About this file

This document provides details for a federal contract solicitation for construction services. The National Park Service is seeking proposals to stabilize an administration building and construct a new visitor center at Pullman National Monument in Chicago, Illinois. Work will include exterior and interior masonry repairs to the administration building, installation of light gauge framing and finishes on the second and third floors, and tenant improvements to the first floor to create a visitor center with exhibits, restrooms, meeting spaces, and offices. Proposals are due on or around July 18, 2019. The contract is anticipated to be a firm-fixed price contract between $5 million and $10 million with a period of performance from September 2019 to August 2020. This procurement is set aside for small businesses with a NAICS code of 236220 and size standard of $36.5 million.

Contract Price Schedule, fillable

View the file

Other files for this federal contract opportunity

Other files attached to Pullman National Monument, PULL 223195-253045, newest first.
File Type Posted
SF_30-Amendment_0007-140P2019R0048_10.28.19.pdf PDF
Amendment_Number_0007_Narrative.pdf PDF
1-140P2019R0048,_Amendment_No._0006.pdf PDF
9-A6.4_WINDDTLS_A6-Addendum_191022.pdf PDF
8-A2.4B_INT_ELEV_A2-Addendum_191022.pdf PDF
10-ED1.0_POWER_1ST_FLOOR_DEMOLITION.PDF PDF
3-PULL_Visitor_Center,_Bidding_Questions_as_of_10-22-2019.pdf PDF
2-Amendment_Number_0006_Narrative.pdf PDF
7-282000_FL_-_Video_Surveillance.pdf PDF
PULL_223195_Sustainability_Checklist_2019-0619.pdf PDF
SF_30_-_140P2019R0048-Amendment_0005.pdf PDF
North_Bay_Electrical_Equipment.pdf PDF
PULL_223195_ARCH_Submittal_List_2019-0820.pdf PDF
PULL_Visitor_Center,_Bidding_Questions_as_of_10-21-2019-FINAL.pdf PDF
PULL_VC_Contractor_Site_Visit_Attendees_191017.pdf PDF
SF_30_Amendment___4_140P2019R0048.pdf PDF
PULL_Prebid_Notes.pptx PPTX presentation
1-Amendment__4_Narrative.pdf PDF
2-Amend__4,_Vol_II,_Instructions_.pdf PDF
B11_PULL_223195-253045_VC_prebid_attendees_191009.pdf PDF
PULL_Visitor_Center,_Bidding_Questions,_10-1-2019.xlsx XLSX spreadsheet
Amendment_0003_140P2019R0048.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
B02_SF_30,_Amend_No._002.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
B01_PULL_223195-253045_140P2019R0048_SF_1442,_Amend__1.pdf PDF
B08_PULL_223195-253045_Amend__1,_Narrative.pdf PDF
_B08_PULL_223195-253045_Amend__1,_page_175_of_180,_preproposal.pdf PDF
B08_PULL_223195-253045_Amend__1,_SF_30.pdf PDF
4-B03_PULL_223195-253045_General_Decision,_IL20190009_.pdf PDF
B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx XLSX spreadsheet
C_-_Limited_Hazardous_Materials_Report_GSG.pdf PDF
A_-_Soils_Investigation_Report_TSC.pdf PDF
E2.1_-_VC_Exhibit_Design_Part1.pdf PDF
E1.3_-_Site_Development_Drawings_DRAFT_2019-0719_Part3.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
5-PSP_Vol_I,_pkg.pdf PDF
B_-_VC_Building_Soil_Sampling_Report_DAI.pdf PDF
D2_-_Pullman_Stabilization_Project_Manual.pdf PDF
E1.1_-_Site_Development_Drawings_DRAFT_2019-0719_Part1.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
3-PULL_223195_FINAL_Drawings_2019-0913.pdf PDF
E1.2_-_Site_Development_Drawings_DRAFT_2019-0719_Part2.pdf PDF
6-PSP_Vol_II,_pkg.pdf PDF
E2.2_-_VC_Exhibit_Design_Part2.pdf PDF
D1_-_Pullman_Stabilization_Drawings.pdf PDF
1-PULL_223195_FINAL_Spec_BOOK_1_2019-0913.pdf PDF
2-PULL_223195_FINAL_Spec_BOOK_2_2019-0913.pdf PDF
B08_PULL_223195-153045_140P2019R0048_Binder1.pdf PDF
Show all 50

Pullman National Monument, PULL 223195-253045 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Template

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: 140P2019R0048
PARK - PMIS: PULL - 223195/250678
DEVELOPED AREA: PULLMAN NATIONAL MONUMENT
PROJECT TITLE: PULLMAN VISITORS CENTER & ADMINISTRATION BUILDING EXTERIOR
Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Visitors Center BUILD OUT1Lump Sum$0.00
2Administration Building EXTERIOR & STRUCTURAL STABILIZATION1Lump Sum$0.00
TOTAL BASE PRICE (Contract Line Item Number 1 through 2) ------------------------------------$0.00
All measurement and payment information is included in the project specifications, Section 012700.

&RPULL - 223195

CPS - &P

Design-Bid-Build Sample

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: N2011080811
PARK - PMIS: YELL 012345
DEVELOPED AREA: Old Faithful
PROJECT TITLE: Johnstonian Visitors Center
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identify why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Visitors Center1Lump Sum$0.00
2Water Line400L.F.- 0
3Sanitary Sewer line200L.F.- 0
4Rock Excavation150C.Y.- 0
TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ------------------------------------$0.00
5OPTION A, Geothermal Wells1Lump Sum$ - 0
6OPTION B, Photovoltaic system1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 5 and 6) -------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 6) -------------$0.00
All measurement and payment information is included in the project specifications, Section 012700.

&RYELL - 012345

CPS - &P

Design-Build Sample

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: N2011080811
PARK - PMIS: YOSE 012345
DEVELOPED AREA: Yosemite Valley
PROJECT TITLE: Design and Build a New Structure
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Design1Lump Sum$0.00
2Construction1Lump Sum$0.00
TOTAL BASE PRICE (Contract Line Item Number 1 through 2) ---------------------------------------------------------$0.00
3OPTION A, Photovoltaic System1Lump Sum$0.00
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3 ) -----------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 3) ------------$0.00

&RYOSE - 012345