ITB-25-1_Pre-Bid_Meeting_Agenda_and_Sign_In_Sheets_5.27.25.pdf

PDF 252 KB Posted

Attached to
Cruise Terminal 5 Marine Improvements
Solicitation number
ITB-25-1
Issued by
Florida

About this file

The document is a Pre-Bid Agenda and Sign-In Sheet for the Canaveral Port Authority's Cruise Terminal 5 Marine Improvements project (Project #25-011D, Solicitation #ITB-25-1). The non-mandatory pre-bid meeting was held on May 27, 2025, at 8:30 AM, with bid packages due on June 11, 2025, at 2:00 PM. The project scope includes selective demolition of an existing open pile pier and mooring dolphin components, construction of new open pile pier extensions to the north and south, modification of existing aluminum catwalks, and utility modifications. Pre-bid site visits were scheduled for May 27th and June 3rd, 2025. The project timeline indicates Commission Approval on June 25, 2025, with Substantial Completion set for June 30, 2026, and liquidated damages of $10,000 per day for delays.

The project requires TWIC badging for contractors during construction, and all questions must be submitted through VendorLink with answers posted on the site. The sign-in sheets show representatives from companies such as Russell Marine and C&D Construction attending the pre-bid meeting. While specific pricing details are not provided in this document, the project appears to be a significant marine infrastructure improvement initiative. Contractors will need to comply with badging requirements and follow the specified communication channels for any inquiries related to the bid.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Port Canaveral & Foreign Trade Zone 136 445 Challenger Road Suite 301 Cape Canaveral FL 32920 USA 321.783.7831 www.portcanaveral.com

Pre-Bid Agenda Tuesday May 27, 2025 @ 08:30 AM

Cruise Terminal 5 Marine Improvements Project #: 25-011D

Solicitation #: ITB-25-1

1) Introductions

a) Please sign in

b) Canaveral Port Authority

2) Bid Packages due on June 11,2025 @ 2:00 PM

a) Late proposals will NOT be accepted!

b) Pre-bid site visits are schedule for May 27th & June 3rd, 2025

3) Review Proposal

a) Pre-bid is non mandatory.

b) Scope to include:

i) Selective demolition of existing open pile pier and mooring dolphin components.

ii) Construction of new open pile pier extension to the north and south.

iii) Modification of existing aluminum catwalks

iv) Utility modifications

c) Any Addendum will be issued through the Purchasing Department.

d) Badging will be required by contractor during construction. TWIC badging will be required.

4) Schedule

a) Commission Approval: June 25, 2025

b) Substantial Completion: June 30, 2026

c) Liquidated Damages at $10,000 per day

5) Questions & Answers All questions will need to go through VendorLink and answers will be posted on site.

6) Site Visit

End of Agenda

Pre-Bid Agenda 05.27.25
ITB-25-1 Pre-Bid Meeting Sign In Sheets 5.27.25

File details come from the government source that posted it. Updated .