Cruise Terminal 5 Marine Improvements

Awarded State & local contract opportunity

Solicitation number
ITB-25-1
State
Florida
Responses due

Opportunity facts

UNSPSC codes
Show all 46

Updated .

About this opportunity

The Canaveral Port Authority is seeking competitive bids for the Cruise Terminal 5 Marine Improvements project (ITB-25-1), a comprehensive marine infrastructure renovation located in Port Canaveral, Florida. The project involves selective demolition of an existing open-pile concrete pier and adjacent mooring dolphins, followed by constructing new open pile concrete pier extensions to the north and south of the existing pier. Key deliverables include installing new mooring fixtures, marine fenders, steel monopile mooring dolphins, modifying existing aluminum catwalks, updating electrical raceway and potable water lines, and completing pier deck repairs. Bidders must demonstrate ten years of documented marine structures construction experience and possess appropriate Florida contractor licensing. Sealed proposals will be received until 2:00 PM EDT on June 11, 2025, with non-mandatory pre-bid site visits scheduled for May 27 and June 3, 2025, at 445 Challenger Road in Cape Canaveral. The project is targeted for completion by June 30, 2026, and will be awarded to the lowest responsive bidder. Bidders are required to submit a 5% bid bond, detailed financial statements, insurance certificates, and a comprehensive list of subcontractors.

While no specific set-aside designations for disadvantaged enterprises were explicitly noted in the bid documents, the project does include provisions for an Owner Direct Purchase Program for material procurement. The total project budget includes a contingency allowance of $660,000, suggesting a substantial overall investment in marine infrastructure improvements. Contractors must comply with various state and federal regulations, including E-Verify employment eligibility verification and specific environmental protection standards. The project involves significant environmental considerations, as outlined in the Environmental Resource Permit, which includes protocols for marine species protection, particularly for manatees, marine turtles, and right whales. The technical specifications indicate a sophisticated engineering approach, with rigorous testing protocols including dynamic pile load testing and vibration monitoring. While specific total project value is not explicitly stated, the comprehensive nature of the improvements, detailed technical specifications, and environmental compliance requirements suggest a complex marine construction project with significant capital investment.

Opportunity text

The Project consists of: At Cruise Terminal 5, perform selective demolition of the existing open-pile concrete pier and adjacent mooring dolphins. Construct new open pile concrete pier extensions to the north and south of the existing pier, including mooring fixtures and marine fenders. Construct new steel monopile mooring dolphins. Modify existing aluminum catwalks and install in the new designated positions. Modify the existing electrical raceway system and potable water lines. Complete repairs to the existing pier deck joints and curbs, and install new concrete curbs and handrails.

Files

File Type Posted
ITB-25-1_Bid_Tabulation-Approved.pdf PDF
ITB-25-1_Bid_Tabulation.pdf PDF
Question_30_Table_A_Concrete_Mix_Types.pdf PDF
ITB-25-1_Addendum_5.pdf PDF
ITB-25-1_Addendum_4.pdf PDF
25CPA002_Addendum_3_Complete_2025_0609.pdf PDF
ITB-25-1_Addendum_2.pdf PDF
ITB-25-1_Addendum_2.pdf PDF
ITB-25-1_Pre-Bid_Meeting_Agenda_and_Sign_In_Sheets_06.03.25.pdf PDF
ITB-25-1_Pre-Bid_Meeting_Agenda_and_Sign_In_Sheets_06.03.25.pdf PDF
ITB-25-1_Addendum_1.pdf PDF
ITB-25-1_Addendum_1.pdf PDF
ITB-25-1_Pre-Bid_Meeting_Agenda_and_Sign_In_Sheets_5.27.25.pdf PDF
ITB-25-1_Pre-Bid_Meeting_Agenda_and_Sign_In_Sheets_5.27.25.pdf PDF
ITB-25-1_Pre-Bid_Meeting_Agenda_and_Sign_In_Sheets_5.27.25.pdf PDF
ITB-25-1_Bid_Documents-Div_00.pdf PDF
ITB-25-1_CT5_Notice_to_Bid-Final-kdp.pdf PDF
ITB-25-1_Bid_Documents-APPENDIX_A_PERMITS.pdf PDF
ITB-25-1_Bid_Documents-Div_00.pdf PDF
ITB-25-1_Bid_Documents-APPENDIX_A_PERMITS.pdf PDF
ITB-25-1_Bid_Documents-APPENDIX_B_SOIL_BORING_LOGS.pdf PDF
ITB-25-1_Bid_Documents-APPENDIX_C_MASTER_CRUISE_SCHEDULE.pdf PDF
ITB-25-1_Bid_Documents-Div_01.pdf PDF
ITB-25-1_Bid_Documents-Div_00.pdf PDF
ITB-25-1_CT5_Notice_to_Bid-Final-kdp.pdf PDF
ITB-25-1_Bid_Documents-APPENDIX_B_SOIL_BORING_LOGS.pdf PDF
ITB-25-1_Bid_Documents-APPENDIX_B_SOIL_BORING_LOGS.pdf PDF
ITB-25-1_Bid_Documents-Technical_Specs.pdf PDF
ITB-25-1_CT5_Notice_to_Bid-Final-kdp.pdf PDF
ITB-25-1_Bid_Documents-APPENDIX_B_SOIL_BORING_LOGS.pdf PDF
ITB-25-1_Bid_Documents-Div_01.pdf PDF
ITB-25-1_Bid_Documents-APPENDIX_C_MASTER_CRUISE_SCHEDULE.pdf PDF
ITB-25-1_Bid_Documents-Div_01.pdf PDF
ITB-25-1_Bid_Documents-Technical_Specs.pdf PDF
ITB-25-1_Bid_Documents-Technical_Specs.pdf PDF
ITB-25-1_Bid_Documents-APPENDIX_A_PERMITS.pdf PDF
ITB-25-1_Bid_Documents-Technical_Specs.pdf PDF
ITB-25-1_Bid_Documents-APPENDIX_A_PERMITS.pdf PDF
ITB-25-1_Drawings-CRUISE_TERMINAL_5_IMPROVEMENTS_BID_SET.pdf PDF
ITB-25-1_Bid_Documents-APPENDIX_C_MASTER_CRUISE_SCHEDULE.pdf PDF
ITB-25-1_Bid_Documents-Div_01.pdf PDF
ITB-25-1_CT5_Notice_to_Bid-Final-kdp.pdf PDF
ITB-25-1_Drawings-CRUISE_TERMINAL_5_IMPROVEMENTS_BID_SET.pdf PDF
ITB-25-1_Bid_Documents-Div_00.pdf PDF
ITB-25-1_Drawings-CRUISE_TERMINAL_5_IMPROVEMENTS_BID_SET.pdf PDF
ITB-25-1_Bid_Documents-APPENDIX_C_MASTER_CRUISE_SCHEDULE.pdf PDF
ITB-25-1_Drawings-CRUISE_TERMINAL_5_IMPROVEMENTS_BID_SET.pdf PDF
Show all 47

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity