ITB-25-1_Drawings-CRUISE_TERMINAL_5_IMPROVEMENTS_BID_SET.pdf

PDF 60 MB Posted

Attached to
Cruise Terminal 5 Marine Improvements
Solicitation number
ITB-25-1
Issued by
Florida

About this file

The document ITB-25-1_Drawings-CRUISE_TERMINAL_5_IMPROVEMENTS_BID_SET.pdf is a bid set for the Canaveral Port Authority's Cruise Terminal 5 Marine Improvements project in Port Canaveral, Florida. The project involves selective demolition of an existing open-pile concrete pier and adjacent mooring dolphins, followed by constructing new open pile concrete pier extensions to the north and south of the existing pier. Key deliverables include installing new mooring fixtures, marine fenders, steel monopile mooring dolphins, modifying existing aluminum catwalks, updating electrical raceway and potable water lines, and completing pier deck repairs. Sealed proposals will be received until 2:00 PM EDT on June 11, 2025, with non-mandatory pre-bid site visits scheduled for May 27 and June 3, 2025, at 445 Challenger Road in Cape Canaveral. The project is targeted for completion by June 30, 2026, and will be awarded to the lowest responsive bidder.

The project requires bidders to demonstrate ten years of documented marine structures construction experience and possess appropriate Florida contractor licensing. Bidders must submit a 5% bid bond, detailed financial statements, insurance certificates, and a comprehensive list of subcontractors. The total project budget includes a contingency allowance of $660,000. The bid documents include provisions for an Owner Direct Purchase Program for material procurement and require compliance with E-Verify employment eligibility verification and specific environmental protection standards. The Environmental Resource Permit outlines protocols for marine species protection, including considerations for manatees, marine turtles, and right whales. Technical specifications include sophisticated engineering requirements such as dynamic pile load testing and vibration monitoring, indicating a complex marine construction project with significant environmental and technical considerations.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .