This is a specification reference document for the City of DeBary's Rob Sullivan Park Maintenance Barn project (Bid #05-15), establishing the standards and procedures that contractors must follow during construction. The project involves the construction of a 25' x 40' x 14' A-frame steel building, with the contractor responsible for delivery and installation, while the City retains responsibility for obtaining necessary permits. The document incorporates the Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction and Roadway Traffic and Design Standards as baseline technical references for the project, with contractors required to use Divisions Two and Three of the FDOT Specifications as they apply to construction methods and material quality. The Project Manual takes precedence over FDOT specifications in cases of conflict, and any plan details provided supersede FDOT Design Standards unless otherwise directed by the Engineer.

Contractors are obligated to inform the Owner and Engineer in writing of any ambiguous or conflicting specifications prior to construction, with the Engineer determining which information governs construction. The Contractor bears full responsibility for the removal and replacement of any improperly constructed items resulting from specification misinterpretation at no additional cost to the Owner. FDOT Standard Specifications may be purchased from FDOT or downloaded from www.dot.state.fl.us/specificationsoffice. The document establishes the framework for measurement and payment according to the Contract Documents rather than FDOT standards, ensuring that technical specifications align with the specific requirements of the City of DeBary project.

View the file

Other files for this state and local contract opportunity

Other files attached to Rob Sullivan Park Maintenance Barn, newest first.
File Type Posted
00015-List_of_Drawings.pdf PDF
Admin_Requirements.pdf PDF
Agreement_Form.pdf PDF
Certificate_of_Final_Completion.pdf PDF
Consent_of_Surety_to_Final_Payment.pdf PDF
Contract_Closeout.pdf PDF
Contractors_Partial_Release_of_Lien.pdf PDF
Measurement_and_Payment_Lump_Sum.pdf PDF
Notice_to_Proceed.pdf PDF
Pre-Bid_Meeting_-_Sign_In_Sheet_-_Bidders_List.pdf PDF
Product_Selection_and_Substitution.pdf PDF
Project_Schedule.pdf PDF
Temporary_Facilities_and_Controls.pdf PDF
00010-Index.pdf PDF
01110-Summary_of_Work.pdf PDF
Change_Order_Form.pdf PDF
Contractors_Application_for_Payment.pdf PDF
Insurance_Certification.pdf PDF
Insurance_Requirements.pdf PDF
Map.pdf PDF
Material_and_Workmanship_Bond-Updated_by_CA.pdf PDF
Notice_of_Award.pdf PDF
Partial_Release_of_Lien_Subcontractors_and_Suppliers.pdf PDF
Preconstruction_Video.pdf PDF
Project_Field_Order_Form.pdf PDF
References.pdf PDF
Request_for_Information.pdf PDF
Substantial_Completion.pdf PDF
Work_Directive_Change_Form.pdf PDF
Ad_Bid_05-15_Sullivan_Maintenance_Barn_2.pdf PDF
Bid_Bond_Form.pdf PDF
Final_Release_of_Lien_Subcontractors_and_Suppliers.pdf PDF
Instructions_To_Bidder.pdf PDF
Payment_Bond_City_of_DeBary.pdf PDF
Performance_Bond_City_of_DeBary.pdf PDF
Project_Specifications.pdf PDF
Regulatory_Requirements.pdf PDF
Supplementary_Conditions.pdf PDF
Bid_Form.pdf PDF
Contractors_Final_Release_of_Lien.pdf PDF
Maintenance_of_Traffic.pdf PDF
Project_title_page.pdf PDF
Quality_Control.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Debary – Rob Sullivan Park Maintenance Barn (Bid # 05-15)

SECTION 01425

FDOT STANDARDS REFERENCE

PART 1 GENERAL

1.01 Section Includes

Instruction on the use and applicability of FDOT standards on the project

1.02 Requirements

A. The Florida Department of Transportation, Standard Specifications for Road and Bridge Construction, latest non-metric edition ("Standard Specifications"), and Roadway Traffic and Design Standards, latest non-metric edition ("Design Standards") are referenced herein as source documents for applicable technical specifications and construction details to be used in the construction of this project. The term “latest edition” refers to the latest edition implemented by FDOT and includes all FDOT implemented supplements.

B. Method of Measurement and Basis of Payment is to be in accordance with these

Contract Documents rather than the Florida Department of Transportation Standard Specifications. Any item which is detailed in the Plans and for which material types, sizes and quality are also called out, the "Design Standards" shall take preference over the plan detail unless otherwise directed by the Engineer.

C. Where the FDOT Standard Specifications use the reference "Department", replace "Department" with "Owner", except for when such reference is to Department Standards and evaluation criteria.

D. The Design Standards are referenced herein as a source document for applicable construction items and details called for in the plans for which a specific plan detail is not provided. The Contractor shall construct the items called for in the plans in accordance with the "Design Standards" unless otherwise defined or detailed in the plans or as directed by the Owner, Engineer or authorized representative.

E. In case of conflict, the Project Manual takes precedence over FDOT specifications for a particular construction requirement.

F. Copies of the latest implemented edition and implemented supplements of the Florida Department of Transportation Standard Specifications may be purchased from FDOT for a nominal charge. Copies are also for download via the internet at “www.dot.state.fl.us/specificationsoffice”.

G. The Contractor shall inform the Owner and Engineer in writing of any specification that the Contractor feels is ambiguous or conflicting with other plan notes and details prior to the construction of the associated item. The Engineer

City of Debary – Rob Sullivan Park Maintenance Barn (Bid # 05-15) will determine which information is to be used for construction. The Contractor is responsible for the removal and replacement of any item improperly constructed resulting from a misinterpretation of the specifications at no additional cost to the Owner.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION

3.01 General

The Contractor shall use Divisions Two (II) and Three (III) of the FDOT Specifications as they relate to methods of construction and material types and quality for the appropriate construction items contained within this project.

END OF SECTION