About this file

This document provides details for a federal contract opportunity to stabilize the administration building and construct a new visitor center at the Pullman National Monument site in Chicago, Illinois. The National Park Service is soliciting proposals on a small business set-aside basis for a firm-fixed price contract with an estimated value between $5-10 million and a period of performance from September 1, 2019 to August 30, 2020. The contract will require the stabilization of the three-story administration building, including full exterior and interior masonry work, floor slab installation, and minimal build-out of the second and third floors. A new visitor center will be constructed within approximately 10,000 square feet of the first floor, including interpretive exhibits, retail, meeting spaces, and back-of-house office areas. Full mechanical, electrical, plumbing and telecommunications systems will be installed throughout the building. The pre-solicitation notice does not specify a proposal due date but notes an organized pre-proposal site visit will take place on October 9, 2019.

Amend #1, Narrative

View the file

Other files for this federal contract opportunity

Other files attached to Pullman National Monument, PULL 223195-253045, newest first.
File Type Posted
191024_RFI_Response_WSP_009-010_MEP_detail.pdf PDF
SF_30-Amendment_0007-140P2019R0048_10.28.19.pdf PDF
Amendment_Number_0007_Narrative.pdf PDF
11-S1.0_01STRPLN_S1-Addendum_191024.pdf PDF
5-084413_Glazed_Aluminum_Curtain_Walls.pdf PDF
4-10.22.19_-_Pullman_Visitor_Center_Camera_Changes.pdf PDF
8-A2.4B_INT_ELEV_A2-Addendum_191022.pdf PDF
10-ED1.0_POWER_1ST_FLOOR_DEMOLITION.PDF PDF
3-PULL_Visitor_Center,_Bidding_Questions_as_of_10-22-2019.pdf PDF
2-Amendment_Number_0006_Narrative.pdf PDF
7-282000_FL_-_Video_Surveillance.pdf PDF
PULL_VC_Contractor_Site_Visit_Attendees_191017.pdf PDF
North_Bay_Electrical_Equipment.pdf PDF
PULL_223195_ARCH_Submittal_List_2019-0820.pdf PDF
PULL_Visitor_Center,_Bidding_Questions_as_of_10-21-2019-FINAL.pdf PDF
2-Amend__4,_Vol_II,_Instructions_.pdf PDF
B11_PULL_223195-253045_VC_prebid_attendees_191009.pdf PDF
1-Amendment__4_Narrative.pdf PDF
SF_30_Amendment___4_140P2019R0048.pdf PDF
PULL_Prebid_Notes.pptx PPTX presentation
Amendment_0003_140P2019R0048.pdf PDF
PULL_Visitor_Center,_Bidding_Questions,_10-1-2019.xlsx XLSX spreadsheet
B02_SF_30,_Amend_No._002.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
_B08_PULL_223195-253045_Amend__1,_page_175_of_180,_preproposal.pdf PDF
B08_PULL_223195-253045_Amend__1,_SF_30.pdf PDF
B01_PULL_223195-253045_140P2019R0048_SF_1442,_Amend__1.pdf PDF
PULL_223195_ARCH_ContractPriceSchedule_rfp-6-18-19.xls XLS spreadsheet
D1_-_Pullman_Stabilization_Drawings.pdf PDF
1-PULL_223195_FINAL_Spec_BOOK_1_2019-0913.pdf PDF
2-PULL_223195_FINAL_Spec_BOOK_2_2019-0913.pdf PDF
B08_PULL_223195-153045_140P2019R0048_Binder1.pdf PDF
E1.3_-_Site_Development_Drawings_DRAFT_2019-0719_Part3.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
5-PSP_Vol_I,_pkg.pdf PDF
B_-_VC_Building_Soil_Sampling_Report_DAI.pdf PDF
D2_-_Pullman_Stabilization_Project_Manual.pdf PDF
E1.1_-_Site_Development_Drawings_DRAFT_2019-0719_Part1.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
3-PULL_223195_FINAL_Drawings_2019-0913.pdf PDF
E1.2_-_Site_Development_Drawings_DRAFT_2019-0719_Part2.pdf PDF
6-PSP_Vol_II,_pkg.pdf PDF
E2.2_-_VC_Exhibit_Design_Part2.pdf PDF
4-B03_PULL_223195-253045_General_Decision,_IL20190009_.pdf PDF
B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx XLSX spreadsheet
C_-_Limited_Hazardous_Materials_Report_GSG.pdf PDF
A_-_Soils_Investigation_Report_TSC.pdf PDF
E2.1_-_VC_Exhibit_Design_Part1.pdf PDF
Show all 50

Pullman National Monument, PULL 223195-253045 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No.: 140P2019R0048

Amendment No. 0001, Narrative

The purpose of this Amendment No. 001 is to change the preproposal meeting date and time; and extend the proposal due date.

a. Solicitation, Section L, Clause 52.236-27 SITE VISIT CONSTRUCTION) – ALTERNATE I (FEB 1995), the pre-proposal site visit is changed as follows:

FROM:

(b) An organized site visit has been scheduled for—

October 1, 2019, at 1:30 PM CT

(c) Participants will meet at—

Pullman Factory Site; 11057 South Cottage Grove Avenue, Chicago, IL 60628, Pullman National

Monument

TO:

(b) An organized site visit has been scheduled for—

October 9, 2019, at 9:00 AM CT

(c) Participants will meet at—

Pullman Factory Site; 11057 South Cottage Grove Avenue, Chicago, IL 60628, Pullman National

Monument

As a result of this change, a replacement page 175 of 180 is attached.

b. Solicitation, SF 1442, Block 13.a, due date to be considered for award, proposals must be physically received no later than, is changed as follows:

FROM:

“…. are due at the place specified in Item 8 by 1400 (hour) local time 10/22/2019”

TO:

“…. are due at the place specified in Item 8 by 1400 (hour) local time 10/30/2019”

As a result of this change, a replacement SF 1442 is attached.