ITB-25-1_Drawings-CRUISE_TERMINAL_5_IMPROVEMENTS_BID_SET.pdf
PDF 60 MB Posted
- Attached to
- Cruise Terminal 5 Marine Improvements
- Solicitation number
- ITB-25-1
- Issued by
- Florida
About this file
The document ITB-25-1_Drawings-CRUISE_TERMINAL_5_IMPROVEMENTS_BID_SET.pdf is a technical drawing set for the Canaveral Port Authority's Cruise Terminal 5 Marine Improvements project located in Port Canaveral, Florida. The project involves selective demolition of an existing open-pile concrete pier and adjacent mooring dolphins, with subsequent construction of new open-pile concrete pier extensions to the north and south of the existing pier. Key deliverables include installing new mooring fixtures, marine fenders, steel monopile mooring dolphins, modifying aluminum catwalks, updating electrical raceway and potable water lines, and completing pier deck repairs. Sealed proposals are due by 2:00 PM EDT on June 11, 2025, with non-mandatory pre-bid site visits scheduled for May 27 and June 3, 2025, at 445 Challenger Road in Cape Canaveral. The project is targeted for completion by June 30, 2026, and will be awarded to the lowest responsive bidder.
Bidders must demonstrate ten years of documented marine structures construction experience and possess appropriate Florida contractor licensing. The project requires a 5% bid bond, detailed financial statements, insurance certificates, and a comprehensive subcontractor list. A contingency allowance of $660,000 is included in the project budget, indicating a substantial investment in marine infrastructure improvements. Contractors must comply with state and federal regulations, including E-Verify employment eligibility verification and environmental protection standards. The Environmental Resource Permit includes specific protocols for marine species protection, focusing on manatees, marine turtles, and right whales. While no specific set-aside designations for disadvantaged enterprises were noted, the project includes an Owner Direct Purchase Program for material procurement. The technical specifications demonstrate a sophisticated engineering approach with rigorous testing protocols, including dynamic pile load testing and vibration monitoring.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .