25CPA002_Addendum_3_Complete_2025_0609.pdf
PDF 850 KB Posted
- Attached to
- Cruise Terminal 5 Marine Improvements
- Solicitation number
- ITB-25-1
- Issued by
- Florida
About this file
This document is an Invitation to Bid (ITB-25-1) Addendum 3 issued by the Canaveral Port Authority for the Cruise Terminal 5 Marine Improvements project (Project Number 25-011D). The addendum modifies the original bidding documents and provides updates to specific technical specifications and drawings related to marine infrastructure improvements. Key modifications include water quality protection requirements, detailed demolition procedures for existing marine structures, and specific guidelines for removing monopiles, concrete curbs, walkways, and other marine infrastructure components. The document provides precise technical instructions for contractors, including requirements for marine species observation, debris removal, and environmental compliance during the marine construction process.
The addendum includes detailed technical specifications for coating steel components, marine species observation protocols, and specific demolition techniques that prioritize environmental protection and minimal disruption to existing marine ecosystems. The project involves comprehensive marine infrastructure updates, with particular attention to water quality standards, turbidity control, and marine species protection. Specific technical requirements are provided for pile extraction, concrete removal, salvage procedures, and marine environment preservation, with explicit instructions for contractors to follow Florida Administrative Code regulations and maintain strict environmental standards during the marine improvement project.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB-25-1 Page 1 Addendum 3
CANAVERAL PORT AUTHORITY
CRUISE TERMINAL 5 MARINE IMPROVEMENTS
PN 25-011D
ITB-25-1
Addendum 3
June 9, 2025 This addendum is issued as part of the Bidding Documents for the above described project. The changes incorporated in this addendum shall be considered as a part of the Bidding Documents and shall supersede, amend, add to, clarify, or subtract from those conditions shown in the original Bidding Documents. The Bidder shall take care to coordinate modifications herein with all trades and disciplines related to the work. The Bidder shall acknowledge receipt of this addendum on their Bid Form by addendum number and date. Failure to do so may subject Bidder to disqualification.
Released Via VendorLink
10 Pages Total (including attachments)
SPECIFICATIONS
Section 01 11 16:
Replace section 1.02 with the following:
The Contractor shall exercise extreme care to not degrade water quality. All required provisions shall be provided to ensure compliance with all water quality standards of the State of Florida and associated Agencies. Attention is called to Chapter 62-302.530, Florida Administrative Code, and in particular, the requirements that turbidity shall not exceed 29 Nephelometric Turbidity Units above natural background conditions. The waters at Port Canaveral are classified Class III for predominately marine waters.
Adequate silt containment procedures and equipment shall be installed and maintained to control turbidity during the Contract at no additional expense to the Owner.
Section 02 41 00:
Replace sections 3.04 K with the following:
3.04 REMOVAL OF EXISTING FACILITIES
A. General: This section applies to demolition equipment (vibratory sheet pile extractors, saw cutters and jackhammers) for complete removal of items indicated on the demolition drawings. All demolition shall be performed without damage to existing adjacent structures and facilities to remain.
B. Demolition: Perform selective demolition work in a systematic manner.
Use such methods as required to complete work in accordance with demolition schedule and governing regulations.
ITB-25-1 Page 2 Addendum 3
1. Demolish existing steel monopiles by completely extracting it.
Incorporate transverse cut to the steel piling if deemed necessary (optional method indicated on drawing D-601). Salvage steel piling section. Remove and salvage steel bollards. Dispose concrete platform components. Cut into small sections if deemed necessary using power driven saws.
2. Demolish existing concrete curbs and existing concrete pier deck topping sections by cutting with power driven saws. Avoid the use of power driven impact tools.
3. Remove and salvage existing metal walkways/catwalks following the drawing requirements. Cut existing anchor rods flush and grind to depth indicated using power driven saws and grinders.
Grout patch as indicated and in accordance with product manufacturer requirements. Modify the selected sections to be re-used in accordance with the drawing requirements.
4. Remove mooring fender as indicated on the drawings. Cut anchorage hardware for removal. Remove the indicated steel hardware.
5. Pull/extract existing piling completely. Jetting is not permitted as part of this operation unless it is performed inside a casing that encapsulates the jet and pile to at least 10 feet below the pile tip elevation.
6. Demolish existing concrete pile caps by cutting into small sections using power driven saws and/or expansive grout. Avoid the use of power driven impact tools.
7. Transport demolished concrete, and other debris offsite.
Coordinate any required temporary onsite stockpile locations with the Owner.
8. Provide services for effective air and water pollution controls as required by federal and state regulations, the Owner and specification section 01 35 43.
9. Do not allow debris to fall in the water. Use commercial certified divers to ensure that all debris is removed from the bottom.
C. Conduct selective demolition operations and debris removal in a manner that ensures minimum interference with roads, streets, walks, and other adjacent occupied or used facilities.
D. Do not close, block or otherwise obstruct streets, walks, pier, pier apron, or other occupied or used facilities without written permission from authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.
E. Use water sprinkling, temporary enclosures, and other suitable methods to limit dust and dirt rising and scattering in air to lowest practical levels.
ITB-25-1 Page 3 Addendum 3
Comply with governing regulations pertaining to environmental protection.
F. If unanticipated mechanical, electrical or structural elements which conflict with intended function or design are encountered, investigate and measure both nature and extent of the conflict.
1. Submit report to Engineer in writing; provide accurate details.
2. Pending receipt of clarification from Engineer, rearrange selective demolition schedule as necessary to continue overall job progress without delay.
G. Remove daily from site debris, rubbish, concrete and other materials resulting from demolition operations. Transport and legally dispose materials off site (outside Port Canaveral Property). Cost of disposal shall be borne by Contractor.
H. If hazardous materials are encountered during demolition operations, notify the Engineer immediately and comply with applicable regulations, laws, and ordinances concerning removal, handling and protection against exposure or environmental pollution.
I. Burning of removed materials is not permitted.
J. The use of explosives is prohibited.
K. Any damage to the existing bulkhead wall sections and onsite facilities to remain shall be repaired by the Contractor to the satisfaction of the Engineer. Repair costs shall be borne by the Contractor.
Section 05 50 00:
Delete section 2.01 K.
Section 09 96 00:
Replace sections 2.01 with the following:
2.01 MATERIALS:
A. Coating system for new steel components including steel pipe piles, bollards and miscellaneous metals:
1. Primer Coat: Apply uniformly overall one coat of series 90-97
Tnemec Zinc or Series 90G-1K97 Tnemec Zinc (at 2.5 – 3.5 mils dft).
2. Finish Coat: Apply uniformly overall one coat of Tnemec series 142 Epoxoline Reinforced Polyamine Epoxy (each coat at 15 – 18 mils dft, minimum 15 mils dft). Color black 35GR.
ITB-25-1 Page 4 Addendum 3
Appendix A:
The permit sections listed below are amended to include an alternate version of the condition. Both the original bid set version and the below amendment shall be considered for bidding purposes:
Draft FDEP Permit #0272477-016-BM - Specific Condition 5d (page 10 of 31):
A Marine Species Watch Plan detailing the proposal for observing protected marine species. This plan shall include:
i. a list of all observers associated with the project (their names, credentials, qualifications, contact information and a description of their observational experience (nighttime and daytime experience);
ii. a description of where the observers will be located during work and how they will cover the areas required (the observers shall be in elevated positions, if possible, to maximize visibility and this description shall include when tugboats and crew vessels are mooring to the dredge;
iii. the length of work shifts for the observers;
iv. the equipment used to aid in observation (recommend having a spotlight available to use if needed); and
v. The equipment used to communicate with the dredge operator.
Prior to in-water construction, all Marine Species Observers must be approved by FWC, as having adequate experience for this particular project. In order to receive approval from FWC, observers must have significant on-the-job experience observing protected marine species, such as manatees and marine turtles, during major dredging projects.
After FWC reviews the proposed watch plan and observers, modifications or suggestions for improvements to these conservation measures may be required.
Draft FDEP Permit #0272477-016-BM - Specific Condition 23 (page 18 of 31):
During all in-water work, the Permittee shall have dedicated marine species observers present. In-water work shall not commence until the Marine Species Observers have been approved by FWC. Observers shall perform no other duties that may interfere with their ability to observe protected marine species.
Observers shall be outfitted with equipment needed for observation (such as binoculars, polarized sunglasses, two-way radios, lights etc.). The Permittee shall give observers the authority to, and shall require them to, shut down project operations upon sighting a protected marine animal within the designated safety distance (50-feet during daytime and 75-feet during nighttime) of any in-water
ITB-25-1 Page 5 Addendum 3 construction or vessel activity, and if detection of a protected marine animal is not possible due to weather or other conditions (such as during fog, rain, wind, etc.).
Requirements for in-water work are as follows:
a. During in-water bulkhead construction, at least one dedicated marine species observer shall be onsite at all times. If more than one activity is happening at the same time, an observer shall be on duty at each location. This observer shall have prior on-the-job experience as a dedicated manatee observer during similar in-water work (such as pier demolition, bulkhead and pile installation/ removal).
b. During all in-water work, other than clamshell dredging, the Permittee shall require one dedicated marine species observer to be present in daylight, and a minimum of two observers shall be present at night. These observers shall have prior on-the-job experience as dedicated manatee observers during similar in-water work.
Specific Condition 35a (page 22 of 31):
Observer(s) shall have previous on-the-job experience observing whales during dredging projects and shall only have the task of observing whales and reporting whale sightings while on lookout. The Permittee shall ensure that all observers, dredge operators and support vessel operators are familiar with, and adhere to, the federal right whale minimum approach regulation, as defined in 50 CFR224.103(c).
DRAWINGS
Replace drawings D-601, D-602, S-203, S-701, and S-901 with the attached.
END OF ADDENDUM 3
Issued via VendorLink
By
Authority of the Canaveral Port Authority
±3'-6"
MIN. ALL SIDES
INJECT EPOXY WITH
PRESSURE GUN
EXISTING GROUT FILLED
SLOPE PROTECTION MAT
EXISTING FILTER FABRIC
REMOVE EXISTING SOIL AS
NEEDED TO INSTALL NEW MAT
FLUSH AGAINST EXISTING MAT
INSTALL #8 GLASS FIBER REINFORCED
POLYMER REBAR HUGHES BROTHERS
OR EQUIVALENT 3 EQUALLY SPACED
ALONG EACH OF 4 SIDES.
DETAIL NOTE:
LEAVE REINFORCED POLYMER BAR PROTRUDING
FOR INSPECTION BEFORE SAWING.
FILL VOID WITH GRAVEL
APPROXIMATELY 52" DIA X 10'-0"
AFTER PILE EXTRACTION
INSTALL PRO SERVE,
FIBERFORM OR EQUAL, 8"
GROUTED ARTICULATED
MAT
±2 '-0
±1'-8" ±4'-0" ±4'-0" ±1'-8"
INSTALL FILTER FABRIC UNDER
GROUTED MATS, TYP.
EXISTING 52" DIA PIPE
PILE TO BE REMOVED
REMOVE GROUT
BEFORE STEEL
EXTRACTION
EXISTING
GROUTED
FABRIC MATS
ASSESSMENT OF EXISTING
CONDITIONS. SEE NOTE 3
TOP OF DECK
EL. ±9.22'
OPTIONAL FIELD CUT LINE
EL. +4.5'±
EL. -86.00'
NEW 18"
SQUARE
CONCRETE PILE
EXISTING
SCOUR MAT
REMOVE SCOUR MAT
SECTION,
±4'-0" SQUARE MAXIMUM
PRIOR TO DRIVING PILES
EQ EQ
OVERLAP
12" TYP
NEW 18"
SQUARE
CONCRETE PILE
M
IN
CONCRETE
GROUT FILL
LC PILE
8" M
IN
EXISTING
SCOUR MAT
EXISTING 18"
SQUARE
CONCRETE PILE
EXISTING
SCOUR MAT
REMOVE SCOUR
MAT/GROUT SECTION
SEE NOTE 6
EQ EQ
OVERLAP
12" TYP
M
IN
CONCRETE
GROUT FILL AT
THE REMOVED
PILE LOCATIONS
LC PILE
8" M
IN
EXISTING
SCOUR MAT
REMOVE
BEFORE PILE
REMOVAL
D
EM
O
LI
TI
O
N
D
EM
O
LI
TI
O
N S
EC
TI
O N
A N
D D
ET
AI
LS
T M
O N
TE
M
AY
O
R
D Y
U
G L
ED
FO
R D
G L
ED
FO
R D
6/
9/
AD
D
EN
D U
M
D Y
TM
D-601
FILENAME: PLOT DATE: PLOT TIME:6/9/2025 12:37 PM
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
D
AT
E N
O
D
SG
N D
R R
EV
IS
IO
N
C H
K
AP
VD
BY
AP
VD
DWG
A
C R
U
IS
E
TE
R M
IN
AL
M
AR
IN
E
IM
PR
O
VE
M
EN
TS
PO
R
T C
AN
AV
ER
AL
, F
LO
R
ID
A
C an av er al P or t A ut ho rit y
C ap e C an av er al
, F lo rid a
\\brevard\Proj\PortCanaveralPortAut\25CPA002 CT5 Improvements\Drawings\002-D-601_25CPA002.dwg
EB
A
C
C A
PE
C
A N
A V
ER
A
L
FL
C H
A
LL
EN
G
ER
R
O A
D
SU
IT
E
MAY 19, 2025
BI
D
S
ET
Filename
25CPA002
JA
C
O
BS
1.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
JA
C O
BS
A
N D
IS
N
O T
TO
B
E U
SE
D
, I N
W H
O
LE
O R
IN
P
AR
T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T W
IT
H
O U
T
TH
E W
R
IT
TE
N
A U
TH
O
R
IZ
AT
IO
N O
F
JA
C O
BS
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U
M
EN
T O
F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
E, IS
T H
E
PR
O
PE
R
TY
O F
R
EU
SE
O
F D
O C
U M
EN
TS
c
0 1' 2' 4'
SCALE: 1/2" = 1'-0"
6'
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
12'
D-201 D-601 1/2"=1'-0"
EXISTING REMOVABLE CURB
D-601 D-601 1/2"=1'-0"
EXTRACTION DETAIL
D-601 D-601 1/4"=1'-0"
POST EXTRACTION DETAIL
EXISTING PILE CAP
AND PILE
REMOVE REINFORCED
CONCRETE CURB,
STEEL HARDWARE,
WOOD FRAMING AND
EXPANSION JOINT
REMOVE CONCRETE AS SHOWN.
DO NOT CUT THE EXISTING
HORIZONTAL REINFORCEMENT
REMOVE REINFORCED
CONCRETE SECTION SHOWN
EXISTING PILE CAP
AND PILE
D-201 D-601 1/2"=1'-0"
EXISTING CURB
COMPLETELY REMOVE THE MONOPILE MOORING
DOLPHIN, INCLUDING BOLLARD, STEEL PILE,
CONCRETE PLATFORM, GROUT AT SEA BED
LEVEL AND MISCELLANEOUS STEEL
COMPONENTS. SEE REFERENCE DRAWING R-304
FOR THE ORIGINAL DESIGN INFORMATION.
EXISTING
PIER APPROXIMATE EXISTING
GRADE. SEE SURVEY IN
REFERENCE DRAWINGS.
SEE NOTE 3 FOR DIVE
INSPECTION
REQUIREMENTS
D-601 D-601
REPAIR
AFTER PILE
REMOVAL.
SEE DETAIL
D-601 D-601
EXISTING
CONDITIONS.
SEE DETAIL
D-201 D-601 1/4"=1'-0"
EXISTING MONOPILE SHORE DOLPHIN
PATCH EXISTING LENTON
COUPLERS WITH
NON-SHRINK GROUT
EXISTING
EXPANSION JOINT
NOTES:
1. REFER TO DEMOLITION NOTES ON DRAWING G-005 AND
SPECIFICATIONS SECTION 02 41 00 FOR ADDITIONAL
INFORMATION. REFER TO THE REFERENCE SHEETS (R-SHEETS)
FOR THE EXISTING FACILITY DRAWINGS. THE CONTRACTOR IS
RESPONSIBLE FOR VERIFYING ALL AS-BUILT CONDITIONS AND
DIMENSIONS TO BE CONSIDERED AS THE BASIS FOR THE
CONSTRUCTION BIDS.
2. ALL ELEVATIONS SHOWN ARE REFERENCED TO THE MEAN LOW
WATER REFERENCE DATUM.
3. THE CONTRACTOR SHALL RETAIN SERVICES OF COMMERCIALLY
CERTIFIED DIVERS TO INSPECT THE EXISTING CONDITIONS AT
THE PILE TO MUDLINE INTERFACE, BEFORE THE START OF THE
CONCRETE PILE REMOVAL EFFORT. REMOVE GROUT, DEBRIS AND
OTHER DELETERIOUS MATERIALS THAT COULD NEGATIVELY
AFFECT THE CONCRETE PILE REMOVAL EFFORTS.
4. SALVAGE, TRANSPORT, AND UNLOAD AT LOCATION DESIGNATED
BY THE ENGINEER. HAUL DISTANCE NOT TO EXCEED 10 MILES
ROUND TRIP.
5. EXPOSE AND CLEAN THE THREADED COUPLERS FOLLOWING THE
MANUFACTURER'S RECOMMENDATIONS. SEE DRAWING S-603 FOR
THREADED COUPLER LOAD CAPACITY VERIFICATION
REQUIREMENTS.
6. REMOVE EXISTING SCOUR MAT OR GROUT SURROUNDING THE
PILE INTERFACE AT MUDLINE. MAXIMUM EXTENTS ARE 12" EITHER
SIDE OF PILE, TYP.
REMOVE AND SALVAGE
BOLLARD. SEE NOTE 4
D-201 D-601 1/2"=1'-0"
EXISTING CURB
REMOVE AND DISPOSE
MONOPILE AND PLATFORM
R
EM
O
VE
A N
D S
AL
VA
G E
PI
PE
P
IL
E.
SE
E
N O
TE
SAW CUT AND REMOVE
THE EXISTING
CONCRETE CURB
EXISTING PILE
CAP AND PILE
±1'-0"
±2 '-9
±1'-0"
±2'-0"
±1 '-0
±2
'-2 "±3 '-2
±1'-0"
±1 '-0
D-201 D-601 1/2"=1'-0"
EXISTING CURB ON LANDBRIDGE
EXISTING HOLLOW CORE
DECK UNITS
±1'-0"
±1 '-0
SAWCUT AND REMOVE REINFORCED
CONCRETE CURB. COORDINATE
ADDITIONAL DEMOLITION OF THE
EXISTING CONCRETE TOPPPING WITH
NEW JOINT DETAIL ON DRAWING S-605
D-201 D-601 1/2"=1'-0"
MAT PROTECTION DETAIL
MAT REMOVAL
GROUT PLACEMENT
LEGEND:
LIMITS OF DEMOLITION
GRIND ANY REMAINING
EXPOSED STEEL
REINFORCEMENT ONE-INCH
DEEP, MINIMUM AND PATCH
WITH NON-SHRINK GROUT.
REMOVE END CAP AND
EXPOSE THREADED
COUPLERS. SEE NOTE 5.
GRIND ANY REMAINING EXPOSED
STEEL REINFORCEMENT ONE-INCH
DEEP, MINIMUM AND PATCH WITH
NON-SHRINK GROUT.
DO NOT CUT HORIZONTAL
REINFORCEMENT, TYP.
CUT EXISTING #4
DOWELS. GRIND
1" DEEP AND
PATCH WITH
NON-SHRINK
GROUT
APPROXIMATELY 8"
FIELD VERIFY
D-201 D-601 1/2"=1'-0"
MAT PROTECTION DETAIL
MAT REMOVAL
GROUT PLACEMENT
EL. -92.58'±
EM
O
LI
TI
O
N
D
EM
O
LI
TI
O
N S
EC
TI
O N
A N
D D
ET
AI
LS
T M
O N
TE
M
AY
ED
FO
R D
G L
ED
FO
R D
6/
9/
AD
D
EN
D U
M
D Y
TM
D-602
FILENAME: PLOT DATE: PLOT TIME:6/9/2025 12:37 PM
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
D
AT
E N
O
D
SG
N D
R R
EV
IS
IO
N
C H
K
AP
VD
BY
AP
VD
DWG
A
C R
U
IS
E
TE
R M
IN
AL
M
AR
IN
E
IM
PR
O
VE
M
EN
TS
PO
R
T C
AN
AV
ER
AL
, F
LO
R
ID
A
C an av er al P or t A ut ho rit y
C ap e C an av er al
, F lo rid a
\\brevard\Proj\PortCanaveralPortAut\25CPA002 CT5 Improvements\Drawings\002-D-601_25CPA002.dwg
EB
C
C A
PE
C
A N
A V
ER
A
L
FL
C H
A
LL
EN
G
ER
R
O A
D
SU
IT
E
MAY 19, 2025
BI
D
S
ET
Filename
25CPA002
JA
C
O
BS
1.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
JA
C O
BS
A
N D
IS
N
O T
TO
B
E U
SE
D
, I N
W H
O
LE
O R
IN
P
AR
T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T W
IT
H
O U
T
TH
E W
R
IT
TE
N
A U
TH
O
R
IZ
AT
IO
N O
F
JA
C O
BS
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U
M
EN
T O
F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
E, IS
T H
E
PR
O
PE
R
TY
O F
R
EU
SE
O
F D
O C
U M
EN
TS
c
NOTES:
1. REFER TO DEMOLITION NOTES ON DRAWING G-005 AND
SPECIFICATIONS SECTION 02 41 00 FOR ADDITIONAL
INFORMATION. REFER TO THE REFERENCE SHEETS (R-SHEETS)
FOR THE EXISTING FACILITY DRAWINGS. THE CONTRACTOR IS
RESPONSIBLE FOR VERIFYING ALL AS-BUILT CONDITIONS AND
DIMENSIONS TO BE CONSIDERED AS THE BASIS FOR THE
CONSTRUCTION BIDS.
2. ALL ELEVATIONS SHOWN ARE REFERENCED TO THE MEAN LOW
WATER REFERENCE DATUM.
3. THE CONTRACTOR SHALL RETAIN SERVICES OF COMMERCIALLY
CERTIFIED DIVERS TO INSPECT THE EXISTING CONDITIONS AT
THE PILE TO MUDLINE INTERFACE, BEFORE THE START OF THE
CONCRETE PILE REMOVAL EFFORT. REMOVE GROUT, DEBRIS AND
OTHER DELETERIOUS MATERIALS THAT COULD NEGATIVELY
AFFECT THE CONCRETE PILE REMOVAL EFFORTS.
4. THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A WEEKLY
SUMMARY TABLE OF MEASUREMENTS THAT DOCUMENTS THE
ACTUAL LENGTHS OF PILING REMOVED. NOTIFY THE ENGINEER
FOR VISUAL FIELD VERIFICATION OF PILE REMOVAL LENGTHS
BEFORE SUBMITTING THE SUMMARY TABLE.
5. SALVAGE, TRANSPORT, AND UNLOAD AT LOCATION DESIGNATED
BY THE ENGINEER. HAUL DISTANCE NOT TO EXCEED 10 MILES
ROUND TRIP.
0 1' 2' 4'
SCALE: 1/2" = 1'-0"
6'
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
12'
EXISTING
REINFORCEMENT
D-201 D-602 1/2"=1'-0"
EXISTING DOLPHIN
0 4' 8' 16'
SCALE: 1/8" = 1'-0"
24'
REMOVE EXISTING FENDER, INCLUDING: PANEL,
RUBBER ELEMENT, CHAINS AND ANCHOR
INSERTS. SEE REFERENCE DRAWING R-405.
DISPOSE OF FENDER CELL AND FRONTAL FRAME
EXISTING DOLPHIN
AND PILES
REMOVE BOLLARD FIXTURE, STEEL NUTS,
AND GROUT BASE. CUT ANCHOR RODS TO
A MINIMUM DEPTH OF 3" INTO THE
CONCRETE STRUCTURE. PATCH WITH
NON-SHRINK GROUT. SEE NOTE 5
D-201 D-602 1/8"=1'-0"
EXISTING CATWALK
±105'-10"
REMOVE CATWALK. FOR MODIFICATIONS
AND REUSE. REFER TO DEMOLITION
NOTE E ON DRAWING S-201
COMPLETELY REMOVE
AND DISPOSE PILE CAP
AND PILE. SEE NOTE 3
AND 4
SEE DETAIL 5 ON THIS SHEET
FOR BOLLARD REMOVAL
EXISTING DOLPHIN
AND PILES
EXISTING
BULKHEAD WALL
D-201 D-602 1/4"=1'-0"
EXISTING CATWALK
REMOVE AND SALVAGE
CATWALK AND STAIRWAY.
SEE NOTE 5
EXISTING DOLPHIN
AND PILES
EXISTING PIER
±35'-4"
D-201 D-602 1/4"=1'-0"
EXISTING CATWALK
±45'-9"
REMOVE CATWALK FOR
MODIFICATION AND REUSE
EXISTING DOLPHIN
AND PILES
EXISTING PILE
AND CAP
CUT ANCHOR BOLTS FLUSH
WITH CONCRETE SLAB
±3
M
IN
GRIND ENTIRE TOP OF CONCRETE
TOP SURFACE, 3" MINIMUM AVOID
DAMAGING REBAR.
CUT ANCHORS FLUSH,
GRIND ONE INCH DEEP,
MIN. AND PATCH WITH
NON-SHRINK GROUT.
REMOVE BEARING
PLATES AND GROUT.
ANCHOR RODS SHALL
REMAIN
REMOVE AND SALVAGE
THE SUPPORT BRACKET.
CUT ANCHOR RODS FLUSH,
GRIND 1" DEEP AND PATCH
WITH NON-SHRINK GROUT
LEGEND:
LIMITS OF DEMOLITION
GROUT SEAL THE OPENINGS THROUGH THE
SCOUR MAT INTERFACE, AFTER PILE REMOVAL.
SEE DETAIL 11 ON SHEET D-601
LC PILE
CAP
LC PILE
CAP
LC EXISTING
PILE CAP
(APPROXIMATE)
LC PILE
CAP
LC PILE
CAP
LC EXISTING
PILE CAP
(APPROXIMATE)
LC BATTERED
PILE
LC BENT/PILE CAP
LC BATTERED
PILE
LC BENT/PILE CAP
LC BATTERED
PILE
ST
R
U C
TU
R
AL
EN
LA
R G
ED
D
EC
K
AN
D
P
IL
E
PL
AN
N O
R
TH
E N
D T
M O
N
TE
M
AY
O R
D Y
U G
L
ED
FO
R
D G
L
ED
FO
R
D
6/
9/
AD
D
EN
D U
M
D Y
TM
S-203
FILENAME: PLOT DATE: PLOT TIME:6/9/2025 12:37 PM
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
D
AT
E N
O
D
SG
N D
R R
EV
IS
IO
N
C H
K
AP
VD
BY
AP
VD
DWG
A
C R
U
IS
E
TE
R M
IN
AL
M
AR
IN
E
IM
PR
O
VE
M
EN
TS
PO
R
T C
AN
AV
ER
AL
, F
LO
R
ID
A
C an av er al P or t A ut ho rit y
C ap e C an av er al
, F lo rid a
\\brevard\Proj\PortCanaveralPortAut\25CPA002 CT5 Improvements\Drawings\004-S-203_25CPA002.dwg
EB
C
C A
PE
C
A N
A V
ER
A
L
FL
C H
A
LL
EN
G
ER
R
O A
D
SU
IT
E
MAY 19, 2025
BI
D
S
ET
Filename
25CPA002
JA
C
O
BS
1.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
JA
C O
BS
A
N D
IS
N
O T
TO
B
E U
SE
D
, I N
W H
O
LE
O R
IN
P
AR
T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T W
IT
H
O U
T
TH
E W
R
IT
TE
N
A U
TH
O
R
IZ
AT
IO
N O
F
JA
C O
BS
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U
M
EN
T O
F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
E, IS
T H
E
PR
O
PE
R
TY
O F
R
EU
SE
O
F D
O C
U M
EN
TS
c
N
EXISTING PIER
SCALE: 1" =
10 20 30
10'N
5 4 3
2 26
2 SPACE AT 10'-0" = 20'-0"3 SPACE AT 10'-0" = 30'-0"
SP
AC
ES
A T
7' -0
6' -0
TY
P.
'-0
2'
-0
2'-0"
EXISTING PILE
CAP AND PILES
SPAN 1 = 30'-0" SPAN 2 = 28'-0"
'-0
EXISTING DECK
UNITS
SL
O
PE
SL
O
PE
PILE CHART
PILE
TYPE
PILE
NUMBER
CUT-OFF
ELEVATION
DESIGN
TIP
ELEV
BATTER
18" SQ.,
VERTICAL 1-5 EL. 0.85' EL. -100' NONE
18" SQ.,
VERTICAL 6-23 EL. +2.85' EL. -100' NONE
18" SQ.,
BATTERED 27-36 EL. +2.85' EL. -100' 3H : 12V
18" SQ.,
BATTERED 24, 25 EL. +2.85' EL. -100' 1.5H : 12V
18" SQ.,
BATTERED 26 EL. 0.85' EL. -100' 1.5H : 12V
TABLE 1 - TEST PILE PROGRAM
TEST
PILE
NO.
PILE
TYPE
PILE WORKING
AXIAL LOADS
PILE ULTIMATE
AXIAL LOADS
TARGETED FOR
PDA TESTING
DESIGN
TIP ELEV COMMENTS
TP1, TP2 18" SQ.,
VERTICAL 230 KIPS COMPRESSION 460 KIPS COMPRESSION EL. -100' NEGLIGIBLE
TENSION
TP3 18" SQ.,
BATTERED
184 KIPS COMPRESSION
22 KIPS TENSION
368 KIPS COMPRESSION
55 KIPS TENSION EL. -100'
A S-203 S-603
S-203 S-401
S-203 S-602
S-203 S-6033
S-203 S-602
S-203 S-602
TP2
A S-201 S-203 1"=10'
ENLARGED PLAN - NORTH PIER DECK
B S-201 S-203 1"=10'
ENLARGED PLAN - NORTH PIER PILES
60'-0"
2' -0
60'-0"
S-203 S-603
5'-0" 4 SPACES AT 5'-0" = 20'-0" 5'-0" 4 SPACES AT 5'-0" = 20'-0"
±5'-1"
13 20
19 21
S-203 S-601
TYP
S-203 S-605
DECK CONSTRUCTION.
SEE NOTE 7
±2'-0 9/16"
FIELD VERIFY
NEW TOPPING
AGAINST EXISTING
TOPPING INTERFACES.
SEE NOTE 7
REINFORCED
CONCRETE PILE CAP
BELOW
B S-203 S-603
4'-0"
4'-0"
4'-0"
5'-0"
'-0
4'
-0
TP3
TP1
2' -0
SP
AC
ES
AT
'-0
4'
-0
4' -0
±8'-0"
26'-0"30'-0"
TP#
TEST PILE PROGRAM NOTES:
1. ALL TEST PILES SHALL BE USED AS PRODUCTION PILES,
AND SHALL BE DRIVEN IN THE POSITION OF PRODUCTION
PILES AT THE DESIGNATED LOCATIONS.
2. REFER TO "DYNAMIC PILE LOAD TESTING AND VIBRATION
MONITORING", SPECIFICATION SECTION 31 62 17 FOR
DETAILS OF THE TEST PILE INSTALLATION AND TESTING,
INCLUDING PDA TESTING.
3. TEST PILES SHALL BE INSTALLED TO THE DEPTHS
INDICATED BY THE DESIGN TIP ELEVATIONS ON TABLE 1.
PILE EMBEDMENT WILL BE CONFIRMED BY THE TEST PILE
PROGRAM. ANY CHANGES TO THE REQUIRED PILE TIP EL
SHALL BE ISSUED IN WRITING BY THE ENGINEER, BEFORE
PRODUCTION PILES ARE ORDERED.
4. INDICATES TEST PILE LOCATION.
NOTES:
1. ALL ELEVATION VALUES SHOWN ARE BASED ON THE
MEAN LOW WATER (MLW) REFERENCE DATUM, UNO.
2. PILING REQUIREMENTS:
INDICATES VERTICAL PILES
INDICATES BATTERED PILES. ARROW POINTS IN THE
BATTER DIRECTION.
CONSTRUCTION BIDS SHALL BE BASED ON THE PILING
INFORMATION AND DIMENSIONS PRESENTED HEREIN.
OWNER WILL CONSIDER VALUE ENGINEERING CHANGES
TO PILE DIMENSIONS AFTER COMPLETION OF THE PILE
TESTING PROGRAM. REFER TO SPECIFICATIONS 31 62 13
AND 31 62 17 FOR ADDITIONAL INFORMATION.
3. PILE LOCATIONS AND DIMENSIONS ARE TO THE CENTER
OF THE PILE AT THE PILE CUT-OFF ELEVATION.
CONTRACTOR SHALL DETERMINE PILE LENGTHS BASED
ON THE CUT-OFF ELEVATION, DESIGN TIP ELEVATION AND
BATTER SHOWN IN THE PILE CHART. ALL PILES SHALL BE
ANCHORED WITH FULLY TENSION DEVELOPED STEEL
REINFORCEMENT INTO RESPECTIVE PILE CAPS.
4. THE CONTRACTOR SHALL FIELD VERIFY THE EXISTING
AND NEW CONSTRUCTED DECK SPAN DIMENSIONS
BEFORE ORDERING AND FABRICATING THE PC/PS REINF.
CONCRETE DECK UNITS. NOTIFY THE ENGINEER OF ANY
DIMENSION DISCREPANCIES. PROVIDE THE DECK
BEARING DIMENSIONS SHOWN, INCLUDING CONT.
NEOPRENE BEARING PADS OVER ALL BEARING CONTACT
AREAS.
5. THE CONTRACTOR SHALL SUBMIT FOR REVIEW THE
LAYOUT OF ALL PROPOSED CONSTRUCTION JOINTS,
(INCLUDING PILE CAPS AND TOPPING), AT LEAST 14
CALENDAR DAYS BEFORE SUBMISSION OF THE
CORRESPONDING REINFORCEMENT SHOP DRAWINGS.
ANY COMMENTS AND MODIFICATIONS NOTED BY THE
ENGINEER SHALL BE INCORPORATED INTO
REINFORCEMENT SHOP DRAWINGS BEFORE SUBMISSION
FOR REVIEW.
6. SEE DRAWING S-201 FOR REFERENCE POINT
COORDINATES.
7. THE PIER DECK SYSTEM CONSISTS OF 15" AND 18"
THICKNESS PC/PS CONCRETE DECK UNITS AND
REINFORCED CONCRETE TOPPING (COMPOSITE).
REINFORCE TOPPING WITH #4 BARS SPACED 12" OC, TOP,
EW. REFER TO SPECIFICATION SECTION 03 41 13 AND
DRAWING S-901 FOR ADDITIONAL INFORMATION.
THE DESIGN INTENT IS FOR NEW TOPPINGS AGAINST
EXISTING PIER DECK SECTIONS TO MATCH THE EXISTING
TOP SURFACE PROFILE. THE CONTRACTOR SHALL RETAIN
SERVICES FROM FLORIDA REGISTERED SURVEYORS TO
MEASURE AND ESTABLISH THE EXISTING PIER DECK TOP
SURFACE PROFILE ALONG THE INTERFACES. SUBMIT THE
SURVEY INFORMATION FOR REVIEW BY THE ENGINEER
BEFORE PROCEEDING WITH THE NEW TOPPING
CONCRETE PLACEMENT.
8. REFER TO THE STRUCTURAL NOTES ON DRAWING S-001
AND DETAIL DRAWINGS S-902 FOR THE PILING
REQUIREMENT AND DESIGN INFORMATION.
4' -0
±2'-1"
FIELD VERIFY
7' -0
5'
-0
4' -0
2'
-0
REFERENCE
POINT 2
REFERENCE
POINT 1
REFERENCE
POINT 3
REFERENCE
POINT 4
31 32
TOP OF PILE CAPS,
EL. +6.60', UNO
HATCH INDICATES REINFORCED
CONCRETE TOPPING WITH SLOPED
TOP SURFACE PROFILE, CONT.
OVER THE PIER EXTENSION AREA.
SEE PLANS AND NOTE 7.
5' -0
HIGH POINT PIER
DECK TOPPING
EL. +8.63'±
LOW POINT PIER
DECK TOPPING
EL. +8.29'± LOW POINT PIER
DECK TOPPING
EL. +8.29'±
LOW POINT PIER
DECK TOPPING
EL. +8.42'±
LOW POINT PIER
DECK TOPPING
EL. +8.54'±
LOW POINT PIER
DECK TOPPING
EL. +8.60'±
2' -0
/2
/2
LC BATT.
PILE
LC BATT.
PILE
11 1/2"
11 1/2"
/2
SLOPE
(9) 18" THICK x 48" WIDE = 36'-0"
PC/PS CONC
DECK UNITS (SEE NOTE 4)
'-0
'-0
HIGH POINT
CONSTRUCT SHALLOW
REMOVABLE CURB AT
INTERFACE WITH LADDER
PILE CAP
SLOPE
(9) 18" THICK x 48" WIDE = 36'-0"
PC/PS CONC
DECK UNITS (SEE NOTE 4)
(5) 15" THICK x 48" WIDE = 20'-0"
PC/PS CONC
DECK UNITS (SEE NOTE 4)
(5) 15" THICK x 48" WIDE = 20'-0"
PC/PS CONC
DECK UNITS (SEE NOTE 4)
EXISTING BATTERED PILE
APPROXIMATE PROJECTION
BELOW, TYP
INSTALL ONE DRAIN SCUPPER
WITHIN 12" OF THE DECK
TOPPING LOW POINT. SEE
DETAIL 8 ON DRAWINGS S-602
INSTALL DOUBLE #4 TIES AT 12" OC,
PER DETAIL 3 ON SHEET S-603 OVER
THE LENGTH OF 15'-0". ALL OTHER PILE
CAP BEAM REINFORCEMENT PER
DETAIL 4 ON SHEET S-604.
1/2
5/16
1/4
7" 2"
24"
1'-0" 4'-0" 1'-0"4'-0"
5' -0
1' -0
5' -0
1" SOFFIT
PLATE. SEE
NOTE 6
5'-0" 5'-0"
2" SCH 40 ROPE GUARD
COPING. HOT DIP GALV.
200 METRIC TON CAST
STEEL T-HEAD BOLLARD.
1" MIN.
NON-SHRINK
GROUT
1/4
PROVIDE POUR STOP
OR FILL WITH SAND
HINGED ALUM. LUG
PATTERN SAFETY PLATE.
SEE SECTION BELOW
CONCRETE DECK HEAVY
BROOM FINISH
BULKHEAD WALL
ENCASEMENT/CURB
1/2"x24"x8'-0" ALUM. CHK'D
PLATE BEVEL EDGES
STAINLESS STEEL
HINGE (4 TOTAL)
GREASE PIN. 1/2" S.S.
FLAT HEAD BOLTS. 1/2"
S.S. BOLTS INTO
FASCIA PLATE. DRILL
AND TAP FASCIA PLATE
EL. +9.42' (VERIFY IN FIELD)
(TOP OF WALL ENCASE.)
EL. +9.69' (TOP OF
FASCIA PLATE)
SEE NOTE 4
72" O.D.x1" W.T. STEEL PIPE PILE
L6x6x1/2
4' -0
M
IN
1"x9" CONT.
FASCIA PLATE.
SEE NOTE 6
AFTER INSTALLATION OF BOLLARD FILL
ALL COUNTERSUNK HOLES WITH
NEOPRENE SEALANT (NO PROJECTION)
LC PIPE PILE
LC PIPE PILE
ALIGN BOLLARD CENTER WITH
THE CENTER OF PIPE PILE
LC PIPE PILE
PROVIDE NUTS AND 4" SQ x 1/2"
STEEL PLATE WASHERS, EACH
ANCHOR ROD.
VARIES. FIELD CUT
BAR ENDS TO FIT
(2) #4 HOOP
AT 12"
#5 AT 5"± SPACED RADIALLY
ALONG MONOPILE, EQUALLY
(32 TOTAL)
3" C
O N
C R
ET
E
C O
VE
R
, T
YP
SLOPE 1/2"
PER FT
SLOPE 1/2"
PER FT
(7) #4 AT 12"
EXISTING
BULKHEAD WALL
EXISTING SLOPE
PROTECTION
MAT. SEE NOTE 1
EL. +5.0' ±
SEE NOTE 3
MONOPILE DOLPHIN.
SEE DRAWING S-201
OPTIONAL FIELD SPLICE
FULL PENETRATION WELD
EL. 0.00' (MLW)
72" O.D.x1" WALL THICKNESS
EL. +9.69'
SEE NOTE 4
EL. -15.0'
AP
PL
Y C
O
AT
IN
G
PE
R
S
PE
C
IF
IC
AT
IO
N
EL. -85.00'
'-0
NEW SECOND MAT LAYER. SEE
NOTE 2. (ALLOWED TO SLIDE 6")
CUT & SEW SECOND LAYER OF MAT
TO FIT TIGHTLY AROUND MONOPILE.
SEAL WITH CONCRETE
CUT AND REMOVE 8" EXISTING MAT. SEE
NOTE 1. FILL WITH 1" GRAVEL AFTER
DRIVING PILE
EXISTING FILTER FABRIC
PRIMARY LAYER
PROVIDE SECOND LAYER OF
FILTER FABRIC WITH LAP JOINT
ORIENTATED 90° TO PRIMARY
LAYER'S JOINT
3'-6"
ALL AROUND
1'-0"
ALL ROUND
TYP.
3/8
APPROXIMATE LOCATION OF
THE HOLES TO RECEIVE
BOLLARD ANCHORS. PROVIDE
HOLES WITH DIAMETER
DIMENSION 1/8" LARGER THAN
THE ANCHOR BOLT OD. SEE
NOTE 5.
L6x6x1/2 (TYP.)
TYP.
3/8
8"
8"
1/2" PLATE
3/8
TYP.
TYP.
±1'-2 7/8"
±1'-2 7/8"
±1 '-2
1/
±9
/4
DETAIL NOTE:
* VERIFY WITH BOLLARD BOLT PATTERN.
COORDINATE ALL DIMENSIONS AND SUBMIT
STEEL FRAMING SHOP DRAWINGS. FOR REVIEW
BEFORE FABRICATION.
LC PIPE PILE
LC PIPE PILE
ST
R
U C
TU
R
AL
M O
N O
PI
LE
M O
O R
IN
G
D O
LP
H
IN
T M
O N
TE
M
AY
ED
FO
R D
G L
ED
FO
R D
6/
9/
AD
D
EN
D U
M
D Y
TM
S-701
S-701 S-701 1/2"=1'-0"
SECTION
FILENAME: PLOT DATE: PLOT TIME:6/9/2025 12:37 PM
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
D
AT
E N
O
D
SG
N D
R R
EV
IS
IO
N
C H
K
AP
VD
BY
AP
VD
DWG
A
C R
U
IS
E
TE
R M
IN
AL
M
AR
IN
E
IM
PR
O
VE
M
EN
TS
PO
R
T C
AN
AV
ER
AL
, F
LO
R
ID
A
C an av er al P or t A ut ho rit y
C ap e C an av er al
, F lo rid a
6/9/2025 12:37:43 PM004-S-701_25CPA002.dwg\\brevard\Proj\PortCanaveralPortAut\25CPA002 CT5 Improvements\Drawings\004-S-701_25CPA002.dwg
EB
C
C A
PE
C
A N
A V
ER
A
L
FL
C H
A
LL
EN
G
ER
R
O A
D
SU
IT
E
MAY 19, 2025
BI
D
S
ET
Filename
25CPA002
JA
C
O
BS
1.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
JA
C O
BS
A
N D
IS
N
O T
TO
B
E U
SE
D
, I N
W H
O
LE
O R
IN
P
AR
T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T W
IT
H
O U
T
TH
E W
R
IT
TE
N
A U
TH
O
R
IZ
AT
IO
N O
F
JA
C O
BS
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U
M
EN
T O
F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
E, IS
T H
E
PR
O
PE
R
TY
O F
R
EU
SE
O
F D
O C
U M
EN
TS
c
A S-201 S-701 1/2"=1'-0"
PLAN AT ELEV. +8.61'
S-701 S-701 1/8"=1'-0"
MONOPILE SHORE DOLPHIN ELEVATION
S-701 S-701 1"=1'-0"
DETAIL2
S-701 S-701
S-701 S-701
S-701 S-701
S-701 S-701
0 1' 2' 4'
SCALE: 1/2" = 1'-0"
6'
0 4' 8' 16'
SCALE: 1/8" = 1'-0"
24'
S-701 S-701 1/2"=1'-0"
DETAIL
S-701 S-701
NOTES:
1. EXISTING MAT IS 8" NOMINAL THICKNESS ARTICULATED GROUTED MAT
SIMILAR TO FABRIFORM AND HYDROTEC GROUTED MATS.
2. SECOND LAYER MAT SHALL BE 8" NOMINAL THICKNESS ARTICULATED
GROUTED MAT. GROUT SHALL BE FLUID GROUT, 2000 PSI AT 28 DAYS.
3. DEPTH OF EXISTING MAT ALONG BULKHEAD WALL IS A NOMINAL -5'
MLW. AND IS SLOPED TOWARDS THE PIER FACE AT A RATIO OF 3
HORIZONTAL TO 1 VERTICAL.
4. ADJUST ELEVATION OF TOP OF FASCIA PLATE TO PROVIDE 3" ABOVE
ELEVATION OF TOP OF EXISTING WALL CAP.
5. COORDINATE THE QUANTITY, DIMENSIONS AND LOCATION OF FRAMING
HOLES WITH THE APPROVED BOLLARD SHOP DRAWINGS, USE BOLLARD
MANUFACTURER. PROVIDED TEMPLATE FOR FIELD VERIFICATION
BEFORE INSTALLATION.
6. APPLY HIGH PERFORMANCE COATING (PER SPECIFICATION SECTION
09 96 00) TO ALL SURFACES OF SOFFIT AND FASCIA PLATES, TYP.
SCALE: 1" = 1'-0"
0 1' 2' 3'1/2'
FILENAME: PLOT DATE: PLOT TIME:6/9/2025 12:37 PM
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
D
AT
E N
O
D
SG
N D
R R
EV
IS
IO
N
C H
K
AP
VD
BY
AP
VD
DWG
A
C R
U
IS
E
TE
R M
IN
AL
M
AR
IN
E
IM
PR
O
VE
M
EN
TS
PO
R
T C
AN
AV
ER
AL
, F
LO
R
ID
A
C an av er al P or t A ut ho rit y
C ap e C an av er al
, F lo rid a
\\brevard\Proj\PortCanaveralPortAut\25CPA002 CT5 Improvements\Drawings\004-S-901_25CPA002.dwg
EB
C
C A
PE
C
A N
A V
ER
A
L
FL
C H
A
LL
EN
G
ER
R
O A
D
SU
IT
E
MAY 19, 2025
BI
D
S
ET
Filename
25CPA002
JA
C
O
BS
1.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
JA
C O
BS
A
N D
IS
N
O T
TO
B
E U
SE
D
, I N
W H
O
LE
O R
IN
P
AR
T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T W
IT
H
O U
T
TH
E W
R
IT
TE
N
A U
TH
O
R
IZ
AT
IO
N O
F
JA
C O
BS
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U
M
EN
T O
F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
E, IS
T H
E
PR
O
PE
R
TY
O F
R
EU
SE
O
F D
O C
U M
EN
TS
c
ST
R
U C
TU
R
AL
PR
ES
TR
ES
SE
D
C O
N C
R
ET
E D
EC
K
U N
IT
S
T M
O N
TE
M
AY
ED
FO
R D
G L
ED
FO
R D
6/
9/
AD
D
EN
D U
M
D Y
TM
S-901
E S-601 S-602
S-901 3/4"=1'-0"
DETAILS
(4) #4 EQ. SPACED, T&B,
EACH END
4' -0
VARIES
3"
TIE SPACING
3" 6 SPACES AT 3" OC
4 SPACES AT 6" OC
12" OC MAX
4 SPACES AT 6" OC
6 SPACES AT 3" OC
2"
1' -6
2 1/2"
TYP
REFER TO TABLE FOR STRAND COUNTS PER
SPAN SECTION. INITIAL PRE-STRESSING FORCE =
31,000 LBS PER STRAND. EQUALLY SPACE
BOTTOM STRANDS AND REBAR. MAINTAIN
MINIMUM ON CENTER SPACING OF 2"
1' -6
#5 TIES (TYP.) SEE
PLAN FOR SPACING
#5 (TYP)
17" 17"
18" DECK UNITS ELEVATION
18" AND 15" DECK UNIT PLAN
18" SECTION - INTERIOR UNIT
NOTES
1. FIELD VERIFY EXISTING PIER GEOMETRY PRIOR TO FABRICATION. NOTIFY ENGINEER OF ANY
VARIATIONS. SEE SPECIFICATION SECTION 03 41 33 FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
2. DESIGN REQUIREMENTS (FOR INFORMATION ONLY):
a. LOADS:
- DEAD LOADS:
SELF WEIGHT BASED ON A CONCRETE UNIT WEIGHT OF 150 PCF.
- LIVE LOADS:
VEHICULAR LIVE LOAD = 600 PSF UNIFORM. OR HS-20.
b. ALLOWABLE DEFLECTIONS:
- UNDER TOTAL LOAD = CLEAR SPAN/240.
- LONG TERM DEFLECTION UNDER PERMANENT LOADS = CLEAR SPAN /360.
3. CONSTRUCTION/ERECTION SEQUENCE:
a. FIELD MEASURE PIER PILE CAPS AND VERIFY SPAN DIMENSIONS PRIOR TO FABRICATION.
b. INSTALL BEARING PADS AND DECK UNITS FOLLOWING MANUFACTURER'S REQUIRED
PROCEDURES.
c. GROUT LONGITUDINAL JOINTS BETWEEN UNITS.
d. INSTALL AND POST-TENSION TRANSVERSE TIE BAR AFTER GROUT AT JOINTS HAS
ADEQUATELY CURED. POST-TENSION BARS TO 15,000 LBS/EACH. REFER TO NOTE 5 FOR
PC/PS DECK ERECTION OPTIONS AND THE SUGGESTED INSTALLATION SEQUENCE OVER THE
AREA THAT INCLUDES TWO GROUPS OF DECK UNITS OF VARIOUS THICKNESSES.
e. PRESSURE GROUT TIE BAR PVC DUCT 48 HRS AFTER COMPLETING TIE BAR TENSIONING AND
ANCHORAGE.
4. CONCRETE STRENGTH: AT TRANSFER OF THE TENSIONING LOAD. 28 DAY STRENGTH = 6500 P.S.I., 5200 P.S.I. MINIMUM.
5. AT THE AREA THAT INCLUDES TWO GROUPS OF DECK UNITS OF VARIOUS THICKNESSES, THE
CONTRACTOR SHALL PLACE/INSTALL A GROUP OF DECK UNITS OF EQUAL THICKNESS
DIMENSION, AND INSTALL THE CORRESPONDING TRANSVERSE POST-TENSIONING BARS PLUS
GROUTING, BEFORE PROCEEDING TO PLACE/INSTALL THE NEXT GROUP OF DECK UNITS.
ALTERNATIVELY, IT IS THE CONTRACTOR'S OPTION TO INCORPORATE ACCESS BLOCKOUTS AT
THE PT TIE-BAR ANCHORAGE LOCATIONS, MAX. BLOCKOUT WIDTH DIMENSION SHALL BE 12". THE
CONTRACTOR SHALL RETAIN SERVICES FROM QUALIFIED FLORIDA REGISTERED ENGINEERS TO
DESIGN THE MODIFICATIONS TO THE PC/PS DECK UNITS TO INCORPORATE ACCESS BLOCKOUTS.
SUBMIT SIGNED AND SEALED DRAWINGS AND CALCULATIONS FOR REVIEW AT LEAST 30
CALENDAR DAYS BEFORE FABRICATION.
FILL THE BLOCKOUTS WITH CONCRETE MIX EQUAL TO THE PC/PS DECK UNIT MIX AFTER PT
TIE-BAR INSTALLATION PLUS GROUTING IS COMPLETED. CURE CONCRETE FOLLOWING SECTION
03 30 00 REQUIREMENTS BEFORE PROCEEDING WITH DECK TOPPING PLACEMENT.
CONCRETE TOPPING AND CURB
NOT SHOWN FOR CLARITY.
3"
3"
4'-0"
1'-0" 1'-4" 1'-0"4" 4"
0 1' 2' 3'
SCALE: 3/4" = 1'-0"
4'
0 1' 2' 4'
SCALE: 1/2" = 1'-0"
6'
GROUT FILL JOINTS.
CONT. PRIOR TO
CASTING TOPPINGCONC TOPPING (4" MIN)
TO MATCH
PRECAST, PRESTRESSED
CONC DECK UNITS
SMOOTH EXTERIOR
DECK UNIT SIDE
SURFACE
REINF SIMILAR TO
INTERIOR UNITS
#4 CURB
REINFORCEMENT.
WHERE APPLICABLE,
COORDINATE WITH
PLANS. SEE DETAIL 8
ON DRAWING S-602.
VARIES
TYPICAL SECTION - EDGE UNIT
2"
1' -3
2 1/2"
TYP
15" DECK UNITS ELEVATION
15" SECTION - INTERIOR UNIT
(16) 1/2" DIA. PRE-STRESS STRANDS (4) TOP, AND
(12) BOTTOM. FULL LENGTH OF DECK UNITS. INITIAL
PRE-STRESSING FORCE = 31,000 LBS PER STRAND.
EQUALLY SPACE BOTTOM STRANDS AND REBAR.
MAINTAIN MINIMUM ON CENTER SPACING OF 2"
#5 TIES (TYP.) SEE
PLAN FOR SPACING
#5 (TYP)
14" 14"
2"
4" 4"
3" 2"
1'-0" 1'-4" 1'-0"
1' -3
3"
B S-901 S-901 3"=1'-0"
TYPICAL RECESS
6"
3"
6"
3"
6"
(4) #3 EW, TWO EACH
SIDE OF DUCT AT 3" O.C.
FILL ANNULAR SPACE WITH
NON-SHRINK CEMENT GROUT
AFTER POST-TENSIONING BARS
FILL WITH NON-SHRINK GROUT AFTER
POST-TENSIONING AND TIGHTENING NUT
A S-901 S-901 1/2"=1'-0"
TYPICAL DECK UNIT JOINT
TIE BAR (POST TENSIONING BAR): 3/4" DIA.
THREADED ROD (ASTM A615, GR. 60), HOT
DIP GALVANIZED
3" DIA. PVC DUCT, TYP.
B S-901 S-901
TOTAL DECK WIDTH = VARIES"
EDGE UNIT
H
'-6
" O R
'-3
H /2
INTERIOR UNITS = VARIES
A S-901 S-901
POST TENSIONING MULTIPLE DECK UNITS
3/4"=1'-0"
EQ. EQ. EQ.
TIE BARS
18" DECK UNITS
SPAN TOP
STRANDS
BOTTOM
STRANDS
1-2, 6-7 4 10
3 4 8
4-5 4 14
(8) #8 BARS TOTAL.
(4) TOP AND (4) BOTTOM
4'-0"
0 3" 6" 9"
SCALE: 3" = 1'-0"
1'
EQ
EQ
EQ
EQ
3" M
IN
TY
P.
INSTALL POST TENSIONING (PT) BARS
ACROSS GROUPS OF UNITS OF EQUAL
THICKNESS. OVER DECK AREAS THAT
INCLUDE DECK UNITS OF DIFFERENT
THICKNESSES, INSTALL TWO SETS OF PT
BARS, ONE SET FOR EACH GROUP OF DECK
UNITS OF EQUAL THICKNESS. SEE NOTES 3
AND 5 FOR ADDITIONAL INFORMATION.
EDGE UNIT
8" 11" 11" 11" 8"
(8) #8 BARS TOTAL.
(4) TOP AND (4) BOTTOM
8" 11" 11" 11" 8"
OPTIONAL ACCESS
BLOCKOUT. SEE NOTE 5
OPTIONAL ACCESS
BLOCKOUT. SEE NOTE 51
File details come from the government source that posted it. Updated .