Preconstruction_Video.pdf
PDF 80 KB Posted
- Attached to
- Rob Sullivan Park Maintenance Barn State and local contract opportunity
- Solicitation number
- 05-15
- Issued by
- Volusia County, Florida
About this file
This is a Preconstruction Video specification document for the City of Deb ary's Rob Sullivan Park Maintenance Barn project (Bid #05-15) in Florida. The specification requires the contractor to provide continuous color audio-DVD recording of all proposed work areas prior to construction to document pre-construction conditions. The recording must cover all surface features within the construction zone of influence, including roadways, pavements, curbs, driveways, ponds, sidewalks, culverts, headwalls, retaining walls, buildings, landscaping, trees, shrubbery, and fences, with particular attention to identifying any existing faults, fractures, or defects. The contractor must supplement the DVD recording with digital color photographs for areas requiring detail not ascertainable on video. Recording shall be performed prior to placement of any construction materials or equipment on the site, coordinated with the construction schedule so that portions completed first are recorded first. All recordings must occur during times of good visibility with sufficient sunlight and no significant precipitation, mist, or fog, and no more than 10 percent of the area can contain debris or obstructions unless authorized by the engineer.
The preconstruction video must be of professional quality utilizing a DVD-based DVR system with minimum horizontal resolution of 240 lines in 4:3 aspect ratio, MPEG-2 video format stored at 720 x 480 (NTSC) resolution, and Dolby Digital (AC-3) audio minimum. The camera must be mounted at least 10 feet from the ground when using wheeled vehicles and be firmly secured to prevent unsteady pictures during transport. All DVDs shall be new, permanently labeled with video number, project title, recording dates, and include a detailed log describing the various segments of coverage by street or easement names, coverage beginning and end points, directions of coverage, and video unit counter numbers. Any portion of the digital recording deemed unacceptable for determining existing conditions shall be re-filmed at no additional cost to the Owner. Upon completion, all DVDs transfer ownership to the City of Deb ary.
View the file
Other files for this state and local contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Debary Rob Sullivan Park Maintenance Barn (Bid # 05-15)
SECTION 01315
PRECONSTRUCTION VIDEO
PART 1 GENERAL
1.01 Description
Provide continuous color audio-DVD recording along the entire length of all proposed work prior to construction to serve as a record of pre-construction conditions.
Supplement recording with digital color photographs for areas which require details not ascertainable on the DVD.
1.02 Related Requirements
Section 01310 - Administrative Requirements
1.03 Qualifications
The preconstruction audio-video recording shall be of professional quality that will clearly log an accurate visual description of existing conditions. Any portion of the digital recording not acceptable for the determination of the existing condition shall be re-filmed at no additional cost to the Owner.
PART 2 PRODUCTS
2.01 General
The total video recording system and the procedures employed in its use shall be such as to produce a finished product that will fulfill the technical requirements of the project.
The digital portion of the recording shall produce bright, sharp, clear pictures with accurate colors and shall be free from distortion, tearing, rolls or any other form of picture imperfection. The audio portion of the recording shall produce the commentary of the camera operator with proper volume, clarity, and be free from distortion. The recording system shall utilize EIA standard video and RGB compatible video.
2.02 Camera
The camera used in the recording system shall be capable of recording in true color and on standard format DVD.
2.03 Recorder
The recording shall be made with a DVD-based DVR. The recorder shall record the color signal with a minimum horizontal resolution of 240, 4:3 lines, aspect ratio, MPEG-2 video, stored at a resolution of 720 x 480 (NTSC). Audio shall be recorded using Dolby Digital (AC-3) minimum.
2.04 Video Disk
The video disk used for the recordings shall be high resolution, extended still frame capable. The video disk shall be new and thus shall not have been used for any previous recording.
2.05 Video Playback Compatibility
The recorded DVD shall be compatible for playback with any TV Standard DVD player.
PART 3 EXECUTION
3.01 General
A. The recordings shall contain coverage of all surface features located within the construction's zone of influence. The construction's zone of influence shall be defined (1) as the area within the permanent and temporary easements or right-of-way, and areas adjacent to these areas which may be affected by routine construction operations, and (2) by the direction of the Owner. The surface features within the construction's zone of influence shall include, but not be limited to, all roadways, pavements, curbs, driveways, ponds, sidewalks, culverts, headwalls, retaining walls, buildings, landscaping, trees, shrubbery, and fences. Of particular concern shall be the existence or nonexistence of any faults, fractures, or defects. Recorded coverage shall be limited to one side of the street at any one time and shall include all surface conditions located within the zone of influence of construction supported by appropriate audio description.
B. Each video recording of each DVD shall be a simultaneous recorded audio recording. This audio recording, exclusively containing the commentary of the camera operator, shall assist in viewer orientation and in any needed identification, differentiation, clarification, or objective description of the feature being shown in the video portion of the recording. The audio recording also shall be free from any conversations between the camera operator and any other production technicians.
C. All DVDs shall be permanently labeled and shall be properly identified by video number, project title, and date(s) of the recording.
D. Each video shall have a log of that video’s contents. The log shall describe the various segments of coverage contained on that video in terms of the names of streets or easements, coverage beginning and end, directions of coverage, and video unit counter numbers.
3.02 Recording Schedule
A. The recording shall be performed prior to the placement of any construction materials or equipment on the proposed construction site.
B. The Contractor shall coordinate the video recording with the construction schedule so that those portions of the construction that will be completed first will be recorded first. The Contractor shall deliver the video recordings to the Owner upon their completion. Upon delivery of the DVD’s, transfer of ownership of those DVD’s shall be made to the Owner.
3.03 Visibility
All recordings shall be performed during times of good visibility. No recording shall be done during periods of significant precipitation, mist, or fog. The recording shall only be done when sufficient sunlight is present to properly illuminate the subject, and to produce bright, sharp video recordings of those subjects. No recording shall be performed when more than 10% of the area to be recorded contains debris or obstructions unless otherwise authorized by the Engineer.
3.04 Continuity of Coverage
A. In order to increase the continuity of the coverage, the coverage shall consist of a single, continuous, unedited recording which begins at one end of a particular construction area. However, where coverage is required in areas not accessible by conventional wheeled vehicles and smooth transport of the recording system is not possible, such coverage shall consist of an organized, interrelated sequence of recordings at various positions along that proposed construction area (e.g., wooded easement area).
B. The average rate of travel during a particular segment of coverage (e.g., coverage of one side of the street) shall be directly proportional to the number, size, and value of the surface features within that construction area's zone of influence.
3.05 Camera Height and Stability
When conventional wheeled vehicles are used as conveyances for the recording system, the distance between the camera lens and the ground shall not be less than 10 feet. The camera shall be firmly mounted, such that transport of the camera during the recording process will not cause any unsteady picture.
3.06 Camera Control
Camera pan, tilt, zoom-in, and zoom-out rates shall be sufficiently controlled such that recorded objects will be clearly viewed during video playback. In addition, all other camera and recording system controls, such as lens, focus, and aperture, video level, pedestal, chroma, white balance, and electrical focus, shall be properly controlled or adjusted to maximize recorded picture quality.
3.07 Viewer Orientation Techniques
The audio and video portions of the recording shall maintain viewer orientation. To this end, overall establishing views and visual displays of all visible house and building addresses shall be utilized. In easements where the proposed construction location will not be readily apparent in the recorded video, highly visible yellow flags shall be placed in such a fashion as to clearly indicate the proposed centerline of construction.
3.08 Areas to be Video Recorded
A. The Contractor shall be able to televise via DVD playback all areas with paved roads, driveways, sidewalk, along easements, through parks, lawns, and open fields and inside buildings. When video recording on private property, the Contractor shall give the Owner sufficient prior notice of such entry so that property owners may be advised of, and their permission obtained for, the work.
B. At no time shall the Contractor be allowed to use any electrical circuits within private property building structure. All video recording shall be done during regular business hours, unless otherwise specified by the private property owner or the Engineer. The Contractor shall enter and leave private property in a professional and orderly, workmanlike manner.
END OF SECTION