SHALL CONFORM TO THE LATEST EDITION OF
ASTM A775.
3. ALL WELDED WIRE FABRIC SHALL CONFORM TO THE STANDARDS OF
ASTM A 186. WELDED WIRE FABRIC AT EXTERIOR EXPOSED SLABS
SHALL BE EPOXY COATED AND SHALL CONFORM TO ASTM A775.
4. ALL CONCRETE REINFORCEMENT SHALL BE DETAILED, FABRICATED,
LABELED, SUPPORTED AND SPACED IN FORMS AND SECURED IN PLACE
IN ACCORDANCE WITH THE PROCEDURES AND REQUIREMENTS
OUTLINED IN THE LATEST EDITIONS OF THE "BUILDING CODE
REQUIREMENTS FOR REINFORCED CONCRETE", ACI 318, AND THE
"MANUAL OF STANDARD PRACTICE FOR DETAILING CONCRETE
STRUCTURES", ACI 315. USE DIELECTRIC MATERIAL FOR BAR SUPPORTS
AND NYLON COATED TIE WIRE AT EPOXY COATED BARS.
5. ALL REINFORCING SPLICES SHALL BE LAP SPLICED WHERE NECESSARY
OR DESIRABLE BY WIRING TOGETHER IN CONTACT. SPLICE LENGTHS
SHALL CONFORM TO LATEST ACI AND CRSI CRITERIA FOR SIZE AND
TYPE OF REINFORCING STEEL AND CONCRETE COMPRESSIVE
STRENGTHS SPECIFIED.
6. ALL WELDED WIRE FABRIC SHALL BE LAPPED TWO (2) FULL MESH
PANELS AND TIED SECURELY. PROVIDE ADDITIONAL REINFORCING
WHERE SHOWN ON THE DRAWINGS. PLACE MESH 2" FROM THE TOP OF
THE SLAB. NO ELECTRICAL CONDUIT SHALL BE PLACED ABOVE THE
WELDED WIRE FABRIC IN SLABS-ON-GRADE.
7. NO REINFORCING STEEL SHALL BE WELDED IN ANY WAY UNLESS PRIOR
WRITTEN APPROVAL IS GIVEN BY THE AOR, SOR AND LA.
8. PROVIDE ADEQUATE BOLSTERS, HIGH CHAIRS, SUPPORT BARS, ETC. TO
MAINTAIN SPECIFIED CLEARANCES FOR THE ENTIRE LENGTH OF ALL
REINFORCING BARS. PROVIDE CONTINUOUS #4 SPACER BARS IN WALLS
AND SLABS TO SUPPORT DOWELS, AS REQUIRED.
9. CHECKED SHOP DRAWINGS SHOWING REINFORCEMENT DETAILS,
INCLUDING STEEL SIZES, SPACING AND PLACEMENT SHALL BE
SUBMITTED TO THE ARCHITECT FOR REVIEW PRIOR TO FABRICATION.
PRE-CAST CONCRETE NOTES:
1. STRUCTURAL PRECAST ELEMENTS SHALL BE DESIGNED BY A
STRUCTURAL ENGINEER LICENSED IN THE JURISDICTION OF THE
PROJECT FOR THE SPAN AND LOADING CONDITIONS SHOWN ON THE
DRAWINGS AND IN ACCORDANCE WITH ALL APPLICABLE CODES.
2. PRECAST CONCRETE WORK WILL BE PERFORMED IN COMPLIANCE WITH
THE FOLLOWING PUBLISHED INDUSTRY STANDARDS:
a. ACI 301- SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR
BUILDINGS
b. ACI 318 - BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE
c. ACI 315 - DETAILS AND DETAILING OF CONCRETE REINFORCEMENT
d. PCI MNL-116 - MANUAL FOR QUALITY CONTROL FOR PLANTS AND
PRODUCTION OF PRE-CAST AND PRE-STRESSED CONCRETE
PRODUCTS
e. PCI MNL-117 - MANUAL FOR QUALITY CONTROL FOR PLANTS AND
PRODUCTION OF ARCHITECTURAL PRECAST CONCRETE PRODUCTS
f. PCI MNL-120 - PCI DESIGN HANDBOOK
g. PCI MNL-122 - ARCHITECTURAL PRECAST HANDBOOK
h. PCI MNL-123 - DESIGN AND TYPICAL DETAILS FOR CONNECTIONS FOR
PRECAST AND PRE-STRESSED CONCRETE.
i. AWS D1.1 - STRUCTURAL WELDING CODE - STEEL
j. AWS D1.4 - STRUCTURAL WELDING CODE - REINFORCING BARS
3. THE PRECAST MANUFACTURER SHALL BE RESPONSIBLE FOR THE FULL
COORDINATION OF ALL ARCHITECTURAL, MECHANICAL, ELECTRICAL,
AND PLUMBING DETAILS AS THEY AFFECT THE PRECAST SYSTEM.
4. PRIOR TO ANY CORING, THE SIZE AND LOCATION OF CORES SHALL BE
COORDINATED WITH THE PRECAST MANUFACTURER.
5. PRIOR TO THE START OF FABRICATION, THE PRECAST MANUFACTURER
SHALL SUBMIT TO THE AOR, SOR AND LA, FOR INFORMATION ONLY,
CALCULATIONS OF THE DESIGN OF STRUCTURAL ELEMENTS AND
CONNECTIONS, AND, FOR REVIEW, DETAILED ENGINEERED SHOP
DRAWINGS SHOWING STRUCTURAL ELEMENTS, DETAILS, AND
CONNECTIONS.
6. ALL MILD REINFORCEMENT SHALL CONFORM TO ASTM A615, GRADE 60,
UNO. ALL WELDED WIRE FABRIC SHALL CONFORM TO ASTM A 185 AND
SHALL BE W.W.F. 6X6-W1.4XW1.4, UNO.
7. ALL PRESTRESSING STEEL SHALL CONFORM TO ASTM A416, GRADE 250
OR 270. ALL STEEL EMBEDMENTS SHALL CONFORM TO ASTM A36.
8. PROVIDE A MINIMUM OF (4) PRESTRESSING STRANDS PER PLANK.
9. THERE SHALL BE NO FIELD CUTTING OF PRECAST ELEMENTS WITHOUT
THE PRIOR WRITTEN APPROVAL OF THE AOR, SOR AND LA.
10. THE PRECAST MANUFACTURER SHALL PROVIDE ALL WALL
ACCESSORIES AS REQUIRED.
STRUCTURAL STEEL NOTES:
1. ALL DETAILING, FABRICATION AND ERECTION OF STRUCTURAL STEEL
SHALL CONFORM TO THE LATEST EDITIONS OF ALL AISC AND AWS
SPECIFICATIONS AND CODES.
2. ALL STRUCTURAL STEEL WIDE FLANGE SHAPES SHALL MEET THE
REQUIREMENTS OF ASTM A992, FY = 50 KSI, UNLESS NOTED
OTHERWISE. ALL STRUCTURAL STEEL PIPES AND TUBES SHALL MEET
THE REQUIREMENTS OF ASTM A500, GRADE B. ALL OTHER STRUCTURAL
STEEL SHAPES SHALL MEET THE REQUIREMENTS OF ASTM A36 UNO ALL
STEEL TO BE HOT DIP GALVANIZED.
3. ALL BOLTS, NUTS AND WASHERS SHALL CONFORM TO THE
REQUIREMENTS OF ASTM A325 OR ASTM A440. ALL ANCHOR BOLTS
SHALL MEET THE REQUIREMENTS OF ASTM F1554, FY=36 KSI, UNO. ALL
FASTENERS TO BE HOT DIP GALVANIZED UNO.
4. ALL WELDING ELECTRODES SHALL BE E70XX, UNO. ALL WELDING SHALL
BE DONE BY QUALIFIED WELDERS AND SHALL CONFORM TO AWS "CODE
FOR ARC AND GAS WELDING IN BUILDING CONSTRUCTION", LATEST
EDITION.
5. SHOP CONNECTIONS MAY BE WELDED UNO. MINIMUM WELDS NOT
SHOWN ON THE DRAWINGS SHALL BE 1/4" FILLET WELDS ALL AROUND.
6. UNO ON THE DRAWINGS, ALL CONNECTIONS SHALL BE STANDARD
DOUBLE ANGLE SHEAR CONNECTIONS. ALL BOLTS SHALL BE MINIMUM
3/4" DIAMETER, ASTM A325. THE MINIMUM NUMBER OF VERTICAL ROWS
OF BOLTS SHALL BE AS BELOW, UNLESS NOTED OTHERWISE ON THE
DRAWINGS. IN CASES WHERE REACTIONS ARE NOT INDICATED,
PROVIDE AT LEAST 75% OF THE UNIFORM LOAD CARRYING CAPACITY
OF THE BEAM AS DETERMINED IN THE TABLES FOR "UNIFORM LOAD
CONSTANTS FOR BEAMS" IN THE AISC MANUAL OF STEEL
CONSTRUCTION, 14TH EDITION, OR THE REACTION FORCE WHEN
INDICATED ON THE DRAWING AS (F=X.X KIPS).
a. W6,W8, W10: (2) ROWS
b. W12 & W14: (3) ROWS
7. SEE SPECIFICATIONS FOR CONNECTIONS DESIGN RESPONSIBILITIES.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF ALL
ERECTION PROCEDURES AND SEQUENCES WITH RELATION TO
TEMPERATURE DIFFERENTIAL AND TEMPORARY STRUCTURAL
STABILITY.
9. STEEL SHALL BE CLEANED OF RUST, LOOSE MILL SCALE AND OTHER
FOREIGN MATERIALS WHERE REQUIRED FOR PROPER FABRICATION,
FITTING UP OR WELDING.
10. THERE SHALL BE NO FIELD CUTTING OF STRUCTURAL STEEL MEMBERS
FOR THE WORK OF OTHER TRADES WITHOUT THE PRIOR WRITTEN
APPROVAL OF THE AOR, SOR AND LA.
11. REFER TO THE ARCHITECTURAL AND/OR MEP DRAWINGS FOR
ADDITIONAL STRUCTURAL AND MISCELLANEOUS STEEL
REQUIREMENTS. ALL EXTERIOR EDGE ANGLES, LINTELS AND SHELF
ANGLES SHALL BE STAINLESS STEEL OR GALVANIZED AFTER
FABRICATION. SEE SPECIFICATION FOR REQUIREMENTS.
DIMENSIONAL LUMBER:
1. ALL WOOD CONSTRUCTION SHALL CONFORM TO THE "NATIONAL DESIGN
SPECIFICATION FOR WOOD CONSTRUCTION," LATEST EDITION, BY THE
NATIONAL FOREST PRODUCT ASSOCIATION.
2. STRUCTURAL LUMBER SHALL HAVE THE FOLLOWING MINIMUM IN GRADE
UNIT STRESSES:
a. GRADE: STRUCTURAL SELECT, REFER TO SPECIFICATIONS FOR
SPECIES
i. FB = 1200 PSI
ii. FV = 160 PSI iii.FC = 1,200 PSI iv.⊥FC = 615 PSI
v. FT = 650 PSI vi.E = 1,400,000 PSI
3. ALL LUMBER SHALL HAVE AN AVERAGE MOISTURE CONTENT OF NOT
MORE THAN 19%.
4. BOLT HEADS & NUTS BEARING ON WOOD SHALL BE PROVIDED WITH
STANDARD CUT WASHERS.
5. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE
PRESSURE TREATED UNO.
6. MINIMUM NAILED CONNECTIONS FOR WOOD FRAMING MEMBERS SHALL
BE IN ACCORDANCE WITH REQUIREMENTS OF THE LATEST VERSION OF
THE APPLICABLE JURISDICTIONAL BUILDING CODES.
7. ALL STRUCTURAL WOOD EXPOSED TO THE ELEMENTS SHALL BE
PRESSURE TREATED UNO.
8. ALL CONNECTIONS THROUGH OR IN CONTACT WITH PRESSURE
TREATED WOOD SHALL BE MADE WITH CORROSION RESISTANT
FASTENERS.
9. ALL FASTENERS THROUGH OR IN CONTACT WITH TROPICAL
HARDWOODS TO BE TYPE 316 STAINLESS STEEL.
PLANTING PROTECTION AND REMOVAL NOTES:
1. PRIOR TO THE COMMENCEMENT OF PLANTING PROTECTION AND
REMOVAL SCOPE OF WORK, CONVENE A PRE-CONSTRUCTION
CONFERENCE WITH AOR, LA, CONTRACTOR AND ANY ASSOCIATED AND
RELEVANT DESIGN TEAM MEMBERS, SUBCONTRACTORS AND AHJ TO
REVIEW WORK SCOPE, SCHEDULE AND TO REVIEW Q&A BY DESIGN
TEAM, AHJ AND CONTRACTORS. CONTRACTOR TO PROVIDE MINIMUM 5
BUSINESS DAY NOTICE FOR ALL MEETINGS.
2. CONFIRM ALL PLANTING REMOVAL AND PROTECTION QUANTITIES AND
DIMENSIONS.
3. INSTALL PLANT PROTECTION FENCING PRIOR TO SITE WORK AND
MAINTAIN THROUGHOUT CONSTRUCTION PERIOD. NO STORAGE OF
MATERIALS, VEHICULAR ACCESS OR ANY OTHER CONSTRUCTION
ACTIVITIES PERMITTED WITHIN THE PLANT PROTECTION ZONE UNO.
4. ALL PLANT AND SITE PROTECTION FENCING TO BE INSTALLED PRIOR TO
HARDSCAPE DEMOLITION AND/OR CONSTRUCTION OPERATIONS.
5. ADJUST PLANT PROTECTION FENCING AS NEEDED THROUGHOUT
CONSTRUCTION OPERATIONS TO PROTECT CRITICAL ROOT ZONES OF
ALL TREES.
6. MARK ALL ROOT PRUNING LOCATIONS PRIOR TO EXECUTION FOR
REVIEW AND APPROVAL BY LA.
7. PROVIDE 2 INCH (AFTER SETTLING) MULCH LAYER WITHIN CRITICAL
ROOT ZONE OF EXISTING TREES AS MIN PROTECTION DURING
CONSTRUCTION OPERATIONS. COORDINATE WITH AOR AND LA FO
ADDITIONAL MEASURES IF CRITICAL ROOT ZONES NEED TO BE
ACCESSED FOR ANY REASON DURING CONSTRUCTION OPERATIONS.
MULCH LAYER TO BE A ¾ INCH SHREDDED DOUBLE PROCESSED
HARDWOOD BARK FINES.
8. PROVIDE TEMPORARY IRRIGATION FOR ALL EXISTING PLANT MATERIAL
AND MAINTAIN THROUGHOUT CONSTRUCTION OPERATIONS. PROVIDE IN
SUCH A MANNER AS TO NOT IMPACT EXISTING ROOT SYSTEMS OF
PLANT MATERIAL.
9. REMOVE ALL EXISTING TREE AND SHRUB STUMPS AND ROOTS THAT
IMPACT WORK. GRIND OUT STUMPS TO A MINIMUM DEPTH OF 18".
BRING TO FINISH GRADE PRIOR TO COMPLETION OF WORK.
10. REMOVE MULCH, LAWN, AND PLANTING BEDS AND EXCAVATE EARTH TO
COORDINATE WITH GRADING, EARTHWORK AND SITE IMPROVEMENTS.
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
JC/RR
AutoCAD SHX Text
YT/JR
AutoCAD SHX Text 07/19/19
AutoCAD SHX Text
PULLMAN STATE HISTORIC SITE
AutoCAD SHX Text
CHICAGO, ILLINOIS
AutoCAD SHX Text
AutoCAD SHX Text
10/4/2018 9:51:45 AM
AutoCAD SHX Text n:\project active\8037 pullman national monument visitor center\dwg\8037_note.dwg
AutoCAD SHX Text G0.2
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
SLEEVING NOTES:
1. PRIOR TO THE COMMENCEMENT OF SLEEVING WORK, CONVENE A PRE-CONSTRUCTION
CONFERENCE WITH AOR, LA, CONTRACTOR AND ANY ASSOCIATED AND RELEVANT
DESIGN TEAM MEMBERS, SUBCONTRACTORS AND AHJ TO REVIEW WORK SCOPE,
SCHEDULE AND TO REVIEW Q&A BY DESIGN TEAM, AHJ AND CONTRACTORS.
CONTRACTOR TO PROVIDE MINIMUM 5 BUSINESS DAY NOTICE FOR ALL MEETINGS.
2. CONFIRM ALL SLEEVING QUANTITIES AND DIMENSIONS.
3. PROVIDE UTILITY AND/OR IRRIGATION SLEEVES AT ANY LOCATIONS UTILITY AND/OR
IRRIGATION LINES REQUIRE CONECTION THROUGH STRUCTURES, WALLS, UNDER
PAVING, ETC. SLEEVES TO BE CLASS 200 PVC AND BE SIZED MINIMALLY TO BE TWICE
THE CUMULATIVE PIPE SIZE OF THE INTENDED UTILITY/IRRIGATION LINES TO BE
LOCATED INSIDE.
4. STAKE OR FLAG ENDS OF ALL SLEEVE LOCATIONS AND MAINTAIN THROUGHOUT
CONSTRUCTION OPERATIONS.
5. PROVIDE DETECTABLE UNDERGROUND MARKING TAPE FOR ALL SLEEVING LOCATIONS
AND UTILTITY AND IRRIGATION RUNS AS NOTED IN SPECS.
6. SEPARATE ELECTRICAL AND AUDIO WIRE RUNS IN SEPARATE SLEEVES.
7. WATER AND/OR IRRIGATION SUPPLY RUNS TO BE LOCATED IN SEPERATE SLEEVES
THAN OTHER UTILITIES.
HARDSCAPE NOTES:
1. PRIOR TO THE COMMENCEMENT OF HARDSCAPE SCOPE OF WORK, CONVENE A
PRE-CONSTRUCTION CONFERENCE WITH AOR, LA, CONTRACTOR AND ANY ASSOCIATED
AND RELEVANT DESIGN TEAM MEMBERS, SUBCONTRACTORS AND AHJ TO REVIEW
WORK SCOPE, SCHEDULE AND TO REVIEW Q&A BY DESIGN TEAM, AHJ AND
CONTRACTORS. CONTRACTOR TO PROVIDE MINIMUM 5 BUSINESS DAY NOTICE FOR ALL
MEETINGS.
2. CONFIRM ALL HARDSCAPE QUANTITIES AND DIMENSIONS.
3. STAKE AND PAINT OUT ALL STRUCTURE EXTENTS AND FOOTING LOCATIONS, WALL
FACES/BACKS, STAIR LOCATIONS, CURB FACES/BACKS AND PAVING EDGES PER PLANS
FOR AOR AND LA REVIEW AND APPROVAL PRIOR TO EXCAVATION AND INSTALLATION.
ADJUST ANY LAYOUT MODIFICATIONS BY AOR AND LA AT NO ADDITIONAL COST TO THE
OWNER. ALL SURVEY AND LAYOUT COSTS BY CONTRACTOR.
4. ESTABLISH APPROVED LAYOUT LINES AND GRADES AND MAINTAIN THROUGH
CONSTRUCTION FOR VERIFICATION BY AOR AND LA. ALL LINES TO BE STRAIGHT AND
TRUE, ALL CURVES SHALL BE SMOOTH AND NON-FACETED WITH BOTH IN ACCORDANCE
WITH THE PLANS AND APPROVED FIELD LAYOUT BY AOR AND LA.
5. FOR PRECISION OF LAYOUT REQUIREMENTS SEE SPECS. ALL EDGES OF HARDSCAPE
ELEMENTS TO BE PAINTED AND MAINTAINED FOR AOR AND LA REVIEW AND APPROVAL
PRIOR TO FORMING. ALL FORMING AND REINFORCEMENT TO BE REVIEWED AND
APPROVED BY AOR AND LA PRIOR TO POURING.
6. MATCH LINE AND GRADE OF PAVEMENT, LAWN AND PLANTING AREAS TO EXISTING
ADJACENT AREAS.
7. TRANSITION SMOOTHLY BETWEEN DIFFERENT SLOPES WITHOUT ABRUPT CHANGES IN
SLOPE. REFER TO GRADING PLAN.
8. GRADE ALL HARDSCAPE SURFACES TO A MAXIMUM 5% SLOPE WITH A MAXIMUM CROSS
SLOPE OF 2% AND A MINIMUM SLOPE OF 1%. SLOPE ALL PAVEMENT TO DRAIN.
9. ADJUST UTILITY STRUCTURES TO MEET FINISH GRADE.
10. LAYOUT CONTROL JOINTS AT A MAX 5' OC AND EXPANSION JOINTS AT A MAX 30' OC UNO.
IF PAVEMENT IS ARCED, LAYOUT CONTROL JOINTS EQUALLY ALONG LENGTH OF ARCH
AND PERPENDICULAR TO CENTERLINE OF ARC UNO.
11. ALL CONTROL JOINTS AND EXPANSION JOINTS ARE PERPENDICULAR AND PARALLELL TO
BUILDING FAÇADE UNO.
12. CLEARLY MARK ALL VISIBLE SAW CUT CONTROL JOINTS PRIOR TO CUTTING FOR REVIEW
AND APPROVAL BY AOR AND LA.
13. ALL EXPOSED VERTICAL CONCRETE EDGES TO BE CHAMFERED 1/2”, 45̊ UNO.
14. REFER TO SPECIFICATIONS FOR PAVEMENT REPAIR AND RESTORATION CRITERIA.
15. SET BOULDERS OR ANY OTHER STONE ELEMENTS OR FEATURES PRIOR TO PLACING
ADJACENT HARDSCAPES. PROVIDE EXPANSION JOINT BETWEEN VERTICAL ELEMENTS
AND ADJACENT HORIZONTAL SURFACES. COORDINATE WITH AOR AND LA IN FIELD
PRIOR TO FINAL PLACEMENT OF BOULDERS.
16. COORDINATE REQUIREMENTS OF FOUNDATIONS FOR UTILITIES, LIGHITNG, IRRIGATION
AND SITE FURNISHINGS SCOPE IN CONJUCTION WITH ALL HARDSCAPE OPERATIONS.
17. FOR HARDSCAPE DETAILS, SEE SHEET(S) L10.4-L10.7.
LIGHTING NOTES:
1. PRIOR TO THE COMMENCEMENT OF LIGHTING SCOPE OF WORK, CONVENE A
PRE-CONSTRUCTION CONFERENCE WITH AOR, LA, CONTRACTOR AND ANY ASSOCIATED
AND RELEVANT DESIGN TEAM MEMBERS, SUBCONTRACTORS AND AHJ TO REVIEW
WORK SCOPE, SCHEDULE AND TO REVIEW Q&A BY DESIGN TEAM, AHJ AND
CONTRACTORS. CONTRACTOR TO PROVIDE MINIMUM 5 BUSINESS DAY NOTICE FOR ALL
MEETINGS.
2. SHOP DRAWING SUBMITTALS SHALL INCLUDE LAMP INFORMATION SHEETS ALONG WITH
FIXTURE INFORMATION SHEETS.
3. SHOP DRAWING SUBMITTALS SHALL BE PREPARED BY MANUFACTURERS AND/OR
MANUFACTURERS REPRESENTATIVES.
4. VERIFY MOUNTING CONDITIONS, CLEARANCES AND STRUCTURAL SUSPENSION SYSTEM
PRIOR TO FIXTURE PROCUREMENT.
5. ALL CIRCUITS ARE 2-WIRE, NO COMMON NEUTRALS
6. ALL FIXTURE SUBSTITUTIONS MUST BE APPROVED BY AOR AND LA PRIOR TO BID.
7. STAKE ALL LIGHTING LOCATIONS FOR REVIEW AND APPROVAL BY AOR AND LA PRIOR TO
PLANTING. PROVIDE LA WITH A MINIMUM OF 5 BUSINESS DAYS NOTICE PRIOR TO
REVIEW.
8. WORK CAREFULLY WITHIN THE DRIP LINES OF EXISTING TREES SCHEDULED TO REMAIN
TO LIMIT IMPACT TO EXISTING ROOT SYSTEMS. HAND EXCAVATE ONLY IN CRITICAL
ROOT ZONES, NO TRENCHING.
9. COORDINATE ALL LIGHTING FOUNDATIONS WITH GRADING PLAN. TOP OF FOUNDATIONS
TO BE NO MORE THAN 1 INCH ABOVE ADJACENT GRADE UNO. COORDINATE WITH AOR
AND LA FOR ANY UNIQUE CONDITIONS.
10. ALL FEEDS AND WIRING TO BE CONCEALED FROM VIEW OR WHERE POSSIBLE
CONCEALED WITHIN STRUCTURES UNO.
11. CONTRACTOR IS RESPONSIBLE FOR SYSTEM REPAIRS AND ADJUSTMENT UNTIL
SUBSTANTIAL COMPLETION AND FINAL ACCEPTANCE.
12. FOR LIGHTING DETAILS, SEE SHEET(S) L10.10.
IRRIGATION NOTES:
1. PRIOR TO THE COMMENCEMENT OF IRRIGATION SCOPE OF WORK, CONVENE A
PRE-CONSTRUCTION CONFERENCE WITH AOR, LA, CONTRACTOR AND ANY ASSOCIATED
AND RELEVANT DESIGN TEAM MEMBERS, SUBCONTRACTORS AND AHJ TO REVIEW
WORK SCOPE, SCHEDULE AND TO REVIEW Q&A BY DESIGN TEAM, AHJ AND
CONTRACTORS. CONTRACTOR TO PROVIDE MINIMUM 5 BUSINESS DAY NOTICE FOR ALL
MEETINGS.
2. CONFIRM ALL IRRIGATION QUANTITIES AND DIMENSIONS.
3. CONTRACTOR IS REPONSIBLE FOR COORDINATING IRRIGATION INSTALLATION WITH ALL
OTHER TRADES. REFER TO IRRIGATION SHEET(S) FOR IRRIGATION DESIGN.
4. FOR DELEGATED IRRIGATION DESIGN, SEE SPECIFICATIONS. LOW THROW SPRAY
SYSTEM SHALL BE SPECIFIED IN LIEU OF DRIPLINE UNO OR APPROVED BY LA.
5. DELEGATED IRRIGATION SYTEM TO BE DESIGNED FOR 100% IRRIGATION COVERAGE OF
ALL PLANTINGS, LAWN AND GREEN ROOF AREAS UNO. ZONE SYSTEMS ACCORDINGLY
SEPERATING TREE RINGS, PLANTING, LAWN AND ROOF AREAS.
6. DELEGATED IRRIGATION SYSTEM DESIGN TO BE REVIEWED AND APPROVED BY
IRRIGATION CONSULTANT AND/OR AOR AND LA PRIOR TO INSTALLATION.
7. CONTACT ALL UTILTIES AND GENERAL CONTRACTOR AT LEAST 5 BUSINESS DAYS PRIOR
TO START OF CONSTRUCTION OPERATIONS.
8. MAINTAIN ALL CODES REQUIRED BY LOCAL AUTHORITIES.
9. COORDINATE ELECTRICAL HOOKUP WITH AOR, LA, GENERAL CONTRACTOR,
ELECTRICIAN AND OWNER.
10. STATIC PRESSURE READ, PROVIDED BY OTHER UNO. IF PSI IS NOT 75 PSI, NOTIFY AOR, LA AND OWNER.
11. COORDINATE ALL SLEEVES AND PENETRATIONS WITH AOR, LA, GENERAL CONTRACTOR.
IRRIGATION CONTRACTOR IS RESPONSIBLE FOR BORES, SLEEVES AND/OR
PENETRATIONS RELATED TO THE IRRIGATION DESIGN.
12. PROVIDE SLEEVING UNDER ROADS, DRIVES, PAVING, WALLS, ETC. SLEEVE WIRE AND
PIPING SEPERATELY, COORDINATE AS NECESSARY FOR ZONING REQUIREMENTS. ALL
WIRING TO BE SLEEVED IN MIN 2 INCH SLEEVE.
13. COORDINATE ALL LOCATIONS OF CONTROL AND JUNCTION BOXES IN PLANTING BEDS
(NOT LAWN) WHEREVER POSSIBLE. IF BOXES ARE REQUIRED IN LAWNS COORDINATE
LOCATIONS WITH AOR AND LA PRIOR TO INSTALLATION. ALIGN ALL BOXES WITH
ADJACENT CURBS, WALKS OR WALLS A MINIMUM OF 12 INCHES OFF BACK OF ADJACENT
HARDSCAPE EDGE. GROUP BOXES WHEN APPROPRIATE.
14. COORDINATE ALL BOXES, LINES AND HEADS WITH LOCATIONS OF THE PROPOSED
PLANT MATERIAL. DO NOT INSTALL ANY IRRIGATIONS ITEMS THAT WILL INTERFERE WITH
PROPOSED PLANT LOCATIONS. CONTRACTOR TO BRING ANY CONFLICTS TO THE
ATTENTION OF LA PRIOR TO INSTALLATION.
15. IRRIGATION LINES AND HEADS ARE SCHEMATIC. FIELD ADJUSTMENTS MAY BE
REQUIRED BASED ON EXISTING CONDITIONS AND/OR AS THE SYSTEM INTERFACES WITH
THE PLANTINGS.
16. CAP OR PLUG ALL OPENINGS AS SOON AS LINES ARE INSTALLED TO PREVENT DEBRIS IN
THE LINE.
17. INSTALL ALL PIPING AND FITTINGS USING GLUE METHODS CONSISTENT WITH
MANUFACTURER'S RECOMMENDATIONS.
18. ALL GASKETED PRESSURE PIPE AND FITTINGS SHALL BE THRUST BLOCKED. NO
CONCRETE PREFORMED BLOCKS WILL BE ALLOWED.
19. MAINLINE PIPING SHALL BE INSTALLED AT MIN DEPTH OF 10 INCHES TO THE TOP OF PIPE
FROM FINISHED GRADE.
20. LATERAL LINES SHALL BE INSTALLED AT MIN DEPTH OF 10 INCHES TO THE TOP OF PIPE
FROM FINISHED GRADE.
21. THOROUGHLY FLUSH ALL LINES PRIOR TO THE OPERATION OF SPRINKLER HEADS.
22. INSTALL WIRES A MIN OF 8 INCHES BELOW FINISHED GRADE. SPLICES ARE NOT
ALLOWED IN TRENCH. PROVIDE A 24 INCH EXPANSION LOOP AT EACH CHANGE IN
DIRECTION. 5 FEET OF EXCESS DECODER WIRE IS TO BE AT EACH DECODER LOCATION
FOR EASE OF ACCESS.
23. THE IRRIGATION SYSTEM SHALL BE TESTED AT OPERATING PRESSURE FOR A MIN OF 4
HOURS. REPAIR ALL LEAKS AND RETEST AFTER CURING.
24. UPON COMPLETION OF TEST, COMPLETE ASSEMBLY OF ALL EQUIPMENT AND
SPRINKLERS FOR PROPER DISTRIBUTION.
25. PROVIDE AS BUILT DRAWINGS SHOWING ALL COMPONENTS OF THE SYSTEM AND THEIR
FINAL LAYOUT PRIOR TO FINAL PAYMENT. PROVIDE FINAL GPM OF ZONES, WIRE RUNS,
HEADS, VALVES, PIPE SIZES, ETC.
26. CONTRACTOR IS RESPONSIBLE FOR SYSTEM REPAIRS AND ADJUSTMENT UNTIL
SUBSTANTIAL COMPLETION AND FINAL ACCEPTANCE.
27. FOR IRRIGATION DETAILS, SEE SHEET(S) XXXX.
28. FOR IRRIGATION SCHEDULE, SEE SHEET(S) XXXX.
SOIL NOTES:
1. CONFIRM ALL SOIL QUANTITIES AND DIMENSIONS.
2. BASE SOIL MIX SHALL BE AS FOLLOWS:
a. PLANTING TOPSOIL, EITHER EXISTING ON SITE OR IMPORTED, TO BE USED FOR
NEW PLANTING SOILS ACROSS THE ENTIRE SITE SHALL MEET THE FOLLOWING
CRITERIA (AMEND AS NECESSARY TO MEET SPEC):
i. CLAY VALUE NOT TO EXCEED (IDEAL RANGE 10-15%).
ii. SAND VALUE (IDEAL RANGE 60-70%) SAND VALUES SHALL BE MOSTLY MEDIUM TO
COURSE ON THE .25 AND .50 SIEVE.
iii. REMAINDER TO BE SILT (IDEAL RANGE 15-30%)
iv. ORGANIC MATTER NOT LESS THAN 3.5% AND NOT MORE THAN 5%
b. LAWN TOPSOIL, EITHER EXISTING ON SITE OR IMPORTED, TO BE USED FOR NEW
PLANTING SOILS ACROSS THE ENTIRE SITE SHALL MEET THE FOLLOWING CRITERIA
(AMEND AS NECESSARY TO MEET SPEC):
i. CLAY VALUE NOT TO EXCEED 25% (IDEAL RANGE 5-25%).
ii. SAND VALUE (IDEAL RANGE 25-50%) SAND VALUES SHALL BE MOSTLY MEDIUM TO
COURSE ON THE .25 AND .50 SIEVE.
iii. REMAINDER TO BE SILT (IDEAL RANGE 25-50%)
iv. ORGANIC MATTER NOT LESS THAN 3.5% AND NOT MORE THAN 5%
3. AMENDMENTS FOR PLANTING MIXES:
a. MIXED SOIL AMENDMENTS (4” DEPTH PROFILE TILLED INTO THE PROPOSED SOIL
PROFILE DEPTH):
i. 4 PARTS AGED PINE FINES
ii. 4 PARTS COURSE SAND
iii. 2 PARTS COMPOSTED RICE HULLS
b. PLACED SOIL AMMENDMENTS:
i. GYPSUM-50#/1000 SF
ii. UMAXX UREA-4#/1000 SF
iii. POTASSIUM SULFATE-5#/1000SF
iv. MONO-AMMONIUM PHOSPHATE-21#/1000SF
4. AMENDMENTS FOR LAWN MIXES:
a. MIXED SOIL AMMENDMENTS:
i. N/A
b. PLACED SOIL AMMENDMENTS:
i. GYPSUM-50#/1000 SF
ii. UMAXX UREA-4#/1000 SF
iii. POTASSIUM SULFATE-5#/1000SF
iv. MONO-AMMONIUM PHOSPHATE-21#/1000SF
5. PROVIDE MULTIPLE SEPARATE SOURCES FOR INITIAL TESTING IN HOPE TO MINIMIZE
THE NEED FOR ADDITIONAL SOIL AMENDMENTS.
6. PROVIDE 1 QUART SAMPLE ALONG WITH TESTING DATA FOR AOR AND LA REVIEW AND
APPROVAL PRIOR TO FINAL PROCUREMENT AND PLACEMENT.
7. PLANTING MIX SHALL BE LOOSELY MIXED WITH A LOADER BUCKET AS FOLLOWS AND AS
NECESSARY TO MEET SPEC: MIX “MIXED” SOIL AMENDMENTS TOGETHER SEPARATELY IN
THE CORRECT PROPORTION. ADD SOIL AMENDMENTS BLEND TO UNSCREENED
TOPSOIL. USE A PUSH AND DRAG MOTION WITH THE LOADER BUCKET, MIX THE
COMPONENTS. DO NOT OVER MIX. USE TECHNIQUES THAT PRESERVE SOIL PEDS IN THE
FINAL MIX.
8. LAWN MIX TO BE APPROVED TOPSOIL WITHOUT AMENDMENTS UNO.
9. PRIOR TO PLACEMENT SCARIFY/FRACTURE SUB-GRADE AND VERTICAL EDGES OF
PLANTING SOIL EXCAVATIONS.
10. IMPORT SOIL TO MEET PROPOSED GRADES AFTER SETTLING. TOP OF SOIL PROFILE TO
MEET 85% MODIFIED PROCTOR AFTER SETTLING.
11. PROVIDE TEST RESULTS FOR EVERY 1000 YARDS OF PLACED SOIL TO ENSURE ALL SOIL
CONFORMS TO APPROVED PARAMETERS.
12. ONCE PLACED, SOIL PROFILES SHOULD BE PROTECTED FROM COMPACTION. SOIL
PROFILES AFFECTED BY COMPACTION SHOULD BE REMOVED AND REPLACED OR
AMENDED IN PLACE UNDER THE REVIEW OF AOR AND LA.
PLANTING NOTES:
1. PRIOR TO THE COMMENCEMENT OF PLANTING SCOPE OF WORK, CONVENE A
PRE-CONSTRUCTION CONFERENCE WITH AOR, LA, CONTRACTOR AND ANY ASSOCIATED
AND RELEVANT DESIGN TEAM MEMBERS, SUBCONTRACTORS AND AHJ TO REVIEW
WORK SCOPE, SCHEDULE AND TO REVIEW Q&A BY DESIGN TEAM, AHJ AND
CONTRACTORS. CONTRACTOR TO PROVIDE MINIMUM 5 BUSINESS DAY NOTICE FOR ALL
MEETINGS.
2. CONFIRM ALL PLANTING QUANTITIES AND DIMENSIONS. QUANTITIES PROVIDED ARE FOR
THE CONVENIENCE OF THE CONTRACTOR. CONTRACTOR TO VERIFY IMPLIED
COVERAGE ON THE PLANTING PLANS. CONTRACTOR TO BRING ANY DISCREPANCIES TO
THE ATTENTION OF THE LA AT THE TIME OF BID.
3. ALL PLANT MATERIAL TO BE INSTALLED IN CONFORMANCE WITH ALL APPLICABLE CODES
AND ORDINANCES.
4. OBTAIN PERMIT FROM CITY AHJ FOR ANY TREES REMOVED OR REPLACED IN THE
PUBLIC ROW IF APPLICABLE.
5. OBTAIN A PERMIT TO REMOVE, SPRAY OR OTHERWISE AFFECT THE GENERAL HEALTH
OR STRUCTURE OF EXISTING OR NEW TREES AND/OR OTHER PLANT MATERIAL.
6. EXISTING TREES/FENCING TO BE PROTECTED SHALL BE PROTECTED WHILE PROJECT IS
UNDER CONSTRUCTION AND WILL BE REPLACED IF DAMAGED BY CONTRACTOR.
7. TAKE GREAT CARE NOT TO DAMAGE EXISTING OR NEW TREES OR OTHER PLANT
MATERIAL DURING EXCAVATION, PLANTING AND OTHER CONSTRUCTION OPERATIONS.
SEEK AOR AND LA APPROVAL TO WORK WITHIN THE DRIP LINE OF EXISTING TREES.
8. TAKE GREAT CARE WHEN WORKING WITHIN THE DRIP LINE OF ANY TREE IF APPROVED
BY AOR AND LA. WHEN TRENCHING WITHIN DRIP LINES OF ANY TREE, OPERATIONS
SHOULD BE CONDUCTED BY HAND WORKING IN A WHEEL AND SPOKE MANNER
WORKING FROM THE TRUNK OF THE TREE OUTWARD. DAMAGED OR TORN ROOTS
SHOULD BE IMMEDIATELY REPAIRED WITH A SMOOTH, CLEAN CUT. TAKE GREAT CARE
DURING TILLAGE OPERATIONS WITHIN SPECIFIED TREE PROTECTION ZONES OF TREES
TO REMAIN. WHEN MAJOR ROOTS ARE ENCOUNTERED EXCAVATE BY HAND TO AVOID
DAMAGE TO ROOT SYSTEM.
9. ALL PLANT MATERIAL TO BE SPECIMEN QUALITY, WELL MATCHED IN FORM, NURSERY
GROWN, SOUND, HEALTHY, VIGOROUS AND FREE OF INSECTS, DISEASE AND INJURIES
WITH HABIT OF GROWTH THAT IS TYPICAL FOR THE SPECIES. SIZES SHALL BE EQUAL TO
OR GREATER THAN THOSE NOTED ON THE PLANT LIST(S). DO NOT PROCEED WITH
PLANTING INSTALLATION UNLESS LA HAS APPROVED ALL PLANT MATERIAL. ALL B&B
MATERIAL TO BE OBTAINED FROM NURSERIES WITH SIMILAR SOIL CONDITIONS AS THE
PROJECT SITE.
10. PROVIDE AOR AND LA WITH PLANT LIST AND INTENDED NURSERY SUPPLIERS FOR EACH
ITEM TO LA WITHIN 30 DAYS OF AWARD OF CONTRACT. ANY UNAVAILABLE PLANT
MATERIAL SHOULD BE NOTED AT THAT TIME. AOR AND LA RESERVES THE RIGHT TO
ASSIST IN PLANT SOURCING AS NECESSARY. PROVIDE AOR AND LA WITH SUBSTITUTION
LIST IN THE EVENT PROPOSED MATERIALS ARE UNAVAILABLE PRIOR TO PROCUREMENT
FOR FINAL REVIEW AND APPROVAL.
11. COORDINATE NURSERY SELECTION AND TAGGING WITH AOR AND LA. AOR AND LA
RESERVES THE RIGHT TO ACCEPT OR REJECT ANY AND ALL PLANT MATERIAL AS IT
RELATES TO THE REQUIREMENTS IN THE SPECIFICATIONS. AOR AND LA RESERVES THE
RIGHT TO REJECT PLANT MATERIAL IF DAMAGED OR UNHEALTHY UPON ARRIVAL TO THE
PROJECT SITE EVEN AFTER INITIAL APPROVAL.
12. PROVIDE IDENTIFICATION TAG FROM THE SUPPLYING NURSERY SHOWING COMMON
AND BOTANICAL PLANT NAMES FOR AT LEAST ONE PLANT OF EACH UNIQUE SPECIES
DELIVERED TO THE SITE.
13. PRIOR TO PLANTING INSTALLATION, VERIFY PLANTING AREAS ARE GRADED AT =/-0.1
FEET TO FINISHED GRADE.
14. CONFIRM PLANTING AREAS ARE MIN 4 INCHES BELOW FINISH FLOOR ELEVATION UNO.
15. FINISHED GRADE OF PLANTING AREAS TO MEET ADJACENT HARDSCAPES 2 INCHES
BELOW ELEVATION OF HARDSCAPES UNO.
16. IF PLANTING PITS ARE MACHINE EXCAVATED AND GLAZING IS PRONOUNCED, SCARIFY
ALL SIDES.
17. REMOVE ALL ROCK AND DEBRIS 1 INCH AND LARGER FROM PLANTING AREAS. LEGALLY
DISPOSE ALL EXCESS MATERIALS RESULTING FROM THE WORK.
18. WITHIN PLANTING EXCAVATIONS, REMOVE CRUSHED AGGREGATE TO AN ADEQUATE
DEPTH TO ENSURE THAT NO PART OF THE PLANT MATERIAL OR FUTURE EXTENTS OF
ROOT SYSTEM IS IN CONTACT OR AFFECTED BY THE LIME OR LIMESTONE WITHIN THE
AGGREGATE. FOR CRUSHED AGGREGATE PROPOSED WITHIN THE AREAS OF EXISTING
ROOT SYSTEMS CONTRACTOR TO UTILIZE NON-LIMESTONE MATERIAL, CONTRACTOR TO
PROVIDE CUT SHEET SUBMITTAL FOR AOR AND LA REVIEW.
19. STAKE ALL TREES AND FLAG ALL SHRUB LOCATIONS FOR REVIEW AND APPROVAL BY
AOR AND LA PRIOR TO PLANTING. PROVIDE LA WITH A MINIMUM OF 5 BUSINESS DAYS
NOTICE PRIOR TO REVIEW.
20. SET ALL TREES AND SHRUBS ON TOP OF FINISHED GRADE PER APPROVED STAKED AND
FLAGGED LOCATIONS FOR FACING AND FINAL APPROVAL BY AOR AND LA PRIOR TO
PLANTING.
21. FOR ALL GRASSES, PERENNIALS, GROUNDCOVER AND ANNUALS, SET OUT PLANT
MATERIAL ON TOP OF PROPOSED GRADE FOR AOR AND LA REVIEW PRIOR TO PLANTING
IN ACCORDANCE WITH PLANTING PLANS. AOR AND LA RESERVE THE RIGHT TO MODIFY
THEPLANTINGS AS NEEDED.
22. INSTALL ALL PLANT MATERIAL IN ACCORDANCE WITH THE DETAILS AND
SPECIFICATIONS.
23. REMOVE ALL PLANT TYING MATERIAL AND MARKING TAPES AT THE TIME OF PLANTING.
LEAVE AOR AND LA NURSERY SEALS IN PLACE FOR THE DURATION OF THE SPECIFIED
WARRANTY PERIOD.
24. FOR B&B MATERIAL, REMOVE TOP 1/3 OF METAL CAGE AND BURLAP FROM ROOT BALL
AND PROPERLY DISPOSE. DO NOT FOLD DOWN, CAGE MUST BE REMOVED. IMMEDIATELY
REPORT ANY DAMAGE TO ROOT BALLS OR PLANTS TO AOR AND LA.
25. FOR CONTAINER MATERIAL WHERE APPLICABLE LOOSEN ROOT MASS BY HAND OR IF
REQURIED BY CUTTING (4) 1 INCH DEEP VERTICAL SLITS EVENLY SPACED AROUND
ROOT BALL OF PLANT PRIOR TO PLANTING. REPEAT SLITS IN X PATTERN ON BOTTOM OF
ROOT MASS.
26. ROOT FLARE OF PLANTS TO BE SET MIN AT FINISHED GRADE OR NO MORE THAN 3
INCHES ABOVE FINISHED GRADE.
27. ROOT FLARE OF PLANTS INSTALLED IMMEDIATELY ADJACENT TO HARDSCAPE TO BE
PLANTED NO MORE THAN 1 INCH ABOVE FINISHED GRADE TO ENSURE SMOOTH
TRANSITION TO HARDSCAPE.
28. FOR PERENNIALS AND GROUNDCOVERS, PLANT 1 INCH ABOVE SOIL PROFILE TO
ACCOMADE MULCH LAYER.
29. DURING BACKFILL OF ALL PLANTS (WITH THE EXCEPTION OF SOD AND SEEDED LAWNS)
SUPPLEMENT BACKFILL WITH PLANTING SOIL SUPPLEMNTS AS NOTED IN THE SPECS.
REFER TO MANUFACTURER REQUIREMENTS FOR INSTALLATION.
30. DO NOT ALLOW AIR POCKETS TO FORM IN SOIL WHILE BACKFILLING.
31. TREE STAKING AND GUYING TO BE REVIEWED WITH AOR AND LA WHEN DEEMED
NECESSARY PRIOR TO INSTALLATION.
32. ALL NEWLY INSTALLED PLANT MATERIAL SHALL BEAR THE SAME RELATIONSHIP TO THE
NEW GRADE AS THEY BORE TO NURSERY GRADES UNO.
33. WATER AND MAINTAIN PLANT MATERIAL WHILE BEING STORED ON SITE, IMMEDIATELY
AFTER PLANTING AND UNTIL FINAL ACCEPTANCE.
34. ALL PLANTINGS BED EDGES TO HAVE A SPADED EDGE UNO. BOTTOM OF SPADED EDGE
TO BE 2 INCHES BELOW THATCH OR ADJACENT HARDSCAPE SURFACE.
35. PROVIDE 2 INCH (AFTER SETTLEMENT) OF MULCH OVER ALL PLANTING BEDS UPON
COMPLETION OF PLANTING OPERATIONS. MULCH TO BE AS FOLLOWS:
a. TREES AND SHRUBS:
i. SHREDDED DOUBLE PROCESSED HARDWOOD BARK MULCH
b. ORNAMENTAL GRASSES, PERENIIALS AND GROUNDCOVERS:
i. A 50/50 BLEND OF ¾ INCH SHREDDED DOUBLE PROCESSED HARDWOOD BARK
FINES AND ¾ INCH PINE BARK FINES UNO.
36. PRUNE AND MAINTAIN ALL PLANTINGS IN SITE TRIANGLES TO A HEIGHT BELOW 18
INCHES OR ABOVE 7 FEET AS REVIEWED AND APPROVED BY AOR AND LA.
37. PRUNE ALL TREES WITHIN OR IMMEDIATELY ADJACENT TO DRIVES AND WALKS TO A MIN
7 FOOT CBH.
38. SOD IS TO BE CUT WITH 1 INCH OF SOIL UNO.
39. DO NOT ALLOW SOD TO BE ROLLED UP FOR A PERIOD LONGER THAN 12 CONSECUTIVE
HOURS.
40. AOR AND LA TO APPROVE FINE GRADING OF LAWN SOIL PRIOR TO SOD INSTALLATION.
41. SCARIFY LAWN SOIL 1/2 INCH PRIOR TO INSTALLATION AND APPROVED BY LA.
42. ALTERNATE SOD SEAMS TO ELIMINATE CONTINUOUS SEAMS, OVERLAPPING ADJACENT
SOD PANEL BY ½ FOR SMALL ROLL SOD.
43. INSTALL AND MAINTAIN SOD TO ELIMINATE LUMPS IN SURFACE AND SEAMS.
44. SOD TO MEET ALL ADJACENT HARDSCAPE SURFACES FLUSH WITH TOP OF THATCH
LAYER.
45. ROLL SOD WITH APPROPRIATELY SIZED ROLLER TO PROVIDE PROPER SOD TO SOIL
INTERFACE.
46. COMPLETELY WATER IN SOD DEEPLY IMMEDIATELY AFTER ROLLING.
47. PROTECT SEEDED AREAS AND SLOPES AGAINST EROSION AND SEED LOSS DUE TO
BIRDS AND OTHER WILDLIFE BY APPLYING SHORT TERM, BIODEGRADEABLE EROSION
CONTROL BLANKETS, MATS, AND/OR NETTING AFTER COMPLETION OF SEEDING
OPERATIONS. ADHERE TO MANUFACTURER'S REQUIREMENTS FOR REQUIRED
PLACEMENT AND STAKING.
48. PRUNING OPERATIONS SHOULD FOLLOW APPLICABLE ANSI STANDARDS UNO. UPON
COMPLETION OF WORK UNDER THIS CONTRACT, PRUNE AND REPAIR INJURIES TO ALL
PLANTS. LIMIT AMOUNT OF PRUNING TO MINIMUM NECESSARYTO REMOVE INJURED OR
DAMAGED BRANCHES, TWIGS AND STEMS AND TO COMPENSATE FOR THE LOSS OF
ROOTS AS A RESULT OF TRANSPLANTING OPERATIONS. PRUNE IN SUCH A MANNER AS
NOT TO CHANGE NATURAL HABIT OR SHAPE UNO. ALL HEDGE PRUNING TO BE
COMPLETED UNDER THE REVIEW BY AOR AND LA.
49. DURING PUNCH LIST REVIEW, COORDINATE WITH AOR AND LA TO REVIEW AESTHETIC
PRUNING NEEDS FOR ALL PLANTS. AOR AND LA TO MARK (WITH YELLOW RIBBON) OR
SELF CONDUCT AESTHETIC PRUNING WITH CONTRACTOR AS PART OF THE
SUBSTANTIAL COMPLETION REVIEW.
50. WARRANTY ALL PLANT MATERIAL FOR A MIN PERIOD OF 1 YEAR FROM FINAL
ACCEPTANCE UNO IN THE SPECIFICATIONS. REMOVE AND REPLACE PLANTS AS
DETERMINED BY LA TO BE SIGNIFICANTLY UNHEALTHY OR DEAD PER THE CRITERIA SET
FORTH IN THE SPECS. CONDUCT REPLACEMENTS DURING THE APPROPRIATE PLANTING
SEASON AS DETERMINED BY THE LOCAL CLIMATE AND INDUSTRY STANDARDS.
REPLACEMENTS SHOULD CONFORM TO THE CRITERIA SHOWN AND SPECIFIED. SEE
SPECS FOR ALL MAINTENANCE REQUIREMENTS. SIZE, CHARACTER AND FORM OF ALL
REPLACEMENTS TO BE SIMILAR TO THE ORIGINAL APPROVED MATERIAL AND APPROVED
BY THE AOR AND LA.
51. ALL PLANT MATERIAL IS SHOWN AS ANTICIPATED SIZE AT INSTALLATION. PLANT
GROWTH VARIES BY SPECIES AND YEARLY CLIMACTIC CONDITIONS.
52. FOR PLANTING DETAILS, SEE SHEET(S) L10.11.
53. FOR PLANTING SCHEDULE, SEE SHEET(S) L6.13.
SITE FURNISHINGS NOTES:
1. PRIOR TO THE COMMENCEMENT OF SITE FURNISHINGS SCOPE OF WORK, CONVENE A
PRE-CONSTRUCTION CONFERENCE WITH AOR, LA, CONTRACTOR AND ANY ASSOCIATED
AND RELEVANT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .