Contract_Closeout.pdf

PDF 64 KB Posted

Attached to
Rob Sullivan Park Maintenance Barn State and local contract opportunity
Solicitation number
05-15
Issued by
Volusia County, Florida

About this file

This is a contract closeout specification document for the City of Debary's Rob Sullivan Park Maintenance Barn project (Bid #05-15) in Florida, establishing requirements for project completion and final handover to the owner. The specification outlines the contractor's obligations prior to substantial completion, including thorough cleaning of the entire project site, all installed systems, structures, sidewalks, paved areas, and adjacent areas affected by construction. Before requesting inspection for substantial completion certification, the contractor must complete all required cleaning and testing of systems, provide instruction to the owner's operating and maintenance personnel, remove all temporary facilities and services, construction tools, mock-ups, and similar elements from the site, and complete final cleaning with touch-up painting of marred surfaces and restoration of exposed finishes.

Upon project completion, the contractor must deliver comprehensive closeout submittals to the owner including service manuals, installation instructions, special tools, spare parts, the Material and Workmanship Bond, manufacturers' guarantees and bonds extending beyond the contractor's guarantee period, record documents of completed facilities, all keys to doors, gates, and equipment, a checklist confirming completion of all unfinished items from final inspection, waivers of lien from all contractors and subcontractors, and consent of surety. The project involves a 25' x 40' x 14' A-frame steel building requiring delivery and installation, with permits to be handled by the City of Debary.

View the file

Other files for this state and local contract opportunity

Other files attached to Rob Sullivan Park Maintenance Barn, newest first.
File Type Posted
00015-List_of_Drawings.pdf PDF
Admin_Requirements.pdf PDF
Agreement_Form.pdf PDF
Certificate_of_Final_Completion.pdf PDF
Consent_of_Surety_to_Final_Payment.pdf PDF
Contractors_Partial_Release_of_Lien.pdf PDF
Measurement_and_Payment_Lump_Sum.pdf PDF
Notice_to_Proceed.pdf PDF
Pre-Bid_Meeting_-_Sign_In_Sheet_-_Bidders_List.pdf PDF
Product_Selection_and_Substitution.pdf PDF
Project_Schedule.pdf PDF
Temporary_Facilities_and_Controls.pdf PDF
00010-Index.pdf PDF
01110-Summary_of_Work.pdf PDF
Change_Order_Form.pdf PDF
Contractors_Application_for_Payment.pdf PDF
FDOT_Reference.pdf PDF
Insurance_Certification.pdf PDF
Insurance_Requirements.pdf PDF
Map.pdf PDF
Material_and_Workmanship_Bond-Updated_by_CA.pdf PDF
Notice_of_Award.pdf PDF
Partial_Release_of_Lien_Subcontractors_and_Suppliers.pdf PDF
Preconstruction_Video.pdf PDF
Project_Field_Order_Form.pdf PDF
References.pdf PDF
Request_for_Information.pdf PDF
Substantial_Completion.pdf PDF
Work_Directive_Change_Form.pdf PDF
Ad_Bid_05-15_Sullivan_Maintenance_Barn_2.pdf PDF
Bid_Bond_Form.pdf PDF
Final_Release_of_Lien_Subcontractors_and_Suppliers.pdf PDF
Instructions_To_Bidder.pdf PDF
Payment_Bond_City_of_DeBary.pdf PDF
Performance_Bond_City_of_DeBary.pdf PDF
Project_Specifications.pdf PDF
Regulatory_Requirements.pdf PDF
Supplementary_Conditions.pdf PDF
Bid_Form.pdf PDF
Contractors_Final_Release_of_Lien.pdf PDF
Maintenance_of_Traffic.pdf PDF
Project_title_page.pdf PDF
Quality_Control.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Debary – Rob Sullivan Park Maintenance Barn (Bid # 05-15)

SECTION 01750

CONTRACT CLOSEOUT

PART 1 GENERAL

1.01 Section Includes

Substantial completion requirements, clean-up, final completion requirements, closeout submittals

1.02 Clean-Up Operations

A. The entire project site shall be thoroughly cleaned at the completion of the work.

B. Clean all installed pipelines, structures, sidewalks, paved areas, accumulated silt in ponds, plus all adjacent areas affected by construction, as directed by the Owner or jurisdictional agency. Equipment to clean these surfaces shall be subject to approval by the Owner.

1.03 Substantial Completion Requirements

A. Complete the following before requesting the inspection for certification of substantial completion.

1. Complete required cleaning and testing of systems, and instruction of the

Owner's operating and maintenance personnel. Discontinue or change over and remove temporary facilities and services from the project site, along with construction tools and facilities, mock-ups, and similar elements.

2. Complete final cleaning up requirements, including touch-up painting of marred surfaces.

3. Touch-up and otherwise repair and restore marred exposed finishes.

1.04 Closeout Submittals

A. Upon completion of the project, or portions thereof, the Contractor shall transfer to the Owner all applicable items accumulated throughout construction. These include but are not limited to the following items:

1. Service manuals, installation instructions, special tools, and specialties.

2. Spare parts ordered as part of this Contract.

3. Submittal of the Material and Workmanship Bond.

4. Submittal of manufacturers' guarantees, bonds, and letters of coverage extending beyond the time limitations of the Contractor's guarantee.

5. Delivery of any salvaged or borrowed materials or equipment to the

Owner

6. Record documents of completed facilities.

City of Debary – Rob Sullivan Park Maintenance Barn (Bid # 05-15)

7. All keys to all doors, gates, and equipment.

8. Checklist indicating satisfactory completion of all unfinished items from the final inspection.

9. Waivers of lien from Contractor plus all Subcontractors and Suppliers.

10. Consent of Surety.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION - Not Used

END OF SECTION