Substantial_Completion.pdf
PDF 65 KB Posted
- Attached to
- Rob Sullivan Park Maintenance Barn State and local contract opportunity
- Solicitation number
- 05-15
- Issued by
- Volusia County, Florida
About this file
This is a Certificate of Substantial Completion issued by the City of DeBary, Florida for the Rob Sullivan Park Maintenance Barn project (Bid #05-15). The certificate documents the inspection and substantial completion of a 25' x 40' x 14' A-frame steel building that includes delivery and installation. The certificate was executed by authorized representatives of the Contractor, Engineer, and Owner, confirming that the work has been completed in accordance with the Contract Documents. A list of items to be completed or corrected is attached to the certificate, and the Contractor is responsible for completing all remaining items within a specified number of days from the date of substantial completion. The certificate emphasizes that it does not constitute acceptance of work that does not conform to the Contract Documents nor does it release the Contractor from obligations to complete all work in accordance with the contract requirements.
The document serves as a formal record of project progress and establishes key contractual milestones regarding completion status. All parties, including the Engineer, Owner (City of DeBary), and Contractor, must execute the certificate with signatures and printed names and titles. The certificate preserves the Contractor's warranty obligations and ensures accountability for any outstanding work items that require correction or completion after the substantial completion date.
View the file
Other files for this state and local contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Debary – Rob Sullivan Park Maintenance Barn (Bid # 05-15)
SECTION 00626
CERTIFICATE OF SUBSTANTIAL COMPLETION
Project Title Rob Sullivan Park Maintenance Barn
Bid No. 05-15
Owner: City Of DeBary______
Contractor:
Agreement Date:
This Certificate of Substantial Completion applies to all work under the Contract Documents or the following specified parts thereof if construction is phased by contract:
ISSUED TO:
Contractor:
The work to which this Certificate applies has been inspected by authorized representatives of Contractor, Engineer, and Owner and that Work is hereby declared to be substantially completed in accordance with the Contract Documents on:
Date of Substantial Completion
A list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of Contractor to complete and warrant all the Work in accordance with the Contact Documents. All items on the list shall be completed or corrected by Contractor within days of the above date of Substantial Completion.
City of Debary – Rob Sullivan Park Maintenance Barn (Bid # 05-15)
This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of Contractor's obligations to complete the Work in accordance with the Contract Documents.
Executed by Engineer on Date
Engineer: City of DeBary.
By:
(Signature)
(Printed Name and Title)
Executed by Owner on
Owner:
Contractor accepts this Certificate of Substantial Completion on
Contractor:
END OF SECTION