This pre-solicitation notice describes a small business set-aside solicitation for construction services at Pullman National Monument in Chicago, Illinois. The solicitation will stabilize the administration building and construct a new visitor center, with an estimated price range of $5-10 million and period of performance from September 2019 through August 2020. Services include masonry repairs, structural reinforcement, and new construction for visitor amenities, offices and interpretive space. The solicitation will be issued electronically on July 18, 2019 through beta.SAM.gov. Responses are due based on dates in the forthcoming solicitation. The National Park Service within the Department of the Interior will award a firm-fixed price contract to a responsible small business, with a size standard of $36.5 million for NAICS code 236220. This is an opportunity for qualified small businesses to provide construction services that will improve visitor and operations facilities at Pullman National Monument.

Amendment 0004 - Vol II Instructions

View the file

Other files for this federal contract opportunity

Other files attached to Pullman National Monument, PULL 223195-253045, newest first.
File Type Posted
191024_RFI_Response_WSP_009-010_MEP_detail.pdf PDF
SF_30-Amendment_0007-140P2019R0048_10.28.19.pdf PDF
Amendment_Number_0007_Narrative.pdf PDF
11-S1.0_01STRPLN_S1-Addendum_191024.pdf PDF
5-084413_Glazed_Aluminum_Curtain_Walls.pdf PDF
4-10.22.19_-_Pullman_Visitor_Center_Camera_Changes.pdf PDF
8-A2.4B_INT_ELEV_A2-Addendum_191022.pdf PDF
10-ED1.0_POWER_1ST_FLOOR_DEMOLITION.PDF PDF
3-PULL_Visitor_Center,_Bidding_Questions_as_of_10-22-2019.pdf PDF
2-Amendment_Number_0006_Narrative.pdf PDF
7-282000_FL_-_Video_Surveillance.pdf PDF
PULL_VC_Contractor_Site_Visit_Attendees_191017.pdf PDF
North_Bay_Electrical_Equipment.pdf PDF
PULL_223195_ARCH_Submittal_List_2019-0820.pdf PDF
PULL_Visitor_Center,_Bidding_Questions_as_of_10-21-2019-FINAL.pdf PDF
B11_PULL_223195-253045_VC_prebid_attendees_191009.pdf PDF
1-Amendment__4_Narrative.pdf PDF
SF_30_Amendment___4_140P2019R0048.pdf PDF
PULL_Prebid_Notes.pptx PPTX presentation
Amendment_0003_140P2019R0048.pdf PDF
PULL_Visitor_Center,_Bidding_Questions,_10-1-2019.xlsx XLSX spreadsheet
B02_SF_30,_Amend_No._002.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
_B08_PULL_223195-253045_Amend__1,_page_175_of_180,_preproposal.pdf PDF
B08_PULL_223195-253045_Amend__1,_SF_30.pdf PDF
B01_PULL_223195-253045_140P2019R0048_SF_1442,_Amend__1.pdf PDF
B08_PULL_223195-253045_Amend__1,_Narrative.pdf PDF
PULL_223195_ARCH_ContractPriceSchedule_rfp-6-18-19.xls XLS spreadsheet
D1_-_Pullman_Stabilization_Drawings.pdf PDF
1-PULL_223195_FINAL_Spec_BOOK_1_2019-0913.pdf PDF
2-PULL_223195_FINAL_Spec_BOOK_2_2019-0913.pdf PDF
B08_PULL_223195-153045_140P2019R0048_Binder1.pdf PDF
E1.3_-_Site_Development_Drawings_DRAFT_2019-0719_Part3.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
5-PSP_Vol_I,_pkg.pdf PDF
B_-_VC_Building_Soil_Sampling_Report_DAI.pdf PDF
D2_-_Pullman_Stabilization_Project_Manual.pdf PDF
E1.1_-_Site_Development_Drawings_DRAFT_2019-0719_Part1.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
3-PULL_223195_FINAL_Drawings_2019-0913.pdf PDF
E1.2_-_Site_Development_Drawings_DRAFT_2019-0719_Part2.pdf PDF
6-PSP_Vol_II,_pkg.pdf PDF
E2.2_-_VC_Exhibit_Design_Part2.pdf PDF
4-B03_PULL_223195-253045_General_Decision,_IL20190009_.pdf PDF
B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx XLSX spreadsheet
C_-_Limited_Hazardous_Materials_Report_GSG.pdf PDF
A_-_Soils_Investigation_Report_TSC.pdf PDF
E2.1_-_VC_Exhibit_Design_Part1.pdf PDF
Show all 50

Pullman National Monument, PULL 223195-253045 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: 140P2019R0048

Amendment #00004

E. VOLUME II, BUSINESS AND PRICE PROPOSAL – FORMAT, ORGANIZATION,

CONTENTS

1. FORMAT: Submit (1) hard copy and (1) one electronic copy.

2. ORGANIZATION: Include a Table of Contents with tabs for hard copy formats and folders and files for electronic formats named as follows:

SF1442

AMENDMENTS

SECTION B PRICE SCHEDULE

SF 24 BID BOND

SECTION K REPRESENTATIONS AND CERTIFICATIONS

GENERAL REFERENCES

SUBCONTRACTING PLAN (only required for large businesses)

3. CONTENTS:

SF1442: Standard Form 1442, Solicitation, Offer, and Award, (Construction, Alteration, or Repair): Complete blocks 14 through 20C only. An official having the authority to contractually bind the offeror's company must sign the SF 1442 in accordance with the procedures prescribed in FAR 4.102.

AMENDMENTS: Acknowledge all solicitation amendments using one of the methods set forth in Block 11 of Standard Form 30.

SECTION B CONTRACT PRICE SCHEDULE: Enter the proposed dollar amount for each line item in the Price Schedule, including any optional items, if applicable.

Also provide a separate Schedule of Values (SOV) for each line item in the Section B

Contract Price Schedule. Each SOV shall show the line item price broken down by major work components.

SF 24 BID BOND: Submit Standard Form 24, Bid Bond duly executed between the offeror and the bonding company. Refer to clause 52.228-1.

SECTION K REPRESENTATIONS AND CERTIFICATIONS: Submit a completed copy of provision 52.204-8 shown in section “K” of this solicitation. Complete all required representations and certifications if they are not available at www.SAM.gov.

Your firm must maintain current, active registration at www.SAM.gov to be eligible for award and you are encouraged to complete SAM registration before submitting your offer.

http://www.sam.gov/ http://www.sam.gov/

GENERAL REFERENCES: Complete and submit the attached "General

References," form. Information will be used in determining Responsibility pursuant to FAR 9.103.

SMALL BUSINESS SUBCONTRACTING PLAN: Small business offerors are not required to submit a subcontracting plan; however, large business offerors shall complete and submit the attached Subcontracting Plan Form in response to the requirements of clause 52.219-9.

The NPS subcontracting goals for Fiscal Year 2019 are: Small Businesses (43%), Small Disadvantaged Businesses (5%), Women-Owned Businesses (5%), HUBZone

(3%), and Service Disabled Veteran-Owned Businesses (3%).

Subcontracting plans that contain goals less than the NPS goals shall include rationale as to why the above goals cannot be met.

SMALL BUSINESS PATICIPATION PLAN: All offerors, both Small and Large business concerns, are required to submit a Small Business (SB) Participation Plan.

The offeror shall propose the level of participation of SB concerns (as a SB prime and/or no lower than first-tier SB subcontractors) that GUARANTEES A

MINIMUM OF 20 PERCENT OF THE TOTAL CONTRACT VALUE WILL

GO TO SMALL BUSINESSES in performance of the acquisition. Participation in performance of the contract includes joint ventures, teaming arrangements, and subcontracts. Note: Small business offerors may include the work performed by its own company toward the Small Business Participation Plan.

At a minimum, the Small Business Participation Plan must address the elements listed below (paragraphs a thru d).

A. Principal Types of Subcontracted Supplies or Services: List the supplies and/or services to be subcontracted and the corresponding socio-economic status of the businesses projected to receive these subcontracts. Complete the spreadsheet included in the Proposal

Submission Package. Also, explain and provide supporting documentation regarding the level of SB commitments to use SB concerns (for example, what types of commitments, if any, are in place for this specific acquisition as a SB prime and/or written contract, verbal, enforceable, non-enforceable, joint venturing, mentor-protégé, etc.

B. Subcontracted Value: Provide the anticipated amounts and percentages in terms of total projected subcontracting dollars for each of the following Small Business (SB) socio-economic categories: Small

Business (SB), HubZone (HZ), Small Disadvantaged Business (SDB), Woman-Owned (WO), Veteran- Owned (VO), and Service-Disabled

Veteran-Owned (SDVO). The 20 Percent Requirement is based on the products and services to be subcontracted by the prime contractor

(including affiliates). This Requirement is to be identified at only the first tier subcontract level (i.e. not what your subcontractors may be further subcontracting). Complete the spreadsheet included in the

Proposal Submission Package.

C. Method of Identifying Sources: Describe the methods used to identify subcontracting sources. Explain the verification process used to assess the appropriate SB socio-economic status and how the capabilities of the SB concern were determined.

Equitable Opportunity: Describe efforts the offeror will make to assure each of the socio-economic categories have an equitable opportunity to compete for subcontracts. Examples include: Assisting small business concerns, providing counseling, participating in outreach programs, advertising, presenting workshops/seminars, establishing source list, attending small business conferences and trade fairs.

End of Volume II – Business and Price Proposal requirements.

File details come from the government source that posted it. Updated .