_B08_PULL_223195-253045_Amend__1,_page_175_of_180,_preproposal.pdf

PDF 86 KB Posted

Attached to
Pullman National Monument, PULL 223195-253045
Solicitation number
140P2019R0048
Issued by

About this file

This document provides details for a federal contract solicitation to stabilize an administration building and construct a new visitor center at the Pullman National Monument in Chicago, Illinois. The National Park Service is seeking proposals on a small business set-aside basis for construction services with an estimated price range of $5 million to $10 million and a period of performance from September 2019 to August 2020. Interested small businesses must have a size standard of $36.5 million or less according to NAICS code 236220 for construction or restoration of real property. The scope of work involves tenant improvements to convert approximately 10,000 square feet of the administration building into a visitor center with interpretive exhibits, offices, and other public facilities, as well as repairs to stabilize the entire three-story building structure. A pre-proposal meeting may be held in October 2019 with proposals due at a later date to be specified in the solicitation. The solicitation documents will be available on www.fedbizopps.gov starting in July 2019.

Amend #1, page 175 of 180

View the file

Other files

File Type Posted
Amendment_Number_0007_Narrative.pdf PDF
191024_RFI_Response_WSP_009-010_MEP_detail.pdf PDF
SF_30-Amendment_0007-140P2019R0048_10.28.19.pdf PDF
2-Amendment_Number_0006_Narrative.pdf PDF
8-A2.4B_INT_ELEV_A2-Addendum_191022.pdf PDF
11-S1.0_01STRPLN_S1-Addendum_191024.pdf PDF
4-10.22.19_-_Pullman_Visitor_Center_Camera_Changes.pdf PDF
5-084413_Glazed_Aluminum_Curtain_Walls.pdf PDF
3-PULL_Visitor_Center,_Bidding_Questions_as_of_10-22-2019.pdf PDF
9-A6.4_WINDDTLS_A6-Addendum_191022.pdf PDF
10-ED1.0_POWER_1ST_FLOOR_DEMOLITION.PDF PDF
1-140P2019R0048,_Amendment_No._0006.pdf PDF
7-282000_FL_-_Video_Surveillance.pdf PDF
PULL_223195_Sustainability_Checklist_2019-0619.pdf PDF
SF_30_-_140P2019R0048-Amendment_0005.pdf PDF
North_Bay_Electrical_Equipment.pdf PDF
PULL_VC_Contractor_Site_Visit_Attendees_191017.pdf PDF
PULL_Visitor_Center,_Bidding_Questions_as_of_10-21-2019-FINAL.pdf PDF
PULL_223195_ARCH_Submittal_List_2019-0820.pdf PDF
1-Amendment__4_Narrative.pdf PDF
B11_PULL_223195-253045_VC_prebid_attendees_191009.pdf PDF
SF_30_Amendment___4_140P2019R0048.pdf PDF
2-Amend__4,_Vol_II,_Instructions_.pdf PDF
PULL_Prebid_Notes.pptx PPTX presentation
PULL_Visitor_Center,_Bidding_Questions,_10-1-2019.xlsx XLSX spreadsheet
Amendment_0003_140P2019R0048.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
B02_SF_30,_Amend_No._002.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
B08_PULL_223195-253045_Amend__1,_Narrative.pdf PDF
B01_PULL_223195-253045_140P2019R0048_SF_1442,_Amend__1.pdf PDF
B08_PULL_223195-253045_Amend__1,_SF_30.pdf PDF
PULL_223195_ARCH_ContractPriceSchedule_rfp-6-18-19.xls XLS spreadsheet
E2.1_-_VC_Exhibit_Design_Part1.pdf PDF
E1.1_-_Site_Development_Drawings_DRAFT_2019-0719_Part1.pdf PDF
2-PULL_223195_FINAL_Spec_BOOK_2_2019-0913.pdf PDF
C_-_Limited_Hazardous_Materials_Report_GSG.pdf PDF
B_-_VC_Building_Soil_Sampling_Report_DAI.pdf PDF
4-B03_PULL_223195-253045_General_Decision,_IL20190009_.pdf PDF
D1_-_Pullman_Stabilization_Drawings.pdf PDF
B08_PULL_223195-153045_140P2019R0048_Binder1.pdf PDF
5-PSP_Vol_I,_pkg.pdf PDF
1-PULL_223195_FINAL_Spec_BOOK_1_2019-0913.pdf PDF
B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx XLSX spreadsheet
E1.3_-_Site_Development_Drawings_DRAFT_2019-0719_Part3.pdf PDF
D2_-_Pullman_Stabilization_Project_Manual.pdf PDF
A_-_Soils_Investigation_Report_TSC.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
E2.2_-_VC_Exhibit_Design_Part2.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Revised 4/10/19

Document No.

140P2019R0048

Document Title

Pullman National Monument-PULL 223195-253045 Stabilize Administrative Building/Construct New Visitor Center

(c) A copy of the protest served on the Contracting Officer shall be simultaneously furnished by the protester to the

Department of the Interior Assistant Solicitor, Acquisitions and Intellectual Property, 1849 C Street, NW, Room 6511, Washington, DC 20240.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the

Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for— October 9, 2019, at 9:00 AM CT

(c) Participants will meet at— Pullman Factory Site; 11057 South Cottage Grove Avenue, Chicago, IL 60628, Pullman National Monument

52.236-28 PREPARATION OF PROPOSALS—CONSTRUCTION (OCT 1997)

(a) Proposals must be (1) submitted on the forms furnished by the Government or on copies of those forms; and

(2) manually signed. The person signing a proposal must initial each erasure or change appearing on any proposal form.

(b) The proposal form may require offerors to submit proposed prices for one or more items on various bases, including—

(1) Lump sum price;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of paragraphs (b)(1) through (b)(3) of this provision.

(c) If the solicitation requires submission of a proposal on all items, failure to do so may result in the proposal being rejected without further consideration. If a proposal on all items is not required, offerors should insert the words “no proposal” in the space provided for any item on which no price is submitted.

(d) Alternate proposals will not be considered unless this solicitation authorizes their submission.

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.

(b) The use in this solicitation of any Department of Interior Acquisition Regulation (48 CFR Chapter 14) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

File details come from the government source that posted it. Updated .