_Driftwood_Rd_&_Ellis_Rd_IFC_Civil_Plans_S&S-04-15-2025.pdf

PDF 49 MB Posted

Attached to
Driftwood Road and Ellis Road Roadway Improvements
Solicitation number
25-27
Issued by
Walton County, Florida

About this file

The file appears to be a civil engineering plan document for the Driftwood Road and Ellis Road Roadway Improvements project in Miramar Beach, Florida, involving Walton County infrastructure improvements. The project entails reconstructing Driftwood Road and Ellis Road from U.S. Highway 98 to Scenic Gulf Drive, transforming them into a one-way paired roadway system with two 12-foot travel lanes and an 8-foot concrete multiuse path. The project includes comprehensive roadway reconstruction, pavement demolition and rebuilding, stormwater management using Type F curb and gutter with an exfiltration trench, and a phased maintenance of traffic plan. The contract duration is specified as 420 days for substantial completion, with an additional 30 days allocated for punch list completion.

The project includes an optional bid item for potential water and sewer line relocation, demonstrating flexibility in utility infrastructure improvements. Extensive coordination with utility providers is a key component of the project scope. While specific pricing details are not provided in the document, the comprehensive nature of the roadway improvements suggests significant capital investment in local transportation infrastructure. The project appears to be funded through local or county transportation improvement funds, with a focus on enhancing road safety, traffic flow, and multimodal transportation capabilities in the Miramar Beach area.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .