Rob Sullivan Park Maintenance Barn
Closed State & local contract opportunity
- Solicitation number
- 05-15
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- Point of contact
-
- Tom VanDeHey tvandehey@debary.org (386) 804-9195
Updated .
About this opportunity
The City of DeBary, Florida is procuring a construction project for a Rob Sullivan Park Maintenance Barn through Bid #05-15, which involves the delivery and installation of a 25' x 40' x 14' A-frame steel building. The project requires a pre-engineered steel structure with specific technical specifications, including welded joints, T-Truss System design, ridge cap system, and two 12' x 12' roll-up garage doors and one 36" x 80" walk door. The building must meet 140 MPH wind load calculations and be constructed using 14-gauge material with specific coating requirements. The bid was originally posted on May 7, 2015, with proposals due on May 12, 2015, at 10:00 AM local time. Contractors interested in bidding were required to submit comprehensive documentation, including a bid form, bid security, and detailed company information. The project mandates that work must commence no later than 10 days after issuance of the Notice to Proceed and be substantially completed within 15 calendar days from that date. The Engineer's estimated project cost was $16,000, and bidders were required to hold their proposals open for 90 calendar days following the bid opening.
No specific set-aside designations or restrictions for disadvantaged enterprises were explicitly mentioned in the bid documents. The project did not identify any incumbent vendors or specify integration requirements with existing infrastructure. Contractors were required to demonstrate responsibility by having at least three years of experience as a prime contractor and providing current audited financial statements, equipment lists, and construction licenses. The bid documents indicated that the City of DeBary reserves the right to reject any or all proposals and waive any formalities. Insurance requirements were tiered based on the project's total construction cost, with policies ranging from $500,000 to $3,000,000 depending on the project value. The contract included provisions for performance and payment bonds, with the successful bidder required to furnish bonds equal to 100% of the contract price. Liquidated damages were established for failure to meet completion deadlines, with the specific amount calculated at $884 per calendar day excluding Sundays and legal holidays.
Opportunity text
25' x 40' x 14' A frame steel building. Must include delivery and installation. Permits are City's responsibility.
Files
Show all 44
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity