This document is a Mountain Home Air Force Base (MHAFB) Contractor Yard Siting Request form for a roof repair project. The project involves removing and replacing 8,800 square feet of metal roof, gutters, and downspouts on Building B1360, with an estimated start date of March 2025 and a project duration of 60 days. The project requires 1 job trailer, 8 contractor parking spaces, 3 large vehicles, 2 pickup-sized vehicles, and will need a fence around the laydown site, though electricity is not required. The project manager is Jason Thomas, and the contractor is currently to be determined (TBD). The form notes that the project is in the preaward phase and is located in a controlled area where the contractor will need space to operate a lift for loading materials onto the top of building 1360.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft-MHAFB Contractor Laydown Yard-8/3/2023

Mountain Home AFB-Contractor Yard Siting Request This form is used to manage contractor’s yards on MHAFB.

1. Project (title/QYZH #/location) 2. Project Manager (name/number

3. Company/Contractor (name/number)

10. Is a fence required/needed around the laydown site? YES NO

If yes, what size?

4. Project Description:

5. Est. Project Start Date: 6. Expected Length of Project:

7. Number of Job Trailers? (Incl. subcontractors):

9. Is Contractor Parking needed? (Incl. subs), YES NO

If yes how many vehicles?

11. Is Electricity Required for the laydown site? YES NO

8. Number/size of Equipment? (incl. subs)

NO If job includes dirt work, is stockpiling of any soil required? YES (Yes requires additional coordination and a site assignment)

Agency Signature: Remarks:

Agency Signature: Remarks:

Agency Signature: Remarks:

Agency: Remarks:

Please sign/date and return to Community Planner

PM signature: Community Planner:

Assigned Location/Comments (filled out by Community Planner):

This Project is in the preaward phase. B1360 is in a controlled area and the contractor will need room to operate a lift to load materials onto the top of building 1360.

Text1: Repair Roof, AGE Maint. B1360/QYZH150032
Text2: Jason Thomas/728-2723
Text3: TBD
Text4: March 2025
Text5: 60 days
Text6: 1
Text7: 3 large vehicles, 2 pickup size
Text8: Remove and replace 8,800 square feet of metal roof, gutters downspouts.
Check Box9: Yes
Check Box10: Off
Check Box11: Yes
Check Box12: Off
Check Box13: Off
Check Box14: Yes
Check Box15: Off
Check Box16: Off
2024-11-19T13:06:40-0700
THOMAS.JASON.E.1567767104
Text23:
Text24:
Text25:
Text26:
Text27:

File details come from the government source that posted it. Updated .