Driftwood Road and Ellis Road Roadway Improvements
Closed State & local contract opportunity
- Solicitation number
- 25-27
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72141511 Digging services
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 72141509 Trenching service
- 95111614 Single carriageway
- 95111502 Right of way
- 95121647 Elevated roadway or highway
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
- 95111500 Limited traffic thoroughfares
Show all 34
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
- 95111611 Trunk road
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
- 72141106 Gravel or dirt road construction service
- 72141001 Highway and road new construction service
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
- 72101512 Hoist construction service
- 72101513 Offsite construction service
- 72101514 Refuse area construction service
- 72141507 Pile driving service
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- 72141003 Highway and road maintenance service
- 73151502 Joint sealing services
- Point of contact
-
- Jason Cutshaw cutjason@co.walton.fl.us (850) 892-8176
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Walton County, Florida is seeking bids for the Driftwood Road and Ellis Road Roadway Improvements project through Invitation to Bid #25-27, a comprehensive infrastructure reconstruction initiative located in Miramar Beach. The project involves transforming Driftwood Road and Ellis Road from U.S. Highway 98 to Scenic Gulf Drive into a one-way paired roadway system, which includes demolishing and rebuilding asphalt pavement with two 12-foot travel lanes and an 8-foot concrete multiuse path. Bidders must be FDOT prequalified in specific work classes including Drainage, Flexible Paving, Grading, and Sidewalk, with a total contract duration of 420 days for substantial completion and an additional 30 days for punch list items. The bid response deadline is October 20, 2025 at 3:00 pm, with a non-mandatory pre-bid conference scheduled for September 25, 2025 at 8:30 am. The project requires a 5% bid security and involves comprehensive infrastructure improvements, including stormwater management using Type F curb and gutter and an exfiltration trench, with an optional bid item for potential water and sewer line relocation.
The procurement allows for unit price contract bidding and requires extensive documentation, including a drug-free workplace certification, proof of registration, and documentation of previous experience. While no specific set-aside designations for disadvantaged enterprises are explicitly mentioned, bidders must submit various forms and certifications demonstrating compliance with local and state regulations. The project involves multiple permits, including a Florida Department of Transportation Driveway Connection Permit and a Northwest Florida Water Management District Environmental Resource Permit, indicating complex regulatory compliance requirements. Liquidated damages are specified at $3,813.00 per calendar day for substantial completion delays and $1,906.50 per calendar day for punch list item completion delays. Though exact budget ranges are not specified, the comprehensive bid schedule and detailed specification spreadsheet suggest a significant capital investment, with itemized costs including $471,322 for mobilization and $281,515 for maintenance of traffic, indicating a potentially substantial project value for local infrastructure improvement.
Opportunity text
The proposed project, hereinafter referred to as the "Project" consists of the reconstruction of Driftwood Road and Ellis Road-from U.S. Highway 98 to Scenic Gulf Drive in Miramar Beach-into a one‑way paired roadway system. It includes demolition and rebuilding of the asphalt pavement into two 12‑ft travel lanes paired with an 8‑ft concrete multi‑use path. Stormwater will be managed using Type F curb and gutter coupled with an exfiltration trench. The Project also involves a comprehensive and phased maintenance of traffic plan during construction as well as extensive coordination with utility providers, including an optional bid item for potentially relocating water and sewer lines.
Contract Time: The contract duration is FOUR HUNDRED TWENTY (420) days to substantial completion with an additional THIRTY (30) days for punch list completion.