Rock spring resurfacing project

Closed State & local contract opportunity Posted

Solicitation number
PE-77070-NONST-2027-000000006
State
Georgia
Responses due

Opportunity facts

Jurisdiction
NIGP codes
UNSPSC codes
Show all 28
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Lamar County is requesting sealed bids for the 2026 Rock Springs Resurfacing Project, which includes turn lane installations, asphalt patching, shoulder widening, and resurfacing on Rock Springs Road, Chappell Mill Road, and High Falls Road, with bids due September 4, 2026 at 2:00 p.m.

The project encompasses turn lane construction at four separate sites; 335 tons of asphalt patching; 2,217 tons of 19mm asphalt shoulder paving; 3,750 tons of OGI (open-graded intermediate); and 5,954 tons of 9.5mm resurfacing across 6.84 miles of road (Rock Springs Road 0.99 mi, Chappell Mill Road 3.23 mi, High Falls Road 2.62 mi), plus striping. All work must conform to Georgia Department of Transportation Standard Specifications, Supplemental Specifications, Standards and Details, and current editions thereof. Funding is from 2026 LMIG and SPLOST.

Sealed bids will be received and publicly opened at the Lamar County Administration Building, office of the Chairman. Bid documents are available by appointment at the County Office Location or via email request; proposers will receive electronic copies through email or access to the Engineer's FTP site. No documents will be mailed. Questions regarding the project or appointments to obtain documents should be directed to the contact information referenced in the original notice.

Opportunity text

This is an invitation to submit a bid to Lamar County for the 2026 ROCK SPRINGS PROJECTS (including Rock Springs Road, Chappell Mill Road and High Falls Road) as indicated herein. Sealed bids will be received at the office of the Chairman (in Lamar County Administration Building at the above address) up to 2:00 p.m., September 4, 2026 at which time they will be opened and publicly read. This project will be funded with 2026 LMIG and SPLOST funds. Construction includes Turn Lane Installations at 4 separate locations as outlined in different plan sets, Asphalt Patching, Shoulder Widening and Resurfacing on Rock Springs Road (0.99 mi), Chappell Mill Road (3.23mi) and High Falls Road (2.62 mi) within Lamar County. The work will include construction of turn lanes at Rock Springs Road at Chappell Mill Road (Site #1), Rock Springs Church (Site #2), Rock Springs Church Road at High Falls (Site # 3), Chappell Mill Road at Rock Springs Church entrance (Site # 4), with 335 tons of asphalt patching, 2,217 tons of 19mm asphalt shoulder paving, 3,750 tons of OGI, and 5,954 tons of 9.5mm resurfacing (Rock Springs, Chappell Mill and High Falls Roads) and striping. All work shall conform to the Georgia Department of Transportation's (GDOT) Standard Specifications Construction of Transportation Systems, Current Edition; GDOT's Supplemental Specifications Construction of Transportation Systems, Current Edition; and all applicable GDOT Standards and Details; and other contract requirements, specifications and general conditions. Bid Documents may be obtained at the County Office Location by appointment. Proposers are encouraged to request Bid Documents via email. All proposers requesting plans and bid documents will be emailed bid documents and/or granted access to the Engineer's FTP site containing digital copies of plans, specifications, and addenda. No documents will be mailed. Request for Bid Documents and any questions regarding the project or to schedule an appointment to pick-

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity