About this file
This document is Addendum 5 for the Canaveral Port Authority's Cruise Terminal 5 Marine Improvements project (Project Number 25-011D, ITB-25-1), issued on July 23, 2025. The addendum modifies several technical specifications and drawings for a marine infrastructure improvement project, including updates to concrete mix types, steel plate specifications, and detailed demolition and construction plans for pier extensions, pile installations, and structural modifications. The changes affect sections related to project record documents, concrete composition, structural steel, and specific drawing replacements for drawings D-201, D-601, S-001, S-201, S-203, and S-701.
The addendum introduces modifications to concrete mix designs, specifically altering Table A in section 03 30 00 to adjust compressive strength, cementitious material quantities, and water-to-cementitious material ratios for different concrete mix types. It also updates steel plate specifications to ASTM A572, Grade 50 ksi. The document includes comprehensive technical details for pile installations, deck extensions, and marine structure improvements, with specific requirements for as-built documentation, survey measurements, and compliance with local and state environmental regulations. The project involves precise marine engineering work, including pile driving, concrete placement, and structural modifications to existing pier infrastructure.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB-25-1 Page 1 Addendum 3
CANAVERAL PORT AUTHORITY
CRUISE TERMINAL 5 MARINE IMPROVEMENTS
PN 25-011D
ITB-25-1
Addendum 5
July 23, 2025 This addendum is issued as part of the Bidding Documents for the above described project. The changes incorporated in this addendum shall be considered as a part of the Bidding Documents and shall supersede, amend, add to, clarify, or subtract from those conditions shown in the original Bidding Documents. The Bidder shall take care to coordinate modifications herein with all trades and disciplines related to the work. The Bidder shall acknowledge receipt of this addendum on their Bid Form by addendum number and date. Failure to do so may subject Bidder to disqualification.
Released Via VendorLink
12 Pages Total (including attachments)
SPECIFICATIONS
Section 01 11 16:
Replace section 1.21 E with the following.
E. RECORD DOCUMENT SUBMITTALS
1. Maintain at the site one complete set of as-built documents; protect from deterioration and loss in a secure, fire-resistive location.
a. Provide access to as-built documents for the Engineer's reference during normal working hours.
b. Label each document "PROJECT RECORD" in 2 inch high printed letters.
c. Do not use for construction purposes.
2. As-Built and Record Drawings: Refer to Section 01 78 46.
3. As-Built Specifications: Maintain one complete copy of the Project Manual, including addenda, and one copy of other written construction documents such as Field Advices, Change Orders and modifications issued in printed form during construction.
a. Mark these documents to show substantial variations in actual Work performed in comparison with the text of the Specifications and modifications.
ITB-25-1 Page 2 Addendum 5
b. Give particular attention to substitutions, selection of options and similar information on elements that are concealed or cannot otherwise be readily discerned later by direct observation.
c. Note related as-built drawing information and Product Data.
4. Record Product Data: Maintain one copy of each Product Data submittal.
a. Mark these documents to show significant variations in actual Work performed in comparison with information submitted. Include variations in products delivered to the site, and from the manufacturer's installation instructions and recommendations.
b. Give particular attention to concealed products and portions of the Work which cannot otherwise be readily discerned later by direct observation.
c. Note related Change Orders and mark-up of record drawings and Specifications.
5. Selection of As-Built Documents for Submittal: Immediately prior to the date or dates of Substantial Completion, the Contractor will meet at the site with the Engineer to determine which of the submitted Samples that have been maintained during progress of the Work are to be transmitted to the Owner for record purposes. Comply with delivery to the Owner's Sample storage area.
6. As-Built Surveys: Refer to Section 01 78 46.
7. Miscellaneous As-Built Submittals: Refer to other specification sections for requirements of miscellaneous record-keeping and submittals in connection with actual performance of the Work.
8. At contract close-out, deliver one copy and one electronic copy, in PDF format, of as-built documents to the Engineer. Accompany submittal with transmittal letter in duplicate containing the following information:
a. Date.
b. Project title and number.
c. Contractor's name and address.
d. Title and number of each Record Document.
e. Signature of Contractor or his authorized representative.
Section 01 78 46:
Add the specification section attached herewith.
ITB-25-1 Page 3 Addendum 5
Section 03 30 00:
Modify Table A in section 2.03A, as shown herewith:
Table A. Concrete Mix Types
Mix* Type
Min. 28-day Compressive Strength (f’c)
(psi)
Minimum Quantity
Cementitious Material
(lbs/cu yd)
Minimum Quantity Portland Cement
(lbs/cu yd)
Maximum Water/
Cementitious Material
Ratio
Calcium Nitrite
(gals/cuyd)
Other ** Admixtures
Slump Range
(inches)
Air Content Range
C1 6500 675 340 0.37 3.0 G 4-6 1-3
C2R 6500 675 340 0.37 4.5 G 4-6 1-3
C2T 6500 750 375 0.37 5.5 G 6-9 1-3
C3 5000 600 300 0.40 3.0 G 4-6 1-3
C5 3000 470 235 0.50 -- G 7-9 N/A
* C2T= Mix C2 Tremie Placement Method; C2R= Mix C2 Conventional Placement.
** G= Ground Granulated Blast Furnace Slag (Slag Cement).
Section 05 50 00:
Replace section 2.01 D with the following.
D. Steel Plates, Shapes and Bars: ASTM A572, Grade 50 ksi, unless otherwise noted.
DRAWINGS
Replace drawings D-201, D-601, S-001, S-201, S-203, and S-701 with the attached.
END OF ADDENDUM 5
Issued via VendorLink
By
Authority of the Canaveral Port Authority
PN-25-011D
25CPA002 01 78 46-1 ADDENDUM 5
SECTION 01 78 46
PROJECT RECORD DOCUMENTS
PART 1 - GENERAL
1.01 DESCRIPTION: The requirements covered under this Section shall include furnishing the Engineer all as-built information necessary to develop a complete set of Record Drawings for the project.
1.02 APPLICABLE CODES, STANDARDS AND SPECIFICATIONS: The Record
Drawings documentation shall be in accordance with the following codes and standards:
A. Local, County, Municipal and Utility Codes.
B. Florida Department of Environmental Protection (FDEP).
1.03 CERTIFICATIONS: The Contractor shall provide all Record Drawings with a certification to the accuracy and completeness. The as-built information submitted by the Contractor shall be determined by Florida Licensed Surveyor or Engineers.
The information shall confirm that the project was built according to the contractual plans and specifications.
PART 2 - PRODUCTS
2.01 AS-BUILT DRAWINGS - GENERAL: Contractor shall enter the information on a
"working set" of construction as-built drawings. Prior to substantial completion of the project, the Contractor shall submit the working as-built drawings to the Engineer for review. At the completion of project, Contractor shall transfer the as-built information to a clean, redlined, final set of drawings. All constructed components shall be depicted, including any revisions to the original design information. The submitted plans shall be titled “As-Built Drawings”. The final version of the As-Built drawings shall be scanned and submitted as a pdf. Coordinate specific requirements (quantity and location of measurement points, etc.) with the Engineer before the start of construction.
The As-Built drawings shall depict:
A. Location of pilings, foundations, concrete pier components, fenders, and bollards, referenced to the Florida state plane coordinate system and NAVD 88 vertical referenced datum. Include pile top and tip locations.
Highlight any installed components constructed out of tolerance.
B. Horizontal and vertical locations of underground utilities and appurtenances
25CPA002 01 78 46-2 ADDENDUM 5
referenced to referenced to the Florida state plane coordinate system and NAVD 88 vertical referenced datum. (See paragraph 2.02 for special requirements for water and force mains.)
C. Physical location of internal utilities and appurtenances concealed in construction as referenced to visible and accessible features of structure that have been surveyed and for which the required coordinates and elevations have been determined.
D. All field changes of dimension and detail.
E. Physical location of construction joints in concrete; changes in reinforcement placement.
F. Changes made by Field Advice and Change Order.
G. Contractor shall supply the Engineer with four (4) signed and stamped redlined prints for each system and a CD of “PDF” electronic files of the Drawings. As-Built drawings shall be subject to the approval of the Design Engineer and the agencies permitting the construction.
2.02 AS-BUILT DRAWINGS – MUNICIPALITIES and FDEP: The Municipalities and
FDEP must accept As-Built Drawings for all reuse water main systems, potable water main systems, sanitary sewer systems and site drainage systems before any System is allowed to be put into service. As-Builts shall be prepared and sealed by a Florida Registered Surveyor or an Engineer in accordance with the minimum technical standards for surveying as set forth by the Florida Board of Professional Surveyors and Mappers in Chapter 61G17-6 Florida Administrative Code, pursuant to Section 472.027 Florida Statutes. Preliminary As-Built drawings shall be submitted prior to substantial completion. At a minimum, the As-Built shall contain the information required within the environmental permits. Coordinate specific requirements (quantity and location of measurement points, etc.) with the Engineer before the start of construction.
A. Location of piers, berth and mooring structures, pilings, and lighting, referenced to the Florida State Plane coordinate system, North American Datum 1983 (NAD 83). Elevations shall be referenced to NAVD 88 and the Mean Low Water (MLW) reference datums.
B. As-Builts shall be drawn at a minimum scale of 1" = 100'. Areas requiring additional detail shall be enlarged as necessary.
C. Contractor shall supply the Engineer with four (4) signed and sealed black-line prints for each system and a CD of “PDF” and AutoCAD (version 2015 or later) electronic files of the Drawings. As-Built drawings shall be subject to
25CPA002 01 78 46-3 ADDENDUM 5
the approval of the Design Engineer and the agencies permitting the construction.
D. As-Builts shall be drawn at a minimum scale of 1" = 100'. Areas requiring additional detail shall be enlarged as necessary. Elevations shall be referenced to NAVD 88 and the Mean Low Water (MLW) reference datums.
PART 3 - EXECUTION
3.01 RECORDS: Any and all changes in location of components shall be recorded on the As-Built drawings daily. If the Contractor buries any materials without the required as-built data being recorded, the Contractor shall uncover the materials to the satisfaction of the Engineer so that the required data may be obtained.
A. The Contractor shall review the completed As-Built drawings and ascertain that all data furnished is accurate and represents the work installed. No Record Drawings or information shall be accepted from Subcontractors without verification by the General Contractor.
B. All costs associated with the preparation of the As-Built drawings shall be the responsibility of the General Contractor.
3.02 SUBMITTAL:
A. As-Built Drawings: The contract shall not be considered to be in Substantial Completion until the As-Built Drawings and Certifications are accepted by the Engineer and the agencies that permitted the construction. Contractor shall submit the As-Builts and Certifications to the Engineer and the Engineer will coordinate with the agencies.
END OF SECTION
X
X X
X X
X X
X X
X
X
X
X
FUEL
FU
EL
FU
EL
FU
EL
"F
U
EL
"F
U
EL
"F
U
EL
"F
UEL
"F
UEL
"F
UEL
14"FUEL14"FUEL14"FUEL14"FUEL
"W
"W
"W
"W
10"W10"W10"W10"W10"W10"W10"W10"W
"W
"W
"W
"W
"W
"W
"W
"W
8" W
8" W
8" W
"W
"W
"W
"W
8" W
8" W
8" W
8" W
8"W
8"W 8"W 8"W 8"W 8"W
8" W
8" W
8" W
X
XXXXXXXXXXXXXXX
X
XXXXXX
X X
X X X X X X
X
FUELFUELFUEL
14"FUEL14"FUEL
14"FUEL
14"FUEL14"FUEL14"FUEL14"FUEL14"FUEL14"FUEL14"FUEL14"FUEL14"FUEL14"FUEL
10"W10"W10"W
"W
"W
"W
"W
D
EM
O
LI
TI
O
N
EN
LA
R G
ED
D
EM
O
LI
TI
O N
P
LA
N
T M
O N
TE
M
AY
O
R D
Y U
G L
ED
FO
R D
G L
ED
FO
R D
7/
/2
AD
D
EN
D
U M
D
Y
TM
D-201
FILENAME: PLOT DATE: PLOT TIME:7/23/2025 1:29 PM
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
D
AT
E N
O
D
SG
N D
R R
EV
IS
IO
N
C H
K
AP
VD
BY
AP
VD
DWG
A
C R
U
IS
E
TE
R M
IN
AL
M
AR
IN
E
IM
PR
O
VE
M
EN
TS
PO
R
T C
AN
AV
ER
AL
, F
LO
R
ID
A
C an av er al P or t A ut ho rit y
C ap e C an av er al
, F lo rid a
\\brevard\Proj\PortCanaveralPortAut\25CPA002 CT5 Improvements\Drawings\002-D-201_25CPA002.dwg
EB
A
C
C A
PE
C
A N
A V
ER
A
L
FL
C H
A
LL
EN
G
ER
R
O A
D
SU
IT
E
MAY 19, 2025
BI
D
S
ET
Filename
25CPA002
JA
C
O
BS
1.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
JA
C O
BS
A
N D
IS
N
O T
TO
B
E U
SE
D
, I N
W H
O
LE
O R
IN
P
AR
T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T W
IT
H
O U
T
TH
E W
R
IT
TE
N
A U
TH
O
R
IZ
AT
IO
N O
F
JA
C O
BS
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U
M
EN
T O
F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
E, IS
T H
E
PR
O
PE
R
TY
O F
R
EU
SE
O
F D
O C
U M
EN
TS
c
0 20 40 60
SCALE: 1" = 20'
NENLARGED DEMOLITION PLAN
1"=20'
DEMOLITION KEYED NOTES:
ALL ITEMS INDICATED TO BE REMOVED/DEMOLISHED SHALL BE
DISPOSED OFFSITE (OUTSIDE PORT CANAVERAL PROPERTY) BY
CONTRACTOR. ITEMS TO BE SALVAGED ARE NOTED. OWNER WILL
INDICATE THE STORAGE LOCATION. CONTRACTOR TO INCLUDE
HAULING COST FOR SALVAGED ITEMS (MAXIMUM TRANSPORT
DISTANCE 10 MILES ROUND TRIP). CONTRACTOR SHALL NOTIFY
OWNER (CPA) WITH ADVANCE NOTICE (30 DAYS) PRIOR TO THE
START OF DEMOLITION WORKS.
A COMPLETELY REMOVE THE MONOPILE MOORING DOLPHIN,
INCLUDING BOLLARD, STEEL PILE, CONCRETE PLATFORM,
SCOUR MATTING AND/OR GROUT AT SEA BED LEVEL AND
MISCELLANEOUS STEEL COMPONENTS. SALVAGE BOLLARD
AND STEEL PILE. DISPOSE OTHER MATERIALS. SEE SECTION 4
ON DRAWING D-601. SEE REFERENCE DRAWING R-304 FOR
THE ORIGINAL DESIGN INFORMATION.
B REMOVE REINFORCED REMOVABLE CONCRETE CURB
(APPROXIMATELY 43 LINEAR FEET), MISCELLANEOUS STEEL
HARDWARE AND WOOD FRAMING. INCLUDE SAWCUTTING OF
THE EXISTING CURB AS NEEDED FOR REMOVAL. SEE DETAIL 1
ON D-601. SEE REFERENCE DRAWING R-412 FOR THE
ORIGINAL DESIGN INFORMATION.
C REMOVE REINFORCED CONCRETE CURB (APPROXIMATELY 40
LINEAR FEET), DECK CONCRETE AND MISCELLANEOUS STEEL
HARDWARE. INCLUDE SAWCUTTING OF THE EXISTING CURB
AS NEEDED FOR REMOVAL. SEE DETAIL 2 ON D-601. SEE
REFERENCE DRAWING R-203 FOR THE ORIGINAL DESIGN
INFORMATION.
D REMOVE REINFORCED CONCRETE CURB (APPROXIMATELY 20
LINEAR FEET), DECK CONCRETE AND MISCELLANEOUS STEEL
HARDWARE. INCLUDE SAWCUTTING OF THE EXISTING CURB
AS NEEDED FOR REMOVAL. SEE DETAIL 7 ON D-601. SEE
REFERENCE DRAWING R-410 FOR THE ORIGINAL DESIGN
INFORMATION.
E REMOVE AND SALVAGE ALUMINUM CATWALK. REMOVE
PRESTRESSED CONCRETE PILES, CONCRETE PILE CAPS,
WATERLINE AND CONDUIT. SALVAGE CATWALK SECTIONS.
SEE REFERENCE DRAWINGS R-404, R-405, R-501 FOR ORIGINAL
CONSTRUCTION DETAILS.
ENGINEER WILL SELECT TWO CATWALK SECTIONS TO BE
MODIFIED AND INSTALLED AT NEW LOCATION. SEE DRAWING
D-702.
F REMOVE AND SALVAGE ALUMINUM CATWALK, MISC.
HARDWARE. SALVAGE ALL THE ALUMINUM CATWALK
COMPONENTS. SEE REFERENCE DRAWINGS R-301, R-303,
R-502, R-503 FOR THE ORIGINAL DESIGN INFORMATION. SEE
DRAWING S-705 FOR MODIFICATIONS AND REINSTALLATION.
G REMOVE AND SALVAGE ALUMINUM CATWALK, MISC.
HARDWARE. SALVAGE ALL THE ALUMINUM CATWALK
COMPONENTS. SEE REFERENCE DRAWING R-205 FOR THE
ORIGINAL DESIGN INFORMATION.
H REMOVE AND SALVAGE BOLLARD. GRIND THE TOP SURFACE
OF THE CONCRETE DOLPHIN (APPROXIMATELY 560 SQ FT), 3"
MIN. DEPTH. SEE REFERENCE DRAWINGS R-405 FOR THE
ORIGINAL DESIGN INFORMATION. INCLUDE MEANS AND
METHODS OF DEMOLITION IN THE DEMOLITION PLAN.
K REMOVE FENDER. SEE REFERENCE DRAWINGS R-405 FOR THE
ORIGINAL DESIGN INFORMATION.
L REMOVE AND SALVAGE METAL LADDER. CUT BOLTS/ANCHOR
RODS FLUSH WITH CONCRETE SURFACE AND GRIND 1" DEEP.
PATCH WITH NON SHRINK GROUT. SEE REFERENCE DRAWING
R-208 FOR THE ORIGINAL DESIGN INFORMATION.
M INCLUDE DEMOLITION FOR REPAIRS TO EXISTING DECK
JOINTS. INCLUDE REMOVAL OF APPROXIMATELY 200 LINEAR
FEET OF CRACKED CONCRETE AND STEEL HARDWARE ALONG
EXISTING PIER JOINTS. COORDINATE THE LOCATION OF
REPAIRS WITH THE ENGINEER. REFER TO DETAIL CC ON D-603.
SEE REFERENCE DRAWING R-203 FOR THE ORIGINAL DESIGN
INFORMATION.
N INCLUDE DEMOLITION FOR REPAIRS TO EXISTING
REINFORCED CONCRETE CURBS. INCLUDE REMOVAL OF
APPROXIMATELY 150 LINEAR FEET OF CRACKED CONCRETE
CURBS.INCLUDE SAW CUTTING OF THE EXISTING CURBS AS
NEEDED FOR REMOVAL. COORDINATE THE LOCATION OF
REPAIRS WITH THE ENGINEER. SEE REFERENCE DRAWING
R-410 FOR THE ORIGINAL DESIGN INFORMATION.
P REMOVE EXISTING GROUTED SCOUR MAT SECTIONS AT NEW
CONCRETE AND STEEL PILE LOCATIONS. SEE SHEET NOTE 6
FOR SURVEY AND DIVE INSPECTION REQUIREMENTS. SEE
DETAIL 10 ON DRAWING D-601 FOR ADDITIONAL INFORMATION.
R DE-TERMINATE CONDUCTORS CONTINUING TO CATWALK AND
SEAL OPENING.
S DE-TERMINATE CONDUCTORS CONTINUING TO JB-5. AFTER
EXTENSION OF PIER, INSTALL NEW CONDUCTORS FROM THIS
BOX TO NEW JUNCTION BOXES AND FIXTURES.
T REMOVE TWO JUNCTION BOXES, LIGHT POLE, CONDUITS AND
CABLING. COORDINATE WITH THE ENGINEER TO EVALUATE
THE CONDITION OF JB-5. IF CPA DETERMINES THE
COMPONENTS ARE IN GOOD CONDITION, THEY SHALL BE
RE-INSTALLED. SEE DRAWING S-202 FOR ADDITIONAL
INFORMATION. SEE REFERENCE DRAWINGS R-104 THRU R-108
FOR THE ORIGINAL DESIGN INFORMATION.
U REMOVE JUNCTION BOX, LIGHT POLE, CONDUITS AND
CABLING. COORDINATE WITH THE ENGINEER TO EVALUATE
THE CONDITION OF JB-7B AND POLE. IF CPA DETERMINES THE
COMPONENTS ARE IN GOOD CONDITION, THEY SHALL BE
RE-INSTALLED. SEE DRAWING S-202 FOR ADDITIONAL
INFORMATION. SEE REFERENCE DRAWINGS R-104 THRU R-108
FOR THE ORIGINAL DESIGN INFORMATION.
LEGEND:
PHOTO NUMBER AND
ORIENTATION. SEE DRAWINGS
D-701 AND D-702
K
FACE OF
EXISTING PIER
EXISTING
BULKHEAD WALL
EXISTING WATER
LINE BELOW
EXISTING
DOLPHIN
EXISTING
CATWALK18
FACE OF
EXISTING
PIER
EXISTING
BULKHEAD WALL
SHEET NOTES:
1. REFER TO SPECIFICATION SECTION 02 41 00 FOR ADDITIONAL
INFORMATION. SUBMIT FOR REVIEW THE DEMOLITION PLAN, OUTLINING
ALL PLANNED MEANS, METHODS, AND PROCEDURES TO BE IMPLEMENTED
TO COMPLETE THE DEMOLITION WORK. SUBMIT A MIN. OF 30 CALENDAR
DAYS BEFORE THE START OF DEMOLITION WORKS.
2. LOCATION OF EXISTING STRUCTURES AND FEATURES SHOWN IS
APPROXIMATE. CONTRACTOR SHALL VERIFY ALL DIMENSIONS OF EXISTING
STRUCTURES PRIOR TO CONSTRUCTION. SUBMIT ANY DISCREPANCIES TO
THE ENGINEER FOR COORDINATION A MIN. OF 30 CALENDAR DAYS BEFORE
THE START OF DEMOLITION WORKS.
3. SEE DRAWINGS D-701 THRU D-702 SHEETS FOR EXISTING CONDITION
PHOTOGRAPHS.
4. ALL COMPONENTS DESIGNATED TO BE DEMOLISHED SHALL BE
COMPLETELY REMOVED, UNLESS REDUCED DEMOLITION EXTENTS ARE
SHOWN OR OTHER INSTRUCTIONS PROVIDED.
5. THE REINFORCED CONCRETE CURB SECTION WAS CAST MONOLITHICALLY
WITH THE PIER STRUCTURE. SEE DETAIL 3 ON DRAWING D-601.
6. THE CONTRACTOR SHALL RETAIN SERVICES OF PROFESSIONAL
SURVEYORS AND COMMERCIALLY CERTIFIED DIVERS TO ESTABLISH THE
LOCATION, EXTENTS AND INSPECT THE EXISTING GROUTED SCOUR MAT
CONDITIONS WITHIN AREAS TO RECEIVE NEW CONCRETE AND STEEL
PILES. REMOVE ALL DELETERIOUS MATERIALS THAT COULD NEGATIVELY
AFFECT PILE INSTALLATION EFFORTS. THE CONSTRUCTION BIDS SHALL
INCLUDE THE NEEDED EFFORT TO REMOVE SOIL BUILD-UP OVER THE
SCOUR MATS, TO ALLOW PROPER SURVEYS AND LOCATIONS. USE THE
SURVEY INFORMATION TO COORDINATE REMOVAL OF GROUTED SCOUR
MAT SECTIONS FOR INSTALLATION OF NEW PILES.
EXISTING FUEL
LINE BELOW
D-201 D-601
D-201 D-601
D-201 D-601
A
B
C
EXISTING FUEL LINE
UNDERGROUND
±4 0'
-0
±4 0'
-2
L
T
SE
E
SH
EE
T N
O
TE
D
±1 8'
-9
D-201 D-602
D-201 D-602
H
D-201 D-602
E 7 D-201 D-602
F
D-201 D-602
G
CC
D-201 D-603
M
CC
D-201 D-603
M
AA
D-201 D-603
N
AA
D-201 D-603
N
BB
D-201 D-603
N
BB
D-201 D-603
N
TYP TYP
TYP
TYP
D-201 D-601
TYP TYP
EXISTING
LANDBRIDGE
EXISTING
LANDBRIDGE
U
L
P
P
EXISTING SCOUR
MAT EXISTING SCOUR
MAT
EXISTING
DOLPHIN
R
S
JB-5
JB-4
T
T JB-6
JB-7B
JB-7A T
AutoCAD SHX Text S
AutoCAD SHX Text
STOP BAR
±3'-6"
MIN. ALL SIDES
INJECT EPOXY WITH
PRESSURE GUN
EXISTING GROUT FILLED
SLOPE PROTECTION MAT
EXISTING FILTER FABRIC
REMOVE EXISTING SOIL AS
NEEDED TO INSTALL NEW MAT
FLUSH AGAINST EXISTING MAT
INSTALL #8 GLASS FIBER REINFORCED
POLYMER REBAR HUGHES BROTHERS
OR EQUIVALENT 3 EQUALLY SPACED
ALONG EACH OF 4 SIDES.
DETAIL NOTE:
LEAVE REINFORCED POLYMER BAR PROTRUDING
FOR INSPECTION BEFORE SAWING.
FILL VOID WITH GRAVEL
APPROXIMATELY 52" DIA X 10'-0"
AFTER PILE EXTRACTION
INSTALL PRO SERVE,
FIBERFORM OR EQUAL, 8"
GROUTED ARTICULATED
MAT
±2 '-0
±1'-8" ±4'-0" ±4'-0" ±1'-8"
INSTALL FILTER FABRIC UNDER
GROUTED MATS, TYP.
EXISTING 52" DIA PIPE
PILE TO BE REMOVED
SAWCUT AND REMOVE
GROUT BEFORE STEEL
EXTRACTION
EXISTING
GROUTED
FABRIC MATS
ASSESSMENT OF EXISTING
CONDITIONS. SEE NOTE 3
TOP OF DECK
EL. ±9.22'
OPTIONAL FIELD CUT LINE
EL. +4.5'±
EL. -86.00'
NEW 18"
SQUARE
CONCRETE PILE
EXISTING
SCOUR MAT
SAWCUT AND REMOVE
SCOUR MAT SECTION,
±4'-0" SQUARE MAXIMUM
PRIOR TO DRIVING PILES
EQ EQ
OVERLAP
12" TYP
NEW 18"
SQUARE
CONCRETE PILE
M
IN
CONCRETE
FILL (MIX C5 IN
SPEC 03 30 00)
LC PILE
8" M
IN
EXISTING
SCOUR MAT
EXISTING 18"
SQUARE
CONCRETE PILE
EXISTING
SCOUR MAT
SAWCUT AND REMOVE
SCOUR MAT/GROUT
SECTION
SEE NOTE 6
EQ EQ
OVERLAP
12" TYP
M
IN
CONCRETE FILL AT
THE REMOVED PILE
LOCATIONS (MIX C5
IN SPEC 03 30 00)
LC PILE
8" M
IN
EXISTING
SCOUR MAT
REMOVE
BEFORE PILE
REMOVAL
D
EM
O
LI
TI
O
N
D
EM
O
LI
TI
O
N S
EC
TI
O N
A N
D D
ET
AI
LS
T M
O N
TE
M
AY
O
R
D Y
U
G L
ED
FO
R D
G L
ED
FO
R D
6/
9/
AD
D
EN
D U
M
D Y
TM
7/
/2
AD
D
EN
D
U M
D
Y
TM
D-601
FILENAME: PLOT DATE: PLOT TIME:7/23/2025 1:29 PM
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
D
AT
E N
O
D
SG
N D
R R
EV
IS
IO
N
C H
K
AP
VD
BY
AP
VD
DWG
A
C R
U
IS
E
TE
R M
IN
AL
M
AR
IN
E
IM
PR
O
VE
M
EN
TS
PO
R
T C
AN
AV
ER
AL
, F
LO
R
ID
A
C an av er al P or t A ut ho rit y
C ap e C an av er al
, F lo rid a
\\brevard\Proj\PortCanaveralPortAut\25CPA002 CT5 Improvements\Drawings\002-D-601_25CPA002.dwg
EB
C
C A
PE
C
A N
A V
ER
A
L
FL
C H
A
LL
EN
G
ER
R
O A
D
SU
IT
E
MAY 19, 2025
BI
D
S
ET
Filename
25CPA002
JA
C
O
BS
1.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
JA
C O
BS
A
N D
IS
N
O T
TO
B
E U
SE
D
, I N
W H
O
LE
O R
IN
P
AR
T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T W
IT
H
O U
T
TH
E W
R
IT
TE
N
A U
TH
O
R
IZ
AT
IO
N O
F
JA
C O
BS
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U
M
EN
T O
F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
E, IS
T H
E
PR
O
PE
R
TY
O F
R
EU
SE
O
F D
O C
U M
EN
TS
c
0 1' 2' 4'
SCALE: 1/2" = 1'-0"
6'
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
12'
D-201 D-601 1/2"=1'-0"
EXISTING REMOVABLE CURB
D-601 D-601 1/2"=1'-0"
EXTRACTION DETAIL
D-601 D-601 1/4"=1'-0"
POST EXTRACTION DETAIL
EXISTING PILE CAP
AND PILE
REMOVE REINFORCED
CONCRETE CURB,
STEEL HARDWARE,
WOOD FRAMING AND
EXPANSION JOINT
REMOVE CONCRETE AS SHOWN.
DO NOT CUT THE EXISTING
HORIZONTAL REINFORCEMENT
REMOVE REINFORCED
CONCRETE SECTION SHOWN
EXISTING PILE CAP
AND PILE
D-201 D-601 1/2"=1'-0"
EXISTING CURB
COMPLETELY REMOVE THE MONOPILE MOORING
DOLPHIN, INCLUDING BOLLARD, STEEL PILE,
CONCRETE PLATFORM, GROUT AT SEA BED
LEVEL AND MISCELLANEOUS STEEL
COMPONENTS. SEE REFERENCE DRAWING R-304
FOR THE ORIGINAL DESIGN INFORMATION.
EXISTING
PIER APPROXIMATE EXISTING
GRADE. SEE SURVEY IN
REFERENCE DRAWINGS.
SEE NOTE 3 FOR DIVE
INSPECTION
REQUIREMENTS
D-601 D-601
REPAIR
AFTER PILE
REMOVAL.
SEE DETAIL
D-601 D-601
EXISTING
CONDITIONS.
SEE DETAIL
D-201 D-601 1/4"=1'-0"
EXISTING MONOPILE SHORE DOLPHIN
PATCH EXISTING LENTON
COUPLERS WITH
NON-SHRINK GROUT
EXISTING
EXPANSION JOINT
NOTES:
1. REFER TO DEMOLITION NOTES ON DRAWING G-005 AND
SPECIFICATIONS SECTION 02 41 00 FOR ADDITIONAL
INFORMATION. REFER TO THE REFERENCE SHEETS (R-SHEETS)
FOR THE EXISTING FACILITY DRAWINGS. THE CONTRACTOR IS
RESPONSIBLE FOR VERIFYING ALL AS-BUILT CONDITIONS AND
DIMENSIONS TO BE CONSIDERED AS THE BASIS FOR THE
CONSTRUCTION BIDS.
2. ALL ELEVATIONS SHOWN ARE REFERENCED TO THE MEAN LOW
WATER REFERENCE DATUM.
3. THE CONTRACTOR SHALL RETAIN SERVICES OF COMMERCIALLY
CERTIFIED DIVERS TO INSPECT THE EXISTING CONDITIONS AT
THE PILE TO MUDLINE INTERFACE, BEFORE THE START OF THE
CONCRETE PILE REMOVAL EFFORT. REMOVE GROUT, DEBRIS AND
OTHER DELETERIOUS MATERIALS THAT COULD NEGATIVELY
AFFECT THE CONCRETE PILE REMOVAL EFFORTS.
4. SALVAGE, TRANSPORT, AND UNLOAD AT LOCATION DESIGNATED
BY THE ENGINEER. HAUL DISTANCE NOT TO EXCEED 10 MILES
ROUND TRIP.
5. EXPOSE AND CLEAN THE THREADED COUPLERS FOLLOWING THE
MANUFACTURER'S RECOMMENDATIONS. SEE DRAWING S-603 FOR
THREADED COUPLER LOAD CAPACITY VERIFICATION
REQUIREMENTS.
6. REMOVE EXISTING SCOUR MAT OR GROUT SURROUNDING THE
PILE INTERFACE AT MUDLINE. MAXIMUM EXTENTS ARE 12" EITHER
SIDE OF PILE, TYP.
REMOVE AND SALVAGE
BOLLARD. SEE NOTE 4
D-201 D-601 1/2"=1'-0"
EXISTING CURB
REMOVE AND DISPOSE
MONOPILE AND PLATFORM
R
EM
O
VE
A N
D S
AL
VA
G E
PI
PE
P
IL
E.
SE
E
N O
TE
SAW CUT AND REMOVE
THE EXISTING
CONCRETE CURB
EXISTING PILE
CAP AND PILE
±1'-0"
±2 '-9
±1'-0"
±2'-0"
±1 '-0
±2
'-2 "±3 '-2
±1'-0"
±1 '-0
D-201 D-601 1/2"=1'-0"
EXISTING CURB ON LANDBRIDGE
EXISTING HOLLOW CORE
DECK UNITS
±1'-0"
±1 '-0
SAWCUT AND REMOVE REINFORCED
CONCRETE CURB. COORDINATE
ADDITIONAL DEMOLITION OF THE
EXISTING CONCRETE TOPPPING WITH
NEW JOINT DETAIL ON DRAWING S-605
D-201 D-601 1/2"=1'-0"
MAT PROTECTION DETAIL
MAT REMOVAL
GROUT PLACEMENT
LEGEND:
LIMITS OF DEMOLITION
GRIND ANY REMAINING
EXPOSED STEEL
REINFORCEMENT ONE-INCH
DEEP, MINIMUM AND PATCH
WITH NON-SHRINK GROUT.
REMOVE END CAP AND
EXPOSE THREADED
COUPLERS. SEE NOTE 5.
GRIND ANY REMAINING EXPOSED
STEEL REINFORCEMENT ONE-INCH
DEEP, MINIMUM AND PATCH WITH
NON-SHRINK GROUT.
DO NOT CUT HORIZONTAL
REINFORCEMENT, TYP.
CUT EXISTING #4
DOWELS. GRIND
1" DEEP AND
PATCH WITH
NON-SHRINK
GROUT
APPROXIMATELY 8"
FIELD VERIFY
D-201 D-601 1/2"=1'-0"
MAT PROTECTION DETAIL
MAT REMOVAL
GROUT PLACEMENT
ST
U C
TU
R
AL
ST
R
U C
TU
R
AL
N
O
TE
S
T M
O N
TE
M
AY
ED
FO
R D
G L
ED
FO
R D
7/
/2
AD
D
EN
D
U M
D
Y
TM
S-001
DESIGN REFERENCES:
1. ACI 318-10-AMERICAN CONCRETE INSTITUTE'S "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE", 2010 EDITION.
2. AISC-AMERICAN INSTITUTE OF STEEL CONSTRUCTION'S "STEEL CONSTRUCTION MANUAL" (INCLUDING AISC
360-05), 13TH EDITION.
3. CRSI - CONCRETE REINFORCING STEEL INSTITUTE'S "MANUAL OF STANDARD PRACTICE".
4. AWS D1.1 - AMERICAN WELDING SOCIETY'S "STRUCTURAL WELDING CODE -STEEL", 2010 EDITION.
5. AWS D1.6 - AMERICAN WELDING SOCIETY'S "STRUCTURAL WELDING CODE-STAINLESS STEEL", 2007 EDITION.
6. UNIFIED FACILITIES CRITERIA 4-152-01, WITH CHANGE 1 DATED SEPTEMBER 2012., DESIGN PIERS AND WHARVES.
7. API RP 2A-WSD - AMERICAN PETROLEUM INSTITUTE'S "RECOMMENDED PRACTICE FOR DESIGNING AND CONSTRUCTING FIXED OFFSHORE PLATFORMS - WORKING STRESS DESIGN", 21ST EDITION WITH SUPPLEMENT 2, 2005.
STRUCTURAL STEEL AND STEEL PILINGS:
1. ALL STEEL WORK SHALL CONFORM TO AISC-360.
2. PROVIDE STEEL COMPONENTS IN ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS:
· PLATES AND MISCELLANEOUS STEEL = ASTM A572, GRADE 50.
· STEEL PIPE PILES = SEE NOTE 5 BELOW.
3. ALL NON STAINLESS STEEL BOLTS MUST CONFORM TO ASTM A325 UNLESS NOTED OTHERWISE.
4. ALL CONCRETE SHALL EMBEDDED ITEMS SHALL BE 316L STAINLESS STEEL UNLESS OTHERWISE NOTED.
5. PIPE PILES SHALL BE MANUFACTURED EXCEEDING REQUIREMENTS OF ASTM A252 FROM NEW COIL MEETING ASTM A1018 HSLAS, GRADE 70. WELDING SHALL FOLLOW AN APPROVED AWS D1.1 PROCEDURE SPECIFICATION WITH 100 PERCENT VISUAL INSPECTION. PIPE WALL THICKNESS INDICATED ARE MINIMUM VALUES.
THE DESIGN BASIS OF COMPONENTS SHOWN ON THE DRAWINGS ARE AS FOLLOWS:
STEEL PIPE PILING:
· MONOPILE DOLPHINS AT THE NORTH END: 72" OD x 1.00" WALL THICKNESS - LATERAL LOAD 200 MT
· MODIFIED CATWALK AT SOUTH END: 30" OD x 0.625" WALL THICKNESS
6. ALL PILES SHALL BE COATED AS PER SPECIFICATION 09 96 00. SEE DRAWINGS FOR COATING LIMITS.
7. ALL STEEL MEMBERS, BOLTS, FASTENERS AND MISC. HARDWARE SHALL BE HOT DIP GALVANIZED IN
ACCORDANCE WITH ASTM A123 AND ASTM A153 REQUIREMENTS.
CONCRETE:
1. ALL CONCRETE WORK SHALL CONFORM TO ACI 301 "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR
BUILDINGS" AND ACI 318, "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE". CONCRETE FINISHES SHALL INCLUDE A SMOOTH FORM FINISH AND 1.5 IN., 45 DEG. CHAMFERED EDGES WHEN EXPOSED TO VIEW.
PROVIDE BROOM FINISH OVER PIER DECK SURFACE.
2. ALL CEMENT SHALL CONFORM TO ASTM C150, TYPE II.
3. STRUCTURAL CONCRETE SHALL HAVE THE PROPERTIES OUTLINED IN SPECIFICATION 03 30 00 FOR A MINIMUM 28
DAY COMPRESSIVE STRENGTH OF 6,500 PSI. SEE BELOW FOR MIXED TYPE ASSIGNMENTS:
· ALL CONCRETE - MIX TYPE C2R OR C2T
4. ALL GROUT SHALL BE NON-SHRINK, NON-CORROSIVE, NON-METALLIC HAVING A MINIMUM COMPRESSIVE
STRENGTH OF 5,000 PSI, UNLESS SPECIFIED OTHERWISE.
5. CONSTRUCTION JOINT LOCATIONS SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL.
CONCRETE PILING:
1. REFER TO THE DRAWINGS AND SPECIFICATION SECTION 31 62 13 FOR REQUIREMENTS ASSOCIATED WITH
PRECAST, PRE-STRESSED CONCRETE PILES. REFER TO SPECIFICATION SECTION 31 62 17 FOR PILE TESTING REQUIREMENTS. FABRICATE, INSTALL, AND TEST CONCRETE PILES IN ACCORDANCE WITH SPECIFICATION
SECTION 31 62 13 AND 31 62 17 REQUIREMENTS
2. IT IS THE GENERAL DESIGN INTENT THAT CONCRETE PILES WILL BE DRIVEN TO THE SPECIFIED DEPTHS.
ENVIRONMENTAL PERMITS REQUIRE IMPLEMENTATION OF SOUND ATTENUATION MEASURES DURING PILE INSTALLATION IN ACCORDANCE WITH ATTACHMENT 8 OF THE DEPARTMENT OF THE ARMY, JACKSONVILLE DISTRICT CORPS OF ENGINEER (PERMIT NO. SAJ 2007-01580 (SP-JCP) SEE APPENDIX A OF THE SPECIFICATIONS.
COSTS ASSOCIATED WITH IMPLEMENTATION OF THE PERMIT REQUIREMENTS SHALL BE INCLUDED AS PART OF BIDS. THE SOUNDS ATTENUATION MEASURES APPLY TO ALL PILES LOCATED WITHIN EL +4.0' (MLW) OR LOWER
EXISTING SITE GRADING CONTOURS.
POST INSTALLED ANCHORS:
1. INSTALLATION OF ALL POST INSTALLED ANCHORS SHALL BE IN STRICT ACCORDANCE WITH THE REQUIREMENTS
ESTABLISHED BY THE PRODUCT MANUFACTURERS.
2. ANCHOR INSTALLERS SHALL RECEIVE TRAINING AND BE CERTIFIED BY THE ANCHOR MANUFACTURER FOR INSTALLATION, HANDLING AND STORAGE OF THE SPECIFIC TYPES OF ADHESIVE AND MECHANICAL PRODUCTS INDICATED ON THE CONTRACT DOCUMENTS. SUBMIT PROOF OF CERTIFICATION TO ENGINEER PRIOR TO WORK
BEING PERFORMED.
3. INSTALL ANCHORS USING ANY OF THE FOLLOWING PRODUCTS:
· HIT-RE500 V3 ADHESIVE SYSTEM BY HILTI.
· SET XP ADHESIVE SYSTEM BY SIMPSON STRONG TIE.
· AC 100+ GOLD ADHESIVE SYSTEM BY POWERS.
ALUMINUM:
1. ALUMINUM DESIGN SHALL BE IN ACCORDANCE WITH THE ALUMINUM ASSOCIATION, ALUMINUM DESIGN MANUAL, 2010 EDITION.
2. STRUCTURAL ALUMINUM SHALL BE ALLOY 6061-T6, UNLESS OTHERWISE NOTED.
3. ALUMINUM TO BE IN CONTACT WITH HARDENED CONCRETE SHALL BE COATED WITH A HEAVY APPLICATION OF ALKALI RESISTANT BITUMINOUS PAINT. ALUMINUM TO BE EMBEDDED IN CONCRETE SHALL BE GIVEN ONE COAT OF
ZINC CHROMATE PRIMER IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS.
4. ALL BOLTS USED IN ALUMINUM MEMBER CONNECTIONS SHALL BE STAINLESS STEEL AISI 316, UNLESS OTHERWISE
NOTED.
5. THE DESIGN, WORKMANSHIP, TECHNIQUES AND INSPECTION OF ALUMINUM WELDING, INCLUDING WELDER QUALIFICATIONS, SHALL CONFORM TO THE AMERICAN WELDING SOCIETY, AWS D1.2, STRUCTURAL WELDING CODE-ALUMINUM, LATEST ADOPTED EDITION. FILLER ALLOY FOR WELDING SHALL BE TYPE 5356 IN ACCORDANCE WITH AWS A.5.10. SUBMIT ALL CORRESPONDING QUALIFIED WELDING PROCEDURES AND WELDER CERTIFICATES
TO THE ENGINEER FOR REVIEW.
CONCRETE REINFORCING STEEL:
1. STEEL REINFORCING SHALL CONFORM TO:
PRESTRESSING STRANDS - ASTM A416, INCLUDING SUPPLEMENTARY REQUIREMENT S1 "LOW-RELAXATION" WIRE
AND RELAXATION TESTING.
MILD REINFORCING - ASTM A615, GRADE60 (DEFORMED)
2. MINIMUM CONCRETE COVER UNLESS NOTED OTHERWISE:
· EXPOSED TO SEAWATER = 4 IN.
· ELSEWHERE = 3 IN.
3. MILD REINFORCING BAR DETAILS INCLUDING HOOKS AND LAP SPLICES SHALL CONFORM TO ACI 318 AND ACI 315, UNLESS NOTED OTHERWISE. SUBMIT SHOP DRAWINGS FOR REVIEW BY ENGINEER PRIOR TO FABRICATION.
4. ALL HOOKS SHOWN SHALL BE STANDARD HOOKS UNLESS DIMENSIONED OTHERWISE.
5. MILD REINFORCEMENT SPLICES SHALL BE CLASS "B" TENSION UNLESS SHOWN OTHERWISE. LAP SPLICES IN BEAMS SHALL BE STAGGERED AT LEAST TWICE THE REQUIRED SPLICE LENGTH AND HAVE NO MORE THAN 50 PERCENT OF THE REINFORCEMENT SPLICED IN ANY ONE LOCATION. SUBMIT SPLICE LOCATIONS FOR APPROVAL
PRIOR TO FABRICATION.
6. WELDING MUST BE PERFORMED IN ACCORDANCE WITH AMERICAN WELDING SOCIETY CODE DOCUMENTS:
· AWS D1.4 STRUCTURAL WELDING CODE - REINFORCING STEEL LATEST EDITION.
7. EXCEPT AS OTHERWISE SHOWN, ALL HOOKS SHALL BE OF ACI STANDARD DIMENSIONS AND ALL LAP SPLICES SHALL BE ACI 318 CLASS "B" TENSION SPLICES. MECHANICAL. CONNECTORS SHALL DEVELOP 125% OF SPECIFIED YIELD STRENGTH OF BAR IN TENSION OR COMPRESSION, AS CONFIRMED BY TESTS AND CODE APPROVED
CERTIFICATIONS SATISFACTORY TO THE ENGINEER.
WELDING:
1. ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS. ALL WELDED CONNECTIONS SHALL BE PRE-
QUALIFIED IN ACCORDANCE WITH AWS D1.1, D1.2, D1.4, OR D1.6. SUBMIT THE CORRESPONDING QUALIFIED
WELDING PROCEDURES AND WELDER CERTIFICATIONS.
2. ALL ELECTRODES SHALL BE E70XX FOR CARBON STEEL, AND 316L ELECTRODES FOR STAINLESS STEEL UNLESS
OTHERWISE NOTED.
3. ALL WELDED STAINLESS SHALL BE TYPE 316L AND SHALL BE CLEANED IN ACCORDANCE WITH ASTM A-380 AFTER
FABRICATION.
FILENAME: PLOT DATE: PLOT TIME:7/23/2025 1:29 PM
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
D
AT
E N
O
D
SG
N D
R R
EV
IS
IO
N
C H
K
AP
VD
BY
AP
VD
DWG
A
C R
U
IS
E
TE
R M
IN
AL
M
AR
IN
E
IM
PR
O
VE
M
EN
TS
PO
R
T C
AN
AV
ER
AL
, F
LO
R
ID
A
C an av er al P or t A ut ho rit y
C ap e C an av er al
, F lo rid a
\\brevard\Proj\PortCanaveralPortAut\25CPA002 CT5 Improvements\Drawings\004-S-001_25CPA002.dwg
EB
C
C A
PE
C
A N
A V
ER
A
L
FL
C H
A
LL
EN
G
ER
R
O A
D
SU
IT
E
MAY 19, 2025
BI
D
S
ET
Filename
25CPA002
JA
C
O
BS
1.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
JA
C O
BS
A
N D
IS
N
O T
TO
B
E U
SE
D
, I N
W H
O
LE
O R
IN
P
AR
T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T W
IT
H
O U
T
TH
E W
R
IT
TE
N
A U
TH
O
R
IZ
AT
IO
N O
F
JA
C O
BS
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U
M
EN
T O
F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
E, IS
T H
E
PR
O
PE
R
TY
O F
R
EU
SE
O
F D
O C
U M
EN
TS
c
X X
X
X
X
X
ST
R
U C
TU
R
AL
EN
LA
R G
ED
T
O P
O F
ST
R
U C
TU
R
E
PL
AN
SO
U
TH
E
N D
T M
O N
TE
M
AY
O
R D
Y U
G L
ED
FO
R D
G L
ED
FO
R D
7/
/2
AD
D
EN
D
U M
D
Y
TM
S-202
FILENAME: PLOT DATE: PLOT TIME:7/23/2025 1:29 PM
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
D
AT
E N
O
D
SG
N D
R R
EV
IS
IO
N
C H
K
AP
VD
BY
AP
VD
DWG
A
C R
U
IS
E
TE
R M
IN
AL
M
AR
IN
E
IM
PR
O
VE
M
EN
TS
PO
R
T C
AN
AV
ER
AL
, F
LO
R
ID
A
C an av er al P or t A ut ho rit y
C ap e C an av er al
, F lo rid a
\\brevard\Proj\PortCanaveralPortAut\25CPA002 CT5 Improvements\Drawings\004-S-201_25CPA002.dwg
EB
C
C A
PE
C
A N
A V
ER
A
L
FL
C H
A
LL
EN
G
ER
R
O A
D
SU
IT
E
MAY 19, 2025
BI
D
S
ET
Filename
25CPA002
JA
C
O
BS
1.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
JA
C O
BS
A
N D
IS
N
O T
TO
B
E U
SE
D
, I N
W H
O
LE
O R
IN
P
AR
T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T W
IT
H
O U
T
TH
E W
R
IT
TE
N
A U
TH
O
R
IZ
AT
IO
N O
F
JA
C O
BS
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U
M
EN
T O
F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
E, IS
T H
E
PR
O
PE
R
TY
O F
R
EU
SE
O
F D
O C
U M
EN
TS
c
NOTES:
1. ALL ELEVATION VALUES SHOWN ARE BASED ON THE MEAN LOW WATER (MLW)
REF DATUM, UNO.
2. REFERENCE POINT COORDINATES ARE AS FOLLOWS, DEFINE UNITS OF US FEET:
NORTHING EASTING
REF POINT 5 1484127.59 776469.54
REF POINT 6 1483977.59 776470.29
REF POINT 7 1483977.39 776430.14
REF POINT 8 1484127.20 776429.37
COORDINATES ARE BASED UPON NAD '83 STATE PLANE COORDINATES,
FLORIDA EAST ZONE 901. THE CONTRACTOR SHALL FIELD VERIFY ALL
COORDINATES BEFORE THE START OF CONSTRUCTION AND SUBMIT THE
COORDINATES TO THE ENGINEER FOR REVIEW BEFORE PROCEEDING
WITH ANY PORTION OF THE WORK.
3. REFER TO THE GENERAL NOTES AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION REGARDING STRUCTURAL SYSTEMS; INCLUDING MARINE
FENDERING AND MOORING FIXTURES.
4. SECTIONS AND DETAILS ARE TYPICAL UNLESS OTHERWISE NOTED.
5. THE CONTRACTOR SHALL RETAIN SERVICES OF PROFESSIONAL SURVEYORS
AND COMMERCIALLY CERTIFIED DIVERS TO ESTABLISH THE LOCATION, EXTENTS
AND INSPECT THE EXISTING GROUTED SCOUR MAT CONDITIONS WITHIN AREAS
TO RECEIVE NEW CONCRETE AND STEEL PILES. REMOVE ALL DELETERIOUS
MATERIALS THAT COULD NEGATIVELY AFFECT PILE INSTALLATION EFFORTS.
THE CONSTRUCTION BIDS SHALL INCLUDE THE NEEDED EFFORT TO REMOVE
SOIL BUILD-UP OVER THE SCOUR MATS, TO ALLOW PROPER SURVEYS AND
LOCATIONS. USE THE SURVEY INFORMATION TO COORDINATE REMOVAL OF
GROUTED SCOUR MAT SECTIONS FOR INSTALLATION OF NEW PILES.
6. ON CRUISE SHIP DAYS, THE CONTRACTOR SHALL PROVIDE ACCESS TO THE
SOUTH MOORING DOLPHINS FOR CPA MOORING LINE HANDLING CREWS.
SUGGESTED ACCESS: POSITION A SPUD BARGE BETWEEN THE BULKHEAD WALL
AND THE NEAREST MOORING DOLPHIN. USE THE REMOVED SECTIONS OF THE
EXISTING CATWALKS THAT ARE NOT BEEN REUSED, TO BRIDGE BETWEEN THE
BARGE AND THE BULKHEAD WALL AND BETWEEN THE BARGE AND THE MOORING
DOLPHIN.
THE ACCESS REQUIREMENTS SHALL INCLUDE ADEQUATE LIGHTING IN
COMPLIANCE WITH OSHA REQUIREMENTS. SUBMIT ACCESS PLANS FOR
APPROVAL BY CPA. REFER TO THE SPECIFICATIONS, APPENDIX C FOR THE
CRUISE VESSEL SCHEDULE INFORMATION.
ENLARGED TOP OF STRUCTURE PLAN - SOUTH END
1"=20'
N
REFERENCE
POINT 5
FACE OF EXISTING
BULKHEAD WALL
EXISTING PIER
EXISTING MOORING
DOLPHIN AND CATWALK
0 20 40 60
SCALE: 1" = 20'
KEYED NOTES:
A CONSTRUCT THE PILE SUPPORTED CONCRETE PIER EXTENSION. SEE
ENLARGED PLANS ON DRAWING S-204 FOR ADDITIONAL INFORMATION.
B INSTALL NEW FOAM FILLED FENDERS, TYPICAL 3 PLACES TOTAL. SEE
DRAWING S-801.
C INSTALL 125 METRIC TON BOLLARD, TYPICAL 3 PLACES TOTAL. SEE
DRAWING S-802.
D ALUMINUM CATWALK ON PILE SUPPORTED CONCRETE STRUCTURE.
SEE DRAWING S-702.
E INSTALL SALVAGED LADDER. SEE DRAWING S-904 FOR NEW ANCHOR
RODS AND NON-SKID PAINT.
F INSTALL MODIFIED CATWALK.
G CONSTRUCT NEW 12" SQUARE REINFORCED CONCRETE CURB. SEE
DETAIL 10 ON DRAWING S-605.
H EXISTING DECK JOINT REPAIRS. INCLUDE 200 LINEAR FEET OF
EXISTING JOINT REPAIRS. COORDINATE THE LOCATION AND EXTENT
OF REPAIRS AT EACH LOCATION WITH THE ENGINEER. REFER TO
DRAWING D-603. SEE REFERENCE DRAWING R-203 FOR THE ORIGINAL
DESIGN INFORMATION.
J THE CONSTRUCTION BIDS SHALL INCLUDE EXISTING REINFORCED
CONCRETE CURB REPAIRS. INCLUDE 150 LINER FEET OF CONCRETE
CURB REPAIRS. COORDINATE THE LOCATION AND EXTENTS OF
REPAIRS WITH THE ENGINEER. REFER TO DRAWING D-603. SEE
REFERENCE DRAWINGS R-203, R-412 FOR THE ORIGINAL DESIGN
INFORMATION.
K INSTALL ULTRA-HIGH MOLECULAR WEIGHT POLYETHYLENE (UAMW-PE)
STRIPS, APPROX. DIMENSIONS 2" x 6" x 72" AS MANUFACTURED BY
TRELLEBORG FOR THE SPECIFIED FOAM-FILLED FENDERS. INCLUDE
COST OF HARDWARE AND POST-INSTALLED ADHESIVE ANCHOR
INSTALLATION INTO HARDENED CONCRETE. INSTALL AT 15 EXISTING
FENDER LOCATIONS, THREE (3) STRIPS EACH. INSTALL IN
ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
L THE CONSTRUCTION BIDS SHALL INCLUDE ENGINEERING DESIGN,
PROCUREMENT AND INSTALLATION OF SOLAR-POWERED LIGHTING
SYSTEM OVER THE SOUTH PIER EXTENSION DECK AREAS. THE
LIGHTING DESIGN SHALL BE IN COMPLIANCE WITH THE CURRENT
EDITION OF THE FLORIDA BUILDING CODE, OSHA ILLUMINATION AND
THE CANAVERAL PORT AUTHORITY EXTERIOR LIGHT MANAGEMENT
PLAN. REFER TO SPECIFICATION SECTION 01 11 16 FOR ADDITIONAL
INFORMATION.
M COORDINATE WITH THE ENGINEER TO EVALUATE THE CONDITION OF
JUNCTION BOXES JB-5, JB-7B, AND THE LIGHT POLE. IF CPA
DETERMINES THE COMPONENTS ARE IN GOOD CONDITION, THEY
SHALL RE-INSTALLED, OTHERWISE, PROCURE AND INSTALL NEW
SIMILAR COMPONENTS . THE CONTRACTOR SHALL RETAIN SERVICES
FROM QUALIFIED ENGINEERS TO SPECIFY THE NEW ELECTRIC
SYSTEM MATERIAL AND INSTALLATION REQUIREMENTS AND SPECIFY
THE COMPOSITION OF ALL NEW ELECTRIC CIRCUITS. SUBMIT THE
DESIGN PACKAGE FOR REVIEW BY THE ENGINEER BEFORE
PURCHASING MATERIALS. ALL WORK SHALL BE IN ACCORDANCE WITH
THE FLORIDA BUILDING CODE LATEST ADOPTED EDITION.
N INSTALL NEW LADDER. SEE DRAWING S-904.
C S-202 S-204
REFERENCE
POINT 6
REFERENCE
POINT 7
REFERENCE
POINT 8
150'-0"
'-2
F
APPROXIMATE OUTLINE OF
EXISTING SCOUR MAT
EXISTING MOORING
DOLPHIN
C S-202 S-705
D S-202 S-204
B CA
D
E
F S-202 S-904
73'-0" 60'-0"
11'-0" 11'-0"
G
B S-202 S-702
J
H
K
TYP
EXISTING MOORING
DOLPHIN
TYP
EXISTING
PILE CAP
±7'-9"
±8'-6"
SURVEY AND DIVE INSPECTION
OF THE EXISTING GROUTED
SCOUR MATS. SEE NOTE 5 FOR
REQUIREMENTS
N
F S-202 S-904
TYP
TEMPORARY ACCESS TO
MOORING DOLPHIN. SEE NOTE 6
L
M
'-1
'-1
23'-0"JB-4 (1) 1" C
JB-7B
OR NEW
(1) 1" CJB-5 OR
NEW
AutoCAD SHX Text S
LC PILE
CAP
LC PILE
CAP
LC EXISTING
PILE CAP
(APPROXIMATE)
LC PILE
CAP
LC PILE
CAP
LC EXISTING
PILE CAP
(APPROXIMATE)
LC BATTERED
PILE
LC BENT/PILE CAP
LC BATTERED
PILE
LC BENT/PILE CAP
LC BATTERED
PILE
ST
R
U C
TU
R
AL
EN
LA
R G
ED
D
EC
K
AN
D
P
IL
E
PL
AN
N O
R
TH
E N
D T
M O
N
TE
M
AY
O R
D Y
U G
L
ED
FO
R
D G
L
ED
FO
R
D
6/
9/
AD
D
EN
D U
M
D Y
TM
7/
/2
AD
D
EN
D
U M
D
Y
TM
S-203
FILENAME: PLOT DATE: PLOT TIME:7/23/2025 1:29 PM
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
D
AT
E N
O
D
SG
N D
R R
EV
IS
IO
N
C H
K
AP
VD
BY
AP
VD
DWG
A
C R
U
IS
E
TE
R M
IN
AL
M
AR
IN
E
IM
PR
O
VE
M
EN
TS
PO
R
T C
AN
AV
ER
AL
, F
LO
R
ID
A
C an av er al P or t A ut ho rit y
C ap e C an av er al
, F lo rid a
\\brevard\Proj\PortCanaveralPortAut\25CPA002 CT5 Improvements\Drawings\004-S-203_25CPA002.dwg
EB
C
C A
PE
C
A N
A V
ER
A
L
FL
C H
A
LL
EN
G
ER
R
O A
D
SU
IT
E
MAY 19, 2025
BI
D
S
ET
Filename
25CPA002
JA
C
O
BS
1.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
JA
C O
BS
A
N D
IS
N
O T
TO
B
E U
SE
D
, I N
W H
O
LE
O R
IN
P
AR
T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T W
IT
H
O U
T
TH
E W
R
IT
TE
N
A U
TH
O
R
IZ
AT
IO
N O
F
JA
C O
BS
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U
M
EN
T O
F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
E, IS
T H
E
PR
O
PE
R
TY
O F
R
EU
SE
O
F D
O C
U M
EN
TS
c
N
EXISTING PIER
SCALE: 1" =
10 20 30
10'
N
5 4 3
2 26
2 SPACE AT 10'-0" = 20'-0"3 SPACE AT 10'-0" = 30'-0"
SP
AC
ES
A T
7' -0
6' -0
TY
P.
'-0
2'
-0
2'-0"
EXISTING PILE
CAP AND PILES
SPAN 1 = 30'-0" SPAN 2 = 28'-0"
'-0
EXISTING DECK
UNITS
SL
O
PE
SL
O
PE
PILE CHART
PILE
TYPE
PILE
NUMBER
CUT-OFF
ELEVATION
DESIGN
TIP
ELEV
BATTER
18" SQ.,
VERTICAL 1-5 EL. 0.85' EL. -100' NONE
18" SQ.,
VERTICAL 6-23 EL. +2.85' EL. -100' NONE
18" SQ.,
BATTERED 27-36 EL. +2.85' EL. -100' 3H : 12V
18" SQ.,
BATTERED 24, 25 EL. +2.85' EL. -100' 1.5H : 12V
18" SQ.,
BATTERED 26 EL. 0.85' EL. -100' 1.5H : 12V
TABLE 1 - TEST PILE PROGRAM
TEST
PILE
NO.
PILE
TYPE
PILE WORKING
AXIAL LOADS
PILE ULTIMATE
AXIAL LOADS
TARGETED FOR
PDA TESTING
DESIGN
TIP ELEV COMMENTS
TP1, TP2 18" SQ.,
VERTICAL 230 KIPS COMPRESSION 460 KIPS COMPRESSION EL. -100' NEGLIGIBLE
TENSION
TP3 18" SQ.,
BATTERED
184 KIPS COMPRESSION
22 KIPS TENSION
368 KIPS COMPRESSION
55 KIPS TENSION EL. -100'
INCLUDE PDA TESTING OF ONE 72" DIA. STEEL MONOPILE. THE PILE LOCATION AND TESTING REQUIREMENTS WILL BE CONFIRMED BY THE ENGINEER, AFTER REVIEW OF THE CONTRACTOR'S PILE INSTALLATION PLAN.
A S-203 S-603
S-203 S-401
S-203 S-602
S-203 S-6033
S-203 S-602
S-203 S-602
TP2
A S-201 S-203 1"=10'
ENLARGED PLAN - NORTH PIER DECK
B S-201 S-203 1"=10'
ENLARGED PLAN - NORTH PIER PILES
60'-0"
2' -0
60'-0"
S-203 S-603
5'-0" 4 SPACES AT 5'-0" = 20'-0" 5'-0" 4 SPACES AT 5'-0" = 20'-0"
±5'-1"
13 20
19 21
S-203 S-601
TYP
S-203 S-605
DECK CONSTRUCTION.
SEE NOTE 7
±2'-0 9/16"
FIELD VERIFY
NEW TOPPING
AGAINST EXISTING
TOPPING INTERFACES.
SEE NOTE 7
REINFORCED
CONCRETE PILE CAP
BELOW
B S-203 S-603
4'-0"
4'-0"
4'-0"
5'-0"
'-0
4'
-0
TP3
TP1
2' -0
SP
AC
ES
AT
'-0
4'
-0
4' -0
±8'-0"
26'-0"30'-0"
TP#
TEST PILE PROGRAM NOTES:
1. ALL TEST PILES SHALL BE USED AS PRODUCTION PILES,
AND SHALL BE DRIVEN IN THE POSITION OF PRODUCTION
PILES AT THE DESIGNATED LOCATIONS.
2. REFER TO "DYNAMIC PILE LOAD TESTING AND VIBRATION
MONITORING", SPECIFICATION SECTION 31 62 17 FOR
DETAILS OF THE TEST PILE INSTALLATION AND TESTING,
INCLUDING PDA TESTING.
3. TEST PILES SHALL BE INSTALLED TO THE DEPTHS
INDICATED BY THE DESIGN TIP ELEVATIONS ON TABLE 1.
PILE EMBEDMENT WILL BE CONFIRMED BY THE TEST PILE
PROGRAM. ANY CHANGES TO THE REQUIRED PILE TIP EL
SHALL BE ISSUED IN WRITING BY THE ENGINEER, BEFORE
PRODUCTION PILES ARE ORDERED.
4. INDICATES TEST PILE LOCATION.
NOTES:
1. ALL ELEVATION VALUES SHOWN ARE BASED ON THE
MEAN LOW WATER (MLW) REFERENCE DATUM, UNO.
2. PILING REQUIREMENTS:
INDICATES VERTICAL PILES
INDICATES BATTERED PILES. ARROW POINTS IN THE
BATTER DIRECTION.
CONSTRUCTION BIDS SHALL BE BASED ON THE PILING
INFORMATION AND DIMENSIONS PRESENTED HEREIN.
OWNER WILL CONSIDER VALUE ENGINEERING CHANGES
TO PILE DIMENSIONS AFTER COMPLETION OF THE PILE
TESTING PROGRAM. REFER TO SPECIFICATIONS 31 62 13
AND 31 62 17 FOR ADDITIONAL INFORMATION.
3. PILE LOCATIONS AND DIMENSIONS ARE TO THE CENTER
OF THE PILE AT THE PILE CUT-OFF ELEVATION.
CONTRACTOR SHALL DETERMINE PILE LENGTHS BASED
ON THE CUT-OFF ELEVATION, DESIGN TIP ELEVATION AND
BATTER SHOWN IN THE PILE CHART. ALL PILES SHALL BE
ANCHORED WITH FULLY TENSION DEVELOPED STEEL
REINFORCEMENT INTO RESPECTIVE PILE CAPS.
4. THE CONTRACTOR SHALL FIELD VERIFY THE EXISTING
AND NEW CONSTRUCTED DECK SPAN DIMENSIONS
BEFORE ORDERING AND FABRICATING THE PC/PS REINF.
CONCRETE DECK UNITS. NOTIFY THE ENGINEER OF ANY
DIMENSION DISCREPANCIES. PROVIDE THE DECK
BEARING DIMENSIONS SHOWN, INCLUDING CONT.
NEOPRENE BEARING PADS OVER ALL BEARING CONTACT
AREAS.
5. THE CONTRACTOR SHALL SUBMIT FOR REVIEW THE
LAYOUT OF ALL PROPOSED CONSTRUCTION JOINTS,
(INCLUDING PILE CAPS AND TOPPING), AT LEAST 14
CALENDAR DAYS BEFORE SUBMISSION OF THE
CORRESPONDING REINFORCEMENT SHOP DRAWINGS.
ANY COMMENTS AND MODIFICATIONS NOTED BY THE
ENGINEER SHALL BE INCORPORATED INTO
REINFORCEMENT SHOP DRAWINGS BEFORE SUBMISSION
FOR REVIEW.
6. SEE DRAWING S-201 FOR REFERENCE POINT
COORDINATES.
7. THE PIER DECK SYSTEM CONSISTS OF 15" AND 18"
THICKNESS PC/PS CONCRETE DECK UNITS AND
REINFORCED CONCRETE TOPPING (COMPOSITE).
REINFORCE TOPPING WITH #4 BARS SPACED 12" OC, TOP,
EW. REFER TO SPECIFICATION SECTION 03 41 13 AND
DRAWING S-901 FOR ADDITIONAL INFORMATION.
THE DESIGN INTENT IS FOR NEW TOPPINGS AGAINST
EXISTING PIER DECK SECTIONS TO MATCH THE EXISTING
TOP SURFACE PROFILE. THE CONTRACTOR SHALL RETAIN
SERVICES FROM FLORIDA REGISTERED SURVEYORS TO
MEASURE AND ESTABLISH THE EXISTING PIER DECK TOP
SURFACE PROFILE ALONG THE INTERFACES. SUBMIT THE
SURVEY INFORMATION FOR REVIEW BY THE ENGINEER
BEFORE PROCEEDING WITH THE NEW TOPPING
CONCRETE PLACEMENT.
8. REFER TO THE STRUCTURAL NOTES ON DRAWING S-001
AND DETAIL DRAWINGS S-902 FOR THE PILING
REQUIREMENT AND DESIGN INFORMATION.
4' -0
±2'-1"
FIELD VERIFY
7' -0
5'
-0
4' -0
2'
-0
REFERENCE
POINT 2
REFERENCE
POINT 1
REFERENCE
POINT 3
REFERENCE
POINT 4
31 32
TOP OF PILE CAPS,
EL. +6.60', UNO
HATCH INDICATES REINFORCED
CONCRETE TOPPING WITH SLOPED
TOP SURFACE PROFILE, CONT.
OVER THE PIER EXTENSION AREA.
SEE PLANS AND NOTE 7.
5' -0
HIGH POINT PIER
DECK TOPPING
EL. +8.63'±
LOW POINT PIER
DECK TOPPING
EL. +8.29'± LOW POINT PIER
DECK TOPPING
EL. +8.29'±
LOW POINT PIER
DECK TOPPING
EL. +8.42'±
LOW POINT PIER
DECK TOPPING
EL. +8.54'±
LOW POINT PIER
DECK TOPPING
EL. +8.60'±
2' -0
/2
/2
LC BATT.
PILE
LC BATT.
PILE
11 1/2"
11 1/2"
/2
SLOPE
(9) 18" THICK x 48" WIDE = 36'-0"
PC/PS CONC
DECK UNITS (SEE NOTE 4)
'-0
'-0
HIGH POINT
CONSTRUCT SHALLOW
REMOVABLE CURB AT
INTERFACE WITH LADDER
PILE CAP
SLOPE
(9) 18" THICK x 48" WIDE = 36'-0"
PC/PS CONC
DECK UNITS (SEE NOTE 4)
(5) 15" THICK x 48" WIDE = 20'-0"
PC/PS CONC
DECK UNITS (SEE NOTE 4)
(5) 15" THICK x 48" WIDE = 20'-0"
PC/PS CONC
DECK UNITS (SEE NOTE 4)
EXISTING BATTERED PILE
APPROXIMATE PROJECTION
BELOW, TYP
INSTALL ONE DRAIN SCUPPER
WITHIN 12" OF THE DECK
TOPPING LOW POINT. SEE
DETAIL 8 ON DRAWINGS S-602
INSTALL DOUBLE #4 TIES AT 12" OC,
PER DETAIL 3 ON SHEET S-603 OVER
THE LENGTH OF 15'-0". ALL OTHER PILE
CAP BEAM REINFORCEMENT PER
DETAIL 4 ON SHEET S-604.
1/2
5/16
1/4
7" 2"
24"
1'-0" 4'-0" 1'-0"4'-0"
5' -0
1' -0
5' -0
1" SOFFIT
PLATE. SEE
NOTE 6
5'-0" 5'-0"
2" SCH 40 ROPE GUARD
COPING. HOT DIP GALV.
200 METRIC TON CAST
STEEL T-HEAD BOLLARD.
1" MIN.
NON-SHRINK
GROUT
1/4
PROVIDE POUR STOP
OR FILL WITH SAND
HINGED ALUM. LUG
PATTERN SAFETY PLATE.
SEE SECTION BELOW
CONCRETE DECK HEAVY
BROOM FINISH
BULKHEAD WALL
ENCASEMENT/CURB
1/2"x24"x8'-0" ALUM. CHK'D
PLATE BEVEL EDGES
STAINLESS STEEL
HINGE (4 TOTAL)
GREASE PIN. 1/2" S.S.
FLAT HEAD BOLTS. 1/2"
S.S. BOLTS INTO
FASCIA PLATE. DRILL
AND TAP FASCIA PLATE
EL. +9.42' (VERIFY IN FIELD)
(TOP OF WALL ENCASE.)
EL. +9.69' (TOP OF
FASCIA PLATE)
SEE NOTE 4
72" O.D.x1" W.T. STEEL PIPE PILE
L6x6x1/2
4' -0
M
IN
1"x9" CONT.
FASCIA PLATE.
SEE NOTE 6
AFTER INSTALLATION OF BOLLARD FILL
ALL COUNTERSUNK HOLES WITH
NEOPRENE SEALANT (NO PROJECTION)
LC PIPE PILE
LC PIPE PILE
ALIGN BOLLARD CENTER WITH
THE CENTER OF PIPE PILE
LC PIPE PILE
PROVIDE NUTS AND 4" SQ x 1/2"
STEEL PLATE WASHERS, EACH
ANCHOR ROD.
VARIES. FIELD CUT
BAR ENDS TO FIT
(2) #4 HOOP
AT 12"
#5 AT 5"± SPACED RADIALLY
ALONG MONOPILE, EQUALLY
(32 TOTAL)
3" C
O N
C R
ET
E
C O
VE
R
, T
YP
SLOPE 1/2"
PER FT
SLOPE 1/2"
PER FT
(7) #4 AT 12"
EXISTING
BULKHEAD WALL
EXISTING SLOPE
PROTECTION
MAT. SEE NOTE 1
EL. +5.0' ±
SEE NOTE 3
MONOPILE DOLPHIN.
SEE DRAWING S-201
OPTIONAL FIELD SPLICE
FULL PENETRATION WELD
EL. 0.00' (MLW)
72" O.D.x1" WALL THICKNESS
EL. +9.69'
SEE NOTE 4
EL. -15.0'
AP
PL
Y C
O
AT
IN
G
PE
R
S
PE
C
IF
IC
AT
IO
N
EL. -85.00'
'-0
NEW SECOND MAT LAYER. SEE
NOTE 2. (ALLOWED TO SLIDE 6")
CUT & SEW SECOND LAYER OF MAT TO FIT
TIGHTLY AROUND MONOPILE. SEAL WITH
CONCRETE (MIX C5 IN SPEC 03 30 00)
CUT AND REMOVE 8" EXISTING MAT. SEE
NOTE 1. FILL WITH 1" GRAVEL AFTER
DRIVING PILE
EXISTING FILTER FABRIC
PRIMARY LAYER
PROVIDE SECOND LAYER OF
FILTER FABRIC WITH LAP JOINT
ORIENTATED 90° TO PRIMARY
LAYER'S JOINT
3'-6"
ALL AROUND
1'-0"
ALL ROUND
TYP.
3/8
APPROXIMATE LOCATION OF
THE HOLES TO RECEIVE
BOLLARD ANCHORS. PROVIDE
HOLES WITH DIAMETER
DIMENSION 1/8" LARGER THAN
THE ANCHOR BOLT OD. SEE
NOTE 5.
L6x6x1/2 (TYP.)
TYP.
3/8
8"
8"
1/2" PLATE
3/8
TYP.
TYP.
±1'-2 7/8"
±1'-2 7/8"
±1 '-2
1/
±9
/4
DETAIL NOTE:
* VERIFY WITH BOLLARD BOLT PATTERN.
COORDINATE ALL DIMENSIONS AND SUBMIT
STEEL FRAMING SHOP DRAWINGS. FOR REVIEW
BEFORE FABRICATION.
LC PIPE PILE
LC PIPE PILE
ST
R
U C
TU
R
AL
M O
N O
PI
LE
M O
O R
IN
G
D O
LP
H
IN
T M
O N
TE
M
AY
ED
FO
R D
G L
ED
FO
R D
6/
9/
AD
D
EN
D U
M
D Y
TM
7/
/2
AD
D
EN
D
U M
D
Y
TM
S-701
S-701 S-701 1/2"=1'-0"
SECTION
FILENAME: PLOT DATE: PLOT TIME:7/23/2025 1:29 PM
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
PROJ
DATE
D
AT
E N
O
D
SG
N D
R R
EV
IS
IO
N
C H
K
AP
VD
BY
AP
VD
DWG
A
C R
U
IS
E
TE
R M
IN
AL
M
AR
IN
E
IM
PR
O
VE
M
EN
TS
PO
R
T C
AN
AV
ER
AL
, F
LO
R
ID
A
C an av er al P or t A ut ho rit y
C ap e C an av er al
, F lo rid a
7/23/2025 1:29:18 PM004-S-701_25CPA002.dwg\\brevard\Proj\PortCanaveralPortAut\25CPA002 CT5 Improvements\Drawings\004-S-701_25CPA002.dwg
EB
C
C A
PE
C
A N
A V
ER
A
L
FL
C H
A
LL
EN
G
ER
R
O A
D
SU
IT
E
MAY 19, 2025
BI
D
S
ET
Filename
25CPA002
JA
C
O
BS
1.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
JA
C O
BS
A
N D
IS
N
O T
TO
B
E U
SE
D
, I N
W H
O
LE
O R
IN
P
AR
T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T W
IT
H
O U
T
TH
E W
R
IT
TE
N
A U
TH
O
R
IZ
AT
IO
N O
F
JA
C O
BS
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U
M
EN
T O
F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
E, IS
T H
E
PR
O
PE
R
TY
O F
R
EU
SE
O
F D
O C
U M
EN
TS
c
A S-201 S-701 1/2"=1'-0"
PLAN AT ELEV. +8.61'
S-701 S-701 1/8"=1'-0"
MONOPILE SHORE DOLPHIN ELEVATION
S-701 S-701 1"=1'-0"
DETAIL2
S-701 S-701
S-701 S-701
S-701 S-701
S-701 S-701
0 1' 2' 4'
SCALE: 1/2" = 1'-0"
6'
0 4' 8' 16'
SCALE: 1/8" = 1'-0"
24'
S-701 S-701 1/2"=1'-0"
DETAIL
S-701 S-701
NOTES:
1. EXISTING MAT IS 8" NOMINAL THICKNESS ARTICULATED GROUTED MAT
SIMILAR TO FABRIFORM AND HYDROTEC GROUTED MATS.
2. SECOND LAYER MAT SHALL BE 8" NOMINAL THICKNESS ARTICULATED
GROUTED MAT. GROUT SHALL BE FLUID GROUT, 2000 PSI AT 28 DAYS.
3. DEPTH OF EXISTING MAT ALONG BULKHEAD WALL IS A NOMINAL -5'
MLW. AND IS SLOPED TOWARDS THE PIER FACE AT A RATIO OF 3
HORIZONTAL TO 1 VERTICAL.
4. ADJUST ELEVATION OF TOP OF FASCIA PLATE TO PROVIDE 3" ABOVE
ELEVATION OF TOP OF EXISTING WALL CAP.
5. COORDINATE THE QUANTITY, DIMENSIONS AND LOCATION OF FRAMING
HOLES WITH THE APPROVED BOLLARD SHOP DRAWINGS, USE BOLLARD
MANUFACTURER. PROVIDED TEMPLATE FOR FIELD VERIFICATION
BEFORE INSTALLATION.
6. APPLY HIGH PERFORMANCE COATING (PER SPECIFICATION SECTION
09 96 00) TO ALL SURFACES OF SOFFIT AND FASCIA PLATES, TYP.
SCALE: 1" = 1'-0"
0 1' 2' 3'1/2'
File details come from the government source that posted it. Updated .